- Solicitation number
- IFB 680 26-046/ZG 4
- Issued by
- Palm Beach County, Florida
About this file
This document comprises instructions for completing Subcontractor/Subconsultant Schedules 1-4, issued by Palm Beach County, Florida, pursuant to Emergency Ordinance 2025-014 (effective June 3, 2025), for use in responding to solicitations and submitting payment requests for a Grounds Maintenance for Fire Rescue Locations term contract. Prime contractors and consultants must submit Schedule 1 with their bid or proposal, fully completing Section A regardless of Small Business Enterprise (SBE) certification status, including company information and the dollar amount or percentage of work the prime will perform. Schedule 1 must also identify all subcontractors and subconsultants, designating their SBE or Non-SBE status, and calculating the total SBE work percentage. Schedule 2 must be submitted with the bid or proposal for each subcontractor or subconsultant listed on Schedule 1, detailing the specific work to be performed or materials supplied with corresponding dollar amounts or work percentages and line item numbers. Following contract award, the prime contractor must submit Schedule 3 with each payment request, listing subcontractors' names, contracted amounts, approved change orders, revised contract amounts, amounts drawn during the pay period and to date, amounts paid to date, and subcontractor start dates.
Schedule 3(a) applies exclusively to professional services contracts and requires the prime to document the percentage of work performed with its own workforce, amounts paid to date, and each sub-consultant's name, contract amount, work start date, amount paid to date, and percentage of work completed. Schedule 4, provided as a fillable PDF by the user department with pre-filled department number, project number, and prime contractor vendor code, requires the prime to enter subcontractor or sub-consultant names, payment amounts, work order numbers, payment dates, and vendor codes. The prime must obtain the subcontractor's or sub-consultant's signature and notarization on Schedule 4, either in print or via digital signature, confirming payment accuracy and whether any portion of the payment will be disbursed to second or third-tier subcontractors or sub-consultants. The original completed Schedule 4 must be submitted to Palm Beach County with the prime's payment request documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.: 6.17.2025, pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025
INSTRUCTIONS ON COMPLETING
SUBCONTRACTOR/SUBCONSULTANT SCHEDULES 1 – 4*
Respondents must complete and correctly execute the required OEBO Schedules when responding to a solicitation and submitting payment requests after contract award. As long as there is a required API goal, Schedules 1 and 2 must be submitted with all bids or proposals from subcontractors and subconsultants in order to be considered responsive to the solicitation. Following award of the contract, Schedules 3, 3(a), and 4 must be sent along with requests for payment or invoices.
Important Points to Remember
A. Schedule 1 must be completed by the Prime Contractor and submitted with their bid or proposal.
1. All Prime Contractors/Consultants must fully complete Section "A" of this form, regardless of their certification status (Small Business Enterprise (SBE) or Non-SBE).Include the company name, address, contact person, and information, as well as the dollar amount or percentage of work that the prime is responsible for completing.
2. Section “B” of this form must list all Subcontractor(s)/Subconsultant(s) to be utilized on this project. Please check the appropriate box if the Subcontractor(s)/subconsultant(s) is certified as a PBC-OEBO SBE, or if they are Non-SBE.
3. At the very bottom of the Schedule, write down the total bid amount or percentage of work that will be completed by SBE.
4. The Prime or authorized individual must print, sign and date the form.
B. Schedule 2 must be properly executed and submitted with the bid/proposal for all subcontractors/subconsultants listed on Schedule 1.
1. Specify in detail the work to be performed or material supplied, along with the dollar amount or percentage of work for each item and corresponding line item number(s), when available.
2. If there is a portion of the work that will not be performed by the subcontractor/subconsultant, a separate, properly executed Schedule 2 must be submitted for all 2nd and 3rd tier Subcontractors/subconsultants. The original subcontractor/subconsultant must indicate that information in the “red box” located in the middle of the form.
3. All subcontractors/subconsultants must print, sign, and date the form.
C. Schedule 3 is completed by the Prime and submitted with each payment request made to Palm Beach County.
1. In the subcontracting Information section, list the Name(s) of each subcontractor on the project and the total contracted amount for each subcontractor.
2. As the project proceeds, complete each column under the subcontracting Information section accordingly to show, approved change orders, revised contract amounts, amounts drawn this pay period, amounts drawn to date, amounts paid to date and the starting date of the subcontractors.
3. In the Subcontractor Category section, check the appropriate category the represents the type of certification each subcontractor has with Palm Beach County.
4. The Schedule 3 must be signed by the Prime’s designated individual and must include the person's title.
D. Schedule 3(a) is used for professional services contracts only. This Schedule is completed by the Prime and submitted with each payment request made to Palm Beach County.
1. The Prime must complete all of the necessary information, which includes the project name, CSA name and number, contract amounts (original and amended, if applicable), and the Pay Application number.
Rev.: 6.17.2025, pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025
2. The Prime must indicate the percentage of work performed with their own workforce and the amount paid to date.
3. In the “Sub-Consultants” section of the Schedule, the Prime must list the firms’ name and their contract amount. The date when that sub begins their work, the amount paid to date, when applicable, and the percentage of work they have completed by the date of the payment request.
4. The Schedule 3(a) must be signed by the Prime’s designated individual and must include the person's title.
E. Schedule 4 is supplied in a fillable PDF form that allows the Prime to enter the requested information, which is then submitted by the Prime to reflect actual payments made to each subcontractor/subconsultant.
1. The Prime is not to request signature from a Subcontractor/subconsultant unless it has made payment to the Subcontractor/subconsultant.
2. A separate Schedule 4 is required for each Subcontractor/sub consultant.
3. A separate Schedule 4 is required for each contract and payment request in which a disbursement has been made to a subcontractor or sub consultant.
4. A fillable pdf Schedule 4 will be emailed to the prime contractor by the user department. The user department will pre-fill the spaces on the form that pertain to the Department number, project number, and Prime contractor’s vendor code.
5. The Prime will type in the Subcontractor/sub consultant name, payment amount, work order number, if applicable, payment date, and Subcontractor/sub consultant vendor code in the fillable form fields.
Subcontractor/sub consultant vendor codes can be found through the OEBO website at Error!
Hyperlink reference not valid..
6. The Prime will either print the form for the Subcontractor/subconsultant to sign and have notarized, or send the form electronically for digital signature and notarization, if possible, verifying that the information is correct. The Subcontractor/subconsultant must provide information as to whether a portion of the payment received will be disbursed to another Subcontractors/sub consultant. If the Subcontractor/subconsultants indicates that a portion of their payment will be disbursed to 2nd or 3rd tier sub, a separate Schedule 2 must be submitted for the Subcontractor/sub consultant listed.
7. The original completed Schedule 4 is submitted to Palm Beach County with the Prime's payment request documents.
http://www.pbcgov.com/osba/vendordirectory.htm http://www.pbcgov.com/osba/vendordirectory.htm
| INSTRUCTIONS ON COMPLETING |