Instructions to Bidders.pdf

PDF 203 KB Posted

Attached to
Demolition Buildings Foundations and Utilities Bundle Phase III-Demolition of AD Williams Elementary
Solicitation number
PE-76110-NONST-2026-000000100
Issued by
Fulton County, Georgia

About this file

This Instructions to Bidders document pertains to Phase III demolition services for A.D. Williams Elementary School, administered by the Atlanta Independent School System with Sovereign Cooper, Inc. serving as Construction Manager and SSOE, Inc. as Architect. The project encompasses the complete demolition of existing A.D. Williams Elementary School buildings, foundations, and utilities located at 1065 Wilkes Circle North, Atlanta, Georgia 30318. Three separate bid packages are available: Package 02-08 for Erosion & Sediment Control, Package 02-09 for Demolition, and Package 02-10 for Electrical work. Bidders must submit electronic bids to bids@sovereigncooper.com by Friday, August 15, 2025, at 3:00 PM. All required bid documents, plans, sample subcontracts, bid packages, scopes of work, and issued addenda are available via a provided Dropbox link. Prospective bidders are required to confirm their intent to bid and specify their designated scope package prior to submission.

No specific pricing terms, set-asides, incumbent information, funding amounts, or other financial details are outlined in this Instructions to Bidders document. The document directs all questions and bid submissions to the Construction Manager's email address and does not reference site visits, bidders' conferences, award dates, or contract term information within its scope.

View the file

Other files

File Type Posted
Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS TO BIDDERS

Demolition Buildings Foundations and Utilities Bundle Phase III – Demolition of A.D.

Williams Elementary School

Project Name & Location: Demolition Foundation and Utilities Bundle – A.D. Williams Elementary School

1065 Wilkes Cir N, Atlanta, GA 30318

Construction Manager: Sovereign Cooper, Inc.

304 Tribble Gap Rd.

Cumming, GA 30040

Owner: Atlanta Independent School

System 1631 LaFrance

Street NE, Atlanta, GA

30307

Architect: SSOE, Inc.

100 Peachtree Street, NW

Suite 2500

Alpharetta, GA 30303

Bid Time & Date: Bids are to be submitted electronically @ bids@sovereigncooper.com Friday August 15, 2025 UNTIL 3:00 PM.

DESCRIPTION OF PROJECT:

Phase 3 – demolish existing A.D. Williams ES buildings, including foundations and utilities (at 1065 Wilkes Circle).

mailto:bids@sovereigncooper.com

Bid Documents

▪ Plans

▪ Sample Subcontract

▪ Bid package & scope of work

▪ All addendum & clarifications issued prior to bid opening

BID PACKAGES

The following Bid Packages are available for bidding:

Package # Work Description

02-08 A.D. Williams Erosion & Sediment Control

02-09 A.D. Willams Demolition

02-10 A.D. Williams Electrical

Bid Documents can be found at the link below.

Link:

https://www.dropbox.com/scl/fo/0urmv93whk46tcxfvccca/AChV8baJmReL5BH6YRhrask?rlkey=bg2dp3ytx9x k3pxvy1wfl8ptz&st=apqq9xn7&dl=0.

PLEASE REPLY BACK TO bids@sovereigncooper.com. AND CONFIRM YOUR DESIRE TO BID ON THIS PROJECT AND

FOR THE SCOPE PACKAGE FOR YOUR SPECIFIC SCOPE OF WORK

Bids and Questions regarding this project should be sent via e-mail to bids@sovereignccooper.com.

https://www.dropbox.com/scl/fo/0urmv93whk46tcxfvccca/AChV8baJmReL5BH6YRhrask?rlkey=bg2dp3ytx9xk3pxvy1wfl8ptz&st=apqq9xn7&dl=0 https://www.dropbox.com/scl/fo/0urmv93whk46tcxfvccca/AChV8baJmReL5BH6YRhrask?rlkey=bg2dp3ytx9xk3pxvy1wfl8ptz&st=apqq9xn7&dl=0 mailto:bids@sovereigncooper.com.

mailto:bids@sovereignccooper.com

File details come from the government source that posted it. Updated .