Intercom Entry Systems RFP.pdf
PDF 3 MB Posted
- Attached to
- INTERCOM ENTRY SYSTEM
- Solicitation number
- RFP - CGRE - 240000000543
- Issued by
- Clare County, Michigan
About this file
This document is a Request for Proposals (RFP) issued by the Clare-Gladwin Regional Education Service District (CGRESD) for the purchase and installation of an intercom entry system as part of a new construction project for a Career and Technical Education Building located in Clare, Michigan. CGRESD is accepting proposals due by December 20, 2023, and a pre-bid meeting will be held on December 4, 2023. The selected bidder will coordinate the installation with the construction manager, Rockford Construction, and will be responsible for programming the intercom entry system. CGRESD reserves the right to reject any or all proposals.
The RFP provides details on the scope of services, insurance and bonding requirements, proposal submission instructions, and evaluation criteria. Pricing terms are not specified, but the RFP states that CGRESD will consider alternate proposals that deviate from the requested scope of services. There is no information provided on any incumbent vendors, funding sources, or specific budget amounts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 write up.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clare-Gladwin RESD Request for Proposals / Intercom Entry System 28-1523
A. Instructions Clare-Gladwin RESD is accepting proposals for the purchase and complete installation of an intercom entry system as part of new construction for a Career and Technical Education Building located at 3200 S. Clare Ave. Clare, MI 48617. Clare-Gladwin RESD has contracted Rockford Construction to manage the construction project. The selected bidder will coordinate with Rockford Construction for scheduling, installation, and safety requirements for the project's duration, along with the owner for programming of the intercom entry system. Bidders will contract directly with Clare-Gladwin RESD for this proposal. If a bidder plans to submit proposals for multiple bid categories, please provide a total package price.
**CGRESD reserves the right to reject any or all proposals and to make any award that it considers to be in the best interest of CGRESD.**
B. Proposal Submission and Bid Walk To be considered by CGRESD, the complete proposal must be received no later than Wednesday December 20, 2023, at 3:00 pm. Proposals should be mailed or submitted in-person to the address listed below:
Proposal Submission Clare-Gladwin RESD
Attn: Tara Mager - Proposal for Intercom Entry System 4041 East Mannsiding Rd.
Clare, MI 48617
Pre-Bid Meeting December 4th, 2023 at 12:00pm
Clare-Gladwin RESD Administration Building Rooms A&B 4041 East Mannsiding Rd.
Clare, MI 48617
Post-Bid Interviews (Tentative) December 22nd & 23rd, 2023
C. Late Proposals Any proposal received by CGRESD after the time specified above may not be considered, at CGRESD's discretion. The party submitting a proposal shall bear full and total responsibility for ensuring timely receipt of that proposal.
D. Withdrawal of Proposals Proposals may be withdrawn by written notice received at any time prior to the submission deadline.
Proposals may be withdrawn in person, provided that the firm’s representative signs a receipt for the proposal prior to the submission deadline.
E. Questions Concerning this RFP Inquiries may be made to Eric Johnson at the Clare-Gladwin Regional Education Service District located at 4041 E. Mannsiding Rd., Clare, MI 48617, via telephone at (989) 386-9334, or via email at ejohnson@cgresd.net. Information about CGRESD is available during business hours (7:30 a.m. – 4:00 p.m.). Questions & answers will be updated and can be accessed at https://www.cgresd.net/o/cgresd/page/request-for-proposal
F. Economy of Preparation Proposals should be prepared simply, providing a concise description of the firm’s ability to meet the https://www.cgresd.net/o/cgresd/page/request-for-proposal requirements of this RFP.
G. Proposal Signature The proposal should be signed by the person responsible for the decision as to services and costs being offered. In the case of a joint proposal, each party should certify as to services and costs being offered by its own firm in connection with this proposal.
H. Prime Responsibilities The firm selected will be required to assume responsibility for all services described in this RFP and in the proposal, regardless of who actually provides such services and whether the selected firm utilizes separate consultants. The selected firm shall be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.
I. Proposal Preparation Costs All costs incurred for proposal preparation presentation, or contract negotiation, are the responsibility of the firm. CGRESD shall not be responsible for, and will not pay, the cost for any information solicited or received.
J. Acceptance of Proposal Contents The contents of the proposal of the selected firm will become contractual obligations when a contract is issued, except with regard to particular contents which are rejected by CGRESD. Failure of the successful firm to abide by such obligations without the express consent of CGRESD’s Board of Education will result in cancellation of the award.
K. Proposed Project Schedule Bidders must adhere to the attached schedule provided by the Construction Manager. Please reference the attached project schedule.
L. Collusive Bidding and Relationship Disclosure.
The Proposer certifies that their Proposal is made without any previous understanding, agreement or connection with any person, firm, or company making a Proposal for the same project and is in all respects fair and without outside control, collusion, fraud, or other illegal action.
The Proposer shall submit a Familial Relationship Disclosure in substantially the form attached hereto as Attachment “B.”
The Proposer shall also submit an Iran Economic Sanctions Act Certification in substantially the form attached hereto as Attachment “C.”
M. Scope of Services It is assumed that any proposal submitted will include, but shall not necessarily be limited to, the performance of all of the activities and services identified in this RFP and as set forth in the form of Agreement attached as Attachment “A.” CGRESD will consider alternate proposals; however, the proposals must clearly indicate any activities that have been deleted and/or added from the requested scope of services.
N. Insurance Prior to beginning work, the selected firm will be required to provide a copy of insurance certificates for general and professional liability coverages. Clare-Gladwin RESD and Rockford Construction must be named as additional insured for the duration of the project.
O. Bonding The CONTRACTOR shall, at its sole expense, furnish to the OWNER security of the following types and amounts:
Bid Bond 5% Performance Bond 100% Labor Bond 100% Material Bond 100%
INTERCOM ENTRY SYSTEMS
28 1523 - 1
MAGNUS CENTER NEW BUILDING
CLARE GLADWIN RESD
TDF #2022-29--01
SECTION 28 1523 - INTERCOM ENTRY SYSTEMS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Intercom entry system and associated door/entry stations, interior stations, and accessories.
1.02 RELATED REQUIREMENTS
A. Section 07 8400 - Firestopping.
B. Section 26 0526 - Grounding and Bonding for Electrical Systems.
C. Section 26 0553 - Identification for Electrical Systems: Identification products and requirements.
1.03 REFERENCE STANDARDS
A. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design; 2010.
B. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010.
C. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
1.04 ADMINISTRATIVE REQUIREMENTS
A. Coordination:
1. Coordinate the placement of intercom stations with millwork, furniture, equipment, etc.
installed under other sections or by others.
2. Coordinate the work with other installers to provide power for equipment at required locations.
3. Notify Architect-Engineer of any conflicts with or deviations from Contract Documents.
Obtain direction before proceeding with work.
B. Sequencing:
1. Do not install intercom stations until final surface finishes and painting are complete.
1.05 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide manufacturer's standard catalog pages and data sheets for each system component. Include configurations, standard wiring diagrams, dimensions, finishes, service condition requirements, and installed features.
C. Shop Drawings: Include plan views indicating locations of system components and proposed size, type, and routing of conduits and/or cables. Include system interconnection schematic diagrams.
D. Evidence of qualifications for installer.
E. Specimen Warranty: Submit sample of manufacturer's warranty.
F. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and operation of product.
G. Manufacturer's certification that products meet or exceed specified requirements.
H. Field quality control test reports.
I. Operation and Maintenance Data: Include detailed information on system operation, equipment setup, replacement parts, and recommended maintenance procedures and intervals.
J. Executed Warranty: Submit documentation of final executed warranty completed in Owner's name and registered with manufacturer.
K. Project Record Documents: Record actual locations of system components and installed wiring arrangements and routing.
http://www.ada.gov/ http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NECA%20NEIS%201 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NFPA%2070
28 1523 - 2
TDF #2022-29--01
1.06 QUALITY ASSURANCE
A. Comply with the following:
1. ADA Standards.
2. NFPA 70 (National Electrical Code).
3. Applicable TIA/EIA standards.
B. Maintain at the project site a copy of each referenced document that prescribes execution requirements.
C. Manufacturer Qualifications: Company engaged in manufacturing the products specified in this section with minimum three years documented experience.
D. Installer Qualifications: Company with minimum three years documented experience with similar systems and providing contract maintenance service as a regular part of their business;
manufacturer's authorized installer.
E. Products: Listed, classified, and labeled as suitable for the purpose intended.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions.
B. Store products in manufacturer's unopened packaging, keep dry and protect from damage until ready for installation.
1.08 FIELD CONDITIONS
A. Maintain field conditions within manufacturer's required service conditions during and after installation.
1.09 WARRANTY
A. See Section 01 7800 - Closeout Submittals, for additional warranty requirements.
B. Provide minimum one year manufacturer warranty covering repair or replacement due to defective materials or workmanship.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Intercom Entry System:
1. Aiphone Corporation: www.aiphone.com.
2.02 INTERCOM ENTRY SYSTEM
A. Provide new intercom entry system consisting of required equipment, conduit, boxes, wiring, connectors, hardware, accessories, system programming, etc. as necessary for a complete operating system that provides the functional intent indicated.
B. System Description:
1. System Type: Audio-video, analog.
C. Door/Entry Stations:
1. Vandal resistant, with tamper proof hardware.
2. Suitable for the environment where installed.
3. Provide means to initiate call to designated interior station(s).
4. Provide for hands-free two-way communication with interior station(s).
5. Audio-Video Door/Entry Station:
a. Furnished with integral video camera for door/entry monitoring and visitor identification.
b. Call Initiation: Single button; initiates call to pre-determined interior station(s).
c. Finish: Painted steel or stainless steel.
d. Mounting: As indicated on drawings.
e. Features:
1) LED low-light video illumination.
http://www.ada.gov/
28 1523 - 3
TDF #2022-29--01
D. Interior Stations:
1. Audio-Video Guard/Concierge Station:
a. Provides for hands-free and handset two-way communication with designated door/entry station(s), master station(s), and other guard/concierge station(s).
b. Provide means for unlocking/releasing door corresponding to door/entry station communication is established with.
c. Provide means to initiate call with designated door/entry station(s), master station(s), and other guard/concierge station(s).
d. Provide means to initiate video monitoring of connected door/entry station(s).
e. Mounting: Wall or desk.
E. Accessories:
1. Provide components as indicated or as required for a complete operating system.
2. Wiring: Provide manufacturer's recommended cables as indicated or as required for connections between system components.
3. Provide accessory racks/cabinets as indicated or as required for equipment mounting.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that field measurements are as indicated.
B. Verify that characteristics of system components are consistent with the indicated requirements.
C. Verify that mounting surfaces are ready to receive system components.
D. Verify that conditions are satisfactory for installation prior to starting work.
3.02 INSTALLATION
A. Perform work in accordance with NECA 1 (general workmanship).
B. Install products in accordance with manufacturer's instructions.
C. Wiring Method for NFPA 70 Class 2/Class 3 Circuits: Unless otherwise indicated or required by NFPA 70, use cables (not in conduit).
1. Use suitable listed cables in wet locations, including underground raceways.
2. Use suitable listed cables for vertical riser applications.
3. Use listed plenum rated cables in spaces used for environmental air.
4. Install wiring in conduit for the following:
a. Where required for rough-in.
b. Where required by authorities having jurisdiction.
c. Where exposed to damage.
d. Where installed outside the building.
e. For exposed connections from outlet boxes to devices.
5. Conceal all cables unless specifically indicated to be exposed.
6. Route exposed cables parallel or perpendicular to building structural members and surfaces.
D. Provide grounding and bonding in accordance with Section 26 0526.
E. Install firestopping to preserve fire resistance rating of partitions and other elements, using materials and methods specified in Section 07 8400.
F. Identify system wiring and components in accordance with Section 26 0553.
3.03 FIELD QUALITY CONTROL
A. See Section 01 4000 - Quality Requirements, for additional requirements.
B. Test to verify wiring is free of shorts and grounds.
C. Prepare and start system in accordance with manufacturer's instructions.
D. Test system for proper operation.
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NECA%20NEIS%201
28 1523 - 4
TDF #2022-29--01
E. Correct defective work, adjust for proper operation, and retest until entire system complies with Contract Documents.
F. Submit detailed reports indicating inspection and testing results and corrective actions taken.
3.04 CLEANING
A. Clean exposed surfaces to remove dirt, paint, or other foreign material and restore to match original factory finish.
3.05 CLOSEOUT ACTIVITIES
A. See Section 01 7800 - Closeout Submittals, for closeout submittals.
B. See Section 01 7900 - Demonstration and Training, for additional requirements.
C. Demonstration: Demonstrate proper operation of system to Owner, and correct deficiencies or make adjustments as directed.
D. Training: Train Owner's personnel on operation, adjustment, and maintenance of system.
1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.
2. Provide minimum of two hours of training.
3. Instructor: Manufacturer's authorized representative.
4. Location: At project site.
3.06 PROTECTION
A. Protect installed system components from subsequent construction operations.
END OF SECTION
ID Task
Mode
Task Name Duration Start Finish
1 CGRESD 595 days? Mon 2/20/23 Fri 5/30/25
2 Design 205 days Mon 2/20/23 Fri 12/1/23
13 Procurement Items 262 days Wed 2/1/23 Thu 2/1/24
16 Preconstruction/Estimating 112 days? Tue 9/5/23 Wed 2/7/24
61 Construction 347 days? Thu 2/1/24 Fri 5/30/25
62 Submittals 35 days Mon 2/12/24 Fri 3/29/24
63 Procurement 60 days Mon 4/8/24 Fri 6/28/24
64 Mobilization 5 days Mon 4/1/24 Fri 4/5/24
65 Site Work - 65 days Mon 4/1/24 Fri 6/28/24
66 SESC Installation 10 days Mon 4/1/24 Fri 4/12/24
67 Mass Grading 15 days Mon 4/8/24 Fri 4/26/24
68 Site Utilities 90 days Mon 4/15/24 Fri 8/16/24
69 Site Concrete / Asphalt Paving Base Course 40 days Mon 8/5/24 Fri 9/27/24
70 Asphalt Paving Top Course / Striping / Signage 20 days Thu 5/1/25 Wed 5/28/25
71 Seeding / Landscaping Fall 2024 30 days Mon 9/2/24 Fri 10/11/24
72 Final Seeding Landscaping Phase Spring 2025 15 days Mon 5/5/25 Fri 5/23/25
73 Building Construction 325 days? Fri 3/1/24 Thu 5/29/25
74 Building Foundations 30 days Mon 4/15/24 Fri 5/24/24
75 Classrooms/Tech Center 265 days Mon 5/6/24 Fri 5/9/25
76 CMU Walls 45 days Mon 5/6/24 Fri 7/5/24
77 Pre-Eng Building #2 45 days Mon 6/24/24 Fri 8/23/24
78 Cooler/Freezer Install 10 days Mon 7/29/24 Fri 8/9/24
79 Roofing Conference/Tech Center 40 days Mon 8/12/24 Fri 10/4/24
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Project: Design Schedule
Date: Mon 11/27/23
Task Name Duration Start Finish
80 Set Mechanical Equipment 5 days Mon 10/7/24 Fri 10/11/24
81 Interior Framing 30 days Mon 10/7/24 Fri 11/15/24
82 Exterior Glazing/Openings 15 days Mon 8/26/24 Fri 9/13/24
83 Interior MEP Rough-In 30 days Mon 10/21/24 Fri 11/29/24
84 Kitchen MEP Rough-In 20 days Mon 11/4/24 Fri 11/29/24
85 MEP Rough Inspections 10 days Mon 12/2/24 Fri 12/13/24
86 Hang/Finish Drywall 30 days Mon 12/16/24 Fri 1/24/25
87 Paint Structure and Deck 15 days Mon 1/6/25 Fri 1/24/25
88 Prime/1st Coat Drywall 20 days Mon 1/13/25 Fri 2/7/25
89 Paint CMU 30 days Mon 2/10/25 Fri 3/21/25
90 Resonance Tile in Kitchen 10 days Mon 3/24/25 Fri 4/4/25
91 Ceiling Grid 20 days Mon 3/3/25 Fri 3/28/25
92 MEP Trim Out 20 days Mon 3/17/25 Fri 4/11/25
93 Drop Pads 15 days Mon 4/7/25 Fri 4/25/25
94 Flooring 25 days Mon 3/31/25 Fri 5/2/25
95 Final Clean 5 days Mon 5/5/25 Fri 5/9/25
96 Conference Center 75 days Mon 7/8/24 Fri 10/18/24
97 CMU Walls 20 days Mon 7/8/24 Fri 8/2/24
98 Pre-Eng Conference Center 20 days Mon 7/22/24 Fri 8/16/24
99 Roofing Conference Center 20 days Mon 8/12/24 Fri 9/6/24
100 Set Mechanical Equipment 5 days Mon 9/9/24 Fri 9/13/24
101 Exterior Glazing/Openings 10 days Mon 9/9/24 Fri 9/20/24
102 MEP Rough-In 20 days Thu 8/8/24 Wed 9/4/24
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Task Name Duration Start Finish
103 Build/Hang/Finish Bulkhead 10 days Mon 8/19/24 Fri 8/30/24
104 MEP Rough Inspections 2 days Thu 9/5/24 Fri 9/6/24
105 Paint CMU 7 days Tue 8/27/24 Wed 9/4/24
106 Install Operable Wall 5 days Thu 9/5/24 Wed 9/11/24
107 Ceiling Grid 5 days Thu 9/5/24 Wed 9/11/24
108 Overhead MEP Trim Out 10 days Thu 9/5/24 Wed 9/18/24
109 Overhead MEP Inspections 2 days Thu 9/19/24 Fri 9/20/24
110 Doors/Hardware 3 days Thu 9/5/24 Mon 9/9/24
111 MEP Trim Out 5 days Tue 9/10/24 Mon 9/16/24
112 Drop Pads 5 days Mon 9/23/24 Fri 9/27/24
113 Flooring 10 days Mon 9/30/24 Fri 10/11/24
114 Final Clean 5 days Mon 10/14/24 Fri 10/18/24
115 Project Closeout 64 days Mon 4/14/25 Thu 7/10/25
116 Commissioning Kickoff 1 day Mon 4/14/25 Mon 4/14/25
117 Punchlist 30 days Mon 5/12/25 Fri 6/20/25
118 Commissioning 15 days Tue 4/15/25 Mon 5/5/25
119 Test & Balance 5 days Tue 5/6/25 Mon 5/12/25
120 Initial Inspections 5 days Mon 5/5/25 Fri 5/9/25
121 Functional Testing 5 days Mon 5/12/25 Fri 5/16/25
122 Life Safety Testing 2 days Mon 5/19/25 Tue 5/20/25
123 Life Safety Demonstration 2 days Wed 5/21/25 Thu 5/22/25
124 TCO Inspections 5 days Wed 5/21/25 Tue 5/27/25
125 C of O Inspections 2 days Wed 5/28/25 Thu 5/29/25
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Task Name Duration Start Finish
126 Turnover/Owner FFE Install 30 days Fri 5/30/25 Thu 7/10/25
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Affidavit of Bidder – Familial Relationships Form
The undersigned, the owner or authorized officer of (the “Bidder”), pursuant to the familial disclosure requirement provided in the Clare-Gladwin Regional Education Service District’s (the “RESD”) RFP, hereby represent and warrant, except as provided below, that no familial relationships exist between the Bidder or any employee of the above mentioned RESD, and any member of the Boards of Education of the District or the Superintendents of the RESD.
List any Familial Relationships:
BIDDER: ___________________________________
By: ___________________________________
Its: ___________________________________
STATE OF ___________________)
COUNTY OF__________________)
This instrument was acknowledged before me on the______ day of ________________20__, by
_________________________________, Notary Public
_______________________________County, My Commission Expires: _________________________ Acting in the County of: _________________________
AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of (the “Bidder”), certifies to Clare-Gladwin Regional Education Service District (the “RESD”), that any and all persons who will work directly or indirectly for the Bidder, is not an "Iran Linked Business" within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the "Act"), and that in the event Bidder is awarded a Contract as a result of the aforementioned Request for Proposal, the Bidder will not become an "Iran Linked Business" at any time during the course of performing under the Contract.
The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the Contract or proposed Contract for which the false certification was made, whichever is greater, the cost of the RESD's investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on an Invitation To Bid for three (3) years from the date that it is determined that the person has submitted the false certification.
BIDDER: _____________________________________
By: _____________________________________
Its: ____________________________________
STATE OF ___________________)
COUNTY OF__________________)
Acting in the County of: ________________________
Affidavit of Bidder - Compliance with School Safety Initiative Legislation The undersigned, the owner or authorized officer of (the “Bidder”), certifies to Clare-
Gladwin Regional Education Service District (the “RESD”), that any and all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any RESD property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g and have not been convicted of any “listed offenses”.1 The Bidder further warrants and represents that all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any RESD property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g. In this regard, Bidder agrees, without limitation, to report within three (3) business days to the RESD when any such person is charged with a crime listed in Section 1535a(1) of the Revised School Code2 or a substantially similar law, and to immediately report to the RESD if that person is subsequently convicted, pled guilty or pled no contest to that crime.
BIDDER: _____________________________________
By: _____________________________________
Its: ____________________________________
STATE OF ___________________ )
COUNTY OF__________________ )
Acting in the County of: _________________________
1The term listed offenses means those defined in section 2 of the Sex Offenders Registration Act (SORA), MCL 28.722 2MCL.380.1535a(1). 50
CABLE LABEL DETAIL
SHRINK WRAP DETAIL
A 014
Cable Family Cable Number
Green
White
Black
Red
A014
Minimum 1/2" Shrink Tube
1/2" 1" over all open cable.
1-inch separation from Shrink Tube end. Standard cable orientation shown. Label must be readable from top of connector.
MIC LEVEL
LINE LEVEL +3"
VIDEO/DATA +6"
RF/CAT-TV +6"
AC/DC POWER +24"
SPEAKER LEVEL +12"
TYPICAL BACKCAN
A
TA702
A
TA701
LOCATION A LOCATION B
MANUFACTURER
MODEL NUMBER
EQUIPMENT ID NO.
NET RJ452-M
AV - AUDIO VIDEO CONTRACTOR
GC - GENERAL CONTRACTOR
DC - DATA COMMUNICATIONS CONTRACTOR
EC - ELECTRICAL CONTRACTOR
FC - FURNITURE CONTRACTOR
O - OWNER
NOTES:
1. All exposed cable strip-points must have heat-shrink tubing applied.
2. Consult project documents for specific colors if required.
3. Consult project documents for "Clear" heat-shrink requirements on cable labels.
CONDUIT SPACING GUIDELINES
NOTES:
1. All conduit spacing referenced from mic level signals.
2. All distances are minimum required spacing. Where it is not possible to maintain adequate separation, keep parallel groupings to an absolute minimum using 90 degree crossings wherever possible or necessary.
CONDUIT GENERAL NOTES FOR ELECTRICAL CONTRACTOR
- EC to provide and install all conduit, backboxes, gutter boxes, terminal cans, raceways, cable trays and access panels unless otherwise noted.
- EC to install pull lines in all conduits.
- EC shall not substitute conduit type without written permission from the consultant.
- Conduit runs are drawn for illustration only. Actual conduit paths & interim boxes to be determined by the EC.
- EC may increase the size of junction boxes, gutters & conduit as needed in the event that a conflict exists.
- EC to provide and install all high voltage (120V - 240V) cable and fixtures unless otherwise notes.
- Install applicable size pull boxes after 270 deg. of bend or if conduit run is more than 100'.
- Label all conduit for destinations such as box numbers and/or room locations.
- Deburr all rough edges to prevent cable abrasion.
- Ensure all conduits are free from debris & water.
- Ensure all in ground pull boxes and vaults are weather proof & free of debris & water.
- Ensure conduit is electrically isolated from all equipment racks & enclosures.
THE FOLLOWING ILLUSTRATION SHOWN IS USED WHEN A CONNECTION NEEDS TO BE
BROKEN AND CONTINUED WITHIN A DRAWINGS SHEET. AN INTRA/SHEET FLAG WILL BE
USED AND NUMBERED (LABELED) TO SHOW THE CONNECTION IS CONTINUED
ELSEWHERE ON THE SHEET.
DISCRETE LABELING PER INSTANCE
SOURCE/DESTINATION SHEET
RJ452-M N001
N001 RJ452-M
SOURCE
DESTINATION
WHERE DEVICE
RESIDES IN SYSTEM
WHERE DEVICE
RESIDES IN LOCATION A
N001
DISCRETE EQUIPMENT
ID NUMBER
EXAMPLE: CTRL-1
TYPICAL CONNECTION
WITH CONNECTION
TYPE SHOWN
THIS BLOCK TYPICAL FOR ALL DIAGRAMS AND DRAWINGSThe Electrical Contractor or "EC" will be responsible for the following:
*All high voltage wiring/terminations contained within this drawing set. Scope includes, but is not limited to:
PROVISION AND INSTALLATION OF:
*Conduit, gang boxes, pull boxes, and pull string required for the audio and video systems.
*All junction boxes and in-wall enclosures required for the audio communications system. Sizes of all junction boxes and enclosures will be indicated on the audio/video drawings. All junction boxes, pull boxes, and wall mounted enclosures are to be clearly labeled with permanent marker. Refer to audio/video drawings for labeling.
*AC power circuits, outlets, and interconnection of opwer to each video projector location.
*All AC power circuits, outlets, power panels and interconnection of power to the sound equipment racks.
*Wherever possible, all audio circuits shall be supplied from the same A/V electrical panel.
*The designated A/V power panel (if appropriate to the project) shall not furnish power to any other equipment.
*All outlets that service the stage (if there is a stage area) shall be supplied from the same A/V electrical panel.
*All outlets that srevice the control booth (if there is a control booth) shall be supplied from the same A/V electrical panel.
*Wherever possible, all outlets that service the ceiling mounted video projectors shall be supplied from the same A/V electrical panel.
*All high voltage wiring and terminations for projector screens and up/down switches
INSTALLATION OF:
*Installation of the following items which are provided by the A/V contractor:
(Unless specifically noted)
CONDUIT GUIDELINES:
*EMT should be used when possible.
*The EC shall provide pull boxes where appropriate.
*The EC shall provide pull lines in all conduit.
*All conduit to be sized by the EC in accordance with all applicable federal and local codes.
*All conduit paths, routing and installation methods shall be verified with architect and/or consultant prior to installation.
*Use of flex conduit is prohibited without proper approval from the AV contractor.
*The overall AV system requires extensive conduit to be furnished and installed by the EC per the specifications contained within this drawing set. If site conditions prevent conduit to be installed for any particular system(s), or if any conduit is deleted by the EC, the EC shall (at no additional cost) furnish and install all plenum wire that is to be contained within said conduit.
BLU-RAY
CD
DVD
2-WAY SPEAKER
SUBWOOFER
CEILING SPEAKER
AMPLIFIER
PROJECTOR
DISPLAY
PTZ CAMERA
TOUCHPANEL
HEADPHONES
MOBILE DEVICE
CD PLAYER
DVD PLAYER
BLU-RAY PLAYER
DOCUMENT CAMERA
DESKTOP PC
LAPTOP/GUEST PCBLUETOOTH DEVICE
WIRED MIC
AC DUPLEX OUTLET -- STANDARD POWER
AC QUAD OUTLET -- STANDARD POWER
CEILING MOUNTED BOX -- SEE SCHEDULE FOR DETAILS
CEILING SPEAKER ( FLOOR PLAN/RCP )
CEILING MOUNTED NETWORK DROP
WALL MOUNTED NETWORK DROP
FLOOR MOUNTED NETWORK DROP
WALL RACK
FREESTANDING RACK WITH DOORS
WALL MOUNTED BOX -- SEE SCHEDULE FOR DETAILS
FLOOR MOUNTED BOX -- SEE SCHEDULE FOR DETAILS
S
CAMERA ( FLOOR PLAN/RCP )
WP-1
WP-1
WP-1
W P
-1
TO JB-1BOX DESIGNATION
CONDUIT BY E.C.
(2) 1.0" EMT
2@C6
DESTINATION BOX
QTY OF CONDUIT**
CONDUIT SIZE
CONDUIT TYPE
WIRE TYPE
QUANTITY OF WIRE
NOTE:
**QUANTITY IS (1) UNLESS NOTED DIFFERENTLY
EXISTING EQUIPMENT
TO REMAIN
EXISTING EQUIPMENT
TO BE DEMOLISHED
W P
-1 W
P -1
NEW EQUIPMENT
TO BE INSTALLED
EXISTING EQUIPMENT
TO REMAIN/BE REUSED
W P
-1 W
P -1
NOTE: ALL MOUNTING HEIGHTS FOR AVL BOXES
IN THIS PROJECT MEASURED TO CENTER OF BOX
VOLUME CONTROL
(TYP.)
WALL PLATE
TOUCHPANEL
"4
The detail drawing below shows a representation of the calculated throw range for the specified projector in each room layout's reflected ceiling plan (RCP).
**NOTE: This detail is provided as a reference ONLY.
All throw distances are based off of the center of the lens to the center of the projection screen.
Due to the variance in the outer edges of the actual lens optics, it is always a best practice to place the projector as closer to the center of the throw range as possible (also referred to as the "sweet spot").
Minimum and maximum extents are shown to define the possible locations of the projector should any mechanical issues in the field make it necessary to move the projector as a last resort.
Installation teams shall always verify these calculations prior to any installation activities as a secondary process check.
Prior to installation, these items should be reviewed and confirmed:
1. The projected light path is clear from interference, and/or any obstructions.
2. The area for the projector to be installed, physically, is clear of any mechanical obstructions, or items that will hinder the placement of the projector.
Projector shown with actual X/Y lens offset
Maximum throw distance (from lens, in inches)
278" 208"
Minimum throw distance (from lens, in inches)
Projection Center-line
Projection extents (image width)
Projection Screen
TASK FURNISH INSTALL
AC POWER, CONDUIT, RACEWAYS, ELECTRICAL BACKBOXES, JUNCTION
BOXES, PULL BOXES, CABLE TRAYS, FLOOR BOXES AND OTHER CABLE
INFRASTRUCTURE
EC EC
ROUGH OR FINISHED TRIM, CASEWORK, MILLWORK, EQUIPMENT
CAVITIES, STRUCTURAL WORK, WHITE BOARDS, TACK BOARDS, OTHER
NON-ELECTRONIC DISPLAY SURFACES, OR SPECIAL CONSTRUCTION
GC GC
CEILING MOUNTED LOUDSPEAKERS AV AV
CEILING MOUNTED LOUDSPEAKER CABLE AV AV
AUDIOVISUAL CABLE AV AV
AUDIOVISUAL EQUIPMENT AND RACK AV AV
TERMINATIONS OF AUDIOVISUAL CABLE AV AV
VOICE/DATA NETWORK CABLE, CATV-CAT6 CABLE DC DC
VOICE/DATA NETWORK AND NETWORK ELECTRONICS DC DC
PRESENTER COMPUTER O O
AUDIOVISUAL EQUIPMENT WALL MOUNTS OR CEILING MOUNTS RQUIRED
TO FASTEN AUDIOVISUAL EQUIPMENT TO GC PROVIDED SUPPORT
SYSTEMS
AV AV
UNISTRUT, ANCHORS, OR OTHER MATERIALS REQUIRED TO ATTACH
AUDIOVISUAL EQUIPMENT MOUNTS TO STRUCTURE, INCLUDING FLAT
PANEL VIDEO DISPLAY BLOCKING FOR WALL MOUNTED DEVICES
GC GC
PRODUCTION CONSOLE, OTHER TECHNICAL FURNITURE GC GC
CABLE MANAGEMENT HARDWARE AT RACKS AND CONSOLES AV AV
FLOOR BOXES INCLUDING INTERNAL BRACKETS, TEMPORARY COVERS,
AND PERMANENT COVERS
EC EC
CUSTOM COVER PLATES FOR FLOOR BOXES, BACK BOXES AV AV
GENERAL DIVISION OF RESPONSIBILITIES
CABLE LABELING
FAMILY SIGNAL TYPE
A Serial
B Broadband
C Video
D DVI Video
E Digital Media
F Fiber Optic
G AES/EBU
H HDMI
I IR/S
J Optical Audio
K Control Network
L Line-Level
M Microphone
N Network
O I/O
P Power
Q Component Video
R Relay
S Speaker
T DMX
U UTP Signal
V Digital Video
W RGB Signal
X Antenna
Y Y/C S-Video
Z SDI Video
CONDUIT SEPARATION TOLERANCES
CONDUIT NOTES & COORDINATION
SYMBOL CONDUIT SIZE
1 3/4"
2 1"
3 1 1/4"
4 1 1/2"
5 2"
6 3"
7 4"
8 6"
9 8"
10 12"
11 6" CABLE
TRAY
12 12" CABLE
TRAY
13 NO CONDUIT
SYMBOL CONDUIT TYPES
EMT ELECTRICAL
METALLIC TUBING
PVC POLY-VINYL
CHLORIDE
RGD GALVANIZED RIGID
METAL
FLX FLEXIBLE
METALLIC TUBING
PLS FLEXIBLE PLASTIC
TUBING
WMT WIRE MOLD TRACK
IMC INTERMEDIATE
METAL CONDUIT
EXST EXISTING CONDUIT
SYMBOL GENERAL ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
AV AUDIO VISUAL CONTRACTOR
EC ELECTRICAL CONTRACTOR
EXS EXISTING EQUIPMENT
FBO FURNISHED BY OTHERS
FL FLUSH MOUNT
FOH FRONT OF HOUSE
GC GENERAL CONTRACTOR
LAN LOCAL AREA NETWORK
GENERAL ABBREVIATIONS
CABLE CONNECTION FLAGS
SCHEMATIC DEVICE KEY
PREFIX EQUIPMENT NAME ABBREVIATIONS
A AUDIO AMPLIFIER
ACD AUDIO CASSETTE PLAYER/RECORDER
ADA AUDIO DISTRIBUTION AMP
ADT ANTENNA DISTRIBUTION
ALS ASSISTED LISTENING SYSTEM
AMN AUDIO MONITOR
ANT ANTENNA
APA AUDIO PRE-AMP
APB AUDIO PATCHBAY
ASP ANTENNA SPLITTER
ATX AUDIO TRANSFORMER
AVR AUDIO-VIDEO RACK
CAM VIDEO CAMERA
CCU CAMERA CONTROL UNIT
CDC INTEGRATED CD & CASSETTE PLAYER/RECORDER
CDP CD PLAYER
CDR CD RECORDER
CFR CARD/MODULE FRAME
CGN VIDEO CHARACTER GENERATOR
CMB SIGNAL COMBINER
CMP AUDIO COMPRESSOR
COM PRODUCTION COMMUNICATIONS
CON DEVICE CONTROLLER
CPI COMPUTER INTERFACE
CPU COMPUTER
CS INTEGRATED CEILING LOUDSPEAKER & BACKCAN
CTL CONTROL SYSTEM
CVT VIDEO FORMAT CONVERTER
DMR DIGITAL MESSAGE REPEATER
DPB DATA PATCHBAY
DSP DIGITAL SIGNAL PROCESSOR
DSW DATA NETWORK SWITCH
DVC DIGITAL VIDEO CASSETTE PLAYER/RECORDER
DVD DIGTIAL VIDEO DIS PLAYER/RECORDER
DVS DIGTIAL VIDEO SCALER
EFX AUDIO EFFECTS PROCESSOR
EQU AUDIO EQUALIZER
ER EQUIPMENT RACK
FB FLOOR BOX
GAT AUDIO GATE
GUI GRAPHICAL USER INTERFACE
JB JUNCTION BOX
MIC WIRED MIC
MIX AUDIO MIXER
MJ MIC JUNCTION BOX
MON VIDEO MONITOR
MP MIC PLATE
MPA MIC PRE-AMP
MSP MIC SPLITTER
PCM PRODUCTION COMMUNICATIONS MASTER
EQUIPMENT NAME ABBREVIATIONS
ADDITIONAL RESPONSIBILITIES
AV SCHEMATIC SYMBOLS
SHEET LIST - TA SERIES
NUMBER NAME
TA001 AV SYMBOLS, NOTES, DIVISION OF LABOR
TA002 AV SCHEDULES
TA201 AV PLAN - FIRST FLOOR
TA211 AV RCP - FIRST FLOOR
TA301 AV SECTIONS, ELEVATIONS
TA401 AV RACKS, PLATES, DETAILS
TA402 AV TOUCHPANEL STORYBOARD - CONFERENCE CENTER
TA701 AV SCHEMATICS
TC001 TC SYMBOLS, NOTES, DETAILS
TC201 TC PLAN - FIRST FLOOR
TC211 TC RCP - FIRST FLOOR
CABLE TYPES - AV
CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER
C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6
CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE
F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP
HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE
L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ
M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ
RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE
S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P
S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02
S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02
SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE
AV PLAN/RCP SYMBOLS
HAV DESIGN.
55 E. Main Ave. Zeeland, MI 49464
616.836.1776
SHEET TITLE
Issue :
Project Number :
Designed By :
Drawn By :
Checked By :
Date Issue :
R e v is io n s
BIDS/PERMITS
CG-02
TGH
ADF
TGH
11/27/2023
TA001
AV
SYMBOLS,
NOTES,
DIVISION OF
LABOR
C
LA
R E -G
LA
D
W
IN
R E S D
M A
G N
U S C
E N
TE
R
S
C la re A v e
C la re
M
I
WIRE PULL PLAN/RCP DETAIL
EQUIPMENT STYLE - EXISTING EQUIPMENT STYLE - NEW
MOUNTING HEIGHT DETAIL
PROJECTOR THROW RANGE DETAIL (RCP ONLY)
SYMBOL GENERAL ABBREVIATIONS
NTS NOT TO SCALE
OFE OWNER FURNISHED EQUIPMENT
RCP REFLECTED CEILING PLAN
RK RACK MOUNT
SR SURFACE MOUNT
SSH STANDARD SWITCH HEIGHT
SWL SAFE WORKING LOAD
TBD TO BE DETERMINED
UON UNLESS OTHERWISE NOTED
PREFIX EQUIPMENT NAME ABBREVIATIONS
PLS PLASMA SCREEN
PRB ACTIVE PRESS BOX
PRJ VIDEO PROJECTOR
PSU POWER SUPPLY UNIT
PTC PAN TILT CONTROLLER
PTU PAN TILT UNIT
PWR AC POWER DISTRIBUTION
RMT REMOTE CONTROL
RP RACK PANEL
RPB RACKMOUNT PATCHBAY
RX SIGNAL RECEIVER
SCR PROJECTION SCREEN
SEQ POWER SEQUENCING DEVICE
SIGN DIGITAL SIGNAGE PLAYER
SJ SPEAKER JUNCTION
SP LOUDSPEAKER ENCLOSURE
SPLT SIGNAL SPLITTER
STB STAGE BOX SUB SNAKE
SUB SUBWOOFER
TP TOUCH PANEL
TSG TEST SIGNAL GENERATOR
TVA MATV DISTRIBUTION AMP
TVC MATV COMBINER
TVD MATV DE-MODULATOR
TVM MATV MODULATOR
TVP MATV HETERDYNE PROCESSOR
TVR TELEVISION RECEIVER
TVS MATV SPLITTER
TVT MATV TAP
TX SIGNAL TRANSMITTER
VC VOLUME CONTROL
VCD VIDEO CASSETTE PLAYER/DVD COMBO
VCR VIDEO CASSETTE PLAYER/RECORDER
VDA VIDEO DISTRIBUTION AMP
VDR VIDEO DISC RECORDER
VJ VIDEO JUNCTION BOX
VP VIDEO PLATE
VPB VIDEO PATCHBAY
VSC VIDEO SCAN CONVERTER
VSG VIDEO SYNC GENERATOR
VSP VIDEO SIGNAL PROCESSOR
VSW VIDEO SWITCHER
VTX VIDEO TRANSFORMER
WFV WAVE FORM/VECTOR SCOPE MONITOR
WM WIRELESS MICROPHONE
WP WALL PLATE
WRX WIRELESS RECEIVER
WTX WIRELESS TRANSMITTER
XVR AUDIO CROSSOVER
N o
D a te D e sc ri p ti o n
/2
/2
B
ID
S / P
E R
M
IT
S
HAV DESIGN.
55 E. Main Ave. Zeeland, MI 49464
616.836.1776
SHEET TITLE
Issue :
Project Number :
Designed By :
Drawn By :
Checked By :
Date Issue :
R e v is io n s
BIDS/PERMITS
CG-02
TGH
ADF
TGH
11/27/2023
TA002
AV
SCHEDULES
C
LA
R E -G
LA
D
W
IN
R E S D
M A
G N
U S C
E N
TE
R
S
C la re A v e
C la re
M
I
AV BOX SCHEDULE
BOX # LOCATION TYPE MOUNTING HEIGHT MOUNTING TYPE
BOX & COVER
PROVIDED BY
CONN. PLATE
PROVIDED BY COMMENTS
JB-1 TABLES / CHAIR STORAGE 120 10x10x6 7' - 0" SURFACE EC AV
MP-1 HEALTH CLASSROOM 145 3 GANG DEEP 4' - 6" FLUSH EC AV
TP-1 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV
TP-1 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV
TP-2 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV
TP-2 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV
VC-1 HEALTH CLASSROOM 145 1 GANG EXTRA DEEP 4' - 6" FLUSH EC AV
VC-2 HEALTH SIMULATION 144 1 GANG EXTRA DEEP 4' - 6" FLUSH EC AV
VJ-1 CONFERENCE CENTER 118 2 GANG DEEP 16' - 8" FLUSH EC AV
VJ-2 CONFERENCE CENTER 118 2 GANG DEEP 16' - 8" FLUSH EC AV
WB-1 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-2 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-3 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-4 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-5 CONFERENCE CENTER 118 WB-X3NK-GNG 1' - 6" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-6 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-7 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
WB-8 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx
AV DISPLAY SCHEDULE
LABEL LOCATION MAKE MODEL MOUNT
MON-1 CULINARY CLASSROOM 124 VIEWSONIC CDE6520-W LTM1U
MON-2 CULINARY CLASSROOM 124 VIEWSONIC CDE6520-W LTM1U
AV LOUDSPEAKER SCHEDULE
LABEL LOCATION MAKE MODEL ROTATION PITCH AZIMUTH
SP-1 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-2 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-3 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-4 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-5 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-6 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-7 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-8 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-9 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-10 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-11 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-12 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-13 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-14 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-15 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-16 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-17 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-18 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-19 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-20 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-21 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-22 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-23 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-24 CONFERENCE CENTER 118 QSC AD-C6T-LP
SP-S1 QSC NL-C4-WH
SP-S2 QSC NL-C4-WH
AV PROJECTION SCREEN CALCS
LABEL LOCATION MAKE MODEL
ASPECT
RATIO
SCREEN
HEIGHT
SCREEN
WIDTH
SCR-1 CONFERENCE CENTER 118 DALITE 35195L 16x9 90" 160"
SCR-2 CONFERENCE CENTER 118 DALITE 35195L 16x9 90" 160"
AV PROJECTOR CALCS
LABEL LOCATION MAKE MODEL
ASPECT
RATIO LENS
IMAGE
HEIGHT
IMAGE
WIDTH
THROW
DISTANCE
PRJ-1 CONFERENCE CENTER 118 EPSON EB-PU2213B 16x9 ELPLM15 92" 164" 26' - 0"
PRJ-2 CONFERENCE CENTER 118 EPSON EB-PU2213B 16x9 ELPLM15 92" 164" 26' - 0"
MOBILE CART, VOICE LIFT SCHEDULE
MODEL LOCATION
MOBILE CART & VOICE LIFT ADULT LEARNING CLASSROOM 128
MOBILE CART & VOICE LIFT CULINARY CLASSROOM 124
MOBILE CART & VOICE LIFT CRIMINAL JUSTICE CLASSROOM 133
MOBILE CART & VOICE LIFT CERT TESTING CLASSROOM 137
VOICE LIFT DIGITAL MEDIA CLASSROOM 135
MOBILE CART & VOICE LIFT EDUCATIONAL CLASSROOM 142
MOBILE CART & VOICE LIFT TRANSITIONS CLASSROOM 143
MOBILE CART & VOICE LIFT HEALTH CLASSROOM 145
N o
D a te D e sc ri p ti o n
/2
/2
B
ID
S / P
E R
M
PT
DISP
PT
DISP
PT
DISP
PT
DISP
PT
DISP
PT
DISP
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224
L E N
O V
O E
2 2
L O
G I T E C
H k
L E N
O V
O E
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224
L E N
O V
O E
2 2
L O
G I T E C
H k
L E N
O V
O E
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E22 24
LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224LENOVO E2224
LOGITECH k360
LENOVO E2224
L E N
O V
O E
2 2
L O
G I T E C
H k
L E N
O V
O E
L E N
O V
O E
L O
G I T E C
H k
L E N
O V
O E
L E N
O V
O E
L O
G I T E C
H k
L E N
O V
O E
L E N
O V
O E
L O
G I T E C
H k
L E N
O V
O E
L E N
O V
O E
L O
G I T E C
H k
L E N
O V
O E
L E N
O V
O E
L O
G I T E C
H k
L E N
O V
O E
WB-8
WB-1
WB-4
WB-5
W B
-7
W B
-2
W B
-3
W B
-6
JB-1
TP-2
TP-1
TP-2
TP-1
M P
-1
CRIM JUSTICE
WORKOUT
DIGITAL MEDIA
DIGITAL MEDIA
CLASSROOM
CRIM JUSTICE
CLASSROOM
CERT TESTING
CLASSROOM
ADULT LEARNING
CLASSROOM
CORRIDOR
HEALTH
SIMULATION
TRANSITIONS
CLASSROOM
EDUCATIONAL
CLASSROOM
HEALTH
CLASSROOM
WOMEN
MEN
STORAGE
MECH
JC
STORAGE
CORRIDOR
PRODUCTION
ROOM
SOUND ROOM
VEST
STUDENT
COMMONS
MEN
WOMEN
CULINARY
CLASSROOM
PASSAGE
CULINARY LAB
TABLES / CHAIR
STORAGE
DRY STOR
CONFERENCE
CENTER
CORRIDOR
ADMIN
RECEPTION
COPY
STORAGE
STORAGE
UNISEX
EXTRA OFFICE /
CONF
COUNSELOR
CLOSET
CONF
SPEC POP
COORD
WORK BASE
LEARN COORD
EXTRA OFFICE /
CONF
CTE COORD
DIRECTOR
PASSAGE
TO JB-1 TO JB-1
TO JB-1 TO JB-1
1.0" EMT
1@C6
1.25" EMT
4@C6
1.25" EMT
4@C61.25" EMT
4@C6
1.25" EMT
4@C6
1.0" EMT
1@C6
1.25" EMT
4@C6
1.25" EMT
4@C6
1.0" EMT
1@C6
1.25" EMT
4@C6
TA301
TA301
AVR-1
1.0" EMT
1@C6
1.25" EMT
4@C6
V C
-1 V
C -2
TO JB-1
TO JB-1
1.0" EMT
1@CNT
1.0" EMT
1@C6
1.0" EMT
1@CNT
HAV DESIGN.
55 E. Main Ave. Zeeland, MI 49464
616.836.1776
SHEET TITLE
Issue :
Project Number :
Designed By :
Drawn By :
Checked By :
Date Issue :
R e v is io n s
BIDS/PERMITS
CG-02
TGH
ADF
TGH
11/27/2023
TA201
AV PLAN -
FIRST FLOOR
C
LA
R E -G
LA
D
W
IN
R E S D
M A
G N
U S C
E N
TE
R
S
C la re A v e
C la re
M
I
1/8" = 1'-0"
AV PLAN - FIRST FLOOR - FULL BUILDING
CABLE TYPES - AV
CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER
C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6
CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE
F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP
HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE
L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ
M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ
RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE
S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P
S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02
S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02
SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE
AV GENERAL NOTES
# NOTES
1 (1) MOBILE CART SYSTEM AND/OR (1) VOICE LIFT SYSTEM TO BE PROVIDED FOR THIS SPACE. SEE SCHEMATICS FOR DETAILS
2 EC TO PROVIDE (1) DATA JACK AND (1) 20A/120V CIRCUIT NEAR PROJECTOR AT THIS LOCATION
3 EC TO PROVIDE (2) DATA JACKS AND (3) 20A/120V CIRCUITS NEAR AVR-1
4 AV TO INSTALL MARSHALL CV605-U3 PTZ CAMERA ABOVE INSTRUCTOR'S STATION AT THIS LOCATION. HDMI WIRING TO TRAVEL
TO CEILING-MOUNTED DISPLAYS NEARBY. COORDINATE EXACT LOCATION W/ OWNER'S REP
5 EC TO PROVIDE 4 SQ. BACKBOX IN CEILING AT THIS LOCATION FOR WIRELESS MIC RECEIVER. PROVIDE 1.0" EMT CONDUIT PATH FROM 4 SQ BOX TO JB-1. AV TO INSTALL SHURE MXWAPT4=-Z10 TO CEILING AT THIS LOCATION.
6 AV TO INSTALL C2G 14626 WALL MOUNT SHELF NEXT TO AVR-1 AT AN APPROPRIATE MOUNTING HEIGHT. INSTALL SHURE MXWNCS4 CHARGING STATION ATOP SHELF AND PROVIDE WIRE PATH FROM CHARGING STATIONS TO AVR-1
7 AV TO INSTALL WOLFVISION CYNAP CORE PRO AND VISIONARY TX TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM
LOCATION TO JB-1 AS NEEDED
8 AV TO INSTALL CLOCK AUDIO C303W-D-P-UDP TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM LOCATION TO JB-1 AS
NEEDED
N o
D a te D e sc ri p ti o n
/2
/2
B
ID
S / P
E R
M
PT
DISP
PT
DISP
PT
DISP
PT
DISP
PT
DISP
VJ-1
VJ-2
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PRJ-2
SCR-2
PRJ-1
SCR-1
TO JB-1
TO JB-1
1.0" EMT
1@C6
1.0" EMT
1@C6
1.0" EMT
1@CNT
1.0" EMT
1@CNT
MON-1 MON-2
SP-3
SP-2
SP-1
SP-15
SP-14
SP-13
SP-6
SP-5
SP-4
SP-18
SP-17
SP-16
SP-9
SP-8
SP-7
SP-21
SP-20
SP-19
SP-12
SP-11
SP-10
SP-24
SP-23
SP-22
5TO JB-1
1.0" EMT
1@S16
1@S16
1@S16
1@S16
1@S16
1@S16
1@S16
1@S161@S16
1@S16
1@S16
TO JB-1
1.0" EMT
1@S16
1@S16
1@S16
1@S16
1@S16
1@S16
1@S16
1@S16 1@S16
1@S16
1@S16
TO JB-1
1.0" EMT
1@S16
TO JB-1
1.0" EMT
1@S16
1.0" EMT
1@C6
1.0" EMT
1@C6
TO JB-1
1.0" EMT
1@C6
TO JB-1
TO JB-1
TO JB-1
SP-S1
SP-S2
1.0" EMT
1@C6
1.0" EMT
1@C6
1@C6
HAV DESIGN.
55 E. Main Ave. Zeeland, MI 49464
616.836.1776
SHEET TITLE
Issue :
Project Number :
Designed By :
Drawn By :
Checked By :
Date Issue :
R e v is io n s
BIDS/PERMITS
CG-02
TGH
ADF
TGH
11/27/2023
TA211
AV RCP -
FIRST FLOOR
C
LA
R E -G
LA
D
W
IN
R E S D
M A
G N
U S C
E N
TE
R
S
C la re A v e
C la re
M
I
1/8" = 1'-0"
AV RCP - FIRST FLOOR - FULL BUILDING
CABLE TYPES - AV
CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER
C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6
CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE
F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP
HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE
L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ
M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ
RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE
S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P
S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02
S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02
SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE
AV GENERAL NOTES
# NOTES
1 (1) MOBILE CART SYSTEM AND/OR (1) VOICE LIFT SYSTEM TO BE PROVIDED FOR THIS SPACE. SEE SCHEMATICS FOR DETAILS
2 EC TO PROVIDE (1) DATA JACK AND (1) 20A/120V CIRCUIT NEAR PROJECTOR AT THIS LOCATION
3 EC TO PROVIDE (2) DATA JACKS AND (3) 20A/120V CIRCUITS NEAR AVR-1
4 AV TO INSTALL MARSHALL CV605-U3 PTZ CAMERA ABOVE INSTRUCTOR'S STATION AT THIS LOCATION. HDMI WIRING TO TRAVEL
TO CEILING-MOUNTED DISPLAYS NEARBY. COORDINATE EXACT LOCATION W/ OWNER'S REP
5 EC TO PROVIDE 4 SQ. BACKBOX IN CEILING AT THIS LOCATION FOR WIRELESS MIC RECEIVER. PROVIDE 1.0" EMT CONDUIT PATH FROM 4 SQ BOX TO JB-1. AV TO INSTALL SHURE MXWAPT4=-Z10 TO CEILING AT THIS LOCATION.
6 AV TO INSTALL C2G 14626 WALL MOUNT SHELF NEXT TO AVR-1 AT AN APPROPRIATE MOUNTING HEIGHT. INSTALL SHURE MXWNCS4 CHARGING STATION ATOP SHELF AND PROVIDE WIRE PATH FROM CHARGING STATIONS TO AVR-1
7 AV TO INSTALL WOLFVISION CYNAP CORE PRO AND VISIONARY TX TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM
LOCATION TO JB-1 AS NEEDED
8 AV TO INSTALL CLOCK AUDIO C303W-D-P-UDP TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM LOCATION TO JB-1 AS
NEEDED
N o
D a te D e sc ri p ti o n
/2
/2
B
ID
S / P
E R
M
PRJ-1
SCR-1
PRJ-2
SCR-2
VJ-2
WB-5
TP-2TP-1
WB-4
VJ-1
13' - 8"
VJ-1
PRJ-1
SCR-1
WB-3WB-2
MON-1 MON-2
HAV DESIGN.
55 E. Main Ave. Zeeland, MI 49464
616.836.1776
SHEET TITLE
Issue :
Project Number :
Designed By :
Drawn By :
Checked By :
Date Issue :
R e v is io n s
BIDS/PERMITS
CG-02
TGH
ADF
TGH
11/27/2023
TA301
AV
SECTIONS,
ELEVATIONS
C
LA
R E -G
LA
D
W
IN
R E S D
M A
G N
U S C
E N
TE
R
S
C la re A v e
C la re
M
I
1/4" = 1'-0"
EAST SECTION 2
1/8" = 1'-0"
NORTH SECTION
N o
D a te D e sc ri p ti o n
/2
/2
B
ID
S / P
E R
M
PUSH
NEUTRIK
M
IC
/L
IN
E
IN
PUSH
NEUTRIK
M
IC
/L
IN
E
IN
A V
-1 A
V -2
AVR-1
DRAWER (UD2)2 RU MISC.
BLANK1 RU MISC.
A-01
(QSC CX-Q 8K4)
2 RU MAINS
BLANK1 RU MISC.
SW-2
(GSM4230PX)
1 RU AV NET
SW-1
(GSM4248PX)
1 RU AV NET
DSP-1
(QSC CORE NANO)
1 RU SHELF
DIGITAL SIGNAL
PROCESSOR
UPS-1
(UPX-2000R-2)
2 RU
2000VA POWER
BACKUP
BLANK2 RU MISC.
BLANK1 RU MISC.
GPIO-1
(QSC QIO-GP8x8)
1 RU SHELF POTS RX, FIRE ALARM
BLANK1 RU MISC.
WB-x (TYP. OF 8) FSR WB-X3-GNG-B
F U
T U
R E
TX-x (VISIONARY SOLUTIONS DUETE5-WP-WHITE)
IO-x (ATTEROTECH unD6IO)
AVR-1
DWR-16-22
16-SP WALL RACK
20A/120V
20A/120V x2
RACK NOTES:
1. INSTALL RACK RAILS AT APPROPRIATE DISTANCE FROM
BACK OF EQUIPMENT FOR LACER BARS.
2. ALL WIRING IN BACK OF RACKS SHOULD BE SECURED TO THE
LACER BARS.
3. WIRING TO AND FROM THE RACK SHALL BE RUN ON THE LEFT
HAND SIDE OF THE RACK AS YOU FACE THE REAR OF THE
RACK.
4. ALL POWER CONNECTIONS AND WIRING SHALL BE RUN ON
THE RIGHT HAND SIDE OF THE RACK AS YOU FACE THE REAR
OF THE RACK.
5. ALL WIRING SHALL BE CONTAINED IN PANDUIT FINGER TRAY
OR SIMILAR.
6. WIRING SHALL BE SEPARATED IN FINGER TRAY(S)
ACCORDING TO SIGNAL AND WIRE TYPE.
7. ALL WIRES TERMINATING IN THE EQUIMENT RACK MUST
HAVE A UNIQUE LABEL. SEE DRAWINGS FOR LABELING
DETAILS.
8. ALL EQUIPMENT SHALL HAVE A LABEL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .