Intercom Entry Systems RFP.pdf

PDF 3 MB Posted

Attached to
INTERCOM ENTRY SYSTEM
Solicitation number
RFP - CGRE - 240000000543
Issued by
Clare County, Michigan

About this file

This document is a Request for Proposals (RFP) issued by the Clare-Gladwin Regional Education Service District (CGRESD) for the purchase and installation of an intercom entry system as part of a new construction project for a Career and Technical Education Building located in Clare, Michigan. CGRESD is accepting proposals due by December 20, 2023, and a pre-bid meeting will be held on December 4, 2023. The selected bidder will coordinate the installation with the construction manager, Rockford Construction, and will be responsible for programming the intercom entry system. CGRESD reserves the right to reject any or all proposals.

The RFP provides details on the scope of services, insurance and bonding requirements, proposal submission instructions, and evaluation criteria. Pricing terms are not specified, but the RFP states that CGRESD will consider alternate proposals that deviate from the requested scope of services. There is no information provided on any incumbent vendors, funding sources, or specific budget amounts.

View the file

Other files

File Type Posted
Addendum 1 write up.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clare-Gladwin RESD Request for Proposals / Intercom Entry System 28-1523

A. Instructions Clare-Gladwin RESD is accepting proposals for the purchase and complete installation of an intercom entry system as part of new construction for a Career and Technical Education Building located at 3200 S. Clare Ave. Clare, MI 48617. Clare-Gladwin RESD has contracted Rockford Construction to manage the construction project. The selected bidder will coordinate with Rockford Construction for scheduling, installation, and safety requirements for the project's duration, along with the owner for programming of the intercom entry system. Bidders will contract directly with Clare-Gladwin RESD for this proposal. If a bidder plans to submit proposals for multiple bid categories, please provide a total package price.

**CGRESD reserves the right to reject any or all proposals and to make any award that it considers to be in the best interest of CGRESD.**

B. Proposal Submission and Bid Walk To be considered by CGRESD, the complete proposal must be received no later than Wednesday December 20, 2023, at 3:00 pm. Proposals should be mailed or submitted in-person to the address listed below:

Proposal Submission Clare-Gladwin RESD

Attn: Tara Mager - Proposal for Intercom Entry System 4041 East Mannsiding Rd.

Clare, MI 48617

Pre-Bid Meeting December 4th, 2023 at 12:00pm

Clare-Gladwin RESD Administration Building Rooms A&B 4041 East Mannsiding Rd.

Clare, MI 48617

Post-Bid Interviews (Tentative) December 22nd & 23rd, 2023

C. Late Proposals Any proposal received by CGRESD after the time specified above may not be considered, at CGRESD's discretion. The party submitting a proposal shall bear full and total responsibility for ensuring timely receipt of that proposal.

D. Withdrawal of Proposals Proposals may be withdrawn by written notice received at any time prior to the submission deadline.

Proposals may be withdrawn in person, provided that the firm’s representative signs a receipt for the proposal prior to the submission deadline.

E. Questions Concerning this RFP Inquiries may be made to Eric Johnson at the Clare-Gladwin Regional Education Service District located at 4041 E. Mannsiding Rd., Clare, MI 48617, via telephone at (989) 386-9334, or via email at ejohnson@cgresd.net. Information about CGRESD is available during business hours (7:30 a.m. – 4:00 p.m.). Questions & answers will be updated and can be accessed at https://www.cgresd.net/o/cgresd/page/request-for-proposal

F. Economy of Preparation Proposals should be prepared simply, providing a concise description of the firm’s ability to meet the https://www.cgresd.net/o/cgresd/page/request-for-proposal requirements of this RFP.

G. Proposal Signature The proposal should be signed by the person responsible for the decision as to services and costs being offered. In the case of a joint proposal, each party should certify as to services and costs being offered by its own firm in connection with this proposal.

H. Prime Responsibilities The firm selected will be required to assume responsibility for all services described in this RFP and in the proposal, regardless of who actually provides such services and whether the selected firm utilizes separate consultants. The selected firm shall be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.

I. Proposal Preparation Costs All costs incurred for proposal preparation presentation, or contract negotiation, are the responsibility of the firm. CGRESD shall not be responsible for, and will not pay, the cost for any information solicited or received.

J. Acceptance of Proposal Contents The contents of the proposal of the selected firm will become contractual obligations when a contract is issued, except with regard to particular contents which are rejected by CGRESD. Failure of the successful firm to abide by such obligations without the express consent of CGRESD’s Board of Education will result in cancellation of the award.

K. Proposed Project Schedule Bidders must adhere to the attached schedule provided by the Construction Manager. Please reference the attached project schedule.

L. Collusive Bidding and Relationship Disclosure.

The Proposer certifies that their Proposal is made without any previous understanding, agreement or connection with any person, firm, or company making a Proposal for the same project and is in all respects fair and without outside control, collusion, fraud, or other illegal action.

The Proposer shall submit a Familial Relationship Disclosure in substantially the form attached hereto as Attachment “B.”

The Proposer shall also submit an Iran Economic Sanctions Act Certification in substantially the form attached hereto as Attachment “C.”

M. Scope of Services It is assumed that any proposal submitted will include, but shall not necessarily be limited to, the performance of all of the activities and services identified in this RFP and as set forth in the form of Agreement attached as Attachment “A.” CGRESD will consider alternate proposals; however, the proposals must clearly indicate any activities that have been deleted and/or added from the requested scope of services.

N. Insurance Prior to beginning work, the selected firm will be required to provide a copy of insurance certificates for general and professional liability coverages. Clare-Gladwin RESD and Rockford Construction must be named as additional insured for the duration of the project.

O. Bonding The CONTRACTOR shall, at its sole expense, furnish to the OWNER security of the following types and amounts:

Bid Bond 5% Performance Bond 100% Labor Bond 100% Material Bond 100%

INTERCOM ENTRY SYSTEMS

28 1523 - 1

MAGNUS CENTER NEW BUILDING

CLARE GLADWIN RESD

TDF #2022-29--01

SECTION 28 1523 - INTERCOM ENTRY SYSTEMS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Intercom entry system and associated door/entry stations, interior stations, and accessories.

1.02 RELATED REQUIREMENTS

A. Section 07 8400 - Firestopping.

B. Section 26 0526 - Grounding and Bonding for Electrical Systems.

C. Section 26 0553 - Identification for Electrical Systems: Identification products and requirements.

1.03 REFERENCE STANDARDS

A. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design; 2010.

B. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010.

C. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Coordination:

1. Coordinate the placement of intercom stations with millwork, furniture, equipment, etc.

installed under other sections or by others.

2. Coordinate the work with other installers to provide power for equipment at required locations.

3. Notify Architect-Engineer of any conflicts with or deviations from Contract Documents.

Obtain direction before proceeding with work.

B. Sequencing:

1. Do not install intercom stations until final surface finishes and painting are complete.

1.05 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide manufacturer's standard catalog pages and data sheets for each system component. Include configurations, standard wiring diagrams, dimensions, finishes, service condition requirements, and installed features.

C. Shop Drawings: Include plan views indicating locations of system components and proposed size, type, and routing of conduits and/or cables. Include system interconnection schematic diagrams.

D. Evidence of qualifications for installer.

E. Specimen Warranty: Submit sample of manufacturer's warranty.

F. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and operation of product.

G. Manufacturer's certification that products meet or exceed specified requirements.

H. Field quality control test reports.

I. Operation and Maintenance Data: Include detailed information on system operation, equipment setup, replacement parts, and recommended maintenance procedures and intervals.

J. Executed Warranty: Submit documentation of final executed warranty completed in Owner's name and registered with manufacturer.

K. Project Record Documents: Record actual locations of system components and installed wiring arrangements and routing.

http://www.ada.gov/ http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NECA%20NEIS%201 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NFPA%2070

28 1523 - 2

TDF #2022-29--01

1.06 QUALITY ASSURANCE

A. Comply with the following:

1. ADA Standards.

2. NFPA 70 (National Electrical Code).

3. Applicable TIA/EIA standards.

B. Maintain at the project site a copy of each referenced document that prescribes execution requirements.

C. Manufacturer Qualifications: Company engaged in manufacturing the products specified in this section with minimum three years documented experience.

D. Installer Qualifications: Company with minimum three years documented experience with similar systems and providing contract maintenance service as a regular part of their business;

manufacturer's authorized installer.

E. Products: Listed, classified, and labeled as suitable for the purpose intended.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions.

B. Store products in manufacturer's unopened packaging, keep dry and protect from damage until ready for installation.

1.08 FIELD CONDITIONS

A. Maintain field conditions within manufacturer's required service conditions during and after installation.

1.09 WARRANTY

A. See Section 01 7800 - Closeout Submittals, for additional warranty requirements.

B. Provide minimum one year manufacturer warranty covering repair or replacement due to defective materials or workmanship.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Intercom Entry System:

1. Aiphone Corporation: www.aiphone.com.

2.02 INTERCOM ENTRY SYSTEM

A. Provide new intercom entry system consisting of required equipment, conduit, boxes, wiring, connectors, hardware, accessories, system programming, etc. as necessary for a complete operating system that provides the functional intent indicated.

B. System Description:

1. System Type: Audio-video, analog.

C. Door/Entry Stations:

1. Vandal resistant, with tamper proof hardware.

2. Suitable for the environment where installed.

3. Provide means to initiate call to designated interior station(s).

4. Provide for hands-free two-way communication with interior station(s).

5. Audio-Video Door/Entry Station:

a. Furnished with integral video camera for door/entry monitoring and visitor identification.

b. Call Initiation: Single button; initiates call to pre-determined interior station(s).

c. Finish: Painted steel or stainless steel.

d. Mounting: As indicated on drawings.

e. Features:

1) LED low-light video illumination.

http://www.ada.gov/

28 1523 - 3

TDF #2022-29--01

D. Interior Stations:

1. Audio-Video Guard/Concierge Station:

a. Provides for hands-free and handset two-way communication with designated door/entry station(s), master station(s), and other guard/concierge station(s).

b. Provide means for unlocking/releasing door corresponding to door/entry station communication is established with.

c. Provide means to initiate call with designated door/entry station(s), master station(s), and other guard/concierge station(s).

d. Provide means to initiate video monitoring of connected door/entry station(s).

e. Mounting: Wall or desk.

E. Accessories:

1. Provide components as indicated or as required for a complete operating system.

2. Wiring: Provide manufacturer's recommended cables as indicated or as required for connections between system components.

3. Provide accessory racks/cabinets as indicated or as required for equipment mounting.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that field measurements are as indicated.

B. Verify that characteristics of system components are consistent with the indicated requirements.

C. Verify that mounting surfaces are ready to receive system components.

D. Verify that conditions are satisfactory for installation prior to starting work.

3.02 INSTALLATION

A. Perform work in accordance with NECA 1 (general workmanship).

B. Install products in accordance with manufacturer's instructions.

C. Wiring Method for NFPA 70 Class 2/Class 3 Circuits: Unless otherwise indicated or required by NFPA 70, use cables (not in conduit).

1. Use suitable listed cables in wet locations, including underground raceways.

2. Use suitable listed cables for vertical riser applications.

3. Use listed plenum rated cables in spaces used for environmental air.

4. Install wiring in conduit for the following:

a. Where required for rough-in.

b. Where required by authorities having jurisdiction.

c. Where exposed to damage.

d. Where installed outside the building.

e. For exposed connections from outlet boxes to devices.

5. Conceal all cables unless specifically indicated to be exposed.

6. Route exposed cables parallel or perpendicular to building structural members and surfaces.

D. Provide grounding and bonding in accordance with Section 26 0526.

E. Install firestopping to preserve fire resistance rating of partitions and other elements, using materials and methods specified in Section 07 8400.

F. Identify system wiring and components in accordance with Section 26 0553.

3.03 FIELD QUALITY CONTROL

A. See Section 01 4000 - Quality Requirements, for additional requirements.

B. Test to verify wiring is free of shorts and grounds.

C. Prepare and start system in accordance with manufacturer's instructions.

D. Test system for proper operation.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NECA%20NEIS%201

28 1523 - 4

TDF #2022-29--01

E. Correct defective work, adjust for proper operation, and retest until entire system complies with Contract Documents.

F. Submit detailed reports indicating inspection and testing results and corrective actions taken.

3.04 CLEANING

A. Clean exposed surfaces to remove dirt, paint, or other foreign material and restore to match original factory finish.

3.05 CLOSEOUT ACTIVITIES

A. See Section 01 7800 - Closeout Submittals, for closeout submittals.

B. See Section 01 7900 - Demonstration and Training, for additional requirements.

C. Demonstration: Demonstrate proper operation of system to Owner, and correct deficiencies or make adjustments as directed.

D. Training: Train Owner's personnel on operation, adjustment, and maintenance of system.

1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.

2. Provide minimum of two hours of training.

3. Instructor: Manufacturer's authorized representative.

4. Location: At project site.

3.06 PROTECTION

A. Protect installed system components from subsequent construction operations.

END OF SECTION

ID Task

Mode

Task Name Duration Start Finish

1 CGRESD 595 days? Mon 2/20/23 Fri 5/30/25

2 Design 205 days Mon 2/20/23 Fri 12/1/23

13 Procurement Items 262 days Wed 2/1/23 Thu 2/1/24

16 Preconstruction/Estimating 112 days? Tue 9/5/23 Wed 2/7/24

61 Construction 347 days? Thu 2/1/24 Fri 5/30/25

62 Submittals 35 days Mon 2/12/24 Fri 3/29/24

63 Procurement 60 days Mon 4/8/24 Fri 6/28/24

64 Mobilization 5 days Mon 4/1/24 Fri 4/5/24

65 Site Work - 65 days Mon 4/1/24 Fri 6/28/24

66 SESC Installation 10 days Mon 4/1/24 Fri 4/12/24

67 Mass Grading 15 days Mon 4/8/24 Fri 4/26/24

68 Site Utilities 90 days Mon 4/15/24 Fri 8/16/24

69 Site Concrete / Asphalt Paving Base Course 40 days Mon 8/5/24 Fri 9/27/24

70 Asphalt Paving Top Course / Striping / Signage 20 days Thu 5/1/25 Wed 5/28/25

71 Seeding / Landscaping Fall 2024 30 days Mon 9/2/24 Fri 10/11/24

72 Final Seeding Landscaping Phase Spring 2025 15 days Mon 5/5/25 Fri 5/23/25

73 Building Construction 325 days? Fri 3/1/24 Thu 5/29/25

74 Building Foundations 30 days Mon 4/15/24 Fri 5/24/24

75 Classrooms/Tech Center 265 days Mon 5/6/24 Fri 5/9/25

76 CMU Walls 45 days Mon 5/6/24 Fri 7/5/24

77 Pre-Eng Building #2 45 days Mon 6/24/24 Fri 8/23/24

78 Cooler/Freezer Install 10 days Mon 7/29/24 Fri 8/9/24

79 Roofing Conference/Tech Center 40 days Mon 8/12/24 Fri 10/4/24

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Project: Design Schedule

Date: Mon 11/27/23

Task Name Duration Start Finish

80 Set Mechanical Equipment 5 days Mon 10/7/24 Fri 10/11/24

81 Interior Framing 30 days Mon 10/7/24 Fri 11/15/24

82 Exterior Glazing/Openings 15 days Mon 8/26/24 Fri 9/13/24

83 Interior MEP Rough-In 30 days Mon 10/21/24 Fri 11/29/24

84 Kitchen MEP Rough-In 20 days Mon 11/4/24 Fri 11/29/24

85 MEP Rough Inspections 10 days Mon 12/2/24 Fri 12/13/24

86 Hang/Finish Drywall 30 days Mon 12/16/24 Fri 1/24/25

87 Paint Structure and Deck 15 days Mon 1/6/25 Fri 1/24/25

88 Prime/1st Coat Drywall 20 days Mon 1/13/25 Fri 2/7/25

89 Paint CMU 30 days Mon 2/10/25 Fri 3/21/25

90 Resonance Tile in Kitchen 10 days Mon 3/24/25 Fri 4/4/25

91 Ceiling Grid 20 days Mon 3/3/25 Fri 3/28/25

92 MEP Trim Out 20 days Mon 3/17/25 Fri 4/11/25

93 Drop Pads 15 days Mon 4/7/25 Fri 4/25/25

94 Flooring 25 days Mon 3/31/25 Fri 5/2/25

95 Final Clean 5 days Mon 5/5/25 Fri 5/9/25

96 Conference Center 75 days Mon 7/8/24 Fri 10/18/24

97 CMU Walls 20 days Mon 7/8/24 Fri 8/2/24

98 Pre-Eng Conference Center 20 days Mon 7/22/24 Fri 8/16/24

99 Roofing Conference Center 20 days Mon 8/12/24 Fri 9/6/24

100 Set Mechanical Equipment 5 days Mon 9/9/24 Fri 9/13/24

101 Exterior Glazing/Openings 10 days Mon 9/9/24 Fri 9/20/24

102 MEP Rough-In 20 days Thu 8/8/24 Wed 9/4/24

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Task Name Duration Start Finish

103 Build/Hang/Finish Bulkhead 10 days Mon 8/19/24 Fri 8/30/24

104 MEP Rough Inspections 2 days Thu 9/5/24 Fri 9/6/24

105 Paint CMU 7 days Tue 8/27/24 Wed 9/4/24

106 Install Operable Wall 5 days Thu 9/5/24 Wed 9/11/24

107 Ceiling Grid 5 days Thu 9/5/24 Wed 9/11/24

108 Overhead MEP Trim Out 10 days Thu 9/5/24 Wed 9/18/24

109 Overhead MEP Inspections 2 days Thu 9/19/24 Fri 9/20/24

110 Doors/Hardware 3 days Thu 9/5/24 Mon 9/9/24

111 MEP Trim Out 5 days Tue 9/10/24 Mon 9/16/24

112 Drop Pads 5 days Mon 9/23/24 Fri 9/27/24

113 Flooring 10 days Mon 9/30/24 Fri 10/11/24

114 Final Clean 5 days Mon 10/14/24 Fri 10/18/24

115 Project Closeout 64 days Mon 4/14/25 Thu 7/10/25

116 Commissioning Kickoff 1 day Mon 4/14/25 Mon 4/14/25

117 Punchlist 30 days Mon 5/12/25 Fri 6/20/25

118 Commissioning 15 days Tue 4/15/25 Mon 5/5/25

119 Test & Balance 5 days Tue 5/6/25 Mon 5/12/25

120 Initial Inspections 5 days Mon 5/5/25 Fri 5/9/25

121 Functional Testing 5 days Mon 5/12/25 Fri 5/16/25

122 Life Safety Testing 2 days Mon 5/19/25 Tue 5/20/25

123 Life Safety Demonstration 2 days Wed 5/21/25 Thu 5/22/25

124 TCO Inspections 5 days Wed 5/21/25 Tue 5/27/25

125 C of O Inspections 2 days Wed 5/28/25 Thu 5/29/25

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Task Name Duration Start Finish

126 Turnover/Owner FFE Install 30 days Fri 5/30/25 Thu 7/10/25

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Affidavit of Bidder – Familial Relationships Form

The undersigned, the owner or authorized officer of (the “Bidder”), pursuant to the familial disclosure requirement provided in the Clare-Gladwin Regional Education Service District’s (the “RESD”) RFP, hereby represent and warrant, except as provided below, that no familial relationships exist between the Bidder or any employee of the above mentioned RESD, and any member of the Boards of Education of the District or the Superintendents of the RESD.

List any Familial Relationships:

BIDDER: ___________________________________

By: ___________________________________

Its: ___________________________________

STATE OF ___________________)

COUNTY OF__________________)

This instrument was acknowledged before me on the______ day of ________________20__, by

_________________________________, Notary Public

_______________________________County, My Commission Expires: _________________________ Acting in the County of: _________________________

AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner or authorized officer of (the “Bidder”), certifies to Clare-Gladwin Regional Education Service District (the “RESD”), that any and all persons who will work directly or indirectly for the Bidder, is not an "Iran Linked Business" within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the "Act"), and that in the event Bidder is awarded a Contract as a result of the aforementioned Request for Proposal, the Bidder will not become an "Iran Linked Business" at any time during the course of performing under the Contract.

The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the Contract or proposed Contract for which the false certification was made, whichever is greater, the cost of the RESD's investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on an Invitation To Bid for three (3) years from the date that it is determined that the person has submitted the false certification.

BIDDER: _____________________________________

By: _____________________________________

Its: ____________________________________

STATE OF ___________________)

COUNTY OF__________________)

Acting in the County of: ________________________

Affidavit of Bidder - Compliance with School Safety Initiative Legislation The undersigned, the owner or authorized officer of (the “Bidder”), certifies to Clare-

Gladwin Regional Education Service District (the “RESD”), that any and all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any RESD property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g and have not been convicted of any “listed offenses”.1 The Bidder further warrants and represents that all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any RESD property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g. In this regard, Bidder agrees, without limitation, to report within three (3) business days to the RESD when any such person is charged with a crime listed in Section 1535a(1) of the Revised School Code2 or a substantially similar law, and to immediately report to the RESD if that person is subsequently convicted, pled guilty or pled no contest to that crime.

BIDDER: _____________________________________

By: _____________________________________

Its: ____________________________________

STATE OF ___________________ )

COUNTY OF__________________ )

Acting in the County of: _________________________

1The term listed offenses means those defined in section 2 of the Sex Offenders Registration Act (SORA), MCL 28.722 2MCL.380.1535a(1). 50

CABLE LABEL DETAIL

SHRINK WRAP DETAIL

A 014

Cable Family Cable Number

Green

White

Black

Red

A014

Minimum 1/2" Shrink Tube

1/2" 1" over all open cable.

1-inch separation from Shrink Tube end. Standard cable orientation shown. Label must be readable from top of connector.

MIC LEVEL

LINE LEVEL +3"

VIDEO/DATA +6"

RF/CAT-TV +6"

AC/DC POWER +24"

SPEAKER LEVEL +12"

TYPICAL BACKCAN

A

TA702

A

TA701

LOCATION A LOCATION B

MANUFACTURER

MODEL NUMBER

EQUIPMENT ID NO.

NET RJ452-M

AV - AUDIO VIDEO CONTRACTOR

GC - GENERAL CONTRACTOR

DC - DATA COMMUNICATIONS CONTRACTOR

EC - ELECTRICAL CONTRACTOR

FC - FURNITURE CONTRACTOR

O - OWNER

NOTES:

1. All exposed cable strip-points must have heat-shrink tubing applied.

2. Consult project documents for specific colors if required.

3. Consult project documents for "Clear" heat-shrink requirements on cable labels.

CONDUIT SPACING GUIDELINES

NOTES:

1. All conduit spacing referenced from mic level signals.

2. All distances are minimum required spacing. Where it is not possible to maintain adequate separation, keep parallel groupings to an absolute minimum using 90 degree crossings wherever possible or necessary.

CONDUIT GENERAL NOTES FOR ELECTRICAL CONTRACTOR

- EC to provide and install all conduit, backboxes, gutter boxes, terminal cans, raceways, cable trays and access panels unless otherwise noted.

- EC to install pull lines in all conduits.

- EC shall not substitute conduit type without written permission from the consultant.

- Conduit runs are drawn for illustration only. Actual conduit paths & interim boxes to be determined by the EC.

- EC may increase the size of junction boxes, gutters & conduit as needed in the event that a conflict exists.

- EC to provide and install all high voltage (120V - 240V) cable and fixtures unless otherwise notes.

- Install applicable size pull boxes after 270 deg. of bend or if conduit run is more than 100'.

- Label all conduit for destinations such as box numbers and/or room locations.

- Deburr all rough edges to prevent cable abrasion.

- Ensure all conduits are free from debris & water.

- Ensure all in ground pull boxes and vaults are weather proof & free of debris & water.

- Ensure conduit is electrically isolated from all equipment racks & enclosures.

THE FOLLOWING ILLUSTRATION SHOWN IS USED WHEN A CONNECTION NEEDS TO BE

BROKEN AND CONTINUED WITHIN A DRAWINGS SHEET. AN INTRA/SHEET FLAG WILL BE

USED AND NUMBERED (LABELED) TO SHOW THE CONNECTION IS CONTINUED

ELSEWHERE ON THE SHEET.

DISCRETE LABELING PER INSTANCE

SOURCE/DESTINATION SHEET

RJ452-M N001

N001 RJ452-M

SOURCE

DESTINATION

WHERE DEVICE

RESIDES IN SYSTEM

WHERE DEVICE

RESIDES IN LOCATION A

N001

DISCRETE EQUIPMENT

ID NUMBER

EXAMPLE: CTRL-1

TYPICAL CONNECTION

WITH CONNECTION

TYPE SHOWN

THIS BLOCK TYPICAL FOR ALL DIAGRAMS AND DRAWINGSThe Electrical Contractor or "EC" will be responsible for the following:

*All high voltage wiring/terminations contained within this drawing set. Scope includes, but is not limited to:

PROVISION AND INSTALLATION OF:

*Conduit, gang boxes, pull boxes, and pull string required for the audio and video systems.

*All junction boxes and in-wall enclosures required for the audio communications system. Sizes of all junction boxes and enclosures will be indicated on the audio/video drawings. All junction boxes, pull boxes, and wall mounted enclosures are to be clearly labeled with permanent marker. Refer to audio/video drawings for labeling.

*AC power circuits, outlets, and interconnection of opwer to each video projector location.

*All AC power circuits, outlets, power panels and interconnection of power to the sound equipment racks.

*Wherever possible, all audio circuits shall be supplied from the same A/V electrical panel.

*The designated A/V power panel (if appropriate to the project) shall not furnish power to any other equipment.

*All outlets that service the stage (if there is a stage area) shall be supplied from the same A/V electrical panel.

*All outlets that srevice the control booth (if there is a control booth) shall be supplied from the same A/V electrical panel.

*Wherever possible, all outlets that service the ceiling mounted video projectors shall be supplied from the same A/V electrical panel.

*All high voltage wiring and terminations for projector screens and up/down switches

INSTALLATION OF:

*Installation of the following items which are provided by the A/V contractor:

(Unless specifically noted)

CONDUIT GUIDELINES:

*EMT should be used when possible.

*The EC shall provide pull boxes where appropriate.

*The EC shall provide pull lines in all conduit.

*All conduit to be sized by the EC in accordance with all applicable federal and local codes.

*All conduit paths, routing and installation methods shall be verified with architect and/or consultant prior to installation.

*Use of flex conduit is prohibited without proper approval from the AV contractor.

*The overall AV system requires extensive conduit to be furnished and installed by the EC per the specifications contained within this drawing set. If site conditions prevent conduit to be installed for any particular system(s), or if any conduit is deleted by the EC, the EC shall (at no additional cost) furnish and install all plenum wire that is to be contained within said conduit.

BLU-RAY

CD

DVD

2-WAY SPEAKER

SUBWOOFER

CEILING SPEAKER

AMPLIFIER

PROJECTOR

DISPLAY

PTZ CAMERA

TOUCHPANEL

HEADPHONES

MOBILE DEVICE

CD PLAYER

DVD PLAYER

BLU-RAY PLAYER

DOCUMENT CAMERA

DESKTOP PC

LAPTOP/GUEST PCBLUETOOTH DEVICE

WIRED MIC

AC DUPLEX OUTLET -- STANDARD POWER

AC QUAD OUTLET -- STANDARD POWER

CEILING MOUNTED BOX -- SEE SCHEDULE FOR DETAILS

CEILING SPEAKER ( FLOOR PLAN/RCP )

CEILING MOUNTED NETWORK DROP

WALL MOUNTED NETWORK DROP

FLOOR MOUNTED NETWORK DROP

WALL RACK

FREESTANDING RACK WITH DOORS

WALL MOUNTED BOX -- SEE SCHEDULE FOR DETAILS

FLOOR MOUNTED BOX -- SEE SCHEDULE FOR DETAILS

S

CAMERA ( FLOOR PLAN/RCP )

WP-1

WP-1

WP-1

W P

-1

TO JB-1BOX DESIGNATION

CONDUIT BY E.C.

(2) 1.0" EMT

2@C6

DESTINATION BOX

QTY OF CONDUIT**

CONDUIT SIZE

CONDUIT TYPE

WIRE TYPE

QUANTITY OF WIRE

NOTE:

**QUANTITY IS (1) UNLESS NOTED DIFFERENTLY

EXISTING EQUIPMENT

TO REMAIN

EXISTING EQUIPMENT

TO BE DEMOLISHED

W P

-1 W

P -1

NEW EQUIPMENT

TO BE INSTALLED

EXISTING EQUIPMENT

TO REMAIN/BE REUSED

W P

-1 W

P -1

NOTE: ALL MOUNTING HEIGHTS FOR AVL BOXES

IN THIS PROJECT MEASURED TO CENTER OF BOX

VOLUME CONTROL

(TYP.)

WALL PLATE

TOUCHPANEL

"4

The detail drawing below shows a representation of the calculated throw range for the specified projector in each room layout's reflected ceiling plan (RCP).

**NOTE: This detail is provided as a reference ONLY.

All throw distances are based off of the center of the lens to the center of the projection screen.

Due to the variance in the outer edges of the actual lens optics, it is always a best practice to place the projector as closer to the center of the throw range as possible (also referred to as the "sweet spot").

Minimum and maximum extents are shown to define the possible locations of the projector should any mechanical issues in the field make it necessary to move the projector as a last resort.

Installation teams shall always verify these calculations prior to any installation activities as a secondary process check.

Prior to installation, these items should be reviewed and confirmed:

1. The projected light path is clear from interference, and/or any obstructions.

2. The area for the projector to be installed, physically, is clear of any mechanical obstructions, or items that will hinder the placement of the projector.

Projector shown with actual X/Y lens offset

Maximum throw distance (from lens, in inches)

278" 208"

Minimum throw distance (from lens, in inches)

Projection Center-line

Projection extents (image width)

Projection Screen

TASK FURNISH INSTALL

AC POWER, CONDUIT, RACEWAYS, ELECTRICAL BACKBOXES, JUNCTION

BOXES, PULL BOXES, CABLE TRAYS, FLOOR BOXES AND OTHER CABLE

INFRASTRUCTURE

EC EC

ROUGH OR FINISHED TRIM, CASEWORK, MILLWORK, EQUIPMENT

CAVITIES, STRUCTURAL WORK, WHITE BOARDS, TACK BOARDS, OTHER

NON-ELECTRONIC DISPLAY SURFACES, OR SPECIAL CONSTRUCTION

GC GC

CEILING MOUNTED LOUDSPEAKERS AV AV

CEILING MOUNTED LOUDSPEAKER CABLE AV AV

AUDIOVISUAL CABLE AV AV

AUDIOVISUAL EQUIPMENT AND RACK AV AV

TERMINATIONS OF AUDIOVISUAL CABLE AV AV

VOICE/DATA NETWORK CABLE, CATV-CAT6 CABLE DC DC

VOICE/DATA NETWORK AND NETWORK ELECTRONICS DC DC

PRESENTER COMPUTER O O

AUDIOVISUAL EQUIPMENT WALL MOUNTS OR CEILING MOUNTS RQUIRED

TO FASTEN AUDIOVISUAL EQUIPMENT TO GC PROVIDED SUPPORT

SYSTEMS

AV AV

UNISTRUT, ANCHORS, OR OTHER MATERIALS REQUIRED TO ATTACH

AUDIOVISUAL EQUIPMENT MOUNTS TO STRUCTURE, INCLUDING FLAT

PANEL VIDEO DISPLAY BLOCKING FOR WALL MOUNTED DEVICES

GC GC

PRODUCTION CONSOLE, OTHER TECHNICAL FURNITURE GC GC

CABLE MANAGEMENT HARDWARE AT RACKS AND CONSOLES AV AV

FLOOR BOXES INCLUDING INTERNAL BRACKETS, TEMPORARY COVERS,

AND PERMANENT COVERS

EC EC

CUSTOM COVER PLATES FOR FLOOR BOXES, BACK BOXES AV AV

GENERAL DIVISION OF RESPONSIBILITIES

CABLE LABELING

FAMILY SIGNAL TYPE

A Serial

B Broadband

C Video

D DVI Video

E Digital Media

F Fiber Optic

G AES/EBU

H HDMI

I IR/S

J Optical Audio

K Control Network

L Line-Level

M Microphone

N Network

O I/O

P Power

Q Component Video

R Relay

S Speaker

T DMX

U UTP Signal

V Digital Video

W RGB Signal

X Antenna

Y Y/C S-Video

Z SDI Video

CONDUIT SEPARATION TOLERANCES

CONDUIT NOTES & COORDINATION

SYMBOL CONDUIT SIZE

1 3/4"

2 1"

3 1 1/4"

4 1 1/2"

5 2"

6 3"

7 4"

8 6"

9 8"

10 12"

11 6" CABLE

TRAY

12 12" CABLE

TRAY

13 NO CONDUIT

SYMBOL CONDUIT TYPES

EMT ELECTRICAL

METALLIC TUBING

PVC POLY-VINYL

CHLORIDE

RGD GALVANIZED RIGID

METAL

FLX FLEXIBLE

METALLIC TUBING

PLS FLEXIBLE PLASTIC

TUBING

WMT WIRE MOLD TRACK

IMC INTERMEDIATE

METAL CONDUIT

EXST EXISTING CONDUIT

SYMBOL GENERAL ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AV AUDIO VISUAL CONTRACTOR

EC ELECTRICAL CONTRACTOR

EXS EXISTING EQUIPMENT

FBO FURNISHED BY OTHERS

FL FLUSH MOUNT

FOH FRONT OF HOUSE

GC GENERAL CONTRACTOR

LAN LOCAL AREA NETWORK

GENERAL ABBREVIATIONS

CABLE CONNECTION FLAGS

SCHEMATIC DEVICE KEY

PREFIX EQUIPMENT NAME ABBREVIATIONS

A AUDIO AMPLIFIER

ACD AUDIO CASSETTE PLAYER/RECORDER

ADA AUDIO DISTRIBUTION AMP

ADT ANTENNA DISTRIBUTION

ALS ASSISTED LISTENING SYSTEM

AMN AUDIO MONITOR

ANT ANTENNA

APA AUDIO PRE-AMP

APB AUDIO PATCHBAY

ASP ANTENNA SPLITTER

ATX AUDIO TRANSFORMER

AVR AUDIO-VIDEO RACK

CAM VIDEO CAMERA

CCU CAMERA CONTROL UNIT

CDC INTEGRATED CD & CASSETTE PLAYER/RECORDER

CDP CD PLAYER

CDR CD RECORDER

CFR CARD/MODULE FRAME

CGN VIDEO CHARACTER GENERATOR

CMB SIGNAL COMBINER

CMP AUDIO COMPRESSOR

COM PRODUCTION COMMUNICATIONS

CON DEVICE CONTROLLER

CPI COMPUTER INTERFACE

CPU COMPUTER

CS INTEGRATED CEILING LOUDSPEAKER & BACKCAN

CTL CONTROL SYSTEM

CVT VIDEO FORMAT CONVERTER

DMR DIGITAL MESSAGE REPEATER

DPB DATA PATCHBAY

DSP DIGITAL SIGNAL PROCESSOR

DSW DATA NETWORK SWITCH

DVC DIGITAL VIDEO CASSETTE PLAYER/RECORDER

DVD DIGTIAL VIDEO DIS PLAYER/RECORDER

DVS DIGTIAL VIDEO SCALER

EFX AUDIO EFFECTS PROCESSOR

EQU AUDIO EQUALIZER

ER EQUIPMENT RACK

FB FLOOR BOX

GAT AUDIO GATE

GUI GRAPHICAL USER INTERFACE

JB JUNCTION BOX

MIC WIRED MIC

MIX AUDIO MIXER

MJ MIC JUNCTION BOX

MON VIDEO MONITOR

MP MIC PLATE

MPA MIC PRE-AMP

MSP MIC SPLITTER

PCM PRODUCTION COMMUNICATIONS MASTER

EQUIPMENT NAME ABBREVIATIONS

ADDITIONAL RESPONSIBILITIES

AV SCHEMATIC SYMBOLS

SHEET LIST - TA SERIES

NUMBER NAME

TA001 AV SYMBOLS, NOTES, DIVISION OF LABOR

TA002 AV SCHEDULES

TA201 AV PLAN - FIRST FLOOR

TA211 AV RCP - FIRST FLOOR

TA301 AV SECTIONS, ELEVATIONS

TA401 AV RACKS, PLATES, DETAILS

TA402 AV TOUCHPANEL STORYBOARD - CONFERENCE CENTER

TA701 AV SCHEMATICS

TC001 TC SYMBOLS, NOTES, DETAILS

TC201 TC PLAN - FIRST FLOOR

TC211 TC RCP - FIRST FLOOR

CABLE TYPES - AV

CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER

C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6

CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP

HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE

L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE

S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P

S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02

S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02

SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

AV PLAN/RCP SYMBOLS

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA001

AV

SYMBOLS,

NOTES,

DIVISION OF

LABOR

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

WIRE PULL PLAN/RCP DETAIL

EQUIPMENT STYLE - EXISTING EQUIPMENT STYLE - NEW

MOUNTING HEIGHT DETAIL

PROJECTOR THROW RANGE DETAIL (RCP ONLY)

SYMBOL GENERAL ABBREVIATIONS

NTS NOT TO SCALE

OFE OWNER FURNISHED EQUIPMENT

RCP REFLECTED CEILING PLAN

RK RACK MOUNT

SR SURFACE MOUNT

SSH STANDARD SWITCH HEIGHT

SWL SAFE WORKING LOAD

TBD TO BE DETERMINED

UON UNLESS OTHERWISE NOTED

PREFIX EQUIPMENT NAME ABBREVIATIONS

PLS PLASMA SCREEN

PRB ACTIVE PRESS BOX

PRJ VIDEO PROJECTOR

PSU POWER SUPPLY UNIT

PTC PAN TILT CONTROLLER

PTU PAN TILT UNIT

PWR AC POWER DISTRIBUTION

RMT REMOTE CONTROL

RP RACK PANEL

RPB RACKMOUNT PATCHBAY

RX SIGNAL RECEIVER

SCR PROJECTION SCREEN

SEQ POWER SEQUENCING DEVICE

SIGN DIGITAL SIGNAGE PLAYER

SJ SPEAKER JUNCTION

SP LOUDSPEAKER ENCLOSURE

SPLT SIGNAL SPLITTER

STB STAGE BOX SUB SNAKE

SUB SUBWOOFER

TP TOUCH PANEL

TSG TEST SIGNAL GENERATOR

TVA MATV DISTRIBUTION AMP

TVC MATV COMBINER

TVD MATV DE-MODULATOR

TVM MATV MODULATOR

TVP MATV HETERDYNE PROCESSOR

TVR TELEVISION RECEIVER

TVS MATV SPLITTER

TVT MATV TAP

TX SIGNAL TRANSMITTER

VC VOLUME CONTROL

VCD VIDEO CASSETTE PLAYER/DVD COMBO

VCR VIDEO CASSETTE PLAYER/RECORDER

VDA VIDEO DISTRIBUTION AMP

VDR VIDEO DISC RECORDER

VJ VIDEO JUNCTION BOX

VP VIDEO PLATE

VPB VIDEO PATCHBAY

VSC VIDEO SCAN CONVERTER

VSG VIDEO SYNC GENERATOR

VSP VIDEO SIGNAL PROCESSOR

VSW VIDEO SWITCHER

VTX VIDEO TRANSFORMER

WFV WAVE FORM/VECTOR SCOPE MONITOR

WM WIRELESS MICROPHONE

WP WALL PLATE

WRX WIRELESS RECEIVER

WTX WIRELESS TRANSMITTER

XVR AUDIO CROSSOVER

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

IT

S

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA002

AV

SCHEDULES

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

AV BOX SCHEDULE

BOX # LOCATION TYPE MOUNTING HEIGHT MOUNTING TYPE

BOX & COVER

PROVIDED BY

CONN. PLATE

PROVIDED BY COMMENTS

JB-1 TABLES / CHAIR STORAGE 120 10x10x6 7' - 0" SURFACE EC AV

MP-1 HEALTH CLASSROOM 145 3 GANG DEEP 4' - 6" FLUSH EC AV

TP-1 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

TP-1 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

TP-2 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

TP-2 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

VC-1 HEALTH CLASSROOM 145 1 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

VC-2 HEALTH SIMULATION 144 1 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

VJ-1 CONFERENCE CENTER 118 2 GANG DEEP 16' - 8" FLUSH EC AV

VJ-2 CONFERENCE CENTER 118 2 GANG DEEP 16' - 8" FLUSH EC AV

WB-1 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-2 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-3 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-4 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-5 CONFERENCE CENTER 118 WB-X3NK-GNG 1' - 6" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-6 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-7 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-8 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

AV DISPLAY SCHEDULE

LABEL LOCATION MAKE MODEL MOUNT

MON-1 CULINARY CLASSROOM 124 VIEWSONIC CDE6520-W LTM1U

MON-2 CULINARY CLASSROOM 124 VIEWSONIC CDE6520-W LTM1U

AV LOUDSPEAKER SCHEDULE

LABEL LOCATION MAKE MODEL ROTATION PITCH AZIMUTH

SP-1 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-2 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-3 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-4 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-5 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-6 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-7 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-8 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-9 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-10 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-11 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-12 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-13 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-14 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-15 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-16 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-17 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-18 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-19 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-20 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-21 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-22 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-23 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-24 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-S1 QSC NL-C4-WH

SP-S2 QSC NL-C4-WH

AV PROJECTION SCREEN CALCS

LABEL LOCATION MAKE MODEL

ASPECT

RATIO

SCREEN

HEIGHT

SCREEN

WIDTH

SCR-1 CONFERENCE CENTER 118 DALITE 35195L 16x9 90" 160"

SCR-2 CONFERENCE CENTER 118 DALITE 35195L 16x9 90" 160"

AV PROJECTOR CALCS

LABEL LOCATION MAKE MODEL

ASPECT

RATIO LENS

IMAGE

HEIGHT

IMAGE

WIDTH

THROW

DISTANCE

PRJ-1 CONFERENCE CENTER 118 EPSON EB-PU2213B 16x9 ELPLM15 92" 164" 26' - 0"

PRJ-2 CONFERENCE CENTER 118 EPSON EB-PU2213B 16x9 ELPLM15 92" 164" 26' - 0"

MOBILE CART, VOICE LIFT SCHEDULE

MODEL LOCATION

MOBILE CART & VOICE LIFT ADULT LEARNING CLASSROOM 128

MOBILE CART & VOICE LIFT CULINARY CLASSROOM 124

MOBILE CART & VOICE LIFT CRIMINAL JUSTICE CLASSROOM 133

MOBILE CART & VOICE LIFT CERT TESTING CLASSROOM 137

VOICE LIFT DIGITAL MEDIA CLASSROOM 135

MOBILE CART & VOICE LIFT EDUCATIONAL CLASSROOM 142

MOBILE CART & VOICE LIFT TRANSITIONS CLASSROOM 143

MOBILE CART & VOICE LIFT HEALTH CLASSROOM 145

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PT

DISP

PT

DISP

PT

DISP

PT

DISP

PT

DISP

PT

DISP

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224

L E N

O V

O E

2 2

L O

G I T E C

H k

L E N

O V

O E

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224

L E N

O V

O E

2 2

L O

G I T E C

H k

L E N

O V

O E

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224

L E N

O V

O E

2 2

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

WB-8

WB-1

WB-4

WB-5

W B

-7

W B

-2

W B

-3

W B

-6

JB-1

TP-2

TP-1

TP-2

TP-1

M P

-1

CRIM JUSTICE

WORKOUT

DIGITAL MEDIA

DIGITAL MEDIA

CLASSROOM

CRIM JUSTICE

CLASSROOM

CERT TESTING

CLASSROOM

ADULT LEARNING

CLASSROOM

CORRIDOR

HEALTH

SIMULATION

TRANSITIONS

CLASSROOM

EDUCATIONAL

CLASSROOM

HEALTH

CLASSROOM

WOMEN

MEN

STORAGE

MECH

JC

STORAGE

CORRIDOR

PRODUCTION

ROOM

SOUND ROOM

VEST

STUDENT

COMMONS

MEN

WOMEN

CULINARY

CLASSROOM

PASSAGE

CULINARY LAB

TABLES / CHAIR

STORAGE

DRY STOR

CONFERENCE

CENTER

CORRIDOR

ADMIN

RECEPTION

COPY

STORAGE

STORAGE

UNISEX

EXTRA OFFICE /

CONF

COUNSELOR

CLOSET

CONF

SPEC POP

COORD

WORK BASE

LEARN COORD

EXTRA OFFICE /

CONF

CTE COORD

DIRECTOR

PASSAGE

TO JB-1 TO JB-1

TO JB-1 TO JB-1

1.0" EMT

1@C6

1.25" EMT

4@C6

1.25" EMT

4@C61.25" EMT

4@C6

1.25" EMT

4@C6

1.0" EMT

1@C6

1.25" EMT

4@C6

1.25" EMT

4@C6

1.0" EMT

1@C6

1.25" EMT

4@C6

TA301

TA301

AVR-1

1.0" EMT

1@C6

1.25" EMT

4@C6

V C

-1 V

C -2

TO JB-1

TO JB-1

1.0" EMT

1@CNT

1.0" EMT

1@C6

1.0" EMT

1@CNT

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA201

AV PLAN -

FIRST FLOOR

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

1/8" = 1'-0"

AV PLAN - FIRST FLOOR - FULL BUILDING

CABLE TYPES - AV

CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER

C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6

CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP

HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE

L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE

S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P

S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02

S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02

SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

AV GENERAL NOTES

# NOTES

1 (1) MOBILE CART SYSTEM AND/OR (1) VOICE LIFT SYSTEM TO BE PROVIDED FOR THIS SPACE. SEE SCHEMATICS FOR DETAILS

2 EC TO PROVIDE (1) DATA JACK AND (1) 20A/120V CIRCUIT NEAR PROJECTOR AT THIS LOCATION

3 EC TO PROVIDE (2) DATA JACKS AND (3) 20A/120V CIRCUITS NEAR AVR-1

4 AV TO INSTALL MARSHALL CV605-U3 PTZ CAMERA ABOVE INSTRUCTOR'S STATION AT THIS LOCATION. HDMI WIRING TO TRAVEL

TO CEILING-MOUNTED DISPLAYS NEARBY. COORDINATE EXACT LOCATION W/ OWNER'S REP

5 EC TO PROVIDE 4 SQ. BACKBOX IN CEILING AT THIS LOCATION FOR WIRELESS MIC RECEIVER. PROVIDE 1.0" EMT CONDUIT PATH FROM 4 SQ BOX TO JB-1. AV TO INSTALL SHURE MXWAPT4=-Z10 TO CEILING AT THIS LOCATION.

6 AV TO INSTALL C2G 14626 WALL MOUNT SHELF NEXT TO AVR-1 AT AN APPROPRIATE MOUNTING HEIGHT. INSTALL SHURE MXWNCS4 CHARGING STATION ATOP SHELF AND PROVIDE WIRE PATH FROM CHARGING STATIONS TO AVR-1

7 AV TO INSTALL WOLFVISION CYNAP CORE PRO AND VISIONARY TX TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM

LOCATION TO JB-1 AS NEEDED

8 AV TO INSTALL CLOCK AUDIO C303W-D-P-UDP TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM LOCATION TO JB-1 AS

NEEDED

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PT

DISP

PT

DISP

PT

DISP

PT

DISP

PT

DISP

VJ-1

VJ-2

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

PRJ-2

SCR-2

PRJ-1

SCR-1

TO JB-1

TO JB-1

1.0" EMT

1@C6

1.0" EMT

1@C6

1.0" EMT

1@CNT

1.0" EMT

1@CNT

MON-1 MON-2

SP-3

SP-2

SP-1

SP-15

SP-14

SP-13

SP-6

SP-5

SP-4

SP-18

SP-17

SP-16

SP-9

SP-8

SP-7

SP-21

SP-20

SP-19

SP-12

SP-11

SP-10

SP-24

SP-23

SP-22

5TO JB-1

1.0" EMT

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S161@S16

1@S16

1@S16

TO JB-1

1.0" EMT

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16 1@S16

1@S16

1@S16

TO JB-1

1.0" EMT

1@S16

TO JB-1

1.0" EMT

1@S16

1.0" EMT

1@C6

1.0" EMT

1@C6

TO JB-1

1.0" EMT

1@C6

TO JB-1

TO JB-1

TO JB-1

SP-S1

SP-S2

1.0" EMT

1@C6

1.0" EMT

1@C6

1@C6

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA211

AV RCP -

FIRST FLOOR

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

1/8" = 1'-0"

AV RCP - FIRST FLOOR - FULL BUILDING

CABLE TYPES - AV

CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER

C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6

CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP

HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE

L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE

S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P

S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02

S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02

SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

AV GENERAL NOTES

# NOTES

1 (1) MOBILE CART SYSTEM AND/OR (1) VOICE LIFT SYSTEM TO BE PROVIDED FOR THIS SPACE. SEE SCHEMATICS FOR DETAILS

2 EC TO PROVIDE (1) DATA JACK AND (1) 20A/120V CIRCUIT NEAR PROJECTOR AT THIS LOCATION

3 EC TO PROVIDE (2) DATA JACKS AND (3) 20A/120V CIRCUITS NEAR AVR-1

4 AV TO INSTALL MARSHALL CV605-U3 PTZ CAMERA ABOVE INSTRUCTOR'S STATION AT THIS LOCATION. HDMI WIRING TO TRAVEL

TO CEILING-MOUNTED DISPLAYS NEARBY. COORDINATE EXACT LOCATION W/ OWNER'S REP

5 EC TO PROVIDE 4 SQ. BACKBOX IN CEILING AT THIS LOCATION FOR WIRELESS MIC RECEIVER. PROVIDE 1.0" EMT CONDUIT PATH FROM 4 SQ BOX TO JB-1. AV TO INSTALL SHURE MXWAPT4=-Z10 TO CEILING AT THIS LOCATION.

6 AV TO INSTALL C2G 14626 WALL MOUNT SHELF NEXT TO AVR-1 AT AN APPROPRIATE MOUNTING HEIGHT. INSTALL SHURE MXWNCS4 CHARGING STATION ATOP SHELF AND PROVIDE WIRE PATH FROM CHARGING STATIONS TO AVR-1

7 AV TO INSTALL WOLFVISION CYNAP CORE PRO AND VISIONARY TX TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM

LOCATION TO JB-1 AS NEEDED

8 AV TO INSTALL CLOCK AUDIO C303W-D-P-UDP TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM LOCATION TO JB-1 AS

NEEDED

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PRJ-1

SCR-1

PRJ-2

SCR-2

VJ-2

WB-5

TP-2TP-1

WB-4

VJ-1

13' - 8"

VJ-1

PRJ-1

SCR-1

WB-3WB-2

MON-1 MON-2

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA301

AV

SECTIONS,

ELEVATIONS

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

1/4" = 1'-0"

EAST SECTION 2

1/8" = 1'-0"

NORTH SECTION

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PUSH

NEUTRIK

M

IC

/L

IN

E

IN

PUSH

NEUTRIK

M

IC

/L

IN

E

IN

A V

-1 A

V -2

AVR-1

DRAWER (UD2)2 RU MISC.

BLANK1 RU MISC.

A-01

(QSC CX-Q 8K4)

2 RU MAINS

BLANK1 RU MISC.

SW-2

(GSM4230PX)

1 RU AV NET

SW-1

(GSM4248PX)

1 RU AV NET

DSP-1

(QSC CORE NANO)

1 RU SHELF

DIGITAL SIGNAL

PROCESSOR

UPS-1

(UPX-2000R-2)

2 RU

2000VA POWER

BACKUP

BLANK2 RU MISC.

BLANK1 RU MISC.

GPIO-1

(QSC QIO-GP8x8)

1 RU SHELF POTS RX, FIRE ALARM

BLANK1 RU MISC.

WB-x (TYP. OF 8) FSR WB-X3-GNG-B

F U

T U

R E

TX-x (VISIONARY SOLUTIONS DUETE5-WP-WHITE)

IO-x (ATTEROTECH unD6IO)

AVR-1

DWR-16-22

16-SP WALL RACK

20A/120V

20A/120V x2

RACK NOTES:

1. INSTALL RACK RAILS AT APPROPRIATE DISTANCE FROM

BACK OF EQUIPMENT FOR LACER BARS.

2. ALL WIRING IN BACK OF RACKS SHOULD BE SECURED TO THE

LACER BARS.

3. WIRING TO AND FROM THE RACK SHALL BE RUN ON THE LEFT

HAND SIDE OF THE RACK AS YOU FACE THE REAR OF THE

RACK.

4. ALL POWER CONNECTIONS AND WIRING SHALL BE RUN ON

THE RIGHT HAND SIDE OF THE RACK AS YOU FACE THE REAR

OF THE RACK.

5. ALL WIRING SHALL BE CONTAINED IN PANDUIT FINGER TRAY

OR SIMILAR.

6. WIRING SHALL BE SEPARATED IN FINGER TRAY(S)

ACCORDING TO SIGNAL AND WIRE TYPE.

7. ALL WIRES TERMINATING IN THE EQUIMENT RACK MUST

HAVE A UNIQUE LABEL. SEE DRAWINGS FOR LABELING

DETAILS.

8. ALL EQUIPMENT SHALL HAVE A LABEL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .