This is an Intent to Award document issued by the State of Oregon on July 11, 2022, for contract S-73000-00003429/35335, awarding the work to Brown Contracting, Inc., based in Eugene, Oregon. The project encompasses ADA (Americans with Disabilities Act) curb ramp repairs and reconstruction across multiple Oregon state highways and routes, including I-205, I-5, I-84, OR-141, OR-213, OR-217, OR-224, OR-43, OR-8, OR-99W, US-26, US-30, and US-30BY. The scope of work involves 36 distinct repair objects at various milepost locations, with individual tasks ranging from grinding asphalt and concrete lips to reconstructing full turn spaces and curb/gutter systems. Each object typically includes traffic control services (ranging from 0 to 12 hours at $750 per hour) and repair work priced on a lump-sum basis. The contract was awarded with an Intent to Award date of July 11, 2022.
The total bid amount for Brown Contracting, Inc. is $260,500.00, covering all traffic control and repair work across the 36 project locations. Individual repair costs range from $1,500.00 to $20,000.00 per object, with traffic control hours and associated costs varying based on the complexity of each repair site. The document provides detailed line-item pricing for each object, including unit prices and total costs, establishing a transparent cost structure for the awarded contract. No information regarding contract term, renewal options, set-asides, or incumbent vendors is provided in this Intent to Award document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Intent to Award S-73000-00003429/35335 | |||||
| 7/11/22 | |||||
| Bidder name: | Brown Contracting, Inc. | ||||
| City, State: | Eugene, OR | ||||
| Item | Description | Est Qty | Unit | Unit Price | Total |
| Object ID. 446 I-205 MP 6.46 Corner 2 Ramp 1 - Reconstruct turn space | |||||
| 1 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 2 | Repair Corner | 1 | LS | $ 7,500.00 | $7,500.00 |
| Object ID. 212 I-5 MP 302.28 Corner 1A Ramp 1 - Grind lip at front of ramp | |||||
| 3 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 4 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 327 I-5 MP 7.37 Corner 3 Ramp 2 - Grind high spot along length of curb | |||||
| 5 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 6 | Repair Corner | 1 | LS | $ 2500.00 | $2,500.00 |
| Object ID. 297 I-84 MP 16.44 Corner 1A Ramp 2 - Grind AC | |||||
| 7 | Traffic Control Complete | 3 | HR | $ 750.00 | $2,250.00 |
| 8 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object 179 OR141 MP 12.63 Corner 1A Ramp 3 - Cut and patch AC roadway | |||||
| 9 | Traffic Control Complete | 6 | HR | $ 750.00 | $4,500.00 |
| 10 | Repair Corner | 1 | LS | $ 3500.00 | $3,500.00 |
| Object ID. 337 OR141 MP 6.33 Corner 1 Ramp 1 - Cut, remove, replace 6'x10' panel | |||||
| 11 | Traffic Control Complete | 8 | HR | $ 750.00 | $6,000.00 |
| 12 | Repair Corner | 1 | LS | $ 7000.00 | $7,000.00 |
| Object ID. 523 OR141 MP 5.24 Corner 7 Rmp 1 - Grind and fill signal pole foundation joint | |||||
| 13 | Traffic Control Complete | 0 | HR | $0.00 | |
| 14 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 70 OR213 MP 0.95 Corner 4 Ramp 1 - Grind concrete lip at front of domes | |||||
| 15 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 16 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 71 OR213 MP 3.79 Corner 3 Ramp 1 - Grind AC lip | |||||
| 17 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 18 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 72 OR213 MP 3.79 Corner 3 Ramp 2 - Grind AC lip | |||||
| 19 | Traffic Control Complete | 3 | HR | $ 750.00 | $2,250.00 |
| 20 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 73 OR213 MP 3.99 Corner 3 Ramp 1 - Grind concrete lip | |||||
| 21 | Traffic Control Complete | 3 | HR | $ 750.00 | $2,250.00 |
| 22 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 74 OR213 MP 6.5 Corner 1 Ramp 2 - Grind AC lip | |||||
| 23 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 24 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 75 OR213 MP 7.92 Corner 1 Ramp 1 - Grind AC lip front of ramp, conc. Curb lip and repair conc. | |||||
| 25 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 26 | Repair Corner | 1 | LS | $ 3000.00 | $3,000.00 |
| Object ID. 76 OR213 MP 7.92 Corner 2 Ramp 1 - Grind AC lip front of curb and conc. Lip at back of curb | |||||
| 27 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 28 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 77 OR213 MP 7.92 Corner 4 Ramp 2 - Replace curb in front of domes | |||||
| 29 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 30 | Repair Corner | 1 | LS | $ 3000.00 | $3,000.00 |
| Object ID. 152 OR213 MP 6.73 Corner 1 Ramp 1 - Grind AC lip and repair chipped concrete | |||||
| 31 | Traffic Control Complete | 3 | HR | $ 750.00 | $2,250.00 |
| 32 | Repair Corner | 1 | LS | $ 3000.00 | $3,000.00 |
| Object ID. 278 OR213 MP 3.3 Corner 4 Ramp 2 - Replace curb/gutter and patch AC | |||||
| 33 | Traffic Control Complete | 6 | HR | $ 750.00 | $4,500.00 |
| 34 | Repair Corner | 1 | LS | $ 8000.00 | $8,000.00 |
| Object ID. 219 OR217 MP 6.79 Corner 1A Ramp 1 - Grind AC counter slope | |||||
| 35 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 36 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 224 OR217 MP 6.79 Corner 1A Ramp 2 - Cut and patch AC to match curb elevation | |||||
| 37 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 38 | Repair Corner | 1 | LS | $ 5000.00 | $5,000.00 |
| Object ID. 80 OR224 MP 6.26 Corner 4A Ramp 1 - Grind AC lip | |||||
| 39 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 40 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 81 OR224 MP 6.26 Corner 4A Ramp 2 - Grind concrete lip | |||||
| 41 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 42 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 82 OR224 MP 6.26 Corner 4A Ramp 3 - Grind AC lip | |||||
| 43 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 44 | Repair Corner | 1 | LS | $ 1500.00 | $1,500.00 |
| Object ID. 144 OR43 MP 6.13 Corner 2A Ramp 1 - Replace curb and AC at gutter | |||||
| 45 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 46 | Repair Corner | 1 | LS | $ 12500.00 | $12,500.00 |
| Object ID. 145 OR43 MP 6.13 Corner 2A Ramp 2 - Cut and patch AC at gutter | |||||
| 47 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 48 | Repair Corner | 1 | LS | $ 5000.00 | $5,000.00 |
| Object ID. 58 OR8 MP 16.61 Corner 1 Ramp 1 - Grind concrete lip | |||||
| 49 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 50 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 149 OR8 MP 11.95 Corner 4 Ramp 1 - Grind AC and concrete lips | |||||
| 51 | Traffic Control Complete | 6 | HR | $ 750.00 | $4,500.00 |
| 52 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 293 OR8 MP 12.93 Corner 3 Ramp 2 - Patch AC and concrete in front of curb | |||||
| 53 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 54 | Repair Corner | 1 | LS | $ 3000.00 | $3,000.00 |
| Object ID. 380 OR99W MP 8.38 Corner 2 Ramp 1 -Grind Ped pole foundation widen turn space and panels | |||||
| 55 | Traffic Control Complete | 0 | HR | $0.00 | |
| 56 | Repair Corner | 1 | LS | $ 7000.00 | $7,000.00 |
| Object ID. 116 US26 MP 8.89 Corner 2 Ramp 1 - Grind AC lip | |||||
| 57 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 58 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 166 US26 MP 0.21 Corner 2A Ramp 1 - Grind AC lip and seal crack | |||||
| 59 | Traffic Control Complete | 4 | HR | $ 750.00 | $3,000.00 |
| 60 | Repair Corner | 1 | LS | $ 2500.00 | $2,500.00 |
| Object ID. 194 US30 MP 8.27 Corner 3 Ramp 2 - Reconstruct turn space and curb/gutter | |||||
| 61 | Traffic Control Complete | 12 | HR | $ 750.00 | $9,000.00 |
| 62 | Repair Corner | 1 | LS | $ 20000.00 | $20,000.00 |
| Object ID. 399 US30 MP 7.81 Corner 3 Ramp 1 - Reconstruct turn space and curb/gutter | |||||
| 63 | Traffic Control Complete | 12 | HR | $ 750.00 | $9,000.00 |
| 64 | Repair Corner | 1 | LS | $ 20000.00 | $20,000.00 |
| Object ID. 90 US30BY MP 1.42 Corner 1 Ramp 1 - Grind AC lip | |||||
| 65 | Traffic Control Complete | 3 | HR | $ 750.00 | $2,250.00 |
| 66 | Repair Corner | 1 | LS | $ 2500.00 | $2,500.00 |
| Object ID. 210 US30BY MP 1.6 Corner 4 Ramp 1 - Grind AC bump | |||||
| 67 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 68 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| Object ID. 211 US30BY MP 1.85 Corner 4 Ramp 1 - Reconstruct concrete curb/gutter | |||||
| 69 | Traffic Control Complete | 2 | HR | $ 750.00 | $1,500.00 |
| 70 | Repair Corner | 1 | LS | $ 15000.00 | $15,000.00 |
| Object ID. 92 US30BY MP 5.15 Corner 3A Ramp 1 - Grind AC lip | |||||
| 71 | Traffic Control Complete | 3 | HR | $ 750.00 | $2,250.00 |
| 72 | Repair Corner | 1 | LS | $ 2000.00 | $2,000.00 |
| BID TOTAL | $260,500.00 |