This document contains inquiries and responses for Contract No. FODPTT26SB, a commercial painting, wall preparation, and wallpaper removal project for the Office of Traffic Building #1 in Maryland. The project encompasses work in a training room (approximately 10 feet ceiling height) and two identical offices (approximately 8 feet ceiling height each). The scope includes surface preparation, coating application, wallpaper removal and debris disposal, and bulkhead painting in the training room. All square footage measurements provided are approximate, and contractors are responsible for verifying actual measurements on-site. Ceilings are excluded from the painting scope except for bulkheads in the training room. The contract specifies a 60-day completion timeframe, with all work expected to be completed free from defects and corrected at no cost to the administration if issues arise.
The bid pricing includes a dedicated line item for all coatings and materials; the state will not furnish paint or primers. Contractors must assume responsibility for all surface preparation beyond the scope notes, including potential skim coating, joint compound application, and adhesive remediation as detailed in the "Prep Walls" section of the Invitation for Bid (IFB). All work must comply with Maryland's environmental painting regulations and utilize industry best standards for environmentally preferable products. Mobilization, supervision, protection, and cleanup costs must be incorporated into the fixed bid amount. The contract manager will handle furniture covering and relocation, coordinate work scheduling with the contractor, and manage facility access. Post dates for inquiries and responses were March 1, 2026, with inquiry dates ranging from February 26 to February 27, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INQUIRIES AND RESPONSES FOR
CONTRACT NO. FODPTT26SB
Inq. 04 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Are the provided square footage measurements inclusive of all wall surfaces, soffits, bulkheads, window returns, door frames, or any additional architectural features that may require surface preparation and coating?
A. Yes, all measurements given are approximate for the worksite. It is the contractor’s responsibility to confirm the measurements for all areas.
Inq. 05 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Are ceilings, trims, or any additional structural surfaces expected to be included within the painting scope?
A. Ceilings are excluded. Bulkheads in the OOTS training room are included.
Inq. 06 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. What is the anticipated condition of the substrate behind the existing wallpaper? Should bidders assume the potential need for skim coating, joint compound build-up, adhesive remediation, or substrate repair beyond minor crack and hole filling?
A. This is noted in sections “Prep Walls” on page 5 of 16 of the IFB.
Inq. 07 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Will the State be furnishing primer and finish paint materials, or should bidders include all coatings and materials within their bid pricing?
A. Noted on the Bid Price Form is a line item for materials which allocates (do not alter) funds for all coatings and materials.
Inq. 08 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Are there any environmentally preferable product (EPP) requirements or specific coating systems preferred for this project?
A. Ensure compliance with Maryland's environmental painting regulations by utilizing the industry's best standards.
Inq. 09 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Will contractors be responsible for the removal and disposal of wallpaper debris and other jobsite waste?
A. Yes
Inq. 10 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Is there any furniture, equipment, or obstruction within the work areas that will require protection or relocation by the contractor?
A. The contract manager will handle covering and moving all the furniture.
Inq. 11 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Are there any work hour restrictions, facility access limitations, security requirements, or escort procedures that may impact the contractor’s scheduling or labor productivity?
A. The contractor will collaborate with the contract manager to set the schedule for the work.
Inq. 12 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Is there a required project phasing sequence for the Training Room, Office 1, and Office 2 areas?
A. The contract manager will close the training room to give the contractor the time needed to work.
Inq. 13 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Does the State anticipate any liquidated damages or performance penalties for delays beyond the 60-day contract duration?
A. The contractor shall complete all work within the specified timeframe and ensure that all work is free from defects in workmanship. Furthermore, the contractor shall correct any issues at no cost to the administration.
Inq. 14 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Can the State confirm whether any additional surface preparation beyond minor patching (such as full skim coating or sanding of adhesive residue) is expected to be included within the base scope of work?
A. This is noted in section “Prep Walls” on page 5 of 16 of the IFB
Inq. 15 Post Date: 03/01/2026 Inquiry Date: 2/26/2026
Q. Are bidders expected to include mobilization, supervision, protection, and cleanup costs within the fixed bid amount?
A. These costs are generally regarded as part of the overall scope of work and should be included to guarantee a successful and completed project.
Inq. 16 Post Date:03/01/2026 Inquiry Date: 2/27/2026
Q. Additionally, could you please share the ceiling heights and any available photos of both rooms? That information would help us ensure our pricing is accurate and aligned with the scope.
A. Please see below the response.
Approximately 10' floor to ceiling in training room. Below is a visual representation of the training room.
Both offices have a ceiling height of approximately 8 feet. Below is a visual representation of one of the offices. The two offices are identical.
Note: All measurements provided are approximate for the worksite. The contractor is responsible for verifying measurements in all areas