Ingham ISD - Beekman Center - Bid Pack 1 - Mass Timber Design Assist Supply V.1.pdf
PDF 14 MB Posted
- Attached to
- Ingham ISD - Mass Timber Design Assist & Supply
- Solicitation number
- RFP IIS 270000000337 2
- Issued by
- Grand Traverse County, Lansing City, Michigan
About this file
This is a Construction Manager's Project Manual and Bid Pack for Ingham Intermediate School District's Beekman Center project, issued by Owen-Ames-Kimball Co. (Construction Manager) on November 13, 2026. The project solicits bids for Bid Category No. 1—Mass Timber Design Assist & Supply, which encompasses the complete supply and design assistance for glued laminated timber (Glulam) beams and columns, cross-laminated timber (CLT) flooring and roof systems, structural connections, hardware fabrication, and coordination services. The scope includes factory-applied finishes, CNC fabrication of connections, digital 3D modeling, coordination with mechanical, electrical, plumbing, and fire protection trades, and sequencing/erection drawings. Sealed bids in triplicate are due by 1:00 PM local time on Friday, December 4, 2026, at Owen-Ames-Kimball Co., 1595 W. Lake Lansing Road, Suite 200, East Lansing, MI 48823, with mailed bids required by December 3, 2026, at 4:00 PM. A pre-bid site inspection and bidders' conference is scheduled for Thursday, November 19, 2026, at 2:00 PM at Ingham ISD Beekman Center, 2901 Wabash Road, Lansing, MI 48910. Bids will be publicly opened at O-A-K's Operations Center, 6645 East Paris Ave., Caledonia, MI 49316, with virtual attendance available via YouTube live stream.
Bidders must demonstrate at least five years of successful experience in similar work, possess required licenses, and maintain adequate financial resources. Bid security equal to five percent (5%) of the base bid is required, in the form of a certified or cashier's check or bid bond from a surety company rated A- or better. Successful bidders will be required to furnish separate Performance and Labor and Material Payment Bonds, each for 100% of the contract amount, for contracts exceeding $50,000. The bid is binding for sixty (60) days from opening. Bidders must submit unit prices for Glulam, CLT, finishes, protection systems, and various connection types, along with labor rates for additional work. All materials must be U.S. sourced and fabricated; CLT must meet ANSI/APA PRG 320 certification standards. The bid sum includes all applicable Michigan Sales and Use Tax and all bond costs. A Familial Disclosure Statement and Affidavit of Compliance with the Iran Economics Sanctions Act, both notarized, are required for bid consideration. Bidders must also complete a Safety Data Questionnaire addressing safety programs, training, compliance history, and project-specific safety measures. The Construction Manager reserves the right to reject any or all bids and to determine which bidder is considered the lowest qualified bidder.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ingham ISD - Beekman Center
Bid Pack 1 - Mass Timber Design Assist & Supply
CONSTRUCTION MANAGER’S
PROJECT MANUAL
November 13, 2026
Construction Manager:
Owen-Ames-Kimball Co.
1595 West Lake Lansing Rd. Suite 200
East Lansing, MI 48823
616.456.1521
Send RFIs and Substitution Requests to:
Jordan Krausz jordank@oakmi.com
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply www.owen-ames-kimball.com
Construction Management Project Manual Index
Bidding Requirements
Advertisement for Bids
Instruction to Bidders
Statement of Participation
Certificate of Insurance and Endorsement
Bid Form
Familial Disclosure Statement, Affidavit of Compliance
Safety Data Questionnaire
General Conditions
Specifications
Division 1 - General Requirements
01010 Summary of Work
01020 Allowances
01026 Unit Prices
01030 Schedule of Alternates
01040 Project Coordination
01045 Cutting and Patching of New Work
01050 Field Engineering
01095 Reference Standards and Definitions
01200 Project Meetings
01300 Submittals
01400 Quality Control
01500 Temporary Utilities
01600 Material and Equipment
01650 Starting Systems
01700 Contract Close Out
Preliminary Construction Schedules
Subcontractor Submittal Form
Referenced Documents Available for Online Viewing
AIA A132 – 2019 – Standard Form of Agreement Between Owner and Contractor:
https://tinyurl.com/2p8pnk2b
Owen-Ames-Kimball Co. Safety Manual:
https://tinyurl.com/34zxyj49
ADVERTISEMENT FOR BIDS
BID PROPOSAL
Sealed bids, in triplicate, for the Ingham ISD Beekman Center – Mass Timber Design Assist & Supply will be received until 1:00 PM local time, Friday, December 4th, 2026, at (insert location where bids can be delivered). Bids received after this time will neither be considered nor accepted.
All proposals received by the time and date stated above will be opened and read publicly at 1:00 PM local time, Friday December 4th, 2026 at O-A-K's Operations Center, 6645 East Paris Ave., Caledonia, MI 49316. You may attend in person or watch online via a YouTube live stream: https://youtu.be/lAkEZbESTYI (Get Address from Marketing).
Bids may be mailed to Owen-Ames-Kimball Co. 1595 W. Lake Lansing Road, Suite 200, East Lansing, MI 48823.
Mailed bids must be received by December 3rd, 2026 – 4:00 PM. FAXED, EMAILED OR UPLOADED TO BUILDING
CONNECTED BIDS WILL NOT BE ACCEPTED.
In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the
Owner or any employee of the Bidder and any member of the District’s Board of Education or the Superintendent of the District.
SITE INSPECTION
A construction pre-bid meeting will be held at Ingham ISD Beekman Center - 2901 Wabash Rd A, Lansing, MI 48910 at 2:00 PM local time, Thursday November 19th, 2026. All bidders are encouraged to attend.
BID DOCUMENTS
The Bidding Documents may be examined at the following locations:
• Owen-Ames-Kimball Co. Website: http://www.owen-ames-kimball.com/subcontractors/
• Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing and Traverse City.
BIDDER QUALIFICATIONS
Bidders submitting a Bid for this Project shall have qualifications as follows:
a. Shall be a reputable, recognized organization, with at least five (5) years successful experience on work of this type and scope of this project.
b. Shall have a license where required by public authorities having jurisdiction.
c. Shall have ample financial resources for work of this magnitude.
BID SECURITY - PERFORMANCE BONDS
Each bid shall be accompanied by good and sufficient bid security or bid bond in an amount not less than 5% of the
Bid amount and shall secure the Owner from loss or damage by reason of the withdrawal of the Bid by a Bidder or by failure of the successful Bidder to enter into a Contract with the Owner if his Bid is accepted by the Owner.
Bid securities will not be released or returned until the bid “hold-firm” date or a subcontract has been successfully executed for the specific bid category of work, whichever occurs first.
Bid security may be provided by furnishing a bond from a surety company having a rating of A- or better or certified check. Owen-Ames-Kimball is not responsible for the loss of bid security if provided by certified check.
The successful Bidder will be required to secure Performance, Labor and Material bonds for all contracts exceeding
$50,000, from a surety company having a rating of A- or better, for the full amount of the Contract.
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 1 of 11
NOTES: (1) yellow highlighted areas are to be revised to be job specific-place cursor on highlight for comments
(2) remove comments and highlighting prior to final printing remove this note prior to final printing
Remember to change project name in the footer
SUPPLEMENT TO INSTRUCTIONS TO BIDDERS
STANDARD AIA FORMS
The Instructions to Bidders (AIA Document A701-2018 Edition), Articles 1 through 8, and as herein amended or added to, are a part of the Contract Documents, and shall apply to all Contractors, and/or Subcontractors.
ARTICLE 1 – DEFINITIONS Add Subparagraph 1.10 as follows:
1.10 All references made to Owner shall be implied to refer to the Construction Manager.
ARTICLE 3 – BIDDING DOCUMENTS
3.1 Distribution Add Subparagraph 3.1.6 as follows:
3.1.6 The Bidding Documents, including drawings, specifications, and necessary forms, can be examined at the following locations.
• Owen-Ames-Kimball Co. website: www.owen-ames-kimball.com/subcontractors/
• Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing, and Traverse City.
• Buildingconnected plan room.
3.2 MODIFICATION OR INTERPRETATION OF BIDDING DOCUMENTS Revise Subparagraph 3.2.2. as follows:
Line 2 shall read “…ten days…”
ARTICLE 4 – BIDDING PROCEDURES
4.1 PREPARATION OF BIDS Revise Subparagraph 4.1.1. and Add Subparagraph 4.1.6.1, 4.1.9 and 4.1.10 as follows:
Bids shall be submitted, in triplicate, on the Bid Proposal Form included within the bidding Documents.
4.1.6.1 Proposals will be accepted for one (1) Bid Category only, or a combination of two (2) or more Categories. If the Bidders wish to have their combined bid considered for separate categories, they must submit separate proposals for the individual category along with their combined bid proposal.
4.1.9 A Pre-Bid Conference will be held in accordance with the following schedule:
Date: Thursday, November 19th, 2026
Place: Ingham ISD – Beekman Center - 2901 Wabash Road, Lansing, MI 48910
Time: 1:00PM EST
4.1.10 In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or the
Superintendent of the District.
4.2 BID SECURITY Add Subparagraphs 4.2.1.1, 4.2.1.2 and Revise Subparagraph 4.2.3 as follows:
4.2.1.1 Bid security shall be required for each bid tendered.
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 2 of 11
4.2.1.2 Bid security shall be in the form of either a CERTIFIED or CASHIER’S CHECK on an open and solvent bank or bid bond issued by surety company payable to the Owner in an amount equal to five percent (5%) of the base bid.
4.2.3 Revise Lines 1 and 2 to read “If a surety bond is provided the attorney-in-fact who …”.
4.3 ADDENDA Revise Subparagraph 4.3.3 as follows:
4.3.3 Addenda will be issued no later than two days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
4.4 MODIFICATION OR WITHDRAWAL OF BIDS Revise Subparagraph 4.4.3 as follows:
4.4.3 After the time and date of receipt of Bids, a bid may not be modified, withdrawn or cancelled by the Bidder for sixty (60) days.
ARTICLE 5 – CONSIDERATION OF BIDS
5.3 ACCEPTANCE OF BID (AWARD) Revise Subparagraph 5.3.2 and add Subparagraph 5.3.4 as follows:
5.3.2 Revise Line 1 to read “…right to accept Mandatory and Voluntary Alternates in any order…”
5.3.3 Owner reserves the right determine which bidders are considered the lowest qualified bidder and to award to said bidder.
5.3.4 After the Owner has awarded the Bid Categories the Construction Manager will prepare and send a Notice of
Pending Award to the successful Bidders.
ARTICLE 6 – POST-BID INFORMATION
6.1 CONTRACTOR’S QUALIFICATION STATEMENT Revise Subparagraph 6.1 as follows:
The Owner, Architect and Construction Manager may make such investigations as they deem necessary to determine the ability of the Bidder to perform the work. The Bidder shall furnish all such information and data for this purpose as the Construction Manager may request within twenty-four (24) hours, including, but not limited to, lists of projects completed, financial statements for the past two (2) years, a current list of work in progress. The Owner reserves the right, based on the advice of the Construction Manager and
Architect, to reject any bid if the evidence submitted, or investigation of such Bidder, fails to prove that such
Bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein.
6.3 SUBMITTALS Revise Subparagraph 6.3.1, replace Subparagraphs 6.3.1.1 thru 6.3.1.3 and add
Subparagraphs 6.3.1.4 thru 6.3.1.6 as follows:
6.3.1 The Bidder shall within ten (10) days upon issuance of a Notice of Pending Award furnish to the Owner through the Construction Manager the following:
6.3.1.1 The necessary insurance forms as specified in the Bidding Documents.
6.3.1.2 A cost breakdown on the continuation sheets of the “Application and Certificate for Payment”, AIA
Document G703 showing all major work items, separated by both material and labor.
6.3.1.3 A list of the work which will be performed with the Bidder’s own forces, a list of their subcontractors and a list of work that will be performed by the subcontractor’s forces.
6.3.1.4 Names of the manufacturer’s, products and suppliers of principle items, materials or systems proposed for the work.
6.3.1.5 Schedule information.
6.3.1.6 The Bidder will be notified in writing if any of the above items are not acceptable.
ARTICLE 7 – PERFORMANCE BOND AND PAYMENT BOND
7.1 BOND REQUIREMENTS Revise Subparagraph 7.1.1 as follows and Delete Subparagraph 7.1.3
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 3 of 11
7.1.1 For Contracts exceeding $50,000 the Bidder shall furnish separate Performance and Payment Bonds covering the Contract and the payment of all obligations arising thereunder in an acceptable form to the Owner and the Construction Manager. Such bonds can be secured through the Bidder’s usual sources provided that they fulfill requirements specified elsewhere in these Documents. The cost of such bonds shall be paid for by the Bidder. A space has been provided on the Proposal Form for the Bidder to identify the amount that shall be added to their proposal should the bonds be required. Should they be required the Bidder shall deliver the bonds to the Construction Manager not later than the date of execution of the Contract.
7.2 TIME OF DELIVERY AND FORM OF BONDS Delete Subparagraph 7.2.2
ARTICLE 8 – ENUMERARTION OF THE PROPOSED CONTRACT DOCUMENTS
8.1 Revise sentence to read: Copies of the proposed Contract Documents will be made available to the Awarded
Bidder as modified and would include but not limited to the following documents as issued by the Construction
Manager.
ARTICLE 9 – INSURANCE
9.1 INSURANCE REQUIREMENTS The required insurance will name Owen-Ames-Kimball Co., Owner and
Architect, along with their respective officers, agents and employees are named as additional insureds for the auto liability and general liability on a primary and non-contributory basis for ongoing and completed operations. The ONLY acceptable endorsement for the additional insureds requirements is ISO form CG 20
37 07 04.
9.1.1 Commercial General Liability – ISO Occurrence form CG 20 10 07 04 and CG 20 37 07 04 are the required forms.
ARTICLE 10 – DESCRIPTION OF WORK Add paragraph 10.1 and 10.2
10.1 BID CATEGORIES Add Subparagraphs 10.1.1, 10.1.1.1., 10.1.1.2, 10.1.1.3 as follows:
10.1.1 Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in the Bid.
If a conflict in the assignment of work exists between the Bidding Documents and the descriptions of these bid categories, the requirements of the bid category description(s) shall take precedence and the
Construction Manager shall immediately be notified of the conflict. Bidders are to familiarize themselves with all Bid Categories.
10.1.1.1 Requirements for a specific Bid Category, trade or contract will generally be described in that portion of the
Specifications or Drawings related to that trade or contract. Such requirements may, however, be described in other sections of the contract documents. Contractors will be held responsible for having carefully examined all drawings and read all divisions of the specifications and all contract documents to avoid omissions or duplications and to ensure a complete job.
10.1.1.2 There is not necessarily a direct relationship between the Bid Category numbers or names and the
Specification Division or Section numbers.
10.1.1.3 Unless specifically noted as being furnished only, scopes include the complete installation including materials, labor, equipment, interface with the work of other trades, etc.
10.2 INDEX OF BID CATEGORIES Add paragraph 10.2
Bid Category No. 1 – Mass Timber Design Assist & Supply
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 4 of 11
10.3 BID CATEGORY DESCRIPTIONS Add paragraph 10.3
Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in Bid.
Unless specifically noted as being furnished only or install only, scope includes complete installation including all labor, material, equipment, etc.
Bidders are required to familiarize themselves with all Bid Categories and Alternates.
BID CATEGORY NO. 9 – MASS TIMBER DESIGN ASSIST & SUPPLY
Include:
1. Complete Mass Timber Supply work as shown on the drawings and as specified in the following sections:
06 1800 Glued Laminated Construction
2. Glulam grade reference: SP 24f -V4 V3 simple spans; 24F-V5 multi-spans, Combo 50 Columns
3. Fire Rated Glulam (if applicable)
4. Sourcing for Glulam: in-house
5. Glulam Factory-applied sealer/finishes: Wil-Stain WB Clear Sealer, all sides
6. Glulam Factory-applied primer for fasteners, connection plate materials and hardware
7. All glulam shall be US sourced and fabricated
8. Furnish all cross-laminated timber (CLT) as indicated/required. i.e. Floors, Shear Walls, Stairs, and Elevator Shafts
(TBD)
9. Provide species as SP CLT
10. CLT ANSI/APA PRG 320 Certification (Performance standards for cross laminated timber)
11. Sourcing for CLT: In House
12. Factory-applied sealer/finishes at CLT: Wil-Stain WB Clear Sealer, applied to both faces.
13. All CLT shall be US sourced and fabricated.
14. CLT: CLT connection design to include the following; Panel to Panel, Panel to supporting element (glulam, wall, ledger), Diaphragm chord and drag element connection design, Dependencies and expectations Complete design criteria information provided by the SEOR, FRR Design, 2hr Floors 1hr Roof.
15. Glulam beam to beam connections, beam to column connections, beam to auxiliary framing element connections, column, dependencies and expectations for complete design criteria information provided by SEOR, FRR design of 2 hr. floors and 1 hr. roofs.
16. As part of the mass timber shop drawings, provide a signed and sealed deferred design package including final engineering of the detailing and connections of the Glulam and CLT systems TMP will fulfill the requirements of the EOR providing detail concepts and loading which SmartLam would then finalize. This is similar to deferred steel connection design which is also a separately sealed package.
17. Fabrication and delivery of structural connecting hardware and connections
18. Management of the delivery and sequencing of all material delivered to the site for erection.
19. Propose method of delivering material to site and expectations for erector for sorting, unloading and sequencing material at time of delivery
20. Finalize lead time for fabrication and delivery of material after release for fabrication
21. Coordination of requirements for laydown, storage at or near facility for coordination of installation to minimize to the greatest extent possible the requirements for double handling of mass timber elements.
22. Finalize all requirements under response to provide all required hardware and appurtenances for connections:
Columns to foundations, Columns to columns, Beams to Columns, Beams to Beams, Beams to Shear Wall (as applicable), Shear Wall to Foundation (as applicable) Embeds by others, Beams/ Columns to Curtainwall (as applicable), Include pre-drilling and countersinking for all connection points where possible, Include provisions for testing reports for material fabricated for this project. Include quality control reports indicating conformance with specifications and industry requirements for fire ratings
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 5 of 11
23. Fabrication and delivery of the full structure comprised of all mass timber elements and all connecting hardware for erection to commence
24. Preparation of Sequencing / Erection drawings at the time of issuance of full fabrication documents
25. Preparation and submission of all testing Product Test data (required by specifications to indicate conformance with engineering and fire ratings)
26. Development of a digital 3D model and updates via our coordination process for incorporation with the
Mechanical, Electrical, Plumbing, and Fire Protection trade disciplines.
27. Attendance (virtually through model sharing interface) at 3D model coordination meetings with MEP, FP contractors for coordination of openings, penetrations and coring in mass timber elements.
28. Participate and assist with model clash-detection of other trades and design elements, particularly as it relates to the penetrations and incorporation of elements in and around the mass timber structure (inclusive of decking penetrations).
29. Provide pricing of alternate options concurrently with basis of design baseline systems
30. Provide alternate prices, value engineering and other means and methods of cost risk mitigation to assure the project can be delivered within the Initial Guaranteed Maximum Price.
31. Provide preliminary lay-up and layouts for CLT deck panels
32. Work and partner with the team to solve potential constructability issues including span length challenges, connections for curtainwall and exterior façade elements, etc.
33. Assist in the development of a mock-up drawing to show the critical elements of the mass timber structure for review by all stakeholders.
34. Provisions for the furnishing and delivery of all required samples.
35. Provide material samples as needed with the proposed finish quality of the exposed to view materials that can be expected with the species and level of finish proposed for the project for both the CLT decking and the glulam elements.
36. Work and partner with OAK on the organizing of shipping / transportation logistics: Work with installer to organize deliveries so that deliveries are sequenced with the installation sequence, Prepare shipping / packing drawings showing pieces included in each shipment.
37. Shipping/freight included
38. All connection plates and hardware included
39. Include all Simpson connection hardware as noted in project documents.
40. Preinstallation of connection hardware where feasible
41. Includes Glulam base plates, and Girder and Purlin hardware
42. Support angles at CLT to CLT
43. Primed connection hardware
44. CNC fabrication
45. Includes performance and quality requirements as specified per PRG 320, ANSI 190.1. with all materials conforming to such Standard
46. Includes all submittals, shop drawings, warranties, etc. as specified and required.
47. It is mutually understood and agreed that Vendor has included provisions for all deliveries which shall be coordinated with Contractors Project Manager or Project Superintendent.
48. Include hardware packaged per placement for installer.
49. Subcontractor must coordinate its work with the work of other subcontractors at the site to eliminate conflicts.
No additional costs as a result of a lack of coordination will be accepted.
50. All trades are responsible for review of all pages within the project documents to confirm coordination and all details associated with their scope of work.
Exclude:
1. Installation of mass timber material.
2. Diaphragm design, Connection to concrete or CMU, Steel member design such as beams, columns, ledger angles.
3. Façade connection to glulam members.
4. Glulam member design.
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 6 of 11
5. Connection to concrete or CMU.
GENERAL COMMENTS
Support for Building Systems/Components:
1. Any component of the building construction that requires support and/or blocking that is not shown in the
Documents shall be provided by the contractor that is responsible for the installation of the component.
Anchor Bolt Locations:
1. After anchor bolts have been placed and concrete foundation work completed in one or more areas of the building, as agreed upon by the Construction Manager, the concrete contractor shall survey/verify the location and elevation of all anchor bolts. Any variation in location and elevation of the anchor bolts shall be noted on the approved anchor bolt layout drawing and shall be given to the Construction Manager who shall forward it to the structural steel contractor. If any anchor bolt is not located properly, and the structural steel contractor agrees that the anchor bolt can remain as located, then, with the approval of the structural engineer, the anchor bolt will not be removed, but the concrete contractor shall bear all costs related to any adjustment necessary in the column base plate. If the anchor bolt is required to be relocated, the concrete contractor shall immediately do so as not to cause delay the installation of the structural steel.
Access Doors:
1. The responsibility for access doors shall be as follows: the general trade’s contractor shall furnish all access doors that are shown on the Documents to be installed by the masonry contractor in masonry partitions and by the
LPDA contractor in drywall partitions, drywall ceilings or acoustical ceilings. Any access door that is not shown in the Documents, but that are required by the plumbing, fire protection, HVAC or electrical contractor, shall be provided by the contractor that requires the access door. The door shall be furnished to the masonry contractor for the installation into masonry partitions and to the LPDA contractor for installation into drywall partitions, drywall ceilings or acoustical ceilings.
Food Service Equipment:
1. Shop drawings and detailed equipment schedules for the food service equipment layout and rough-ins shall be submitted by the successful food service contractor in a time frame consistent with the completion schedule, but shall in no case exceed forty-five (45) days after Notice of Award.
2. The plumbing, HVAC and electrical contractors shall carefully review the food service equipment drawings and shall be responsible for all notes on these drawings that pertain to their work.
3. As a separate submission with the food service equipment shop drawings, the food service contractor shall provide written confirmation that all of the electrical requirements for the food service equipment (i.e. quantity, location, phase and voltage) is correctly shown on the contract drawings.
Fireproofing:
1. The LPDA contractor shall include in the base bid return trips to touch-up all spray fireproofing that may be disturbed by other trades during the installation of their work. However, any unreasonable destruction of the fireproofing by the trade contractors will not be considered touch-up and the cost of the repairing these areas shall be the responsibility of the contractor causing damage (backcharge).
Demolition:
1. Dumpsters provided by the Construction Manager for use during construction shall not be available for the disposal of the following items: debris resulting from architectural, structural, mechanical, or electrical demolition
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 7 of 11 operations; site related materials; paint products, hazardous materials. Contractors generating such materials shall provide dumpsters for them and legally dispose of them off site.
2. Unless specifically noted otherwise the division of demolition work shall be as follows: sitework contractor – site demolition; general trades contractor – architectural and structural demolition; mechanical/plumbing contractor –
HVAC and plumbing demolition; fire protection contractor – fire protection demolition; electrical contractor – electrical demolition.
3. Demolition shown on the demolition plans is the responsibility of the Demolition / General Trades Contractor.
Patching of items as a result of demolition shown on the Demolition plans is the responsibility of the contractor who is responsible for similar elements throughout the building.
4. Demolition (and related patching) needed but not shown on the demolition plan is the responsibility of the contractor requiring it.
General Safety:
1. Your Firm, all employees, subcontractors, and material suppliers onsite will comply with Owen-Ames-Kimball
Co.’s Safety Policy and Requirements, INCLUDING BUT NOT LIMITED TO THESE HIGHLIGHTED ITEMS:
a. Hard hats are required.
b. Contractor safety manuals/books will be kept on-site.
c. Contractors must provide their own first aid and fire protection equipment.
d. Contractors are responsible for providing the necessary barricades for their work.
e. Contractors are responsible for their own fall protection.
f. Contractors must comply with the "Right to Know" law.
g. Contractors must comply with O.A.K.'s substance abuse policy.
h. No Smoking, Tobacco, or E-Cigarettes on School Property.
i. A designated competent/qualified person shall be required to be on site for the following but not limited to structural demolition, scaffolding, fall protection & excavations.
j. Contractors shall furnish a written job specific Silica Exposure Plan per MiOSHA requirements.
k. Contractors required to work in a masonry restricted zone must have proper training.
2. Owen-Ames-Kimball Co. Safety Manual can be viewed in its entirety here:
https://tinyurl.com/34zxyj49
End of Instruction Bidders
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 8 of 11
STATEMENT OF PARTICIPATION
Owen-Ames-Kimball Co. strives to recognize and represent the community in which you reside and serve through continuous efforts to encourage local participation and inclusive practices on all our construction projects.
Owen-Ames-Kimball Co. encourages local participation. We believe we have a responsibility to support the growth of the businesses within the community in which the project resides.
Owen-Ames-Kimball Co. practices inclusion. These inclusive practices are established within our organization and in our business endeavors, and strongly promoted on our jobsites. We encourage all of our subcontractors to implement inclusive practices within their organizations and through partnering efforts on our projects.
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 9 of 11
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 10 of 11
Ingham Intermediate School District, Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 11 of 11
SUBMIT IN TRIPLICATE
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 1 of 7
BID FORM
BID TO: Ingham ISD
2630 W. Howell Rd.
Mason, MI 48854
BID FROM: _________________________________________
PROJECT: Beekman Center – Mass Timber Design Assist & Supply
Ladies and Gentlemen:
The undersigned, having familiarized themselves with the local conditions affecting the cost of the Work and having examined the site, and Bidding Documents prepared by TMP, 259 E Michigan Ave, Kalamazoo, MI 49007 hereby propose to furnish all labor, material, equipment, taxes and services required for the proper completion of each of the following categories for this Project, including all addenda issued thereto, for the sum of:
Bid Category No.____________ Title
Dollars ($ _ ), Said amount constituting the Base Bid.
TAXES: Bid sum includes all applicable taxes, including Michigan Sales Tax. Confirm that your company can pay Michigan Sales and Use Tax: ☐ Yes ☐ No
ALLOWANCES: Base bid includes applicable allowance cost(s) as set forth in Section 01020 of the General
Requirements and as identified in the Instruction to Bidders Bid Category Descriptions.
COST OF BONDS: Bid sum includes cost of furnishing a Performance Bond and Labor and a Material
Payment Bond, each in the amount of 100% of Base Bid.
ACKNOWLEDGEMENT OF ADDENDA
The following addenda have been received, are hereby acknowledged, and their execution is included in the above Base Bid:
Addendum No. Dated Addendum No. Dated Addendum No. Dated_________
Addendum No. Dated Addendum No. Dated Addendum No. Dated_________
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 2 of 7
VOLUNTARY ALTERNATES (Identify in detail on appropriate attachment any Voluntary Alternates shown here)
A
B
C
BID SECURITY
Accompanying this Bid, as required by the Instructions to Bidders, is a bid security in the form of
(Certified Check/Cashier's Check/Bidder's Bond) in the amount of:
Dollars ($ _______ ), payable to the Owner, which it is agreed, shall be retained as liquidated damages, not as a penalty, by the
Owner, if the undersigned fails to execute the Contract in conformity with the form of Contract incorporated in the Contract Documents and fails to furnish specified bonds within ten (10) days after date of issuance of Letter of Intent to the undersigned.
If awarded the Contract, the undersigned agrees to commence Work within ten (10) days after date of issuance of Notice of Pending Award, which shall be considered as the notice to proceed, and agrees to complete the Work in accordance with the Construction Progress Schedule.
CONSTRUCTION PROGRESS SCHEDULE
If awarded this Contract, the undersigned:
Endorses the Construction Progress Schedule:
Amends the Construction Progress Schedule as follows:
INSURANCE AND ENDORSEMENTS REQUIREMENTS:
(Samples are attached to the Supplement to Instructions to Bidders)
Acknowledged By:___________________________________________________________________________________________
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 3 of 7
UNIT PRICING
Contractors are to indicate the following unit prices in their proposals. Adjustments to Contracts will be made once actual units have been determined. Unit prices shall include all costs, including profit and overhead.
Category Unit price item Unit Notes
Glulam Beams/Columns $________/CF Name the stress class
CLT CLT Floors/Roofs $________/CF
CLT
Appearance grade premium (exposed vs.
industrial face) $________/sf
Finish
Factory-applied sealer or stain $________/sf
Protection
Factory-applied moisture membrane on CLT top surface $________/sf
Connections
Concealed beam-to-column connectors, by capacity band $________)/ea
Connections
Exposed steel knife plates and brackets, diaphragm strapping, fabricated and $________/lb
Connections
Panel-to-panel splines with fasteners $________/lf
Connections
Hold-downs and shear connectors $_______/ea
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 4 of 7
UNIT LABOR RATES
The undersigned further proposes and agrees that should the amount of work required be increased or decreased where unit prices have not been established, the following labor rates will be the basis for any change order proposal. Labor rates are to include all direct costs without mark-up as defined in Article 7.3 of the General Conditions. Prior to contract award, if requested by the Construction Manager, the successful bidder shall provide documentation substantiating the proposed labor rates.
FEES FOR ADDITIONAL WORK
1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractor’s own forces. This percentage represents both overhead and profit.
2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This percentage represents both overhead and profit.
CREDIT FOR WORK DELETED
Should any work be deleted from Contract by order of the Owner, full cost savings realized thereby will be credited to Owner.
FAMILIAL DISCLOSURE
See Page 6 of this Bid Form for required statement.
AFFIDAVIT OF COMPLIANCE
See Page 7 of this Bid Form for required statement.
SAFETY SUPPLEMENT FORM
The apparent low bidder(s) will be required to complete this form and submit to the project manager no later than (3) days after the bid opening or at the time of the post bid interview. Based on the information supplied
Owen-Ames-Kimball Co. may require further safety measures at no additional cost prior to award if warranted.
Job Hourly Benefits Employer's Payroll Total
Classification Rate Liability Taxes
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 5 of 7
AGREEMENT
The undersigned agree(s) to provide the post-bid information required within (10) days after notification of the Notice of Award and to execute an agreement for work covered by this Proposal on AIA Document
A132-2019, Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment is a
Stipulated Sum.
In submitting this bid, it is understood that the Owner reserves the right to reject any or all bids. It is further agreed that this bid is binding for a period of sixty (60) days from the opening thereof.
Respectfully submitted, Date , 2026
Firm Name
By
Signed
Title
Official Address
(If a corporation, affix seal)
Telephone No. ( ) ext. ___
E-Mail Address
Contact Information if there are questions about bid:
Name:_____________________________________________
Direct or Mobile Phone:__________________________
E-Mail:____________________________________________
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 6 of 7
Familial Disclosure Statement
(Must be completed for bid to be considered)
In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing any familial relationship between the Owner or any employee of the
Bidder and any member of the District’s Board of Education or Superintendent of the District.
___ No, there is not a familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or Superintendent of the District.
___ Yes, there is a familial relationship between the Owner or an employee of the Bidder and a member of the District’s Board of Education or Superintendent of the District. The person(s) and relationship are as follows:
Owner/Employee Name BOE member or Superintendent Name Familial Relationship
Contractor: _________________________________________________________________________________________________
(Name of Contractor)
By: _______________________________________________________________
Title: _______________________________________________________________
Date: _______________________________________________________________
County of: _______________________________________ State of: _______________________________________
This instrument was acknowledged before me on the ____________day of ____________________________, 2026, by,_________________________________________________________________________________, Notary Public
__________________________________________ County, ________________________________.
My Commission Expires: ____________________________________________
Acting in the County of: ____________________________________________
Ingham ISD, Beekman Center – Bid Pack 1 – Mass Timber Design Assist & Supply - Page 7 of 7
Affidavit of Compliance – Iran Economics Sanctions Act
(Must be completed for bid to be considered)
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized office of the below-named contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the Ingham ISD (“the School District”)
Request for Proposals For Beekman Center (“the RFP”), hereby certifies, represents and warrants that the
Contractor (including its officers, directors, employees) is not an “Iran linked business” within the meaning of the Iran Economics Sanctions Act, Michigan Public Act No.517 of 2012 (“the Act”), and that in the event
Contractor will not become an “Iran linked business” at any time during the course of performing any services under this contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School
District’s Investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years form the date determined that the person had submitted the false certification.
Contractor:
(Name of Contractor)
By: _______________________________________________________________
Title: _______________________________________________________________
Date: _______________________________________________________________
County of: _______________________________________ State of: _______________________________________
This instrument was acknowledged before me on the ____________day of ____________________________, 2026, by,_________________________________________________________________________________, Notary Public
__________________________________________ County, ________________________________.
My Commission Expires: ____________________________________________
Acting in the County of: ____________________________________________
Safety Data Questionnaire Supplement to Bid Form
The Safety data listed below shall be submitted no later than three (3) days after the bid opening by the apparent low bidder, or as requested by O-A-K for evaluation. Further documentation may be requested as a part of the evaluation process. Information specified below must be current and accurate.
COMPANY INFORMATION
Company Name:
Company Type:
Address:
City: State: Zip:
Name of your Safety and Health Officer responsible for this project:
Safety Accreditations:
Length of experience in this role:
Safety and Health Officer E-mail:
Safety and Health Officer Phone:
Does your company have a written procedure to ensure that adequate safety and health program resources, such as budget, equipment, training, and manpower are included in your bid?
YES □ NO □
Does your company have a written construction safety program? YES □ NO □
I acknowledge that my company will provide a written Site-Specific safety plan? YES □ NO □
Does your company have a written Accident/Incident Investigation Procedure? YES □ NO □
Does your company provide training and proper equipment for fall protection as required by MIOSHA?
Does your company have a safety training program? YES □ NO □
What mandatory training topics have been covered in the past year?
What percent of your company’s employees have OSHA Training Certification? _______ %
Does your company have a written drug and alcohol-free workplace program that includes drug testing? YES □
NO □
Does your company conduct post-Incident drug and alcohol testing? YES □ NO □
Has your company ever been removed from a project due to safety concerns within the last 3 years?
YES □ NO □ If yes, please briefly explain:
Does your company have a written procedure to screen subcontractors based on their past safety performance and history? YES □ NO □
Explain how you will ensure that subcontractors are following the same safety standards and expectations as your company?
Please list the PPE that your company will require while on site of all of your company’s employees and subcontractors:
I acknowledge that my Employees, Company, and/or Subcontractors can be removed from the project if safety standards and requirements are not being followed. YES □ NO □
Has your company received any citations or violations from MIOSHA in the past three (3) years?
YES □ NO □ If yes, please list:
Has your company received any willful safety violations from MIOSHA in the past five (5) years?
List your company’s Workers Compensation Experience Modification Rate for each of the last three (3) years.
20____________ 20____________ 20____________
List the number of man-hours your company worked in each of the last three (3) years.
List the OSHA recordable injuries your company experienced in each of the last three (3) years.
List the Total Recordable Incident Rate (TRIR) your company experienced in each of the last three (3) years.
Calculation: TRIR = (number of OSHA Recordable Incidents) x 200,000 / Total Number of man-hours worked
PROJECT SPECIFIC
How often will your company perform documented job site safety Inspections?
Daily □ Weekly □ Bi-Weekly □ Monthly □
Does your company conduct toolbox safety talks or weekly safety huddles? YES □ NO □
Does your company have a written procedure to ensure that only employees who are qualified by training and experience are allowed to operate equipment, tools, machinery and vehicles? YES □ NO □
Do you see any potential safety hazards on this project that your company does not have experience with or are concerned about? YES □ NO □ If yes, please explain:
COMPANY ACKNOWLEDGEMENT
I certify that my response and the information provided are true and correct to the best of my personal knowledge and belief and that I have made no willful misrepresentations in the questionnaire, nor have I withheld any relevant information in my statements and answers to questions. I am aware that any information given by me in this questionnaire may be investigated and I hereby give my full permission for and such investigation and I fully acknowledge that any misrepresentations or omissions in my response and information my cause my bid to be rejected.
Furthermore, I acknowledge that O-A-K may, at no additional cost or increase to the bid, require the contractor to perform additional safety requirements if the above information is deemed incomplete, Insufficient, below industry standard, or not to level of safety commitment expected. This may include but not be limited to additional site safety audits and inspections, full time safety supervisor, etc.
Bidders full name and entity status:
Signature
Authorized Representative of Company
Printed Name
Authorized Representative of Company
Title Date
Docusign Envelope ID: 64FB8F5E-D0AA-8EF2-8295-19D6416591CD
Ingham ISD – Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 1 of 21
DIVISION I – GENERAL REQUIREMENTS
01010 SUMMARY OF WORK
01010.1 WORK COVERED BY CONTRACT DOCUMENTS
A. The Project consists of the demolition of the existing Beekman Center and construction of the new.
B. The Instructions to Bidders, Project Manual, Request for Proposals, dated November 13th, 2026, issued by owner, General Conditions AIA A232-2019, General Requirements and Owner-Contractor
Agreements, are a part of all divisions and all contract documents. The order of precedence for interpretation shall be the Agreement between Owner and Contractor, RFP, the Instruction to
Bidders, the Project Manual, the General Conditions and the Contractor’s Proposal. Execution of the
Contract signifies that the Contractors are fully knowledgeable with all requirements of all divisions and documents. No claims for additional compensation will be entertained or paid to any
Contractor on account of its failure to be fully informed of all requirements of all Contract
Documents.
01010.2 CONTRACTS
A. Construct the work of each contract under a separate lump-sum/fixed price contract with the
Owner. Coordination of the work will be provided as specified herein.
B. Contractors shall carefully examine all drawings and read all divisions of the specifications and
Contract Documents and shall include all Work required of them for a complete project.
C. Requirements for a specific trade or contract will generally be described in that portion of the
Specifications or Drawings related to that trade or contract. Such requirements may, however, be described in other sections of the Contract Documents. Contractors will be held responsible for having carefully examined all drawings and read all divisions of the specifications and all contract documents to avoid omissions or duplications and to ensure a complete job.
D. Each Contractor is deemed to be fully informed about conditions relating to the construction of the
Project and the employment of labor thereon by execution of the Contract. The Contractor will not be relieved of its obligation to furnish all material and labor necessary to carry out the provisions of the Contract.
E. Any claim by the Contractor of an inability to meet any requirement set forth on the Contract
Documents, or that any requirement of these documents is impractical or unreasonable, will not be recognized, unless the claim was made at the time the Contractor’s proposal was submitted, and specific provision is made for such claim in the Contract.
F. Unless otherwise specified, the Contractor shall supply all labor, supervision, materials, transportation, apparatus, fuel, energy, and tools, necessary for the entire and proper completion of the Work. It shall perform all Work herein described in a workmanlike manner in accordance with the Contract Documents and shall provide everything properly incidental thereto as shown on the drawings, stated in the specifications, or reasonably implied there from.
G. Each Contractor shall be responsible for its own Work and every part thereof, and all Work of every description used in connection therewith. It shall specifically and distinctly assume all risks of damage or injury from whatever cause to property or persons used or employee on or in connection with his Work, and undertake and promise to indemnify, defend, and hold harmless the
Owner, Architect and Construction Manager against all claims rising out and or on account of any such damage or injury.
H. Each Contractor shall be held responsible for the execution of a satisfactory and complete piece of
Work in accordance with the true intent of the drawings and specifications. It shall provide without extra charge all incidental items required as a part of its Work, even though not particularly specified or indicated. If it has good reason for objecting to the use of any material, application or method of construction as shown or specified, it shall make report of such objection to the
Construction Manager and obtain proper adjustment before the Contract is executed.
Ingham ISD – Beekman Center – Bid Package 1 – Mass Timber Design Assist & Supply - Page 2 of 21
I. Should any material or workmanship be found defective or in any way contrary to the Contract, it may be rejected by the Owner regardless of its state of completion and same must be remedied or removed by the Contractor at no additional cost or expense to Owner.
01010.3 WORK BY OTHERS
A. Work on the Project which is excluded from this Contract is as follows:
Materials testing
Asbestos abatement
01010.4 WORK SEQUENCE
A. Construct Work in stages to accommodate the Owner's use of the premises during the construction period, as applicable. The Construction Manager shall (1) coordinate detailed sequencing and scheduling with the Owner, and (2) provide overall scheduling and coordination for the entire project. All Bidders shall acknowledge the Construction Manager’s right to establish and set up, or subsequently modify, the sequencing and scheduling of all work for the earliest possible completion and benefit to the Owner.
B. Initial sequencing and scheduling detail are provided in the Construction Manager's Preliminary
Project Schedule that is included at the end of these General Requirements/bound with the
Documents. This schedule represents the general order and time frames for work to be followed by the Construction Manager. Bidders are to assume that their Work will be coordinated in a manner consistent with industry practice and the efficient coordination of all trades and that are to recognize that the sequence and pace of their work may be dictated by other trades.
Calendar dates associated with the completion of work of any particular contract are not assured.
All Bidders recognize and will accept modifications to the schedule which, in the opinion of the Construction Manager, are reasonable for the general interest of the Project because of allowable time extensions (formally or informally approved) in any contract, and that such modifications are inherent to the construction process and shall not qualify as a basis for extra compensation from the Owner.
The Bidder, in submitting a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .