INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION Improve Campus Grounds 673-22-120 -Nov 1 2022.pdf

PDF 340 KB Posted

Attached to
5660--FY23: NRM-Tier 1 (PROJ: 673-22-120) DB- IMPROVE JAHVH CAMPUS GROUNDS PHASE 1
Solicitation number
36C24823R0037
Issued by

About this file

This document provides instructions to offerors for a two-phase design-build solicitation for improving campus grounds at the James A. Haley VA Hospital. The solicitation is set aside for verified Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $2-5 million. Phase I proposals are due February 9, 2023 and will be evaluated based on technical approach, experience, and past performance. A maximum of five highly qualified offerors will be invited to submit Phase II proposals including schedules, design concepts, and pricing. Phase II proposals will be evaluated with all technical factors combined being equal to price. The awarded firm-fixed price contract is expected to have a ten month performance period beginning with notice to proceed.

View the file

Other files

File Type Posted
36C24823R0037 0001.docx DOCX document
36C24823R0037 0001.pdf PDF
SPEC 01 32 16. 16 CPM.docx DOCX document
SPEC 26 05 11 Electrical Installations Requirements.docx DOCX document
Price Matrix.xlsx XLSX spreadsheet
SPEC 28 05 00 Common Work Results for Electronic Safety _ Security.docx DOCX document
Davis Bacon Wage Rates 8 Sep 2022 fl208.txt TXT text file
SPEC 01 35 26 Safety Requirements.docx DOCX document
SPEC 01 57 19 Temporary Enviromental Controls.docx DOCX document
Tampa site map.pdf PDF
36C24823R0037_1.docx DOCX document
36C24823R0037_1.pdf PDF
673 22 120 Design Build SOW Nov 2022.pdf PDF
673 22 120 Perspective.pdf PDF
Past Performance Questionnaire.pdf PDF
SPEC 01 00 00 Gen Requirements Project 673-22-120.pdf PDF
EMR.pdf PDF
SPEC 01 74 19 Construction Waste Management.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION

I. GENERAL PROPOSAL INFORMATION

1. Solicitation, attachments, and any issued amendments will be posted at www.beta.sam.gov This is the only official location where these documents can be obtained and where updates are posted. No “hard copy” solicitation materials are available.

2. All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror”.

3. MAGNITUDE OF THIS PROJECT: Between $2,000,000 and $5,000,000.00

4. PROPOSAL DUE DATE:

5. SITE VISIT: Pre-proposal/Site Visit will be conducted during Phase Two this solicitation.

Those offerors selected to participate in Phase Two of the solicitation will receive information about Phase Two pre-proposal conference/Site Visit in the invitation to participate in Phase Two.

6. OFFER ACCEPTANCE PERIOD: Offers providing less than 120-calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

7. REQUESTS FOR INFORMATION: Requests for Information (RFIs) shall be submitted in writing (only) by the Prime Contractor (SDVOSB) to the Contracting Officer’s Representatives Engineer Roland Manio at roland.manio@va.gov and the CO Ken Caryer at Kenneth.Caryer@va.gov. No telephone RFIs/Questions will be accepted. The cutoff for submission of RFIs for PHASE ONE (if any) is: 12/13/2022 @ 4:00PM (EST). Responses will be provided in a Question & Answer format to all offerors via Standard Form (SF) 30 Amendment to the Solicitation. RFI received after due date will only be answered if in the judgement of the CO impacts the project/solicitation.

8. SPECIFICATIONS AND DRAWINGS: There will be no hard copy specifications and drawings provided for this solicitation. However, applicable specifications in the technical information library shall apply.

9. Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project Manager”, Contracting Officer Technical Representative, or their abbreviations are to be replaced with “Contracting Officer’s Representative (COR)”.

10. SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS VERIFICATION: This solicitation is 100% set asides for verified Service-Disabled Veteran-Owned Small Businesses (SDVOSB).

The award of this requirement shall not be delayed due to loss of SDVOSB verification.

Proposals submitted by non-verified SDVOSB shall be excluded from award consideration.

11. SDVOSB Verification: The Government will review VetBiz (https://www.vip.vetbiz.gov/) to confirm SDVOSB status verification for the submitted proposal. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of http://www.beta.sam.gov/ mailto:roland.manio@va.gov mailto:roland.manio@va.gov mailto:Kenneth.Caryer@va.gov.

https://www.vip.vetbiz.gov/

SDVOSB verification status will be performed for the apparent awardee.

12. LIMITATIONS ON SUBCONTRACTING (Reference Contract Clause FAR 52.219-14 for further information): By submission of an offer and execution of a contract, the Offeror agrees that in performance of the contract, the concern will perform at least fifteen (15) percent of the cost of the contract, not including the cost of materials, with its own employees. Signature certification on 852.219-77 VA NOTICE OF LIMITATIONS ON

SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION

(SEP 2021) (DEVIATION) is a requirement for contract award.

13. FUNDS: Funds are not presently available for this acquisition. The Government does not compensate offerors for proposals’ development. Award is subject to availability of funds, in accordance with FAR 52.232-18 Availability of Funds and VAAR 807-173.

14. BONDS: Performance Bonds (SF25) and Payment Bonds (SF25A) are required. Offeror must refer to SF1442 Block 12a for Payment and Performance Bond requirements. Reference Contract Clause FAR 52.228-15 for further information on applicability.

15. OFFER GUARANTEE (BID BOND) (SUBMIT WITH YOUR PHASE TWO PRICE PROPOSAL):

Offeror must refer to SF1442 Block 13B (Bid Bond) requirement. Per FAR Clause 52.228-1- Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less. NOTE: A scanned copy of the original is acceptable with the original sent by mail; only those contracts invited to Phase Two are required to submit bid bonds.

16. SAFETY AND ENVIRONMENTAL RECORD (SUBMIT WITH PHASE ONE PROPOSAL): Offerors shall submit information that specifies the contractor in question has no more than three serious, or one repeat, or one willful Occupational Safety and Health Administration (OSHA) or any Environmental Protection Agency (EPA) violation(s) in the past three (3) years and has an Experience Modification Rate (EMR) should not exceed 1.0. If no EMR, state the reason way no EMR is available. EMR greater than 1.0 will not be acceptable.

Offerors are required to complete and submit attached (Attachment 15 - Safety or Environmental Violations and Experience Modification Rate EMR Form) Past safety and environmental record or any other form that provided the above information. Offerors with an EMR greater than 1.0 will be considered ineligible and will not be evaluated.

17. VETS-4212, Federal Contractor Veterans’ Employment Report (SUBMIT WITH PHASE ONE PROPOSAL): Offerors are required to provide verification of their submission of the annual form VETS-4212 (https://www.dol.gov/agencies/vets/programs/vets4212). This verification shall be the emailed confirmation of receipt notification sent to the offeror after successful submission of their report.

https://www.dol.gov/agencies/vets/programs/vets4212

18. PERFORMANCE PERIOD: Refer to SF1442, Block 11, for performance period. Performance period shall be commenced upon receipt of written Notice to Proceed (NTP) performed in concurrent or sequential phases as indicated or required.

19. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E-

Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54).

II. PROPOSAL PREPARATION AND EVALUATION INFORMATION

PROPOSAL PREPARATION INSTRUCTION

1. PROPOSAL PREPARATION INSTRUCTION:

1.1. The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including attachments and any issued amendments.

1.2. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

1.3. For proposals to receive full consideration for award, offerors should ensure that the information furnished in support of the proposal is factual, accurate, and complete, and directly responds to the requirements of this solicitation.

1.4. These instructions prescribe the format for the proposal and describe the approach for the development of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.

2. PROPOSAL SUBMISSION:

2.1. All Phase One proposals shall be submitted by the Prime Contractor no later than (NLT) closing date and time specified in SF1442, Block 13.A. (subject to amendment) via email Kenneth.Caryer@va.gov. NO OTHER FORMS OF SUBMISSION WILL BE ACCEPTED.

2.2. Your proposal shall be submitted as portable data files (pdf), and documents submitted shall be no larger than 7 Mega Bytes (MB) in size. Send document in separate files as deem necessary. The offeror is responsible to verify that the Government has received the proposals.

2.3. Undeliverable emails due to an offeror’s proposal size, using wrong email address, or else, is not the responsibility of the Government.

mailto:Kenneth.Caryer@va.gov.

2.4. To be considered and accepted as timely the proposal must be received in its entirety prior to the deadline. Failure to provide a proposal in its entirety prior to the deadline will render the proposal noncompliant.

BASIS FOR AWARD

3. BASIS FOR AWARD: It is the Government’s intent to award one (1) firm-fixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the most advantageous to the Government, non-price, price and other factors considered.

4. The proposals must conform to the solicitation requirements and judged to represent the Best Value to the Government. The source selection process will utilize FAR Part 36.3 Two Phase Design- Build Selection Procedures and FAR 15 to evaluate proposals and award the contract.

4.1. All evaluation factors other than price, when combined, are approximately equal to cost or price.

As differences in factor ratings and relative advantages and disadvantages become less distinct, difference in price may become the discriminating factor in determining the most advantageous offer.

Conversely, as differences in price become less distinct, differences in ratings and relative advantages and disadvantages between offers are determinative.

4.2. Intent for No Discussions: Offerors are hereby advised that the Government intends to evaluate proposals and award a contract without conducting discussions with offerors. However, the Government reserves the right to contact Offerors and/or hold discussions if the Contracting Officer determines them to be necessary. Offerors are cautioned that discussions may not be conducted, and Offerors should not assume that they will have an opportunity to revise their proposals after submission.

SELECTION AND EVALUATION PROCEDURES

5. SELECTION AND EVALUATION PROCEDURES: This part describes the mechanism for evaluating and selecting offers for this two-phase design-build procurement.

5.1. This solicitation addresses both the Phase One and Phase Two proposal requirements.

5.2. The Phase One proposals will be evaluated to determine which offerors will be invited to submit Phase Two proposals. Do not submit Phase Two proposals unless specifically instructed by the Contracting Officer.

5.3. After evaluating Phase One proposals, the Government intends to select a maximum of five (5) of the most highly qualified offerors and those will be invited to submit a Phase Two proposals. However, the Government reserves the right to reject any and/all offers.

5.4. Do not submit pricing with the Phase One proposal. Phase One does NOT involve a pricing submission or evaluation of price.

5.5. In Phase Two, Offerors will compete to determine which Offeror will be awarded the Firm Fixed- Price contract. For Phase Two, Offerors must submit technical and price proposals. The Government reserves the right to reject any and/all offers in Phase Two.

PROPOSAL REQUIREMENTS AND FORMATTING (PHASE ONE AND PHASE TWO)

6. PROPOSAL REQUIREMENTS AND FORMATTING (PHASE ONE AND PHASE TWO):

6.1. Proposals shall be typewritten, with fonts no smaller than 10 points, with page layout no smaller than ½” top, bottom and ½” side margins, single space, paginated, portrait mode or letter size paper; except charts may be displayed in landscape mode.

6.2. Solicitation forms requiring to be completed shall be typewritten with fonts no smaller than 9 points.

6.3. No hyperlinks or electronic media will be allowed or considered.

6.4. Any conceptual drawings, renderings, product data sheets, one-line diagrams, etc. included in your proposal, shall be submitted as portable data files (pdf).

6.5. Strongly recommend formatting your technical proposal factor by factor, as listed in the solicitation.

Stick to the page limits.

6.6. Proposals which merely restate the requirement or state that the requirement will be met, without providing supporting rationale, are not sufficient and will not be considered an appropriate response. It is the offeror’s responsibility to insure the completeness of the proposal.

6.7. Offers that do not propose to perform all the work required by the solicitation will not be considered.

6.8. Proprietary Data: Each page of the offeror’s proposals must be reviewed and marked as to proprietary data content by the offeror in strict compliance with FAR 52.215-1. Also, see FAR 3.104-4. A single blanket statement at the front of the proposal is not acceptable. Failure to mark every page will subject the proposal to public release through Freedom of Information Act (FOIA) requests.

6.9. Proposals submitted in response to this solicitation shall be signed by the SDBVOSB 51% owner and dated.

PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS

7. PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s proposal:

PHASE ONE – 1st PACKAGE:

(a) Cover Page with: Phase One - Design Build Project, Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), DUNs number, Cage code, etc.)

(b) Table of Contents

(c) Signed SF 1442 by the SDVOSB, with Blocks 14-20C completed including acknowledgement of any Amendments issued for Phase One.

(d) Completed Experience Modification Rate (EMR) Form.

(e) Verification of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report.

(Refer to paragraph 17 above from the General Information Section)

(f) Copy of current VetBiz SDVOSB certification

PHASE ONE – 2nd (TECHNICAL PROPOSAL):

(a) Cover Page with: Phase One - Design Build Project, Solicitation Number, Project Title and Project Number, Company Information (Principle points of contact, email, address, phone

(c) Required Submittals for Factor 1 – Technical Approach (30 pages max. excluding signed letters of commitments, and copy of licenses)

(d) Required Submittals for Factor 2 – Experience (no page limit)

(e) Required Submittals for Factor 3 – Past Performance (no page limit)

8. PHASE TWO PROPOSAL PREPARATION AND SUBMISSION: Phase Two require submission of technical and price proposal, which shall be evaluated independently. Technical Proposal shall not include pricing data.

DO NOT SUBMIT PHASE TWO PROPOSALS UNLESS SPECIFICALLY INSTRUCTED BY THE

CO.

9. Technical factors consist of Factor 1 – Schedule and Factor 2 – Design Concept. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

The pricing proposal shall be a separate submission from that of the phase II technical proposal.

PHASE TWO – PRICE PROPOSAL PREPARATION INSTRUCTIONS

10. PHASE TWO – PRICE PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s separate price proposal:

PHASE TWO - PRICE PROPOSAL

(a) Cover Page with: Phase Two - Design Build Project, Solicitation Number, Project Title and

(c) Bid Bond-SF24 “scan copy in pdf format” legible and with visible stamps/seals

(d) Copy of current VetBiz SDVOSB certification

(e) Signed SF 1442, with Blocks 14-20C completed including acknowledgement of any Amendments (Phase One and Phase Two) issued.

(f) Completed Price Schedule (Total of Proposed Price of CLIN 0001).

(g) Price Proposal Breakdown to support price proposed.

11. The proposed prices will be analyzed for fairness and reasonableness. Include copy of the Pricing Schedule of the solicitation. Provide a detailed price breakdown for the purpose of evaluating price. The breakdown shall separately at a minimum but not limited to include the following cost elements: Labor (Direct & Indirect), Materials, Material Markups, Material Overhead, Equipment, Subcontractor Cost, Other Direct Costs, Overhead Expenses, Indirect Cost, General & Administrative (G&A) expenses, and Profit. While developing your price proposal please make sure to include all applicable taxes, and government stamps cost.

12. NOTE: Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with

VAAR 852.219-10.

13. PRICE EVALUATION: The Government will initially review pricing independently from the factor evaluation. Price is not rated but will be analyzed for fairness and reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination.

PHASE TWO – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS

14. PHASE TWO – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s technical proposal:

PHASE TWO – TECHNICAL PROPOSAL (Technical Proposal shall NOT include pricing data):

(a) Cover Page with: Phase Two - Design Build Project, Solicitation Number, Project Title and

(c) Required Submittals for Factor 1 – (50 pages max.)

(d) Required Submittals for Factor 2 – Design Concept (20 Pages Max, excluding Schematic)

(e) Required Submittals for Factor 3 – Schedule (no page limit)

NOTE: The Phase Two proposal should be submitted to the same email address as the Phase One proposal.

15. PHASE TWO EVALUATION AND SELECTION CRITERIA: Factors will be rated using an adjectival rating system. For evaluation purposes, each technical factor is equal in importance, and when combined are approximately equal to price.

III. EVALUATION FACTORS FOR AWARD

PHASE ONE EVALUATION FACTORS

The evaluation factors for PHASE ONE consist of Factor 1 - Technical Approach, Factor 2 – Experience and Factor 3 – Past Performance. Each factor shall have equal importance.

PHASE ONE - FACTOR 1: TECHNICAL APPROACH

1. The offeror must submit a proposed technical approach in conjunction with the task to performed in achieving the design build project. Cut and pasting or generally restating the statement of work will not be considered an appropriate response.

2. Briefly describe ability to obtain the necessary resources to perform this project.

3. Provide information that describes intended Design Build Team overall strategy for successfully completing the design-build contract per the detailed SOW and requirements herein.

4. Describe the Offeror’s understanding of the challenges, risk and technical approach with respect to design and construction of this project.

EVALUATION CRITERIA PHASE ONE, FACTOR 1 - TECHNICAL APPROACH: Based on the narrative provided, the Government will evaluate the Offeror’s technical qualifications and technical approach to this design build project and its capability to execute an awarded contract with cohesive and collaborative team effort. The Government will evaluate the strengths, weaknesses, and deficiencies, if any, in the technical qualifications and technical approach narrative and assign one combined technical and risk rating for this factor. All requirements in this factor shall be met by the closing date of Phase One submission.

PHASE ONE - FACTOR 2: EXPERIENCE

➢ Offeror shall demonstrate recent, relevant experience (using Specialized Experience Form), see attachment #3, that are similar in size, scope, and complexity to the project contemplated for this solicitation.

Offeror shall provide a total of three (3) design-build construction projects that best represent the Offeror’s work experience required on this project, completed within the past five (5) years from the issuance date of this solicitation, or that are currently ongoing and substantially complete (at least 50% construction progress completed) or completed and turned over no longer than five (5) years from the date of this solicitation that best represent the Offeror’s work experience required on this solicitation.

Definitions:

➢ Size – A hospital renovation / improvement project for the upgrading and repair of a VA campus exterior amenities with a contract value of $500K or greater. All submitted project experience must meet this requirement.

➢ Scope – A project in which contemplates the design to completion and shall be the basis for construction to completion of this project.

➢ Complexity – A project which required a level of activities (labor, subcontracting, equipment, materials, management, supervision, etc.) in design and construction efforts that are like the level of activities required for this solicitation’s project scope. The offeror’s submitted projects should demonstrate similarity in the interrelated work features required in executing multiple, concurrent design and construction activities. Similarities in features include, but are not limited to: architectural, structural, electrical, mechanical design and construction project elements.

➢ The information provided will be used to evaluate the relevancy and depth of each Offeror’s experience.

➢ Offeror are responsible for providing project descriptions in sufficient detail to permit evaluation of project relevancy to this procurement. The more relevant the experience, the more credit will be given.

➢ Offeror experience shall be submitted using Experience Information Sheet attached. Experience

Information Sheet must be filled out completely.

➢ In this context, “Offeror or Offeror’s” refers to the proposed prime contractor, and all proposed major subcontractor(s).

➢ If more than three (3) projects are submitted, only the first three (3) will be evaluated. If the project is older than five (5) years, it may be considered less relevant.

➢ Experience provided must be verifiable using the POC provided on Specialized Experience

Information Form. It is the offeror’s responsibility to ensure contact information listed on the experience form is accurate and current. The Government may contact point(s) of contact to verify project information on the Specialized Experience form.

EVALUATION CRITERIA PHASE ONE, FACTOR 2 – EXPERIENCE: The information provided will be used to evaluate the relevancy and depth of each Offeror’s specialized experience.

• The more recent and relevant experience, the more credit will be given.

• The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations.

• The Government may place greater importance on projects where the offeror and the proposed design firm had worked together, depending upon overall role and relevancy considerations.

• The Government may place greater importance on projects that were performed at an active VA hospital, depending upon overall role and relevancy considerations.

PHASE ONE - FACTOR 3: PAST PERFORMANCE

1. The offeror shall provide past performance information for each project submitted on Factor 2 – Experience. If available, copies of a completed Contractor Performance Assessment Reporting System (CPARS) for projects performed for the U.S. Government shall be provided. If the project provided has a CPARS, it must be used by the offeror to demonstrate past performance. If CPARS submission is used to validate past performance, it will be the most recent evaluation in the system (i.e. for projects submitted as completed, the final 100% completed CPARS will be provided). The Government reserves the right to check the Past Performance Information Retrieval System (PPIRS) to verify the accuracy of the CPARS submitted.

2. Past Performance will be evaluated based on information provided and any other past performance information obtained by the Government such as but are not limited to past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting system (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), and may contact customers other than those identified by the Offeror when evaluating past performance.

3. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror and the government is under no obligation to check other sources and/or may not contact all the identified POCs.

4. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

5. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact Kenneth.Caryer@va.gov offerors shall specify which PPQ if any will be submitted by client with a valid and accurate email and telephone number information.

6. Note: Subcontractor’s Consent – Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide, with proposal, a letter of consent from referenced subcontractors authorizing release of their past performance information for this requirement.

7. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance.

mailto:Kenneth.Caryer@va.gov

EVALUATION CRITERIA FACTOR 3 – PAST PERFORMANCE: The Government will perform a performance confidence assessment of the Offeror’s probability of successfully meeting the contract requirements, considering the degree of success of the D/B team’s recent (substantially completed or turned over no longer than seven (7) years from the date of this solicitation), relevant experience. The Government will assess the past performance on projects submitted under the Specialized Experience Factor and reserves the right to conduct telephone interviews with points of contact identified in the proposal and/or to review other recent projects rated in CPARS or other agency performance databases, review and/or contact Offeror-furnished references, or to review personal knowledge. The Government will first assess the relevancy of recent projects accomplished by the offeror to the scope of this contract and consider how well the Offeror performed on the contracts.

The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. The rating for this factor will be expressed as a degree of confidence in the Offeror’s ability to successfully accomplish the contract requirements.

PHASE ONE EVALUATION AND SELECTION CRITERIA: Factors will be rated using an adjectival rating system. For evaluation purposes, each technical factor is equal in importance.

- - - END OF EVALUATION FACTORS PHASE ONE - - -

PHASE TWO EVALUATION FACTORS

**DO NOT SUBMIT PHASE TWO PROPOSALS UNLESS SPECIFICALLY INSTRUCTED BY THE CO.**

PHASE TWO EVALUATION FACTORS: The evaluation factors for PHASE TWO consist of Factor 1 – Schedule and Factor 2 – Design Concept. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

PHASE TWO – FACTOR 1: SCHEDULE

(20 pages max.)

The offeror is required to submit a proposed progress schedule in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. The detailed schedule, will indicate specific tasks with dates for each step of the process including:

a. Design Period (112 Days): The design period sub periods (i.e., first and second reviews, other meetings, internal QUALITY ASSURANCE /QUALITY CONTROL plan reviews, etc.).

b. Construction Period (360 Days): Mobilization; Demolition method and sequencing; Excavation;

Structure Completion; Exterior finishing; Procurement and installation of equipment; Provisions for overtime or shift work; Timing of relocation of existing equipment; Site utilities, roadway realignment;

and temporary rerouted medical center vehicular and pedestrian routes, tests and final inspection and close out.

c. General Project Delivery Schedule and Narrative - Show relationships between construction document development/completion (including required review activities) and construction activities.

d. Submit a preliminary (CPM) Critical Path Method schedule for the design and construction in accordance with SECTION NO.: 01 32 16 16 -Project Schedules –Design Build. The schedule should show the critical paths of installation from beginning to end date. Schedule shall be structured in calendar days.

Furthermore, the Offeror shall specify how much allowance has been made for bad weather in the schedule, the days of the week and the hours of construction operations during each phase of the work, and the percentage of contract completion that will be achieved at the end of each month of the contract.

Part of the proposal shall include a preliminary CPM schedule, from design phase to construction phase completing the project on the given POP.

e. The Offeror will provide a written commitment as to the time frame (number of days after receipt of the notice to proceed) within which the Offeror will guarantee completion. The maximum anticipated completion of this project (including design and construction of the entire project) is indicated on the submitted schedule.

f. The project will start at the issuance of the Notice to Proceed. For scheduling purposes, assume the Notice to Proceed will be issued ten (10) calendar days after the award date. (Note that there is no guarantee the Notice to Proceed will be issued within this timeframe.)

EVALUATION CRITERIA PHASE TWO, FACTOR 1 –Schedule: The Government will evaluate the strengths, weaknesses and any deficiencies, if any in the schedule submission to successfully execute the project and assign one combined technical and risk rating for this factor. All requirements for this factor shall be met by the closing date of Phase Two submission.

PHASE TWO - FACTOR 2: DESIGN CONCEPTS

(20 pages max. excluding schematic)

1. Offeror shall submit a narrative description of how they intend to approach the scope of work to successfully complete design-build services for this project in accordance with solicitation requirements.

2. Provide at least one (1) 24 x 36 schematic illustrating your proposed layout but not a detailed design.

3. The narrative will also detail how the contractor intends to execute the design-build SOW, meeting all technical requirements, safety and otherwise and done within time limits. The description shall include in detail approach to construction safety and infection control.

4. Explain how project will be accomplished to ensure minimal interruptions with daily hospital operations and patient care.

5. Demonstrate techniques for management of work coordination with subcontractors and measures/corrective action that will be taken for substandard performance.

EVALUATION CRITERIA PHASE TWO FACTOR 2 – DESIGN CONCEPTS AND TECHNICAL SOLUTIONS:

Based on the narrative provided, the Government will evaluate the Offeror’s design concepts and technical solution to this design build project. The Government will evaluate the strengths, weaknesses, and deficiencies, if any, and assign one combined technical and risk rating for this factor. All requirements in this factor shall be met by the closing date of Phase Two submission.

PHASE 2 EVALUATION AND SELECTION CRITERIA: Factors will be rated using an adjectival rating system. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

File details come from the government source that posted it. Updated .