This Statement of Work (SOW) defines the requirements for Industrial Process Water Treatment Supplies and Services for Fleet Readiness Center Southeast (FRCSE), a naval facility in Jacksonville, Florida that repairs and overhauls aircraft, engines, and components. The contractor must provide all personnel, equipment, tank supplies, transportation, materials, and supervision necessary to deliver activated resins in appropriate vessels to support water treatment operations across three treatment buildings (780, 794, and 799). The Government retains responsibility for vessel hookup, installation, and plant operations. The contract period runs five years from March 1, 2026 to February 28, 2031, with contractor operations limited to 6:00 AM to 2:30 PM Monday through Friday, excluding federal holidays and facility closures. Deliveries must occur through Building 175, door nine at NAS Jacksonville unless prearranged with the Technical Point of Contact.
The technical scope requires delivering replacement ion exchange and granular activated carbon vessels in various configurations and sizes (30 cubic feet, 3.6 cubic feet, and 1.2 cubic feet) within ten calendar days of Blanket Purchase Agreement call placement, with emergency delivery within 72 hours for production-critical orders. The contractor must provide starting quantities matching current configurations plus onsite spares within ten days of initial BPA call award. Specific configurations support NPW generation, hexavalent chromium treatment, reverse osmosis pretreatment, complex cyanide removal, and deionized water production across multiple treatment trains operating at flow rates between 3 to 75 gallons per minute. All media waste must be managed in strict accordance with Resource Conservation and Recovery Act (RCRA) requirements, with manifests submitted on EPA Form 8700-22 at least 48 hours prior to hazardous material transportation. The contractor assumes full responsibility for spill cleanup and spent media disposal or regeneration, and must maintain RCRA permit documentation and provide annual compliance certifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SourcesSought.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
INDUSTRIAL PROCESS WATER TREATMENT SUPPLIES BPA
FLEET READINESS CENTER SOUTHEAST
Approved by:
Digital Signature: _________________________________________
DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Reference DoDI 5230.24 for reasons/categories) (17 April 2025). Other requests for this document must be referred to the Fleet Readiness Center Southeast, NAS Jacksonville, 101 Wasp Street, Jacksonville, FL 32212.
STATEMENT OF WORK
INDUSTRIAL PROCESS WATER TREATMENT SUPPLIES AND SERVICES
FLEET READINESS CENTER SOUTHEAST
1.0 SCOPE
The content of this Statement of Work (SOW) describes the requirements for Industrial Process Water Treatment Supplies and Services for the Fleet Readiness Center Southeast (FRCSE). The contractor shall provide all personnel, equipment, tank supplies, transportation, materials, supervision, and other items necessary to deliver activated resins contained within the appropriate vessels. The Government will be responsible for the actual hookup and installation of the vessel and all plant operations. The Contractor is not authorized to install or place portable vessels in service.
1.1 Background
FRCSE is an industrial facility that reworks, repairs, and overhauls various aircraft, engines, and components. Many of the rework processes generate hazardous industrial process water. This industrial water will require treatment prior to being discharged or reused as Non-Potable Water (NPW). FRCSE requires supplies that fit current plant configurations to support the water treatment operations. This SOW defines the requirement for industrial process water treatment supplies required by FRCSE. Building 780 utilizes two (2) treatment operations for industrial wastewater treatment. Batch Fenton Reaction is used first to oxidize incoming constituents contributing to Chemical Oxygen Demand (COD). The batch is then processed for metals by precipitation. Batches are transferred to an equalization tank for metals polishing via ion exchange technology. The second treatment line utilizes ion exchange technology. This system specifically targets hexavalent chromium, from a single waste stream, prior to interdiction into the bulk waste stream. All industrial waste converges at the equalization tank before final treatment using ion exchange. Water from the equalization tank is single passed through several ion exchange vessels to produce NPW, which is collected in a separate tank for reuse or disposal.
Building 794 utilizes point source treatment processes for complex cyanide removal and deionizing water production. Rinse water containing complex cyanide is treated using ion exchange technology prior to introduction into the bulk waste stream. Incoming process water to B794, NPW or domestic, is precondition for chlorine and organics prior to being filtered through the reverse osmosis unit. If the reverse osmosis units fail, the incoming B794 process water will pass through ion exchange vessels to produce the American Society for Testing and Material (ASTM) IV required to process water. Building 799 has one (1) treatment operations for industrial wastewater treatment. Industrial wastewater can be treated using traditional metals precipitation with a chromium 6 to chromium 3 pretreatment conversion step. Rinse waters that are acceptable will be directly sent to the equalization tank. All industrial waste converges at the equalization tank before final treatment using ion exchange. Water from the equalization tank is single pass through several ion exchange vessels to produce NPW, which is collected in a separate tank for disposal into the municipality wastewater collection system.
To sustain production operations, each treatment plant requires specialized, contractor provided tank systems as described in the requirements section. The demand for the specialized tank systems are determined through organic chemical analysis of the water in use to treat aircraft components. The results of the chemical analyses provides determination for when the resins require replacing.
2.0 APPLICABLE DOCUMENTS
FRCSE industrial process water contains various levels of Resource Conservation and Recovery Act (RCRA) Metals. The contractor will be responsible for adhering to all RCRA regulations during any phase of providing the required supplies.
Attachment 1: Provides the technical specifications in terms of maximum limits for influent industrial process water and deliverable non-potable water (included in SOW).
Attachment 2: Provides the locations, and description, of point treatment and starting quantity locations (included in SOW).
Attachment 3: Provides visual Ion Exchange Media (IEX) location and current configurations (included in SOW).
Attachment 4: Provides facility connection sizes.
Attachment 5: Provides FRCSE work restriction instructions (separate attachment).
3.0 GENERAL REQUIREMENTS
3.1 Security
Refer to FRCSE Work Restriction (See Attachment 5)
3.2 Period of Performance
The period of performance for this contract is five (5) years, 01 March 2026 to 28 February 2031
3.3 Place of Performance
NAS Jacksonville, FL, FRCSE, Industrial wastewater treatment plants and adjacent buildings. (See attachment 3).
3.4 Hours of Operations
The contractor is responsible for conducting business between the hours of 6:00 AM to 2:30 PM Monday through Friday, except federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or Government directed closings.
3.5 Recognized Holidays
The contractor shall not schedule delivery or pickup of vessels on federal holidays listed by U.S. Office of Personnel Management website (https://www.opm.gov/ and https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/).
When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday observance. There are occasions when the FRCSE reduces operations in conjunction with the following holidays: Thanksgiving Day, Christmas Day, and New Year's Day, which encompass additional non-holiday workdays and weekends. When such a notice is given, the contractor shall modify their support level for the reduced operations.
4.0 TECHNICAL REQUIREMENTS
The contractor shall deliver, pick up and dispose of carbon and ion exchange resin tanks in accordance with task order quantities. The new contractor shall provide starting quantities that match the current configuration (reference SOW Attachment 2), plus onsite spares. The starting quantities and onsite spares shall be delivered no later than ten (10) calendar days after receipt of BPA award and/or initial BPA call. Due to the uncertainty of the quantities required for the new Treatment Plants, a five-year Blanket Purchase Agreement (BPA) is recommended. The BPA will establish a maximum order limit during the five-year period. Individual BPA Calls will be placed to meet industrial water treatment supply demand requirements. If the contract is awarded to other than incumbent, the new contractor shall provide the starting quantities that match the current configuration (reference SOW attachment 2) plus onsite spares. Delivery of all portable vessels and connectors and hoses shall be coordinated with the Technical Point of Contact (TPOC) and shall commence ten (10) calendar days after receipt of the initial BPA call. The incumbent vendor will be required to pick up all existing tanks and the new awardee (if applicable) will deliver fresh vessels with resins or GAC as specified in the SOW paragraph 5.1. The portable IEX and GAC will be organized into the appropriate configurations at all eight (08) treatment locations identified in Attachment 2. The requirements for the eight (8) specific configurations are described in paragraphs 4.1-4.7. All configurations must be compatible with the current connection configurations identified in Attachment 3. Under normal operations, the contractor shall be required to deliver replacement system vessels within 10 days of BPA call placement. Delivery at the listed address within ten (10) calendar days is considered a standard order. Emergency Orders – To prevent loss of production, emergency orders will require the contractor to delivery emergency replacements within 72 hours (three business days), or a timeframe agreed upon by both parties. The Government estimates that about two (2) emergency orders will be required per year. No monthly rental fee shall be charged for these vessels.
If the contractor is unable to deliver within the ten (10) day window, a case-by-case extension may be granted with prior communication to the TPOC. Reasonings such as acts of God, adverse weather, and inability to provide heated transport are examples of justifiable reasons.
The BPA requirement will be as follows:
Table 1
Item Description
30CF CARBON MEDIA TANKS
30CF HEX CHROME MEDIA TANKS
30CF HEAVY METAL MEDIA SCU TANKS
30CF TANK DELIVERY
30CF TANK HAZMAT PICKUP
3.6CF HEX CHROME MEDIA TANKS
3.6CF MIXED BED MEDIA TANKS
3.6CF ANION MEDIA TANKS
3.6CF CATION MEDIA TANKS
3.6CF CARBON MEDIA TANKS
3.6CF TANK DELIVERY
3.6CF TANK HAZMAT PICKUP
1.2CF CARBON MEDIA TANKS
1.2CF CYANIDE MEDIA TANKS
1.2CF MIXED BED MEDIA TANKS
1.2CF TANK DELIVERY
1.2CF TANK HAZMAT PICKUP
| 4.1 | The portable IEX and GAC vessel train for NPW generation (B799, B780) is utilized in the treatment of industrial processed effluent water. These vessels shall treat 50 - 75 gallons per minute (GPM) at approximately 50-70 pounds square inch (PSI) in the Treatment Plants. |
| 4.1.1 | The vessel trains for NPW generation shall be design or configured to minimize pressure differential (DP) between the influent and effluent nozzles. |
| 4.1.2 | The IEX vessels for non-specific metals removal shall be configured in a lead, lag, and offline spare configuration. |
| 4.2 | The portable IEX and GAC vessel train for Hex Chrome (Chemical designation: Chromium +6) targeting (B780) shall treat 50 - 75 GPM at approximately 50-70 PSI in the Treatment Plants. |
| 4.2.1 | This overall treatment configuration shall treat industrial process water. The effluent from this water treatment from the IEX and GAC vessel train is utilized as industrial process recycled water or NPW. This IEX and GAC train functions as a pretreatment process and works in conjunction with the NPW IEX train to achieve NPW water quality. |
| 4.2.2 | The IEX and GAC vessel train shall be design or configured to minimize pressure differential (DP) between the influent and effluent nozzles. The IEX and GAC vessels for specific metals removal shall be configured in a lead, lag, and offline spare configuration. |
| 4.3.3 | This IEX and GAC train functions as a pre-treatment process and works in conjunction with the NPW IEX train to achieve NPW quality water. This train shall be designed or configured to minimize pressure differential (DP) between the influent and effluent nozzles. IEX vessels for specific metals removal shall be configured in a lead, lag, and offline spares configuration. |
| 4.3 | The portable GAC vessel train for Reverse Osmosis (RO) pre-treatment (B794) shall treat 40-50 GPM at approximately 35 PSI in the basement of 794. This overall treatment configuration shall treat NPW, generated by B799, and/or NAS Jacksonville potable water for reagent water conforming to ASTM D1193 Type IV production via a 20 GPM RO unit. The GAC vessel train is required to meet the ASTM D1193 Type IV requirements for organics and Chlorine removal and RO membrane requirements. A typical NAS Jacksonville water sample will be provided upon request. |
| 4.3.1 | The portable GAC (new and exhausted) must fit in the restrictions of B794 5,000-pound freight elevator. Open measurements of elevator’s width, height, depth are 54, 72, 82 inches respectively. |
| 4.3.2 | The portable GAC vessel train for Reverse Osmosis (RO) pre-treatment shall be design or configured to minimize DP between the influent and effluent nozzles. |
| 4.4 | The portable IEX vessel train for RO backup (B794) shall treat 5-12 GPM at approximately 35-50 PSI in the basement of 794. This overall treatment configuration shall treat NPW, generated by B799, and or NAS Jacksonville potable water to deionized water conforming with ASTM D1193 Type IV (latest version) for reagent water in the event that both RO units fail. A typical NAS Jacksonville water analysis sample can be found in Attachment 4. |
| 4.4.1 | The portable IEX vessels (new and exhausted) must fit in the restrictions of B794 5,000-pound freight elevator. Open measurements of elevator’s width, height, depth are 54, 72, 82 inches respectively |
| 4.4.2 | This resin train shall work with the GAC unit described in paragraph 4.4 for organics and Chlorine removal and all shall be design or configured to minimize DP between the influent and effluent nozzles. IEX vessels shall be configured in a lead, lag, and offline spare configuration. |
| 4.5 | The portable GAC and IEX vessel train for Complex cyanide targeting (B794) shall treat 3-15 GPM across three (3) parallel sets of GAC and IEX vessels at approximately 50 (PSI) in the basement of 794. This overall treatment configuration shall treat industrial process water. |
| 4.5.1 | The effluent from this water treatment is utilized as industrial process recycled water or NPW. This IEX train will function as a pretreatment process and work in conjunction with the NPW IEX train to achieve NPW water quality. |
| 4.5.2 | The portable IEX vessels (new and exhausted) must fit in the restrictions of B794’s 5,000-pound freight elevator and weigh less than 75 pounds each. Open measurements of elevator’s width, height, depth are 54, 72, 82 inches respectively |
| 4.5.3 | IEX vessels specific for complex cyanide removal shall be configured in a lead, lag, and offline spare configuration across parallel sets. |
| 4.6 | The portable IEX vessel train for de ionizing waterjet medium (B794A) shall polish recirculating water for conductivity to water jetting activities at 10 GPM at approximately 10-20 psi. Effluent conductivity should maintain a conductivity of less than 125 micro-Siemens per cubic centimeter (µS) for the typical life expectancy of properly regenerated or fresh media given influent quality. |
| 4.7 | The portable IEX vessel for de ionizing EDM cooling medium (B101) shall polish recirculating water for conductivity reduction to EDM activities at 10 GPM at approximately 10-15 psi. Effluent conductivity should maintain a conductivity of less than 125 micro-Siemens per cubic centimeter (µS/cm³) for the typical life expectancy of properly regenerated or fresh media given influent quality |
5.0 TRANSPORTATION, DELIVERY, STORAGE, AND RETURNS
| 5.1 | Deliveries shall arrive at NAS Jacksonville, FL through the shipping facility at Building 175, door nine (9) unless an alternative is prearranged with the TPOC. The Contractor shall provide starting quantities that match the current configuration (reference SOW attachment 2), plus onsite spares. The starting quantities and onsite spares shall be delivered no later than ten (10) calendar days after receipt of initial BPA call and subsequent calls. |
| 5.2 | The Contractor shall provide copies of all uniform hazardous waste manifests for all containers/tanks when removed from FRCSE to the TPOC and installation, NAS JAX, Environmental Part B facility. |
| 5.3 | If samples of the water to be treated are required by the contractor, the contractor shall provide all necessary containers, manifests, handling and laboratory analysis at no expense to the government. |
| 5.4 | The contractor shall provide a signed copy of the manifest for all containers/tanks at FRCSE NAS Jacksonville and manage all media waste in accordance with RCRA requirements. The contractor shall provide all certification / audit documentation to show proper management of all RCRA waste for the initial system to the Government and may be requested to provide certification / audit documentation of compliant facilities annually. Contractor will provide a copy of the current RCRA permit with solicitation. |
| 5.5 | The contractor shall comply with the manifesting requirements outlined in Title 40 of the Code of Federal Regulations (CFR) regarding environmental regulations. A manifest shall be submitted on EPA Form 8700-22 to the TPOC, the FRCSE Environmental Office, and NAS Jacksonville RCRA Part B Facility (NAVFAC Public Works Department) at least 48 hours prior to transportation of HAZMAT materials (FAR 52.223-3 and DFARs 252.223-7001). The contractor shall be required to comply with Federal Regulations 40CFR268 as stated in 40 CFR § 268.41 - Treatment standards expressed as concentrations in waste extract. The TPOC will provide POCs for the FRCSE and NAVFAC Environmental Office upon award on the contract. |
| 5.6 | The contractor shall comply with all requirements of United States Department of Transportation (DOT) regulations, 49 CFR parts 100-199 regarding waste transportation under this contract. Upon completion of each service, the contractor shall go to NAVFAC Engineering, Bldg. 144, to have the load inspected for compliance or prearrange for onsite inspection. |
| 5.7 | The contractor shall be solely responsible for all spills or leaks during the performance of the contract that occur as a result of, or are contributed to by the actions of its agents, subcontractors and/or employees. The contractor shall clean up such spills or leaks to the satisfaction of the Government and in a manner that complies with applicable federal, state, and local laws and regulations. The cleanup shall be at no cost to the Government. |
| 5.8 | Returns shall be picked up at FRCSE’s industrial wastewater plants or an adjacent predetermined location. |
| 5.9 | The contractor shall be responsible for transport and disposal or regeneration of spent media in accordance with RCRA. |
| 5.10 | On site storage - The contractor shall provide onsite back up IEX vessels at buildings 780, 799, 794. No other on-site storage space is available. These vessels are identified in Attachment 2. |
6.0 TECHNICAL POINT OF CONTACT (TPOC)
The FRCSE TPOC will serve as the primary government point of contact for the contractor regarding the technical execution of this requirement. The TPOC will ensure the contractor meets all technical requirements by reviewing and approving deliverables to verify adherence to standards, providing feedback, and ensuring any necessary corrections are implemented.
TPOC: Scott Bixel, Mechanical Engineer, FRCSE
7.0 DELIVERABLES
CONTRACT DATA REQUIREMENT LIST (CDRL)
| CDRL Number |
| Description |
| SOW Paragraph Reference |
| A001 |
| Manifest and land disposal restriction paperwork (EPA Form 8700-22) |
| 5.5 |
Attachment 1
Maximum Limits for Industrial Process Recycled Water
| Parameters |
| Non-Potable Water (NPW) |
| Process Effluent Water |
| EPA Test Method |
| Nickel |
| 5 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Chromium |
| 5 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Cadmium |
| 5 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Lead |
| 2 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Zinc |
| 5 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Manganese |
| 5 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Silver |
| 2 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Iron |
| 10 mg/L |
| 50 mg/L |
| SW-846 6010 |
| Copper |
| 10 mg/L |
| 50 mg/L |
| SW-846 6010 |
| Magnesium |
| 20 mg/L |
| 100 mg/L |
| SW-846 6010 |
| Calcium |
| 35 mg/L |
| 200 mg/L |
| SW-846 6010 |
| Chlorides |
| 40 mg/L |
| 400 mg/L |
| 300.0 |
| Fluorides |
| 3 mg/L |
| 30 mg/L |
| 300.0 |
| Phosphates |
| 10 mg/L |
| 100 mg/L |
| 300.0 |
| Sulfates |
| 100 mg/L |
| 500 mg/L |
| 300.0 |
| Nitrates |
| 10 mg/L |
| 100 mg/L |
| 300.0 |
| Bicarbonates |
| 75 |
| 300 mg/L |
| n/a |
| Free Cyanide |
| Not detected |
| Not detected |
| 335.2 |
| Total Dissolved Solids |
| 250 mg/L |
| 2000 mg/L |
| n/a |
| Conductivity |
| 500 micro-siemens |
| 4000 micro-siemens |
| 120.1 |
| pH (lower and upper limits) |
| 6.5 – 8.5 |
| 5 – 9 |
| 150.1 |
| Oil & Grease |
| Not detected |
| Not detected |
| 413.1 |
| Chemical Oxygen Demand |
| 125 mg/L |
| 1000 mg/L |
| 410.2 |
*Note: Maximum Limits represents a worst-case scenario and not reflective of normal.
Attachment 2
| cu ft |
| Media |
| Placed Directly in Service |
| On Site Spares |
| Total to be delivered |
| 30 |
| Carbon “GAC” |
| 4 |
| 1 |
| 5 |
| 30 |
| Cr+6 |
| 2 |
| 1 |
| 3 |
| 3.6 |
| M.B |
| 2 |
| 0 |
| 2 |
| 3.6 |
| Anion |
| 3 |
| 3 |
| 6 |
| 3.6 |
| Cation |
| 3 |
| 3 |
| 6 |
| 1.2 |
| CN |
| 6 |
| 3 |
| 9 |
| 1.2 |
| M.B |
| 2 |
| 1 |
| 3 |
| 30 |
| General Metals |
| 4 |
| 2 |
| 6 |
| 1.2 |
| Carbon |
| 3 |
| 0 |
| 3 |
Attachment 3 Current Equipment location
· 4.1 799 NPW train
· 4.1 780 NPW train
· 4.2 GAC and Cr +6 780
· 4.3 R.O Pretreatment GAC 794
· 4.4 RO back up 794
· 4.5 Complex Cyanide 794
· 4.6 Water Jets media B794A
W.J#2 W.J#3 W.J#1
· 4.7 EDM coolant treatment B101
`EDM#1
EDM#2
Attachment 4
| Sec. |
| Bldg. |
| Description |
| Connections |
| Effluent requirement |
| Current configuration |
| Assoc. Meters |
| 4.1 |
| B799 |
| NPW generation IEX train |
| 2” camlock |
| Table A |
| 30 cuft GAC, metals lead, metals lag, |
| Cond between metals and overall post conductivity |
| 4.1 |
| B780 |
| NPW generation IEX train |
| 2” camlock |
| Table A |
| 30 cuft GAC, metals lead, metals lag. |
| Cond between metals and overall post conductivity |
| 4.2 |
| B780 |
| GAC & Chromium +6 |
| 2” camlock |
| Table A(¹) |
| 30 cuft GAC, metals lead, metals lag. |
| Post conductivity |
| 4.3 |
| B794 |
| RO pretreatment |
| 2” camlock |
| None |
| GAC, softeners, RO |
| Post conductivity |
| 4.4 |
| B794 |
| RO back up |
| 1” union |
| ASTM D1193 Type IV (latest version) for Reagent water |
| 3.6 cuft mixed bed, mixed bed |
| Post conductivity |
| 4.5 |
| B794 |
| Complex Cyanide |
| 1” union |
| Table A |
| 1.2 cuft GAC, lead anionic cyanide (ACN), lag ACN |
| Post conductivity |
| 4.6 |
| B794A |
| Water jet media treatment |
| 1” union |
| Conductivity <125 uS |
| 3.6 cuft anion, cation |
| Post conductivity. |
| 4.7 |
| B101 |
| EDM coolant treatment |
| 1” union |
| Conductivity <125 uS |
| 1.2 cuft mixed bed |
| Post conductivity |
image1.png image2.JPG image3.JPG image4.JPG image5.JPG image6.JPG image7.JPG