STATEMENT OF WORK:
COMMERCIAL INDUSTRIAL SERVICES (CIS) INTERIOR DECK COVERING
SYSTEM SERVICES CONTRACT FOR THE REMOVAL, REPAIR, REPLACEMENT OF
EXISTING, AND/OR INSTALLATION OF NEW INTERIOR DECK COVERING SYSTEM.
PURPOSE:
The primary purpose of the Commercial Industrial Services (CIS) Interior Deck Covering
System Services contract is to provide labor, services, equipment, and materials for the removal, repair, replacement of existing, and/or installation of new interior deck covering system onboard
U.S. Navy ships.
The effort required hereunder shall be performed in accordance with the statement of work contained in Section C herein, attachments, and references in accordance with all other terms and conditions set forth herein.
C.1 REFERENCES:
C.1.1 The requirements of the following scope of work, references, and attachments shall be utilized in the execution of this contract unless otherwise stated herein. Whenever specifications, Naval Sea Systems Command (NAVSEA) Standard Items (NSI), standards, drawings, publications or other documents undergo subsequent revisions, the contractor shall use the latest revised version during delivery order execution. If future revisions result in a change to the contractor’s price, the Contractor shall promptly notify the contract administration office of the revision details and the expected impact. The Administrative Contracting Officer (ACO) will then negotiate and incorporate the necessary changes via bilateral modification to the contract.
When future revision result in no change to the contractor’s price, the Contractor shall utilize the latest version as soon as the change becomes known without a need for a contract modification.
(a) NAVSEA Standard Items
Category I NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and shall be invoked on all delivery orders.
The following Category II NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and shall be invoked on all delivery orders.
009-26 Deck Covering; accomplish
009-32 Cleaning and Painting Requirements; accomplish
009-114 Mold remediation; accomplish
(b) OPNAVINST 5100.23G; Navy Safety and Occupational Health Program Manual
(c) Occupational Safety and Health Act (OSHA) of 1970
(d) Code of Federal Regulations (CFR) Title 29 Labor, Chapter XVII Occupational Safety and
Health Administration, Department of Labor, Part 1910 Occupational Safety and Health
Standards
(e) CFR Title 29 Labor, Chapter XVII Occupational Safety and Health Administration, Department of Labor, Part 1915 Occupational Safety and Health Standards for Shipyard
Employment
(f) CFR Title 40 Protection of Environment, Chapter 1 Environmental Protection Agency, Subchapter C Air Programs, Part 63 National Emission Standards for Hazardous Air Pollutants for Source Categories, Subpart II National Emission Standards for Shipbuilding and Ship Repair
(Surface Coating)
(g) CFR Title 40 Protection of Environment, Chapter 1 Environmental Protection Agency, Subchapter I Solid Wastes, Parts 260 through 273
(h) CFR Title 49 Transportation, Chapter 1 Pipeline and Hazardous Materials Safety, Administration, Department of Transportation, Parts 100 through 177
(i) United States Code (USC) Title 10, Subtitle C, Part IV, Chapter 633, Section 7311, Repair or
Maintenance of Naval Vessels: Handling of Hazardous Waste
(j) California Code of Regulations (CCR), Title 22, Div. 4.5, Environmental Health Standards
For the Management of Hazardous Waste. Online at https://oal.ca.gov/publications/ccr/
(k) National Fire Protection Association (NFPA) Standard 312, Standards for Fire Protection of
Vessels during Construction, Conversion, Repair and Lay-up. Online at https://www.nfpa.org/
(m) Resource Conservation and Recovery Act (RCRA) Laws and Regulations. Online at https://www.epa.gov/rcra
(n) Commander Fleet Forces Command Instruction (COMFLTFORCOMINST) 4790.3, Work
Authorization Form (WAF)
(p) NAVSEA Standard Work Template 077-001, Hazardous Waste Produced on Naval Vessels;
control
(q) Naval Base San Diego Instruction 3170.1 Policy Governing Port Operations and Laydowns
(r) NAVFAC P-307, Management of Weight Handling Equipment.
https://www.epa.gov/rcra
(s) Base Support Vehicles and Equipment (BSVE) Standard Operating Procedure (SOP) # 11-2, Naval Base Coronado Contractor Crane Oversight Plan.
(t) BSVE SOP # 11-2, Naval Base San Diego Contractor Crane Oversight Plan
(u) BSVE SOP # 11-2, Naval Base Point Loma Contractor Crane Oversight Plan
(v) Current Southwest Region Maintenance Center (SWRMC) approved adhesive, paint and solvent lists.
(w) Systems and Specifications, SSPC Painting Manual Volume 1 and Volume 2
(x) S9086-CH-STM-010, Naval Ship’s technical Manual (NSTM) Chapter 074 Volume 3; Gas
Free Engineering
(y) S9086-VD-STM-010, NSTM Chapter 631 Volume 1, Preservation
(z) S9086-VG-STM-010; Chapter 634 Deck Covering.
(aa) S9286-T8-STM-010, Chapter 593, Pollution Control
(ab) MIL-STD-1623, Department of Defense Design Criteria Standard. Fire Performance
Requirements and Approved Specifications for Interior Finish Materials and Furnishings (Naval
Shipboard Use)
(ac) MIL-STD-3020, Fire Resistance of US Naval Surface Ships
(ad) MIL-A-46106, Adhesive-Sealants, Silicone, RTV, One-Component
(ae) MIL-D-18873, Deck Covering Magnesia Aggregate Mixture
(af) MIL-D-23134, Military Specification, Deck Underlay and Covering, Insulating, Magnesia, Aggregate Mixture.
(ag) MIL-DTL-15562, Detail Specification, Matting or Sheet, Floor Covering Insulating for High
Voltage Application
(ah) MIL-DTL-24441, Paint, Epoxy-Polyamide, General Specification for
(ai) MIL-PRF-3135, Performance Specifications, Deck Covering Underlay Materials
(aj) MIL-PRF-23236, Coating System for Ship Structures
(ak) MIL-PRF-24176, Performance Specification, Cement, Epoxy, Metal Repair and Hull
Smoothing
(al) MIL-PRF-24613, Performance Specifications, Deck Covering Materials, Interior, Cosmetic, Polymeric
(am) MIL-PRF-32170, Performance Specifications, Deck Tiles, Wear Resistant
(an) MIL-PRF-32171, Deck Coatings, High Durability
(ao) MIL-PRF-32854, Performance Specifications, Deck Covering Materials, Monolithic
(ap) MIL-PRF-32704, Deck Covering Materials, Tile and Sheet Flooring
C.1.2 If the contractor does not have copies of the statement of work, references, documents, technical manuals, military standards, procedures, and regulations etc., the Shipbuilding
Specialist (SBS) must be notified so that copies can be disseminated.
C.1.3 Documents not listed above may also be invoked, as required, for individual delivery orders. Specific the statement of work and references for individual delivery orders shall be identified on each delivery order and associated the statement of work and references technical documentation.
C.2 GENERAL REQUIREMENTS:
C.2.1 The quality of all services rendered shall conform to the highest standard in the relevant profession, trade or field of endeavor. Without additional expense to the Government, the
Contractor shall be responsible for obtaining any necessary insurance, licenses and permits, and for complying with all applicable laws, codes and regulations, in connection with the performance of the work. The Contractor is responsible for ensuring that proper safety and health precautions are taken to protect the workers and the property of others.
C.2.2 All work being performed in this contract shall be accomplished in accordance with (IAW) references C.1.1(a) through C.1.1(ap).
C.2.3 The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, scaffolding services, rigging services, crane services, transportation, testing, utilities (i.e. air, water and electricity, etc.), and required services and support to accomplish the work specified in this contract.
C.2.4 The Contractor shall provide all cranes necessary to accomplish the work under this contract, including floating cranes when required and cranes with a boom capacity great enough to reach ships berthed second ship out IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(ap).
C.2.5 The Contractor may utilize government utilities (i.e. air, water, and electricity, etc.)
available at the pier to accomplish the work specified in this contract. It is the Contractor’s responsibility to arrange for, coordinate with, meet the requirements of, and pay Naval Facilities
Engineering Command-Southwest (NAVFAC-SW) for use of government utilities.
C.2.6 The Contractor shall comply with the Occupational Safety and Health Standard for
Shipyard Employment (CFR, Title 29, Part 1915) promulgated under Public Law A85-742, Amended Section 41 of the Longshoremen’s and Harbor Workers Compensation Act (33
U.S.C.942) and adopted by the Department of Labor as Occupational Safety and Regulations, for all work being performed under this contract on the navigable waters of the United States including any dry-dock or marine railway. Nothing contained in this contract or any delivery order there under shall be construed as relieving the Contractor from any obligation, which it may have for compliance with the aforesaid regulations IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(ap).
C.2.7 The Contractor shall immediately notify the ACO and SBS verbally and in writing or electronic means of difficulties that may jeopardize the completion of specified work.
C.2.8 The Government will not be responsible for work delays or stoppages caused by the
Contractor’s failure to comply with registration and access requirements. Similarly, the
Government shall monitor and take appropriate action against contractors who repeatedly or egregiously violate access control requirements.
C.2.9 The Contractor shall complete the work requirement specified in this contract within the
Milestone Events and Dates provided in the delivery orders, which includes weekends and holidays. Work may be required outside normal working hours. Normal working hours are defined as between 0600 and 1800, Sunday through Saturday.
C.2.10 Prior to staring any work in this contract and the awarded Delivery Order, the Contractor shall notify the Ship’s Authorized Representative (SAR) of the equipment and systems that require isolation so that tag outs can be accomplished as required. The Contractor shall accomplish a complete tag-out of the equipment and the affected systems prior to the execution of work stated in the contract and the awarded delivery order IAW the requirements of the statement of work and references C1.1.(a) through C.1.1.(ap)
C.2.11 The Contractor shall follow procedures for system tag-out IAW the requirements of the statement of work and references C.1.1.(a) through (ap), including NSI 009-24.
C.2.12 The Contractor shall notify the SAR immediately when all work stated in the contract and the awarded delivery order is completed and the system is ready for activation and removal of tags.
C.2.13 The Contractor shall coordinate schedules of work-affected areas with the other contractors and the SAR daily at the beginning of each shift.
C.2.14 The Contractor awarded a delivery order shall submit a Test and Inspection Plan (TIP) and Production Schedule specific to each delivery order. The TIP and Production Schedule shall be submitted to the SBS and Quality Assurance Specialist (QAS) no later than 1 day prior to the start of productive work for all delivery orders awarded under this contract.
C.2.15 The Contractor is encouraged to attend ship checks as specified by the SBS to identify the work requirement, Milestone Events and Dates, and other pertinent information. The Contractor shall immediately notify the SBS if the Contractor will be delayed or will be unable to attend the ship check.
C.2.16 The Contractor shall be responsible for the removal of all interferences necessary to accomplish the work specified on the delivery order. The Contractor shall reinstall all previously removed interferences/equipment upon completion of the work specified on the delivery order
IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(ap).
C.2.17 The Contractor shall ensure required engineering controls to prevent environmental pollutant discharges from work areas and safety boundaries are in place prior to the start of
Interior Deck Covering System services specified in this contract.
C.2.18 Nothing in this contract shall relieve the Contractor from complying with applicable federal, state and local laws, codes, ordinances and regulations, including, but not limited to obtaining of licenses and permits, in connection with the use of hazardous material and the generation of hazardous waste in the performance of this contract.
C.2.19 The Contractor shall comply with applicable federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
C.3 SCOPE OF OF WORK:
C.3.1 Within 24 hours of Milestone Events and Dates, the Contractor shall submit one legible copy, in hard copy or electronic media, a Condition Found Report (CFR) to the SBS identifying discrepancies associated with the equipment/areas specified in each delivery order. The
Contractor shall be responsible for discrepancies or damages not noted in the initial CFR.
C.3.2 The Contractor shall submit one legible copy, in hard copy or electronic media, of subsequent CFR’s identifying discrepancies or damages associated with the description of work to the SBS within 4 hours of conditions found.
C.3.3 Within 24 hours after receipt of the awarded Delivery Order, the Contractor shall submit
Pier Laydown request to the CIS SBS IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(ap).
C.3.4 Prior to the start of work under each delivery order the Contractor shall ensure that the required Work Authorization Form (WAF) is properly filled out and authorized IAW the ships
WAF Program and reference C.1.1.(n). The authorized WAF shall be posted at the primary and secondary entrances to the location of work. In the event the ship does not have an established
WAF program, the Contractor will provide the necessary documents.
C.3.5 For work on Aircraft Carriers, the Contractor shall submit WAFs in sufficient detail so that the ship can provide proper work area isolation. The Contractor shall initiate WAFs in the
Information Management System (IMS). Computer terminals will be made available by Newport
News Shipbuilding (NNS) for maintenance providers to enter WAFs directly into this system.
Once the WAF is entered in IMS, the Contractor shall print the WAF, sign the WAF and submit the WAF to the Work Test Control/Maintenance Support Center (WTC/MSC) on the ship for processing and authorization. The Contractor shall be responsible for updating status of the
WAF in IMS as work is authorized and completed.
NOTE: Typical routing for ship’s force concurrences requires 3 days.
The Contractor shall establish an account in Electronic-Systems Operations Management System
(E-SOMS) in order to produce an Electronic Work Authorization Form (E-WAF) to obtain ship departmental concurrences via routing on the vessel.
C.3.6 The Contractor shall be responsible for cleanup of any spills and/or mitigation of hazards associated with the work being performed hereunder, from the ship and from the Naval Facility
IAW the requirements of all applicable regulations, the statement of work, and references
C.1.1.(a) through C.1.1.(ap).
C.3.7 The Contractor shall be responsible for the cleanliness of the work area. All waste created by the Contractor as a result of the removal and installations, specified herein, shall be removed from the ship as required and at the end of each shift.
C.3.8 The Contractor shall be responsible for the disposal of all liquid wastes, solid waste, hazardous wastes, and non-hazardous wastes, dust, and debris generated in the performance of the Interior Decking services specified in this contract.
C.3.9 The Contractor shall comply with Federal Emergency Planning Community Right to know
Act (EPCRA) and permit conditions for all APCD permitted equipment during all cleaning evolutions. Submit one completed copy of each report to SWRMC Code 106-B, Environmental
Department IAW the requirements of the statement of work and references C.1.1.(a) through
C.1.1.(ap).
C.3.10 The Contractor shall be responsible to gas free the space(s) IAW with references C.1.1(a) through C.1.1(ap). The Contractor shall provide gas-free certification and maintain certification
IAW 29 Code of Federal Regulations Part 1915. The Contractor shall post the gas free certificate on the job site during the performance period.
C.3.11 All existing deck covering system scheduled for removal shall be considered Asbestos
Containing Material (ACM) unless it can be established by laboratory analysis, visual inspection of marking (red adhesive, red dyed cloth, stenciling or affixed metal tag) or visual inspections performed by a person holding current Asbestos Hazard Emergency Response Act (AHERA)
Building Inspector certification that the material does not contain asbestos.
C.3.12 The Contractor shall take a representative sample of coating from each location requiring removal within four (4) hours after receipt of delivery orders for laboratory testing.
C.3.13 The analysis of any waste (deck covering system) requiring the services of a test laboratory shall be performed by a laboratory certified by National Voluntary Laboratory
Accreditation Program (NVLAP).
C.3.14 All waste generated that is deemed non-hazardous after laboratory testing shall be removed from the pier daily and shall not be allowed to accumulate. Waste generated deemed hazardous shall be removed from the pier no later than the last day of the assigned performance period. All waste shall be properly and legally disposed of in accordance with all applicable
State, Local, and Federal Regulations and IAW the statement of work and references C.1.1.(a) through C.1.1.(ap).
C.3.15 The Contractor shall comply with the San Diego County Air Pollution Control District
(APCD) rules 361.141 – 361.150 or the most current APCD asbestos regulations, 40CFR61, Subpart M and the EPA Clean Air Act Applicability Determination Index. Provide one copy of each original written notification, all revised notifications and all written and electronic communications submitted to the APCD to the Supervisor Code 106 Environmental Manager prior to the start of work.
C.3.16. The Contractor shall ensure that all marine coating (painting), solvent, and adhesive applications are performed IAW the requirements of the statement of work and references
C.1.1.(a) through C.1.1.(ap).
C.3.17 All Contractor personnel and equipment must be licensed/registered/certified to operate/maintain/service all equipment involved in the performance of the requirements of this contract.
C.3.18 The Contractor shall submit all required permits to SWRMC Code 106-B for all
Contractor owned or rental equipment prior to start of work.
C.3.19 The Contractor shall be responsible for the disposal of all liquid wastes, solid waste, hazardous wastes, and non-hazardous wastes, dust, and debris generated in the insulation and lagging services specified in this contract.
C.3.20 All waste generated deemed non-hazardous shall be removed from the pier daily and will not be allowed to accumulate. Waste generated deemed as hazardous shall be removed from the pier no later than the last day of the assigned performance period.
C.3.21 The Contractor shall provide covered containers, offload, transportation, and disposal of solids waste, liquid waste, hazardous waste, non-hazardous waste, dust and debris generated by performance of this contract, to meet Clean Air Act, Clean Water Act and Hazardous Waste
Regulations.
C.3.22 The Contractor shall identify all hazardous waste and extremely hazardous waste produced during the performance of this contract.
C.3.23 Trucks intended for hauling hazardous waste shall be state certified and licensed for transporting hazardous waste. Contractor will manifest all hazardous waste using site specific
Environmental Protection Agency (EPA) generated Identification (ID) number.
C.3.24 The Contractor shall submit emission inventory, Hazardous Waste Manifest Form to
SWRMC Code 106-B Environmental Dept. upon completion of this contract.
C.4 INSPECTION PROCEDURES:
C.4.1 (I) Inspections require verification and documentation by a separate individual, other than the person who has accomplished the work, who is qualified as an inspector and currently certified where required by the technical documents.
C.4.2 (V) Inspections require verification and documentation by the qualified tradesperson, trade supervisor, or inspector.
C.4.3 (Q) Inspections require verification and documentation by a qualified Technical
Representative.
C.4.4 (G) A symbol inserted in a work item to establish a point in the sequence of accomplishment of work at which time the SBS shall be notified by the prime contractor in all cases to permit observation of a specific test or inspection (I) (V) (Q) by the government.
C.4.5 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the SBS of checkpoints via electronic method. Notification shall be at least two hours, but not more than one working day, prior to commencing the specific requirements in the paragraph annotated with the symbol (G). Notify the SBS not later than four hours before the end of the last preceding day shift when tests or inspections following a (G) checkpoint is scheduled after normal day shift working hours, on a weekend, or on a federal holiday. Normal working hours are defined as between 0600 and 1800, Sunday through Saturday.
C.4.6 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the SBS for cancellation of the scheduled test or inspection as soon as known, but no later than one hour prior to the scheduled check point.
C.4.7 For (G) checkpoints scheduled after normal working hours, on a weekend, or a federal holiday, the Contractor shall notify the SBS to cancel a scheduled test or inspection as soon as known, but no later than two hours prior to the scheduled check point.
C.5 CERAMIC TILES (QUARRY AND/OR PORCELAIN)
C.5.1 The Contractor shall provide labor, services, equipment, and materials for the removal of the existing deck covering system, and the subsequent surface preparation, cleaning, and coating application IAW the requirements of NSI 009-26, NSI 009-32, the statement of work, and
C.5.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, to include new underlayment material and new waterproof membrane IAW the requirements of NSI
009-26, NSI 009-32, the statement of work and references C.1.1(a) through C.1.1(ap).
C.5.1.2 The removal and new installation shall include the Cove Base (Bull Nose) tiles, where installed, around the perimeter of the compartment, stalls, and equipment foundations
(I) CHECKPOINT: Preliminary Inspection
C.5.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the removal of existing and installation of the new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, IAW the requirements of the statement of work and
C.5.2.1The inspection shall include adjacent locations that will be affected by the removal of existing deck covering system and installation of the new Ceramic Tiles (Quarry and/or
Porcelain) deck covering system.
C.5.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the type, color, pattern, and size of Ceramic Tiles (Quarry and/or Porcelain) deck covering system to be installed.
C.5.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.5.2, C.5.2.1, and C.5.2.2 to the SBS. The Contractor shall be responsible for discrepancies or damages not noted in the
CFR.
(I) CHECKPOINT: Unobstructed Flow Test – Deck Drain(s)
C.5.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), where installed, prior to disturbance of the existing deck covering system, IAW the requirements of the statement of work and
C.5.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.5.3 to the SBS. The
Contractor shall be responsible for discrepancies or damages not noted in the CFR.
(V) CHECKPOINT: Surface Preparation, Cleaning, and Coating Application
C.5.4 The Contractor shall accomplish the removal of the existing deck covering system and the subsequent surface preparation, cleaning, and coating application of the exposed substrate and adjacent vertical surfaces IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
C.5.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.5.4 to the SBS. The
(I) CHECKPOINT: Underlayment Slope and Fairness – Positive Drain(s)
C.5.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and provides positive draining to deck drain(s), where installed, IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
C.5.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.5.5 to the SBS. The
(I) CHECKPOINT: Waterproof Membrane
C.5.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
C.5.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.5.6 to the SBS. The
C.5.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), where installed, IAW the
(V)(G) CHECKPOINT: Installed and Cured Ceramic Tiles (Quarry and/or Porcelain)
Deck Covering System
C.5.8 The Contractor shall accomplish an inspection of the completely installed and cured
Ceramic Tiles (Quarry and/or Porcelain) deck covering system IAW the requirements of the
(V)(G) CHECK POINT: Final Contamination/Damage Inspection
C.5.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in the delivery order and adjacent locations ensuring the removal of all protective covering, services, and equipment utilized in the removal of the existing deck covering system and installation of the new Ceramic Tiles (Quarry and/or Porcelain) deck covering system.
C.5.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.5.7, C.5.8, and C.5.9 to the SBS. The Contractor shall be responsible for discrepancies or damages not noted in the CFR.
C.6 WEAR-RESISTANT DECK TILES (MIL-PRF-32170)
C.6.1 The Contractor shall provide labor, services, equipment, and materials for the removal of
C.6.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Wear-Resistant Deck Tiles deck covering system, to include new underlayment material and new waterproof membrane IAW the requirements of NSI 009-26, NSI
009-32, the statement of work, and references C.1.1(a) through C.1.1(ap).
C.6.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the removal of existing deck covering system installation of the new Wear-
Resistant Deck Tiles deck covering system IAW the requirements of the statement of work and
C.6.2.1 The inspection shall include adjacent locations that will be affected by the removal of the existing deck covering and the installation of the new Wear-Resistant Deck Tiles deck covering system.
C.6.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the type, color, pattern, and size of Wear-Resistant Deck Tiles to be installed.
C.6.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.6.2, C.6.2.1, and C.6.2.2
C.6.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational of the existing deck covering system IAW the requirements of the statement of work and
C.6.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.6.3 to the SBS. The
C.6.4 The Contractor shall accomplish the removal of the existing deck covering system and the
C.6.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.6.4 to the SBS. The
C.6.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and
C.6.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.6.5 to the SBS. The
C.6.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the
C.6.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.6.6 to the SBS. The
C.6.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), where installed, of the completely installed and cured Wear-Resistant Deck Tiles deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
(V)(G) CHECKPOINT: Installed Wear-Resistant Deck Tiles Deck Covering System
C.6.8 The Contractor shall accomplish an inspection of the completely installed and cured Wear-
Resistant Deck Tiles deck covering system IAW the requirements of the statement of work and
C.6.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the removal of the existing deck covering system and installation of the new Wear-Resistant Deck Tiles deck covering system.
C.6.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.6.7, C.6.8, and C.6.9 to
C.7 MONOLITHIC DECK COVERING MATERIALS (MIL-PRF-32584): HIGH
DURABILITY COATINGS AND/OR AFFF RESISTANT COATING
C.7.1 The Contractor shall provide labor, services, equipment, and materials for the removal of
C.7.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new High Durability Coatings and/or AFFF Resistant Coatings deck covering system, to include new underlayment material, new waterproof membrane, new prime coat and new top coat, IAW the requirements of NSI 009-26, NSI 009-32, the statement of work, and references C.1.1(a) through C.1.1(ap).
a. Type I – Coatings, high durability, general
b. Type II – Coatings, high durability, corrosion resistant
c. Type III – Coatings, Aqueous Film Forming Foam (AFFF) resistant
C.7.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the removal of the existing deck covering system and installation of the new
High Durability Coatings and/or AFFF Resistant Coatings deck covering system IAW the
C.7.2.1 The inspection shall include adjacent locations that will be affected by the installation of the new High Durability Coatings and/or AFFF Resistant Coatings deck covering system.
C.7.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the color coat, and the color and size of flakes for the High Durability Coatings and/or AFFF Resistant Coatings deck covering system to be installed.
C.7.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.7.2, C.7.2.1, and C.7.2.2
C.7.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational
C.7.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.7.3 to the SBS. The
C.7.4 The Contractor shall accomplish the removal of the existing deck covering system and the
C.7.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.7.4 to the SBS. The
C.7.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and
C.7.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.7.5 to the SBS. The
C.7.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the
C.7.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.7.6 to the SBS. The
C.7.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s)s, where installed, of the completely installed and cured High Durability Coatings and/or AFFF Resistant Coatings deck covering system IAW the requirements of the statement of work and references C.1.1(a) through
C.1.1(ap).
(V)(G) CHECKPOINT: Installed and Cured High Durability Coatings and/or AFFF
Resistant Coatings Deck Covering System
C.7.8 The Contractor shall accomplish an inspection of the completely installed and cured High
Durability Coatings and/or AFFF Resistant Coatings deck covering system IAW the
C.7.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in the delivery order and affected locations ensuring the removal of all protective covering, services, and equipment utilized in the removal of the existing deck covering system installation of the new High Durability Coatings and/or AFFF Resistant Coatings deck covering system.
C.7.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.7.7, C.7.8, and C.7.9 to
C.8 MONOLITHIC DECK COVERING MATERIALS (MIL-PRF-32584): CHEMICAL –
RESISTANT FLOORING
C.8.1 The Contractor shall provide labor, services, equipment, and materials for the removal of
C.8.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Chemical – Resistant Floorings deck covering system, to include new underlayment material, new waterproof membrane, new color coat, new colored flakes, and new seal coat with aggregate, IAW the requirements of NSI 009-26, NSI 009-32, the statement of work, and references C.1.1(a) through C.1.1(ap).
a. Type IV – Chemical-resistant floorings (PRC, terrazzo, color flake) with underlayment
b. Type V – Chemical-resistant floorings (PRC, terrazzo, color flake) no underlayment
C.8.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the removal of the existing deck covering system and installation of the new
Chemical – Resistant Floorings deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
C.8.2.1 The inspection shall include adjacent locations that will be affected by the installation of the new Chemical – Resistant Floorings deck covering system.
C.8.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the color coat, and the color and size of flakes for the Chemical – Resistant Floorings deck covering system to be installed.
C.8.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.8.2, C.8.2.1, and C.8.2.2
C.8.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational
C.8.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.3 to the SBS. The
C.8.4 The Contractor shall accomplish the removal of the existing deck covering system and the
C.8.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.4 to the SBS. The
C.8.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and
C.8.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.5 to the SBS. The
C.8.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the
C.8.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.6 to the SBS. The
C.8.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s)s, where installed, of the completely installed and cured Chemical – Resistant Floorings deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
(V)(G) CHECKPOINT: Installed and Cured Chemical-Resistant Floorings Deck Covering
System
C.8.8 The Contractor shall accomplish an inspection of the completely installed and cured
Chemical – Resistant Floorings deck covering system IAW the requirements of the statement of
C.8.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in new Chemical – Resistant Floorings deck covering system.
C.8.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.8.7, C.8.8, and C.8.9 to
C.9 MIL-DTL-15562: ELECTRICAL GRADE SHEETING AND MATTING
C.9.1 The Contractor shall provide labor, services, equipment, and materials for the removal of
C.9.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Electrical Grade Sheeting and Matting deck covering system described in paragraph C.9.1.2 and C.9.1.3, to include new underlayment material, IAW the requirements of NSI 009-26, NSI 009-32, the statement of work, and references C.1.1(a) through C.1.1(ap).
a. Type I – Smooth Surface
b. Type II – Smooth Surface
c. Type III – Raised Diamond Tread Pattern
C.9.1.2 Electrical Grade Sheeting and Matting deck covering system IAW the requirements of
NSI 009-26 including Attachment D, Paragraph 1, sub-paragraphs A, B, C and D, the statement of work, and references C.1.1(a) through C.1.1(ap).
C.9.1.3 Electrical Grade Sheeting and Matting (Loose Lay) deck covering system IAW the requirements of NSI 009-26, Attachment D, Paragraph 2, sub-paragraphs A and B, the statement
C.9.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the removal of the existing deck covering system installation of the new
Electrical Grade Sheeting and Matting deck covering system IAW the requirements of the
C.9.2.1 The inspection shall include adjacent locations that will be affected by the installation of the new Electrical Grade Sheeting and Matting deck covering system.
C.9.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the color and pattern of Electrical Grade Sheeting and Matting to be installed.
C.9.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.9.2, C.9.2.1, and C.9.2.1
C.9.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational
C.9.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.9.3 to the SBS. The
C.9.4 The Contractor shall accomplish the removal of existing deck covering system and the
C.9.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.9.4 to the SBS. The
C.9.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and
C.9.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.9.5 to the SBS. The
C.9.6 The Contractor shall verify that all DC deck fittings are free, removable, and operational installed and cured Electrical Grade Sheeting and Matting deck covering system IAW the
(V)(G) CHECKPOINT: Installed and Cured Electrical Grade Sheeting and Matting Deck
Covering System
C.9.7 The Contractor shall accomplish an inspection of the completely installed and cured
Electrical Grade Sheeting and Matting deck covering system IAW the requirements of the
C.9.8 The Contractor shall accomplish an inspection of the inspection of the locations listed in new Electrical Grade Sheeting and Matting deck covering system.
C.9.9 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.9.6, C.9.7, and C.9.8 to
C.10 CARPETING
C.10.1 The Contractor shall provide labor, services, equipment, and materials for the removal of
C.10.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of the new Carpeting deck covering system, to include new underlayment material, IAW the requirements of NSI 009-26, NSI 009-32, the statement of work and references C.1.1(a) through C.1.1(ap).
C.10.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the removal of the existing deck covering system and the installation of the new Carpeting deck covering system IAW the requirements of the statement of
C.10.2.1 The inspection shall include adjacent locations that will be affected by the installation of the Carpeting deck covering system.
C.10.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the type, color, and pattern of Carpeting to be installed.
C.10.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.10.2, C.10.2.1, and
C.10.2.2 to the SBS. The Contractor shall be responsible for discrepancies or damages not noted in the CFR.
C.10.3 The Contractor shall accomplish the removal of existing deck covering system and the
C.10.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.10.3 to the SBS. The
(I) CHECKPOINT: Underlayment Slope and Fairness
C.10.4 The Contractor shall ensure that the underlayment is installed smooth and fair IAW the
C.10.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.10.4 to the SBS. The
(V)(G) CHECKPOINT: Installed and Cured Carpeting Deck Covering System
C.10.5 The Contractor shall accomplish an inspection of the completely installed and cured
Carpeting deck covering system IAW the requirements of the statement of work and references
C.1.1(a) through C.1.1(ap).
C.10.6 The Contractor shall accomplish an inspection of the inspection of the locations listed in and equipment utilized in the removal of the existing deck covering system and the installation of the new Carpeting deck covering system.
C.10.7 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.10.5 and C.10.6 to the
SBS. The Contractor shall be responsible for discrepancies or damages not noted in the CFR.
C.11 MIL-PRF-32704: SOLID VINYL TILE AND/OR VINYL COMPOSITION TILE
C.11.1 The Contractor shall provide labor, services, equipment, and materials for the removal of
C.11.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of the new Solid Vinyl Tile and/or Vinyl Composition Tile deck covering system, to include new underlayment material, IAW the requirements of NSI 009-26, NSI 009-32, the statement of work and references C.1.1(a) through C.1.1(ap).
C.11.2 The Contractor shall conduct a preliminary inspection of the locations listed in the delivery order designated for the installation of the new Solid Vinyl Tile and/or Vinyl
Composition Tile deck covering system IAW the requirements of the statement of work and
C.11.2.1The inspection shall include adjacent locations that will be affected by the installation of the new Solid Vinyl Tile and Vinyl Composition Tile deck covering system.
C.11.2.2 The Contractor shall coordinate with the SAR and the SBS to determine the type, color, pattern, and size of Solid Vinyl Tile and/or Vinyl Composition Tile to be installed.
C.11.2.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.11.2, C.11.2.1, and
C.11.2.2 to the SBS. The Contractor shall be responsible for discrepancies or damages not noted
C.11.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), when installed, prior to disturbance
C.11.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.11.3 to the SBS. The
C.11.4 The Contractor shall accomplishment the removal of existing deck covering system and the subsequent surface preparation, cleaning, and coating application of the exposed substrate and adjacent vertical surfaces IAW the requirements of the statement of work and references
C.1.1(a) through C.1.1(ap).
C.11.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.11.4 to the SBS. The
C.11.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and provides positive draining to deck drain(s), where installed, IAW the requirements of the
C.11.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.11.5 to the SBS. The
C.11.6 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), when installed, of the completely installed and cured Solid Vinyl Tile and/or Vinyl Composition Tile deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ap).
(V)(G) CHECKPOINT: Installed and Cured Solid Vinyl Tile and/or Vinyl Composition
Tile Deck Covering System
C.11.7 The Contractor shall accomplish an inspection of the completely installed and cured Solid
Vinyl Tile and/or Vinyl Composition Tile deck covering system IAW the requirements of the
C.11.8 The Contractor shall accomplish an inspection of the inspection of the locations listed in and equipment utilized in the removal of the existing deck covering system and the installation of the new Solid Vinyl Tile and/or Vinyl Composition Tile deck covering system.
C.11.9 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.11.6, C.11.7, and C.11.8
C.12 REPAIR OF EXISTING DECK COVERING SYSTEM:
C.12.1 The Contractor shall provide the labor, services, equipment, and materials to repairs the existing deck covering system IAW the requirements of NSI 009-26, NSI 009-32, specifications, the statement of work, and references C.1.1(a) through C.1.1(ap).
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
C.12.1.1 Repair, Recoat or Recolor and Reseal, MIL-PRF-32584: The repair shall include the removal of the damaged deck covering, damaged underlayment, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane, and new deck covering system on removed areas only. Repair, recoat or recolor and reseal (with new colored flakes and new aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck.
a. Type I – Coatings, high durability, general
b. Type II – Coatings, high durability, corrosion resistant
c. Type III – Coatings, Aqueous Film Forming Foam (AFFF) resistant
d. Type IV – Chemical-resistant floorings (PRC, terrazzo, color flake) with…