_Initiator Chamber and Cap SOW(1).doc
DOC document 103 KB Posted
- Attached to
- M28 Parts Federal contract opportunity
- Solicitation number
- N0017424Q0012
About this file
This performance work statement outlines requirements for the manufacturing of hardware components using Naval Surface Warfare Center Indian Head Division drawings. Key details include:
-
The contractor shall fabricate, inspect, test, and deliver initiator chambers, caps, and related components per applicable drawings and specifications. Requirements include first article testing, dimensional inspection, material certification, quality control processes, and export compliance.
-
Components will be delivered to Naval Surface Warfare Center Indian Head Division and include 20 initiator chambers and other quantities indicated for 2015 delivery. First article samples are required before production for several part numbers.
-
The contractor must maintain quality standards per ISO 9001 and ISO/IEC 17025 and submit inspection test plans and certifications of compliance, analysis, and dimensional inspection reports per the listed CDRLs. Final acceptance will be determined by government inspection and certification verification at destination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ N0017424Q0012 - M28 Parts.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURING OF Hardware USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).
2.0 Applicable Documents
M28 - CDRL_A001_Inspection
M28 - CDRL_A002_CoA
M28 - CDRL_A003_CoC
M28 – CDRL_A004_Inspection Plan
10520407 REV G – Chamber, Initiator 10520407 REV G Form 16
10520407 Form 43
10520408 REV F – Cap, Initiator
10520408 REV F Form 16
10520408 Form 43
10520473 REV E – Cap, Initiator
10520473 REV E Form 16
10520473 Form 43
10520552 REV G – Cap, Initiator
10520552 REV G Form 16
10520552 Form 43
10520557 REV F – Cap, Initiator
10520557 REV F Form 16 10520557 Form 43
SAE AMS-S-6758 REV B
SAE AMS-F-7190 REV B
SAE AMS-QQ-P-614 REV F
SAE AMS6327 REV L
SAE AMS6349 REV E
SAE AMS6382 REV R
SAE AMS6415 REV V
SAE AMS6484 REV F
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:
| ANSI/ASQ Z1.4 |
| Sampling Procedures and Tables for Inspection by Attributes |
Code of Federal Regulations (CFR):
| 22 CFR 121 |
| The United States Munitions List |
| 22 CFR 122 |
| Registration of Manufacturers and Exporters |
Department of Defense (DoD) Directives:
| 5230.25 |
| Withholding of Unclassified Technical Data From Public Disclosure |
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
| ISO 9001 |
| Quality Management Systems |
| ISO/IEC 17025 |
| General Requirements for the Competence of Testing and Calibration Laboratories |
2.2 Technical Drawings
Department of Defense Drawings:
10520407 REV G – Chamber, Initiator
10520408 REV F – Cap, Initiator
10520473 REV E – Cap, Initiator
10520552 REV G – Cap, Initiator
10520557 REV F – Cap, Initiator
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.
3.2 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.
3.2.1 First Article Testing
The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.
The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A004 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample, as listed in Table 4, completed units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.
Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor’s cost risk.
3.2.2 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.
3.2.3 Product Certification
The Contractor shall submit a certificate of compliance in accordance with DI-MISC-81356 per CDRL A002 to accompany the shipment of each first article and/or production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-82386 per CDRL A003, showing the first article and/or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”
| Test |
| Requirement |
| Certificate |
| Dwg |
| Location |
| Material |
| 10520407 REV G – Chamber, Initiator |
| IAW DWG Note #2 (M101). |
| Analysis |
| Hardness |
| 10520407 REV G – Chamber, Initiator |
| IAW DWG Note #2 (M101). |
| Analysis |
| Hydrostatic |
| 10520407 REV G – Chamber, Initiator |
| IAW MIL-I-60518A, Section 3.4. (100% testing required.) |
| Analysis |
| Heat Treat |
| 10520407 REV G – Chamber, Initiator |
| IAW DWG Note #2 (M101). |
| Compliance |
| Plating |
| 10520407 REV G – Chamber, Initiator |
| IAW DWG Note #4 (M102). |
| Compliance |
| Dimensional |
| 10520407 REV G – Chamber, Initiator |
| IAW DWG Note #6. |
| Compliance |
| Material |
| 10520408 REV F – Cap, Initiator |
| IAW DWG Note #2 (M101). |
| Analysis |
| Hardness |
| 10520408 REV F – Cap, Initiator |
| IAW DWG Note #7. |
| Analysis |
| Hydrostatic |
| 10520408 REV F – Cap, Initiator |
| IAW MIL-I-60518A, Section 3.4. (100% testing required.) |
| Analysis |
| Heat Treat |
| 10520408 REV F – Cap, Initiator |
| IAW DWG Note #7. |
| Compliance |
| Plating |
| 10520408 REV F – Cap, Initiator |
| IAW DWG Note #4 (M102). |
| Compliance |
| Material |
| 10520473 REV E – Cap Initiator |
| IAW DWG Note #2 (M101). |
| Analysis |
| Hardness |
| 10520473 REV E – Cap Initiator |
| IAW DWG Note #5. |
| Analysis |
| Plating |
| 10520473 REV E – Cap Initiator |
| IAW DWG Note #4 (M102) |
| Compliance |
| Hydrostatic |
| 10520473 REV E – Cap Initiator |
| IAW MIL-I-60518A, Section 3.4. (100% testing required.) |
| Analysis |
| Material |
| 10520552 REV G – Cap, Initiator |
| IAW DWG Note #2 (M101). |
| Analysis |
| Hardness |
| 10520552 REV G – Cap, Initiator |
| IAW DWG Note #5. |
| Analysis |
| Hydrostatic |
| 10520552 REV G – Cap, Initiator |
| IAW MIL-I-60518A, Section 3.4. (100% testing required.) |
| Analysis |
| Heat Treat |
| 10520552 REV G – Cap, Initiator |
| IAW DWG Note #5. |
| Compliance |
| Plating |
| 10520552 REV G – Cap, Initiator |
| IAW DWG Note #4 (M102). |
| Compliance |
| Material |
| 10520557 REV F – Cap, Initiator |
| IAW DWG Note #2 (M133). |
| Analysis |
| Hardness |
| 10520557 REV F – Cap, Initiator |
| IAW DWG Note #7. |
| Analysis |
| Hydrostatic |
| 10520557 REV F – Cap, Initiator |
| IAW MIL-I-60518A, Section 3.4. (100% testing required.) |
| Analysis |
| Heat Treat |
| 10520557 REV F – Cap, Initiator |
| IAW DWG Note #7. |
| Compliance |
| Plating |
| 10520557 REV F – Cap, Initiator |
| IAW DWG Note #4 (M134). |
| Compliance |
| Visual |
| 10520557 REV F – Cap, Initiator |
| IAW DWG Note #5. |
| Compliance |
Table 1: Certification Requirements
3.3 Quality Control
3.3.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.3.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.
3.3.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:
| Critical: |
| 100% |
| Major: |
| Level II |
| Minor: |
| Level I |
Table 2: ACSI Sampling Plan
3.3.4 Government-Identified Nonconformity Reporting Procedures
The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.4 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.4.1 International Trafficking in Arms Regulations (ITAR) Compliance
The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.4.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
3.5 Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.
| CDRL |
| Spec |
| Section |
| Title |
| A001 |
| DI-NDTI-80809 |
| 3.2.2 |
| Final Dimensional Inspection Report |
| A002 |
| DI-MISC-81356 |
| 3.2.3 |
| Certificate of Compliance |
| A003 |
| DI-MISC-82386 |
| 3.2.3 |
| Certificate of Analysis |
| A004 |
| DI-QCIC-81110 |
| 3.2.1 |
| Inspection Test Plan |
Table 3: CDRL Descriptions
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
| Item |
| Year |
| Drawing |
| Rev |
| Nomenclature |
| Qty |
| UOI |
| 1 |
| Base |
| 10520407 |
| G |
| Chamber, Initiator (FAT) |
| 20 |
| EA |
| 2 |
| Base |
| 10520407 |
| G |
| Chamber, Initiator |
| 2015 |
| EA |
| 3 |
| Base |
| 10520408 |
| F |
| Cap, Initiator (FAT) |
| 5 |
| EA |
| 4 |
| Base |
| 10520408 |
| F |
| Cap, Initiator |
| 545 |
| EA |
| 5 |
| Base |
| 10520473 |
| E |
| Cap, Initiator (FAT) |
| 5 |
| EA |
| 6 |
| Base |
| 10520473 |
| E |
| Cap, Initiator |
| 980 |
| EA |
| 7 |
| Base |
| 10520552 |
| G |
| Cap, Initiator (FAT) |
| 5 |
| EA |
| 8 |
| Base |
| 10520522 |
| G |
| Cap, Initiator |
| 370 |
| EA |
| 9 |
| Base |
| 10520557 |
| F |
| Cap, Initiator (FAT) |
| 5 |
| EA |
| 10 |
| Base |
| 10520557 |
| F |
| Cap, Initiator |
| 120 |
| EA |
Table 4: Part Quantities Delivery address provided below:
Naval Surface Warfare Center Indian Head Division ATTN: Sarah Ickes/ Kim Gore 4522 McMahon Road
Bldg. 116, Suite 100 Indian Head, MD 20640