Intake Assembly CDRLs DD Form 1423.docx
DOCX document 18 KB Posted
- Solicitation number
- W56HZV-23-Q-0004
About this file
This solicitation requests offers for an intake assembly identified by National Stock Number 4710-01-537-0413. The required production quantity is 107 units with no option quantity. Offers are due by March 28, 2023 and must remain valid for 90 days. The Department of the Army Materiel Command TACOM Life Cycle Management Command is the contracting agency. Shipments of the intake assembly must meet military preservation, packing and marking requirements and be delivered free on board destination to an Army supply facility in Texarkana, Texas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGNED RFQ W56HZV23Q0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
DD FORM 1423 (MECHANIZED)
CATEGORY: MISC SYSTEM/ITEM: INTAKE ASSEMBLY, COLLECTER, SHIP
TO CONTRACT/PR: EH1C0867EH
NSN: 4710-01-537-0413
1. SEQUENCE NUMBER 14. DRFT/REG/REPRO
2. TITLE OF DATA ITEM DISTRIBUTION COPIES
3. SUBTITLE
4. DATA ITEM NUMBER
5. CONTRACT REFERENCE
6. TECHNICAL OFFICE 7. DD 250 8. APP CODE 9. DIST STATEMENT REQUIRED
10. FREQUENCY 11. AS OF DATE
12. DATE OF 1ST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
15. TOTAL 16. REMARKS
1. A001 14.
SEE ADDRESS CODE / /
2. ENGINEERING CHANGE PROPOSAL (ECP) DISTRIBUTION
ATTACHED**
3.
4. DI-SESS-80639
5. SECTION C
6. FCDD-CBE-M 7. LT 8. N/A 9. *
10. ASREQ 11. N/A 15. TOTAL 0 / 0 / 0
12. ASREQ 13. ASREQ
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
USARMY.RIA.DEVCOM-CBC.MBX.CMACTION@ARMY.MIL. ELECTRONIC FILES SHALL BE
LESS THAN 7MB. THE PREFERRED METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A002 14.
SEE ADDRESS CODE / /
2. REQUEST FOR VARIANCE (RFV) DISTRIBUTION
ATTACHED**
3.
4. DI-SESS-80640
5. SECTION C
6. FCDD-CBE-M 7. LT 8. N/A 9. *
10. ASREQ 11. N/A 15. TOTAL 0 / 0 / 0
12. ASREQ 13. ASREQ
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
USARMY.RIA.DEVCOM-CBC.MBX.CMACTION@ARMY.MIL. ELECTRONIC FILES SHALL BE
LESS THAN 7MB. THE PREFERRED METHOD IS THE DD FORM 1694 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A003 14.
SEE ADDRESS CODE / /
2. NOTICE OF REVISION (NOR) DISTRIBUTION
ATTACHED**
3.
4. DI-SESS-80642
5. SECTION C
6. FCDD-CBE-M 7. LT 8. N/A 9. *
10. ASREQ 11. N/A 15. TOTAL 0 / 0 / 0
12. ASREQ 13. ASREQ
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
USARMY.RIA.DEVCOM-CBC.MBX.CMACTION@ARMY.MIL. ELECTRONIC FILES SHALL BE
LESS THAN 7MB. THE PREFERRED METHOD IS THE DD FORM 1695 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A004 14.
QAR 0 / 1 / 0
2. CERTIFICATE OF COMPLIANCE PCO 0 / 1 / 0
(Blocks 1 thru 6 of Form 010) FCDD-CBE-SQI 0 / 1 / 0 3.
4. DI-MISC-81356A*
5. SECTION E
6. FCDD-CBE-SQI (RI) 7. LT 8. N/A 9. N/A
10. ASREQ 11. N/A 15. TOTAL 0 / 3 / 0
12. ASREQ 13. ASREQ
16. REMARKS
MODIFY DI-MISC-81356, 2.I TO READ: “A STATEMENT ON CONTRACTOR LETTERHEAD
CERTIFYING THAT ALL ITEMS FURNISHED ON THE CONTRACT ARE IN FULL COMPLIANCE
WITH THE TDP (INCLUDING REVISION OF THE DRAWING AND SPECIFICATION), ALL
SPECIFICATIONS AND CONTRACT REQUIREMENTS”. SUBMIT CERTIFICATE OF
CONFORMANCE PRIOR TO ANY DELIVERY. SUBMIT ELECTRONICALLY TO THE PCO.
DATE: 06 JUNE 2022
File details come from the government source that posted it. Updated .