This document contains the Interior Demolition Specifications for a selective interior demolition project located at 137 Hall Avenue, Johnstown, NY 12095. The scope of work includes demolition and removal of vinyl flooring, drywall/plaster walls and ceilings, insulation, electrical wiring, wood paneling, cabinetry, plumbing fixtures and piping, lighting fixtures, and appliances for a +/- 2,000 sq-ft residence. The project has a service-disabled veteran-owned set aside and a due date of February 28, 2024 at 12:00 PM. The contract term is 90 days.
The project is located within Fulton County, New York. No identical or substantially similar procurement contracts have been awarded within the past five years. The document includes detailed specifications for the demolition work, including requirements for refrigerant removal, utility service maintenance, protective measures, disposal of demolished materials, and cleaning. Hazardous materials have been previously removed from the interior, but hazardous materials remain on the exterior low-slope roof.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A.pdf | ||
| Interior Demolition Drawings.pdf | ||
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
137 Hall Avenue Selective Interior Demolition Johnstown NY 12095 2/1/2024
SELECTIVE DEMOLITION 024119 - 1
Copyright © 2020 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Appliances including the Washer & Dryer, Refrigerator and Range to be removed and disposed of by Demolition contractor according to DEC regulations. (Installed Wood Stove to Remain).
C. Historic items, relics, antiques, and similar objects including, but not limited to, lighting, plumbing fixtures and other items of interest or value to owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.4 PRE-INSTALLATION MEETINGS
A. Pre-demolition Meeting: at 137 Hall Avenue, Johnstown NY 12095
1. Inspect and discuss condition of work to be selectively demolished.
2. Review and finalize selective demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review areas where existing construction is to remain and requires protection.
SELECTIVE DEMOLITION 024119 - 2
Copyright © 2020 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
4. Discuss Proposed Protection Measures for protecting individuals and property, for environmental protection, for dust control and for noise control. Indicate proposed locations and construction of barriers.
5. Discuss Construction timeline.
6. Coordination for shutoff, capping, and continuation of utility services.
1.5 INFORMATIONAL SUBMITTALS
A. Pre-demolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Submit before Work begins.
B. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
C. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.8 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
B. Notify Owner of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered during this Work.
1. Hazardous materials at the Interior have been removed by Owner before start of the Work.
2. If additionally suspected hazardous materials are encountered, do not disturb; immediately notify Owner. Hazardous materials will be removed by Owner under a separate contract.
3. Hazardous Materials: Hazardous Materials remain at exterior low slope roof at rear of structure. A report on the presence of hazardous materials is on file for review and use.
SELECTIVE DEMOLITION 024119 - 3
Copyright © 2020 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.
1. Inventory and record the condition of items to be removed and salvaged.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
SELECTIVE DEMOLITION 024119 - 4
Copyright © 2020 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
3.3 UTILITY SERVICES AND MECHANICAL / ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain Mechanical Systems / Plumbing systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed: Locate, identify, disconnect, and seal or cap off Electrical systems serving areas to be demolished.
1. Owner will arrange to shut off electric services when requested by Contractor.
2. Provide temporary means to heat and or light the structure during construction as needed.
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around demolition area.
2. Protect walls, ceilings, floors, and other existing finish work that are labeled as to remain or that are exposed during selective demolition operations.
3. Cover and protect equipment that has not been removed.
4. Comply with requirements for temporary enclosures, dust control, heating, and cooling.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
C. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, no hammering or chopping.
Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space
SELECTIVE DEMOLITION 024119 - 5
Copyright © 2020 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 24 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
9. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to storage area as designated by Owner.
5. Protect items from damage during transport and storage.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by owner, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
SELECTIVE DEMOLITION 024119 - 6
Copyright © 2020 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Demolition and removal of selected portions of building or structure. |
| 2. Salvage of existing items to be reused or recycled. |
| 1.2 DEFINITIONS |
| A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled. |
| B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse. |
| C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated. |
| D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled. |
| 1.3 MATERIALS OWNERSHIP |
| A. Unless otherwise indicated, demolition waste becomes property of Contractor. |
| B. Appliances including the Washer & Dryer, Refrigerator and Range to be removed and disposed of by Demolition contractor according to DEC regulations. (Installed Wood Stove to Remain). |
| C. Historic items, relics, antiques, and similar objects including, but not limited to, lighting, plumbing fixtures and other items of interest or value to owner that may be uncovered during demolition remain the property of Owner. |
| 1. Carefully salvage in a manner to prevent damage and promptly return to Owner. |
| 1.4 PRE-INSTALLATION MEETINGS |
| A. Pre-demolition Meeting: at 137 Hall Avenue, Johnstown NY 12095 |
| 1. Inspect and discuss condition of work to be selectively demolished. |
| 2. Review and finalize selective demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays. |
| 3. Review areas where existing construction is to remain and requires protection. |
| 4. Discuss Proposed Protection Measures for protecting individuals and property, for environmental protection, for dust control and for noise control. Indicate proposed locations and construction of barriers. |
| 5. Discuss Construction timeline. |
| 6. Coordination for shutoff, capping, and continuation of utility services. |
| 1.5 INFORMATIONAL SUBMITTALS |
| A. Pre-demolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Submit before Work begins. |
| B. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include n... |
| C. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition. |
| 1.6 CLOSEOUT SUBMITTALS |
| A. Inventory: Submit a list of items that have been removed and salvaged. |
| 1.7 QUALITY ASSURANCE |
| A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program. |
| 1.8 FIELD CONDITIONS |
| A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical. |
| B. Notify Owner of discrepancies between existing conditions and Drawings before proceeding with selective demolition. |
| C. Hazardous Materials: It is not expected that hazardous materials will be encountered during this Work. |
| 1. Hazardous materials at the Interior have been removed by Owner before start of the Work. |
| 2. If additionally suspected hazardous materials are encountered, do not disturb; immediately notify Owner. Hazardous materials will be removed by Owner under a separate contract. |
| 3. Hazardous Materials: Hazardous Materials remain at exterior low slope roof at rear of structure. A report on the presence of hazardous materials is on file for review and use. |
| D. Storage or sale of removed items or materials on-site is not permitted. |
| E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations. |
| PART 2 - PRODUCTS |
| 2.1 PERFORMANCE REQUIREMENTS |
| A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. |
| B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Verify that utilities have been disconnected and capped before starting selective demolition operations. |
| B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents. |
| C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition ope... |
| D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs. |
| 1. Inventory and record the condition of items to be removed and salvaged. |
| 3.2 PREPARATION |
| A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction. |
| 3.3 UTILITY SERVICES AND MECHANICAL / ELECTRICAL SYSTEMS |
| A. Existing Services/Systems to Remain: Maintain Mechanical Systems / Plumbing systems indicated to remain and protect them against damage. |
| B. Existing Services/Systems to Be Removed: Locate, identify, disconnect, and seal or cap off Electrical systems serving areas to be demolished. |
| 1. Owner will arrange to shut off electric services when requested by Contractor. |
| 2. Provide temporary means to heat and or light the structure during construction as needed. |
| 3.4 PROTECTION |
| A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. |
| 1. Provide protection to ensure safe passage of people around demolition area. |
| 2. Protect walls, ceilings, floors, and other existing finish work that are labeled as to remain or that are exposed during selective demolition operations. |
| 3. Cover and protect equipment that has not been removed. |
| 4. Comply with requirements for temporary enclosures, dust control, heating, and cooling. |
| B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontro... |
| C. Remove temporary barricades and protections where hazards no longer exist. |
| 3.5 SELECTIVE DEMOLITION, GENERAL |
| A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows: |
| 1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level. |
| 2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, no hamme... |
| 3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. |
| 4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppr... |
| 5. Maintain fire watch during and for at least 24 hours after flame-cutting operations. |
| 6. Maintain adequate ventilation when using cutting torches. |
| 7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site. |
| 8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. |
| 9. Dispose of demolished items and materials promptly. |
| B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. |
| C. Removed and Salvaged Items: |
| 1. Clean salvaged items. |
| 2. Pack or crate items after cleaning. Identify contents of containers. |
| 3. Store items in a secure area until delivery to Owner. |
| 4. Transport items to storage area as designated by Owner. |
| 5. Protect items from damage during transport and storage. |
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by owner, items may be removed to a suitable, protected storage location during selective demolition and reins...
| 3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS |
| A. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings." |
| 3.7 DISPOSAL OF DEMOLISHED MATERIALS |
| A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction. |
| 1. Do not allow demolished materials to accumulate on-site. |
| 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. |
| 3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent. |
B. Burning: Do not burn demolished materials.
| 3.8 CLEANING |
| A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began. |