This document is an Offeror Instructions document related to the Inflation Reduction Act (IRA) Sustainability Factor for a federal contract opportunity. The key details are:

The offeror must complete the Sustainability Table by committing to meet certain IRA Limits for each IRA-Eligible Material required by the contract. Based on the offeror's commitments, they will receive Raw Scores of 100, 40, or 20 for each material, which will then be multiplied by the given LEC Materials Evaluation Weights to calculate a Weighted Score. The Total Weighted Score will be the sum of the Weighted Scores for each material.

The related federal contract opportunity is for the Back Lot Security Fencing Project, solicited by the General Services Administration Public Buildings Service Region 5. It is an IRA Project Set-A-Side for Small Businesses Only, with a scope of work that includes vehicular access gate and parking lot re-surfacing.

View the file

Other files

File Type Posted
Amendment 1 to 47PF0024R0060.pdf PDF
JPK_Back Lot Improvements_Pre-Bid_Minutes_061824.pdf PDF
Signin Sheet 618.jpg JPG image
Sample IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
Instructions IRA Project Submittal Reporting Form.pdf PDF
RFP 47PF0024R0060.pdf PDF
LEC Companies.pdf PDF
Post AWARD ALLOCATION FORM IRA (2).xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror Instructions

SUSTAINABILITY FACTOR INSTRUCTIONS TO OFFERORS
1. Offerors shall complete Column B of the Sustainability Table with the applicable IRA Limit they commit to meet for each IRA-Eligible Material.

NOTE: If an offeror is utilizing multiple manufacturers/suppliers within one LEC material subcategory, and those materials achieve different GSA GWP limits, they shall, for evaluation purposes, self-score based on the material/product offered that has the highest GWP. (For example: within the 4,000 PSI concrete subcategory, if Offeror A's 4,000 PSI structural concrete meets GSA’s Top 40% GWP limit, and their 4,000 PSI site concrete meets GSA’s Top 20% limit, Offeror A shall use Top 40% in their scoring.)

2. Based upon the offeror's committment, the offeror will receive a number of Raw Scores in Column C, one for each IRA-Eligible Material required by the Contract. Column C will be automatically populated based on the offeror's input in Column B, as follows:

- Offerors will receive a Raw Score of 100 for each IRA-Eligible Material commitment that is better (lower) than GSA’s Top 20% Limits.

- Offerors will receive a Raw Score of 40 for each IRA-Eligible Material commitment that is only better (lower) than GSA’s Top 40% Limits.

- Offerors will receive a Raw Score of 20 for each IRA-Eligible Material commitment that is only better (lower) than GSA’s Better Than Average Limit.

3. The solicitation provides an LEC Materials Evaluation Weight in Column D. This weight will be multipled by the Raw Score (Column C), to automatically calculate the Weighted Score in Column D. which will be automatically calculated based on the Raw Score. The Weighted Score for each material will be rounded to the nearest hundredth decimal (i.e., two decimal places to the right of the whole number).
4. The Total Weighted Score will automatically add the Weighted Score for each material, rounded to the nearest hundredth decimal.

Sustainability Table IRA-Eligible Material* OFFEROR TO COMPLETE IRA Limit Commitment (i.e., Top 20% Limit, Top 40% Limit, Better Than Average Limit) DO NOT EDIT FORMULA Raw Score (i.e., 100, 40, or 20) DO NOT EDIT - CONTRACTING OFFICER TO PROVIDE LEC Materials Evaluation Weight (Insert as % (Example - 30%) (must add up to 100%) DO NOT EDIT FORMULA Weighted Score (multiply the material’s Raw Score by its LEC Materials Evaluation Weight) Concrete Specified concrete strength class (compressive strength [f'c] in pounds per square inch [PSI])

5000 PSI10%ERROR:#VALUE!
Asphalt90%ERROR:#VALUE!
Total Weighted Score (sum of Weighted Scores) - DO NOT EDIT FORMULAERROR:#VALUE!

* Required construction product assemblies (such as window assemblies) are included in IRA-Eligible Materials categories and will be bound by IRA Limit Commitments. At least 80% of the assembly’s total cost or total weight must be composed of compliant IRA-Eligible Materials.