This is a Statement of Work (SOW) template document for the State of Hawaii's State Laboratories Division (SLD) FY27 Duct Insulation project, issued under RFP SLD ADMIN 27-006. The SOW serves as Attachment 4 to the request for proposal and addresses HVAC ductwork insulation replacement and air leak sealing work. The document establishes the required format and structure that contractor proposals must follow, including five mandatory sections: Background, Objective, Scope of Work, Requirements, and Deliverables & Quality Control Required Key Performance Indicators. Contractors must present their proposed work effort in chronological order using numbered tasks (1, 2, 3, etc.) written in clear, understandable language that demonstrates mutual understanding between the contractor and the State regarding the desired effort and any applicable industry-specific standards.
The file does not contain specific information regarding pricing terms, contract duration, renewal options, set-asides, site visits, bidders' meetings, response deadlines, or funding sources. As a template document, it establishes the structural requirements and content expectations for contractor submissions rather than detailing the substantive terms, financial considerations, or administrative details of the procurement opportunity itself.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Insulation ATTACHMENT 4 RFP: SLD ADMIN 27-006
STATEMENT OF WORK
FOR
STATE LABORATORIES DIVISION FY27 Duct Insulation Work
It is anticipated that the proposed Statement of Work (SOW) will be incorporated as an attachment to the resultant award instrument. The SOW, without restrictive markings, is your company’s affirmation that the SOW is non-proprietary.
[At a minimum, the format and content of the Statement of Work should contain the following information. If options are included, separate sections should be included to address what work will occur in the base and each option period.]
I. BACKGROUND
[The Contractor explain details of the project]
II. OBJECTIVE
[The Contractor gives a clear objective statement]
III. SCOPE OF WORK
[This section should describe, in general terms, the work effort that will be performed by the Contractor.]
IV. REQUIREMENTS
[This section must describe each task(s) the Contractor shall perform using complete sentences.
The task(s) shall be arranged systematically and logically so that both parties (Contractor and State) understand the desired effort. All task(s) must be listed in chronological order. The task(s) must be explained in clear and understandable terms. Include any industry-specific standards that need to be adhered to in fulfilling the SOW.]
(NOTE: Numbering of tasks shall be as follows 1,2,3,4,5, etc.)
V. DELIVERABLES & QUALITY CONTROL REQUIRED KEY PERFORMANCE
INDICATORS
[Deliverable product(s) consist of, but are not limited to, monthly or quarterly progress reports, final reports, software, and hardware (contractor acquired property, government furnished property, prototypes). In this section all of the deliverable items should be defined.]
| STATEMENT OF WORK FOR |
| I. BACKGROUND |
| II. OBJECTIVE |
| III. SCOPE OF WORK |
| IV. REQUIREMENTS |
| V. DELIVERABLES & QUALITY CONTROL REQUIRED KEY PERFORMANCE INDICATORS |