Invitation for Bid W58RGZ23B0008 with Attachments Enclosed.pdf

PDF 6 MB Posted

Attached to
Invitation for Bid for the Overhaul of the Altimeter, Pressure
Solicitation number
W58RGZ-23-B-0008
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W58RGZ-23-B-0008 2023JAN30

ELEANOR BADER (256)313-3082

ELEANOR.L.BADER.CIV@ARMY.MIL

2023FEB28 03:00pm

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280 X

X 100

334511

X

X DOA1

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 71

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: ELEANOR BADER

Buyer Office Symbol/Telephone Number: CCAM-ALA/(256)313-3082

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

W58RGZ-22-B-0008_________________

A-1. This is a 100% Small Business Set-Aside (SBSA) and will be procured with Sealed Bidding Procedures IAW FAR Part 14. The applicable

North American Industry Classification Systems (NAICS) code is 334511 and the 1,250 employees.

A-2. This will be a 5 year Firm-Fixed Price (FFP) Maintenance and Overhaul (M&O) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to Federal Acquisition Regulation (FAR) 52.216-22 in support of the Altimeter, Pressure for the Multisystem Ground Support

Equipment.

A-3. The Altimeter, Pressure is not a Critical Safety Item (CSI). There is an adequate Depot Maintenance Work Requirement (DMWR): DMWR-

55-6610-385, Revision Date: 04/15/1985, Change # : 2.

A-4. Government Furnished Material will not be furnished.

A-5. Access to FedMall is not authorized.

A-6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of delivery orders and not by the contract itself.

A-7. Shipping requirements will be provided in each individual delivery order.

A-8. The yearly estimated quantities listed herein do not commit the Government to ordering that or any quantity above the minimum quantity for the following:

Multisystem Ground Support Equipment

NOUN: Altimeter, Pressure

Input National Stock Number (NSN) & Part Number (P/N)_____________________________________________________

NSN: 6610-01-091-3701

P/N: B4420210002

Output NSN & P/N________________

NSN: 6610-01-091-3701

P/N: B4420210002

Minimum Quantity: 25

Maximum Quantity: 510

FMS Quantities: 85

The maximum quantity includes 85 each reserved for Foreign Military Sales (FMS). However, if no FMS customers require this item, the

United States Army requirer may utilize the FMS quantity.

US quantities (CLIN 0002AA) for ordering periods 1 through 5 are as follows:

1st _ 25 Minimum ______

2nd _ 100_ Estimated ____

3rd _ 100_ Estimated ____

4th _ 100_ Estimated ____

5th _ 100_ Estimated ____

FMS quantities (CLIN 0003AA) for ordering periods 1 through 5 are as follows:

1st 0_ Estimated ___

2 71

W58RGZ-23-B-0008

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

2nd _20 Estimated ___

3rd _20_ Estimated __

4th _22_ Estimated __

5th _23_ Estimated __

A-9. The minimum quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the Firm Fixed unit price in effect during the ordering period in which they are ordered.

A-10. The Contractor shall furnish reusable containers in accordance with (IAW) solicitation/contract section C, paragraph u. and MIL-

STD-20731E with Change 4. In addition, the contractor must comply with MIL-STD-20731E with Change 4 and the latest version of MIL-STD

129R notwithstanding that Attachment 0001 does not. The price for furnishing containers should be provided in Contract Line Item Number

(CLIN) 0005AA.

A-11. All ordering periods are in increments of 12 months from the date of award.

Ordering Periods:_________________

The first ordering period is from date of contract award through 365 days after contract (DACA).

The second ordering period is from 366 DACA through 730 DACA.

The third ordering period is from 731 DACA through 1096 DACA.

The fourth ordering period is from 1097 DACA through 1461 DACA.

The fifth ordering period is from 1462 DACA through 1826 DACA.

Please insert your Firm Fixed unit price for the 1st, 2nd, 3rd, 4th, and 5th year in the spaces provided under each CLIN/SubCLIN.

NOTE: The offeror's attention is called to the requirements for receipt of reparables, which follows:

A-12. An electronic copy of DD Form 1348-1A for all shipments of reparables shall be forwarded to 1) the email address in block 10 on page 1 of the basic contract/delivery order/modification and also to 2) usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil. The DD Form

1348-1A shall annotate to which contract/delivery order the assets will be applied as reparables.

The DD Form 1348-1A guidance as follows:

A. Maintain any receipt documentation received from the depots

B. Upon receipt of material, fill in block 10 to indicate the quantity received and provide a signature and date on the DD Form 1348-1A.

Printed names, name/date stamps, and initials are not acceptable.

C. If a DD Form 1348-1A is not received, a 1348-1A must be created with the corresponding receipt information to contain the following:

I. Unit of issue and quantity - (Positions 23-29)

II. Document Number - (Positions 30-44)

III. NSN - (Positions 8-22)

IV. Condition Code - (Position 71)

V. Unit Price - (Positions 74-80)

VI. Total Price - (Block 1)

VII. Actual quantity received - (Block 10)

VIII. Nomenclature - (Block 17)

IX. Signature and date - (Blocks 22 AND 23)

D. Completed 1348-1A should be sent to the following mailbox upon receipt of material:

usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil

An example of a 1348-1A filled out correctly is attached (See attachment 0002).

A-13. Offerors are required to adhere to FAR 52.223-11 requirements for Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons.

3 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPAs Significant New

Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR Part 82 subpart G with supplemental tables of alternatives available at ( http://www.epa.gov/snap/

A-14. The Government intends to award only one contract as a result of this solicitation.

A-15. Complete the following contractor point of contact information:

Name: ________________________________

Telephone number: ____________________

Fax number: __________________________

E-mail address: ______________________

A-16. Technical Data can only be distributed to contractors with a current Department of Defense (DD) Form 2345, Militarily Critical

Technical Data Agreement, on file with the Defense Logistics Agency. Prospective bidders wishing to obtain access to the unclassified technical data drawings must have Joint Certification Program (JCP) certification. Instructions for obtaining JCP certification can be found at https://www.dla.mil/Logistics-Operations/Services/JCP/ .

DMWR and associated Maintenance and Engineering Orders (MEO) C2164, C4598, C6503, and T1356D can be obtained by contacting the AMCOM publications office via email to Edward McConnell at edward.n.mcconnell1.civ@army.mil or James H. Tietjen at james.h.tietjen.ctr@army.mil. Please notify the Contract Specialist, Eleanor L. Bader, at eleanor.l.bader.civ@army.mil when this request is made.

Solicitaion period will not be extended as a result of late requests for technical data.

A-17. The contractor shall comply with the Total Asset Visibility - contractor (TAV-c) reporting instructions IAW Attachment 0007

Contractor Repair TAV-C Requirements and Exhibit C, TAV-C.

*** END OF NARRATIVE A0001 ***

4 71

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the PVA for the Altimeter, Pressure Output NSN: 6610-01-091-3701 as shown in

CLINs 0002AA and 0003AA.

This is a Firm-Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Contract Requirements".

The Contractor shall prepare 3 assets for PVA. The

Contractor is required to notify the Government

Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil

With copy emailed to the Contract Specialist at:

eleanor.l.bader.civ@army.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 ALTIMETER, PRESSURE

NSN: 6610-01-091-3701

Mfr CAGE: 89944

Mfr Part Number: B4420210002

5 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002AA OVERHAUL OF THE ALTIMETER, PRESSURE (US QTY) $ $ ____________________________________________ ______________ __________________

COMMODITY NAME: ALTIMETER, PRESSURE

CLIN CONTRACT TYPE:

Firm Fixed Price

SYSTEM: Multisystem Ground Support Equipment

INPUT NSN: 6610-01-091-3701

INPUT P/N: B4420210002

OUTPUT NSN: 6610-01-091-3701

OUTPUT P/N: B4420210002

Overhaul shall be in accordance with Section C entitled 'Statement of Work'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.

Offeror is required to fill in proposed firm fixed unit price: US Qty 425 __________

Ordering Period 1- $_________ EST Qty 25 ea

Ordering Period 2- $_________ EST Qty 100 ea

Ordering Period 3- $_________ EST Qty 100 ea

Ordering Period 4- $_________ EST Qty 100 ea

Ordering Period 5- $_________ EST Qty 100 ea

These are only estimated quantities. The total minimum quantity for this requirement is 25 each and _______ the maximum quantity for this requirement is 510 each _________

(425 US / 85 FMS)._________________

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 0001 M&O PACKAGING REQUIREMENTS

LEVEL PRESERVATION: Military

LEVEL PACKING: A

All Wood Packaging Material (WPM) must be ISPM-

6 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

15 compliant.

Preservation requirement and packaging requirement contained in Attachment 0001 M&O

Packaging Requirements.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0003 ALTIMETER, PRESSURE

NSN: 6610-01-091-3701

Mfr CAGE: 89944

Mfr Part Number: B4420210002

0003AA OVERHAUL OF THE ALTIMETER, PRESSURE (FMS QTY) $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: ALTIMETER, PRESSURE

CLIN CONTRACT TYPE:

Firm Fixed Price

SYSTEM: Multisystem Ground Support Equipment

INPUT NSN: 6610-01-091-3701

INPUT P/N: B4420210002

OUTPUT NSN: 6610-01-091-3701

OUTPUT P/N: B4420210002

Overhaul shall be in accordance with Section C entitled 'Statement of Work'.

This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.

Offeror is required to fill in proposed firm fixed unit price: FMS Qty 85 __________

Ordering Period 1- $_________ EST Qty 0 ea

Ordering Period 2- $_________ EST Qty 20 ea

7 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 3- $_________ EST Qty 20 ea

Ordering Period 4- $_________ EST Qty 22 ea

Ordering Period 5- $_________ EST Qty 23 ea

These are only estimated quantities. The total minimum quantity for this requirement is 25 each and _______ the maximum quantity for this requirement is 510 each _________

(425 US / 85 FMS)._________________

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 0001 M&O PACKAGING REQUIREMENTS

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0004 SCRAP

0004AA SCRAP OF THE ALTIMETER, PRESSURE $ ________________________________ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS CLIN APPLIES TO US AND FMS QUANTITY.________________________________________

SECTION C - Description/Specifications/Work Statement_________

Units from CLINs 0002AA and 0003AA shall be scrapped or returned IAW Section C, Statement of Work.

Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN

0002AA AND 0003AA as appropriate. In the event the

PCO determines that certain items are scrap, the

Contractor shall make disposition IAW Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder. The

Government may, at its own discretion, reduce any items determined scrap by input of additional assets

8 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

and said scrap quantities will not count as part of the total maximum quantity. Scrap requires authorization by the Contracting Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.

The containers in which the scrapped items arrived remain Government property and must be returned to the Government.

Offeror is required to fill in proposed firm-fixed unit price:

Ordering Period 1- $ _______ EST Qty 1 ea __

Ordering Period 2- $__________ EST Qty 1 ea

Ordering Period 3- $__________ EST Qty 1 ea

Ordering Period 4- $__________ EST Qty 1 ea

Ordering Period 5- $__________ EST Qty 1 ea

(End of narrative C001)

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

Shipping Containers:

NSN: 8145-00-301-2987, P/N: 13414-017

These prices apply to US and FMS reusable containers.

Offeror is required to fill in proposed firm-fixed unit price for all 5 ordering periods:

Ordering Period 1 $________ EST Qty 1 ea ________

Ordering Period 2 $________ EST Qty 1 ea ________

Ordering Period 3 $________ EST Qty 1 ea ________

9 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 4 $________ EST Qty 1 ea ________

Ordering Period 5 $________ EST Qty 1 ea ________

The contractor shall provide containers IAW

Attachment 0001 M&O Packaging Requirements and

Section C, Description/Specifications/Work

Statement and MIL-STD-20731E with Change 4. In addition, the contractor must comply with MIL-STD-

20731E with Change 4 and 129R notwithstanding that

Attachment 0001 does not state that this version must be complied with.

The Government cannot determine, at the time of contract award, how many of the assets to be repaired will be received by the contractor in unserviceable containers or received without containers.

The contractor, IAW Section C, Statement of Work, shall submit a Report of Discrepancy (ROD), SF Form

364, through its Government DCMA QAR for verification within 7 working days to the address shown on Exhibit D, REPORT OF SHIPPING AND

PACKAGING DISCREPANCY. Assets received in unserviceable containers or without a container require approval by the PCO prior to the purchase of a servicable container.

This CLIN covers containers for CLINs 0002AA and

0003AA.

(End of narrative C001)

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMNENTS LIST (CDRL) _______________________________________

A001 GOVERNMENT PROPERTY INVENTORY REPORT $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: DI-MGMT-80441D

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

A002 DD FORM 1348-1A $ ** NSP ** _______________ __________________

10 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: DI-MISC-80508B

Deliveries or Performance _________________________

A003 TOTAL ASSET VISIBILITY - CONTRACTOR (TAV-C) $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: DI-MGMT-80438B

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

A004 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: DI-MGMT-80503

CLIN CONTRACT TYPE:

Firm Fixed Price

Deliveries or Performance _________________________

11 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Statement of Work for

NSN: 6610-01-091-3701

PRID: CX813

P/N: B4420210002

Status: R

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for Altimeter, Pressure that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.

b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the item(s) by the PCO.

c. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.

d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR):

DMWR-55-6610-385

DATE: 04/15/1985, Change #2

In conjunction with the DMWR, the following MEOs will be used: C2164, C4598, C6503, and T1356D

e. Critical Safety Item: N/A

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the

Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.

g. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit B. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.

h. Product Verification Audit (PVA): The Contractor shall conduct the PVA as specified in Section E, PVA Statement of Work, of the solicitation/contract.

i. Serial Number Report Requirement (SNRR): N/A

j. The items the Contractor shall overhaul are identified below:

INPUT NSN & PART NUMBER (P/N) OUTPUT NSN & PART NUMBER (P/N)_____________________________ ______________________________

NSN: 6610-01-091-3701 NSN: 6610-01-091-3701

P/N: B4420210002 P/N: B4420210002

k. The overhaul planned quantity for 5 years is minimum 25, maximum 510. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to PLANT 7002, DODAAC W25G1U.

(1) 1st year qty 25

(2) 2nd year qty 120

(3) 3rd year qty 120

(4) 4th year qty 122

(5) 5th year qty 123

12 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

l. Inventory Transactions - The contractor shall prepare the following reports:

1. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23

(date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf

The contractor shall prepare this form to include the following corresponding receipt information:

A. Document Number - (Positions 30-44)

B. National Stock Number (NSN) - (Positions 8-22)

C. Condition Code - (Position 71)

D. Unit Price - (Positions 74-80)

E. Total Price - (Block 1)

F. Actual Quantity Received - (Block 10)

G. Nomenclature - (Block 17)

H. Signature and Date - (Blocks 22 and 23)

If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil

2. The contractor shall perform an annual physical inventory on all Government-furnished Property and shall provide it IAW DI-MGMT-

80441, Exhibit A, CDRL A001.

4. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0007

"Contractor Repair TAV-C Requirements".

m. The replacement cost is $7,296.13 for the subject item. When price of overhaul exceeds $4,742.48, a review of disposition will be made by the Government.

n. See attached Packaging Data Requirements Sheet, Attachment 0001 M&O Packaging Requirements.

o. Supplier Interface and Oversight: N/A

p. Shipping Containers NSN: 8145-00-301-2987, P/N: 13414-017 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM. The contractor shall furnish reusable containers in accordance with the Statement of Work and MIL-STD-20731E with Change 4. In addition, the contractor must comply with

MILSTD-20731E with Change 4 notwithstanding that Attachment 1 does not state that this version must be complied with.

q. The contractor shall record the acquisition, receipt, shipment, consumption, disposal of Government Furnished Property (GFP), and any transfer to another contract utilizing the GFP Module in the Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil using the attached GFP attachment.

r. Item Unique Identification (IUID): The Contractor must apply Item Unique Identification (IUID) in accordance with MIL-STD-130, latest version, Army Regulation (AR) 700-145, Item Unique Identification, December 16, 2020, and DA Pamphlet (PAM) 700-145, IUID Procedures, 20

May 2022, and DFARS 252.211-7003. AR 700-145 requires IUID marking on all depot level overhauls and repairs. All registered UIIs MUST be maintained as received and any UIIs created for an item that did not already have one will follow any published documentation, such as DMWRs or Maintenance Engineering Orders. In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. Maintaining a UII as received means the construction of the UII string will not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil.

*** END OF NARRATIVE C0001 ***

13 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 OR EQUIVALENT.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Product Verification Audit (PVA) Contract Requirements (June 2022 update)_________________________________________________________________________

Purpose: This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul/upgrade work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul/upgrade, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(A) (A) The Contractor shall perform and present for acceptance THREE units as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

Systems Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD

Quality Management Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a PVA pursuant to the "Changes" clause of the contract for non-commercial items. If however this procurement is for a commercial item, the contractor and the Contracting Officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.

(B) The Contractor shall,

(1) With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify PCO with information copy to the SRD QMD, ATTN, usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil of the date the

PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least

95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(C) The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(1) Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready

14 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

for Overhaul Inspection Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(D) The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(E) The PVA Team will review the shop travelers, production processes, procedures, tooling, and, equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(F) Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality

Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.

(G) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot

Maintenance Work Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(H) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as

Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(I) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.

(J) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies any may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA

QAR, when it is determined to be prudent to the PVA.

(K) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor.

After the PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.

(L) (L) All defects will be recorded on the SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative.

This will allow immediate actions to begin in the resolution of the defect. Corrective actions, as well as actions taken to prevent recurrence, shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects:

1. Observation: In the event an observation is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurrent deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

15 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.

b. The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above shall be completed.

b. Upon request, the contractor shall provide the SRD technical information necessary for the issuance of a Safety of

Flight Message or Aviation Safety Action Message to the field (if necessary).

c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.

NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.

(M) FINDING DEFINITIONS:

Minor Finding: A defect or a departure from established processes or standards that may result in failure or reduced usability of the product, or a process noncompliance that holds the potential of causing a defect in the future.

Major Finding: A defect, other than critical, that will likely result in failure, or reduce the usability of the product for its intended purpose.

Critical Finding: A defect that would result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the product or a defect likely to prohibit the performance of a major end item or major part thereof. This classification requires immediate cessation of Government acceptance/release of product until corrective actions are acceptable to the contracting officer.

Observation: A condition or circumstance that is noted during the PVA that does not currently meet the aforementioned defect criteria.

This category may also be used as suggestions for continuous improvement.

(N) Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other 2

PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.

(O) If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR.

The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(P) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after official PVA approval from Contracting Officer, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted.

Notification is required 10 business days prior to shipment of the next delivery.

(Q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon receipt of the official PVA approval via the Contracting Officer. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

(R) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed

16 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

to have failed to make delivery within the meaning of the Default clause of this contract.

(S) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)

Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the government.

(T) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity.

*** END OF NARRATIVE E0001 ***

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

*** END OF NARRATIVE E0002 ***

17 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.242-15 STOP-WORK ORDER AUG/1989

2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

3 52.247-29 F.O.B. ORIGIN FEB/2006

4 52.247-34 F.O.B. DESTINATION NOV/1991

5 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY MAR/2022

6 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2022

(a) Definitions. As used in this clause--

"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

"Concatenated unique item identifier" means

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards

Organization (ISO)/International Electrotechnical Commission (IEC) 16022.

"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .

"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.

"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.

"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.

"Governments unit acquisition cost" means

(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .