Industry Day Presentation.pdf
PDF 8 MB Posted
- Attached to
- USACE - Industry Day 2024
- Solicitation number
- Not on record
About this file
This document is an agenda and overview for an industry day event hosted by the U.S. Army Corps of Engineers (USACE) Transatlantic Middle East District (CETAM) on October 10, 2024. The purpose is to provide current and potential contractor partners an overview of CETAM's program opportunities in the U.S. Central Command (CENTCOM) area of responsibility.
The agenda covers CETAM's leadership and organizational structure, contracting approaches, engineering capabilities, and programmatic details for countries such as Kuwait, Saudi Arabia, Jordan, Bahrain, UAE, Qatar, and Israel. Key topics include innovative contracting methods, indefinite delivery contracts, upcoming design and construction opportunities, and operation and maintenance requirements. The event will include a contractor Q&A session in the afternoon. Contractors are invited to submit questions in advance. There is no cost to attend this virtual/in-person industry day event. Presentation materials will be provided prior to the event.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Parking and Dining Options at SU.pdf | ||
| Industry Day Announcement_Amendment 01.pdf | ||
| Industry Day Announcement.pdf | ||
| Industry Day Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
0730 – 0845 Check-in – For virtual attendees, please use link below.
0845 – 0850 Rules of Engagement / Disclaimer Zaraszczak 0900 – 1130 Presentations:
Opening Remarks COL Christopher Klein TAD/TAM/TAE Overview COL Christopher Klein Contracting Overview Durbin Construction Overview Holcomb Engineering Overview Upson Programs Overview Behr
• TAE Johnson
• Kuwait FMS, Lebanon Zaraszczak
• Saudi Arabia Reagan
• Jordan, UAE, Qatar, Bahrain Plummer
• Israel DeMattei
• Services and Procurements Ball
1130 – 1330 Lunch / Networking 1330 – 1455 Question & Answer Session 1455 – 1500 Closing Remarks / Adjourn
Webex Link: https://usace1.webex.com/usace1/j.php?MTID=ma79f47dbaeb3cd9eaa96625d5b5cca54
UNCLASSIFIED
Updated: September 2023
EVENT AGENDA
https://usace1.webex.com/usace1/j.php?MTID=ma79f47dbaeb3cd9eaa96625d5b5cca54
Note that Virtual attendees will be prompted to enter their company name and full name before entering the Webex meeting.
For those calling into the meeting, pls email your phone number with company name, full name and title to Mrs. Jeanette Farrell at Jeanette.Farrell@usace.army.mil.
All virtual attendees are asked to keep their microphones on mute.
Bathroom breaks are on your own as needed.
The morning session will not be used for questions. Please save those questions for the afternoon Q&A session.
Lunch will be a two-hour block to allow attendees to get to an eating establishment and return, eat, network, and converse about the morning session to be ready for questions during the afternoon Q&A session.
There are two options for eating on campus: (1) Food court here in the Brandt Student Center and (2) Allen Dining Hall. No cash at either location. There is also a coffee stand in the Brandt Student Center.
UNCLASSIFIED
UNCLASSIFIED
Updated: September 2023
RULES OF ENGAGEMENT
mailto:Jeanette.Farrell@usace.army.mil
Information presented by USACE Personnel about programs in the region does not constitute any official position of the Department of the Army (DA), the Department of Defense (DoD), or USACE Host Nation partners.
Information presented by USACE personnel about programs in the region does not constitute a commitment of funds, any offer or solicitation for any business, or any promise by USACE, the United States, or USACE Host Nation partners regarding future business.
This presentation and this Industry Day do not constitute a solicitation. The US Government is not requesting bids or any effort from contractors until a solicitation is posted to the System for Award Management website.
References to postings of laws and regulations on the internet in this presentation do not indicate that the versions posted on the referenced webpages are authoritative or up-to-date.
Contractors with questions about US laws and regulations should seek independent legal advice and should not rely on this presentation.
UNCLASSIFIED
UNCLASSIFIED
Updated: September 2023
DISCLAIMER – NON-ENDORSEMENT
Industry Day
Christopher D. Klein, PMP Colonel, U.S. Army Commander, Middle East District
10 October 2024
Command Sergeant Major
Command Sgt.
Maj. Clifton D.
Morehouse
Colonel Nikki L. Haupt
Programs & Business Director
John L. Adams Senior Executive Service (SES)
P.E., PMP
Division Commander
Colonel Craig S.
Baumgartner
OUR LEADERSHIP
Craig.S.Baumgartner@usace.army.mil John.L.Adams@usace.army.mil Nikki.L.Haupt@usace.army.mil Clifton.D.Morehouse@usace.army.mil
Deputy Commander
UNCLASSIFIED
UNCLASSIFIED
mailto:Craig.S.Baumgartner@usace.army.mil mailto:John.L.Adams@usace.army.mil mailto:Nikki.L.Haupt@usace.army.mil mailto:Clifton.D.Morehouse@usace.army.mil
Deputy for Programs and Project Management Expeditionary District
Viet Nguyen P.E., PMP
Commander Expeditionary District
LTC Eder C.
Ramirez, PMP
Deputy for Programs and Project Management Middle East District
INCOMING
Commander Middle East District
Colonel Christopher D. Klein
DISTRICT LEADERSHIP
Christopher.D.Klein@usace.army.mil Eder.C.Ramirez@usace.army.mil Viet.Q.Nguyen@usace.army.mil
UNCLASSIFIED
UNCLASSIFIED
mailto:Christopher.D.Klein@usace.army.mil mailto:Eder.C.Ramirez@usace.army.mil mailto:Viet.Q.Nguyen@usace.army.mil
Hi Viz Watchlist
Safety:
FY24 Exposure Hours: 17,959,840 Recordable Accidents: 6 0 Class A Accidents
Deliver the Program TAM along with the Lebanese Armed Forces (LAF), DSCA, and ODC-L, held a SAMR/FMR 29 Apr - 02 May.
Innovation:
- CENTCOM Climate Change/Environmental Monthly Sync
- Distributed Low-Energy Wastewater Treatment (D-
LEWT)
- Matterport Lidar 3D Technology
- Tunnel Detection Technology
- Iraq Water Security and Resilience
Focus Areas:
Security Cooperation Western Access Detention Facilities
Above Echelon Support:
Army Geospatial Center
- BuckEye Enhanced Capability Manned Aircraft Team US Army Engineering & Support Center, Huntsville
- Electronic Security Systems Center of Expertise
- Medical Facilities Center of Expertise
- Cost Engineering software support
- Task Force SAFE, Kuwait, Iraq, Jordan, Syria Engineering Research and Development Center
- Bulkhead Ventilation Study
USCENTCOM hosted the 7th annual TAG SPP Conference. 14- 16 May. General Officers from several states, USAFCENT and USARCENT were in attendance along with participants from USACE
District Project Location Funding Pgm $ MEGA Projects
1 TAM MMSC KSA FMS
2 TAM Falcon 5 / F-15 Qatar FMS 3 TAE Super Hornet / F-18 Kuwait FMS
Strategic Projects
4 TAM P-563 KSA FMS
5 TAE Detention Facilities IQ / SY CTEF 6 TAE Int’l Zone Security Upgrades IQ FMS 7 TAM Western Access Network KSA 2350j
8 TAM THAAD KSA FMS
9 TAE 550N Renovations Kuwait O&M
FY24 MILCON Summary TAM 468025 P992 Fleet Maintenance Facility BA MILCON
Construction continues the new Air Traffic Control Tower at MSAB, Jordan. Turnover scheduled for
FEB25.
The Qatar Area Office held a formal partnering session with all interested partners for the Falcon 5/F-15QA project 22-23 Apr 2024.
PROGRAM OVERVIEW
Security Assistance Military Construction IIS/Work For Others Real Estate
In Progress (Active work + Closeout)
155 120 10 180 $6.06b $48.7M $114M 40.4M
Future Workload (Agreement/Authorization Signed)
28 41 5 140+ $938M $376M $5.4M $37M
Potential Opportunities (Preliminary discussions, no signed Agreement/Authorization)
28 37 4 140+ $6.4b $3.8b $10.6M $140M
UNCLASSIFIED
UNCLASSIFIED
$1.33B
$8.05B
TAM SPECIALIZED CAPABILITIES
Over 70% of all USACE FMS COS for Non-Permanent Facilities TCX for Aircraft Hangar Fire Protection Regional Planning Support Center
Team TAM MIL DAC FSN TOTAL
CONUS 9 299 0 308
OCONUS 4 72 47 123
TOTAL 13 371 47 431
Data Date: 10/04/2024
UNCLASSIFIED
UNCLASSIFIED
https://app.mil.powerbigov.us/groups/me/reports/8f72c643-2335-49e5-90e0-2b396e9b5418/?pbi_source=PowerPoint
UNCLASSIFIED
Data Date: 10/04/2024 https://app.mil.powerbigov.us/groups/me/reports/8f72c643-2335-49e5-90e0-2b396e9b5418/?pbi_source=PowerPoint
TAM Strategic Partnership Priorities
Kuwait
- Office of Military Cooperation (OMC)-Kuwait
- Kuwait Ministry of Defense (KMOD)
- Kuwait Naval Force
- Construction Management Office
CURRENT STRATEGIC PARTNERSHIP ASSESSMENTS
Bahrain
- Office of Military Cooperation (OMC)
- Bahrain Ministry of Works (MOW)
- Bahrain Defense Force (BDF)
- United Kingdom Permanent Joint HQ (UKPJHQ)
U.S. Partners
- DSCA
- DASA (DE&C)
- Naval Support Activity (NSA)
- 5TH Fleet
- U.S. Army Central (ARCENT)
- U.S. Special Operations Command Central (SOCCENT)
- U.S. Air Forces Central
(AFCENT)
- 1ETSG
- 1st Theater Sustainment CMD
- Air Force Civil Engineer Center
(AFCEC)
- Air Force Security Assistance and Cooperation Directorate
(AFSAC)
- Navy Int’l Prgms Office (NIPO)
- U.S. Special Operations Command Central (SOCCENT)
- U.S. Naval Forces Central Command (NAVCENT)
- CENTCOM/SOCOM
- Army Aviation & Missile CMD
- Missile Defense agency (MDA)
- U.S. Army Security Assistance Command (USASAC)
- US Ambassadors & SDO/DATTs
Jordan
- Military Assistance Program - Jordan
- Royal Jordanian Armed Forces
- 322nd Air Expeditionary Wing (AEW)
- Area Support Group Jordan (ASG-J)
Qatar
- Office of Military Cooperation (OMC)
- Qatar Emiri Air Defense Force (QEADF)
- Qatari Emiri Corps of Engineers (QECE)
- Qatari Emiri Air Force (QEAF)
- 379th Air Expeditionary Wing (AEW)
Egypt
- Egyptian Air Force, Army, and Navy
- Egyptian Engineering Authority
- Office of Military Cooperation (OMC)
UAE
- Office of Military Cooperation (OMC)
- UAE Command Military Works (CMW)
- Air Force Life Cycle Management Center
- Air Force Security Assistance and Cooperation Directorate
- Defense Security Cooperation Agency
Kingdom Of Saudi Arabia
- Ministry of Defense (MOD)
- Royal Saudi Land Forces Aviation Command
- Royal Saudi Air Force
- Royal Saudi Naval Forces
- Ministry of Interior Military Assistance Group
- General Directorate of Military Works
- CAD (Contract & Agreement Department)
- Office of the PgM, Saudi Arabian National Guard
- 378th Air Expeditionary Wing (AEW) Oman
- N/A
Kuwait
- Office of Military Cooperation (OMC)-Kuwait
- Kuwait Ministry of Defense (KMOD)
- Kuwait Naval Force
- 386th Air Expeditionary Wing (AEW)
- Theater Engineer Brigade (TEB)
- Area Support Group (ASG)
- Combined Joint Task Force Operation Inherent Resolve (OIR) HQ
- Construction Management Office
- U.S. Army Security Assistance Command
(USASAC)
- Kuwait MPW, MEP, MEW
Iraq
- Office of Security Cooperation (OSC)
- Ministry of Interior (MoI)
- Ministry of Defense (MoD)
- Combined Joint Task Force Operation Inherent Resolve (CJTF-OIR)
- Visa waiver for DoD Civilian
- Passport processing
Syria
- Office of Security Cooperation (OSC)
- Ministry of Interior (MoI)
- Ministry of Defense (MoD)
- Combined Joint Task Force Operation Inherent Resolve (OIR)
CASA Region - Tajikistan, Pakistan, Kyrgyzstan, Kazakhstan, Uzbekistan, Turkmenistan
- Office of Security Cooperation (OSC)
- Request TAE inclusion in initial planning and discussion
TAE Strategic Partnership Priorities
Lebanon -Office of Military Cooperation (OMC) -Lebanese Armed Forces (LAF)
Israel
- Israel Ministry of Defense
(IMOD)
- Israel Army
- Israel Navy
- Israel Air Force
Contracting Overview
Mr. Matthew Durbin Chief, Acquisition Branch
UNCLASSIFIED Updated: September 2023
Contracting Leadership
Innovative Methods of Procurement
Comparison of Innovative Methods
Reminders about System for Award Mgmt
TORN Procedures with New Contracts
Active IDIQs
Planned IDIQs
CONTRACTING - AGENDA
TAM Contracting Leadership Ms. Lisa C. Billman, District Chief of Contracting lisa.c.billman@usace.army.mil
Ms. Michelle R. Pearman, Deputy District Chief of Contracting/Oversight Branch Chief michelle.r.pearman@usace.army.mil Responsible for the coordination with higher headquarters on upward reporting, oversight of solicitation and contract quality/adherence to the regulations and process improvements.
Mr. Matthew D. Durbin, Acquisition Branch matthew.d.durbin@usace.army.mil Responsible for Source Selection processes, Acquisition planning and scheduling, data analysis and visualization, cost/price analysis, other contract evaluation/awards as necessary to keep things on schedule.
Mr. Kenneth G. Baker, Construction Branch kenneth.g.baker@usace.army.mil Responsible for all A-E and construction contracts and task orders for requirements within the District’s area of responsibility.
Mr. John (Alex) Padgett, Procurement Branch john.a.padgett@usace.army.mil Responsible for all Centers of Standardization (COS) requirements, A-E IDIQ placement/administration, services and supplies within the District’s area of responsibility.
UNCLASSIFIED
UNCLASSIFIED
mailto:lisa.c.billman@usace.army.mil mailto:michelle.r.pearman@usace.army.mil mailto:matthew.d.durbin@usace.army.mil mailto:kenneth.g.baker@usace.army.mil mailto:michelle.r.pearman@usace.army.mil
Multi-step advisory process (FAR 15.202) – Advise prospective offerors on whether they would be viable competitors for a particular acquisition
Delayed price proposals – Delaying price to start or continue evaluation process while responding to bidder inquiries that impact price
Bifurcated solicitation – Issuing the solicitation while design is being completed to start the evaluation process during design. Will withhold evaluation of price until the full design is complete.
INNOVATIVE METHODS OF PROCUREMENT
MULTI-STEP ADVISORY
PROCESS DELAYED PRICE PROPOSALS BIFURCATED SOLICITATION
When to use Pre-solicitation
To advise prospective offerors whether they would be viable competitors for a particular acquisition
After solicitation, during evaluation
When award is critical, and evaluation can’t be delayed
Pre-100% design complete
When award is critical, and evaluation of management team, past performance and non-design related proposal information is possible
Advantages Improved partnering with Industry
Increased pool of viable competitors
No impact to acquisition timeline
Maintained schedule
Better, more refined pricing from offerors
Maintained schedule
Ability to evaluate non-design
Disadvantages Process does not preclude non-viable competitors from submitting a proposal
May delay selection if evaluation concludes before date set for price proposal
Potential for disconnect between technical proposal and price
Potential for disconnect between technical proposal and price
COMPARISON OF INNOVATIVE PROCESSES
Potential offerors must:
– Maintain its SAM registration from proposal submission through life of contract
– Advise Contracting Officer if there are issues with SAM registration
Failing to maintain SAM registration may make the offeror unacceptable or ineligible for award
– If option is to be exercised and SAM registration is not up to date, may lose option work/time
REMINDERS ABOUT SYSTEM FOR AWARD MGMT
• For each task order to be awarded under a MATOC the KO will notify all A-E firms within the MATOC pool via a Task Order Requirement Notice (TORN).
• A Simplified TORN will be used when there is sufficient information in the existing SF330s on file to determine the most highly qualified firm. Supplemental information will NOT be requested, accepted, or evaluated for Simplified TORNs.
• A Request for Supplemental Information (RSI) TORN may be used when the available information within the existing SF330s on file is insufficient to determine the most highly qualified firm and firms must submit a response to be considered. The RSI TORN will NOT be routinely used. Typically, this will only be used for large, technically complicated projects.
• TORN Procedures will continue to be used for the existing SATOCs awarded in FY19.
• New MATOCs will not be competed against the FY 19 SATOCs or against other MATOCs.
TORN PROCEDURES WITH NEW CONTRACTS
• KOs will notify all A-E firms in a MATOC via Task Order Requirement Notice (TORN)
• Simplified TORN sufficient information available to determine the most highly qualified firm
Supplemental information will NOT be requested, accepted, or evaluated for Simplified TORNs
• Request for Supplemental Information (RSI) TORN insufficient information to determine the most highly qualified firm
ONLY for large, technically complicated, or otherwise atypical projects.
• TORN Procedure use will continue for the existing FY19 SATOCs
• New MATOCs will NOT compete against the FY19 SATOCs or against other MATOCs
TORN PROCEDURES WITH NEW CONTRACTS
EXISTING TOOL TYPE TOTAL
CAPACITY USED AVAILABLE*
PERCENT
CAPACITY
AVAILABLE
SUNSET
DATE
Large Business Design SATOC Tetra Tech
Architect- Engineer $46M $20.5M $25.5M 5.4% 11 DEC 2024
Large Business Design SATOC Baker Jacobs JV
Architect- Engineer $46M $45.1M $871K 1.89% 11 DEC 2024
Large Business Design SATOC Stanley Consultants
Architect- Engineer $46M $43.4M $41.8M 5.6% 11 DEC 2024
Large Business Design SATOC
AECOM-B&V JV
Architect- Engineer $46M $4.2M $41.8M 90.9% 13 DEC 2024
Large Business Design SATOC M&H-CDM Smith JV
Architect- Engineer $46M $8.3M $37.7M 82.1% 13 DEC 2024
Small Business Design SATOC Robert & Company
Architect- Engineer $5M $1.7M $3.3M 65.9% 25 DEC 2024
Small Business Design SATOC Native Tech Solutions
Architect- Engineer $5M $2.3M $2.7M 53.7% 25 DEC 2024
*Capacity available as of 25 SEP 24
ACTIVE INDEFINITE DELIVERY CONTRACTS
CAPACITY USED AVAILABLE*
PERCENT
CAPACITY
AVAILABLE
SUNSET
DATE
Communications SATOC - Baker Architect- Engineer $9M $471K $8.5M 94.8% 14 FEB 2025
Fire Protection SATOC - Stanton Architect- Engineer $9M $110K $8.9M 98.7% 13 NOV 2024
Topographical SATOC - Lowe Architect- Engineer $18M $1.9M $16M 89.7% 16 NOV 2024
GEO SATOC - IGVJ
Architect- Engineer $9M $3.5M $5.5M 61.1% 25 DEC 2024
MMSC SATOC- Tetra Tech Architect- Engineer $45M $39.5M $5.4M 12.2% 04 FEB 2025
THAAD SATOC- AECOM-Tetra Tech JV Architect- Engineer $90M $69M $21M 23.3% 01 JAN 2027
P-563 Integrator SATOC Tecnica Y Proyectos TYPSA
Architect- Engineer $290M $58.4M $231.6M 79.85% 16 FEB 2028
*Capacity available as of 25 SEP 24
ACTIVE INDEFINITE DELIVERY CONTRACTS
CAPACITY USED AVAILABLE*
PERCENT
CAPACITY
AVAILABLE
SUNSET
DATE
Master Planning SATOC - Pond-Baker Architect- Engineer $24M $4.4M $19.6M 81.5% 27 JUN 2028
P-563 Design MATOC Scott Browning, LTD/WSP USA Solutions//Hellmuth, Obata & Kassabaum, P.C./Skidmore, Owings & Merrill Llp/Jacobs Government Services Co/HKS, Inc/M. Arthur Gensler Jr. & Associates, Inc
Architect- Engineer $700M $80.9M $619.1M 78.5% 29 JUN 2026
Israel Design MATOC HDR Architecture, Inc./CH2M Hill/WSP USA Solutions, Inc.
Architect- Engineer $35M $436K $34.5M 98.8% 10 SEP 2028
Jordan JOC- Morganti Group Construction $48.5M $3.5M $45M 92.8% 22 NOV 2024
Pacer Forge - American International Contractors
Construction $55M $19M $35.7M 64.9% 29 MAR 2027
*Capacity available as of 25 SEP 24
ACTIVE INDEFINITE DELIVERY CONTRACTS
CAPACITY USED AVAILABLE*
PERCENT
CAPACITY
AVAILABLE
SUNSET
DATE
Egypt SATOC- Interdyne Corp. Construction $41M $14.8M $26M 63.84% 19 MAY 2025
Kuwait JOC- MVL Inc. Construction $75M $38M $37M 49.29% 19 APR 2025
Kuwait Apache Support DWC General Trading & Cont Co.
Construction $8M $7.9M $140K 1.76% 29 SEP 2025
THAAD MATOC
Albawani Cont Co./Al-Latifia Trading & Cont Inc./Al Yamama Contracting for Trading & Contracting/Saudi Archirodon Co. Ltd./El Seif Engineering Contracting Co./Orient Construction Co Weavers Ltd.
Construction $990M $7.8M $982M 99.21% 15 NOV 2028
Shield 5 – O&M Services Al Rawabet Commercial Services & Contracting Co.
Services $33M $15.5 $17.4M 52.85% 31 MAY 2027
KSA Personal Support Services Versar, Inc.
Services $7.5M $1.4M $6.1M 81.3% 23 MAY 2025
*Capacity available as of 25 SEP 24
ACTIVE INDEFINITE DELIVERY CONTRACTS
CAPACITY USED AVAILABLE*
PERCENT
CAPACITY
AVAILABLE
SUNSET
DATE
KSA DB-DBB MATOC
AICI-Archirodon JV LLC/Al Hamra Kuwait Co./Dogus Insaat VeTicaret Anonim Sirketi/Gilbane Yuksel JV/MVL Saudi Builders Group LLC/Perini Mgmt Services
Construction $449M $11M $438M 97.5% 29 JUN 2030
Relocatable Bldgs (RLB) MATOC Itera LLC/MVL USA Inc./Dorce Prefabrik Yapi Ve Insaat Sanayii T/Atlantic Diving Supply Inc. / Panorama Contracting and Engineering Services
Services $250M $5K $250M 100% 09 JAN 2029
Taxi and Runway Repair – ISR CDM/Conti//Relyant
Services $50M $3.5M $46.5M 93.07% 12 OCT 2028
North DBB MATOC – ISR Bryan Global/CDM/Conti//Relyant
Construction $50M $36.8M $13.2M 26.49% 21 JUN 2026
South DBB MATOC – ISR Bryan Global/CDM/Conti//Relyant
Construction $50M $17M $32.8M 66.69% 21 JUN 2026
*Capacity available as of 25 SEP 24
ACTIVE INDEFINITE DELIVERY CONTRACTS
Typical types of contracts TAM awards
Current capacities may not last through sunset dates necessitating earlier re-procurement
Current contracts may not be used by customers and not reprocured
KEY TAKEAWAYS
PLANNED TOOL TYPE
TOTAL
CAPACITY
PLANNED
SCOPE ADVERTISE/
AWARD
A-E Design MATOC, CENTCOM A-E Services $240M
A-E services in support of the design and construction activities to support a variety of worldwide missions under North American Industrial Classification System (NAICS) code 541330. This MATOC will primarily support the operational requirements of various CENTCOM stakeholders as well as TAD Districts’ worldwide missions, including the Technical Center of Expertise for Hangar Fire Protection, USSOCOM Center of Excellence, and any worldwide missions, USACE enterprise missions or tasks, or Department of Defense (DoD) initiatives that may be assigned to TAD in the next five (5) years.
Award 1Q25
A-E Construction Phase Support Services SATOC
A-E Services $75M
Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for General Architect- Engineer (A-E) Construction Phase Support Services (CPSS) throughout the U.S.
Army Corps of Engineers, Transatlantic Division Middle East District (CETAM) Area of Responsibility (AOR). Work will primarily consist of CPSS in support of the CETAM mission in the U.S. Central Command (CENTCOM) AOR, which includes the Middle East and portions of Southwest and Central Asia. Work may also be performed at Continental United States (CONUS) locations. CONUS work may include indirect services, such as administrative or management support, or services that direct contract execution such as engineering review or professional scheduler services.
Award 1Q25
KU-B-HBK Maintenance and Support SATOC (MSC-K) Services $48M
Services to provide regular and re-occurring facility maintenance, corrective maintenance services, and other related supporting tasks for multiple Kuwait Ministry of Defense (KMOD) installations and sites throughout the country.
Award 1Q25
KU-B-HBM
MTCC O&M SATOC Services $30M
Services to provide regular and re-occurring facility maintenance, corrective maintenance services, and other related supporting tasks for the Bubiyan Fanar Maritime Traffic Control Center (MTCC) and related facilities on behalf of the Kuwait Naval Forces (KNF). The MTCC is a fixed, self-supporting offshore platform located approximately 30 nautical miles off the coast of Kuwait City.
Award 2Q25
PLANNED INDEFINITE DELIVERY CONTRACTS
TOTAL
CAPACITY
PLANNED
SCOPE ADVERTISE/
AWARD
Personal Services Contract (PSC) Follow-On Services $49M
Provide Quality Assurance Representatives (QAR) to monitor construction projects throughout the Kingdom of Saudi Arabia (KSA). The required personnel would perform the functions of project and program management, construction management, project engineering, quality assurance, real estate, and support staff through a Firm-Fixed-Price (FFP), Personal Services Contract (PSC) for its continued operations in the KSA. These positions shall replicate typical Foreign Service National (FSN) employee positions obtained by U.S. Government Agencies to support overseas projects and locations. This contract is for personal services in exclusive support of TAM’s missions throughout KSA
Advertise 2Q25
Qatar Falcon 5 O&M IDIQ Services $40M
Provide regular and re-occurring facility maintenance, corrective maintenance services, and other related supporting tasks for QEAF Falcon 5 Facilities on Al Udied Airbase in Qatar. The scope of this IDIQ is for “routine” installation, maintenance, alteration, and repair services. The scope of the services which could be executed under this SATOC includes such tasks as (but is not limited
to) regular maintenance services on facility building systems and components such as HVAC, power generation, structural systems and roofs, communication systems, fire protection, elevators, and security systems to include cameras, CCTV systems, etc. The contract will also allow for the repair and/or replacement of specific building systems, equipment, and infrastructure which have fallen into disrepair, procurement support (such as for spare parts, consumables, or other facility related equipment) and for minor construction incidental to, or in support of the services required for an effective operations & maintenance (O&M) program.
Award 3Q25
A-E Geotechnical Surveying SATOC A-E Services $9M
Architect-Engineer (A-E) Indefinite Delivery/ Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for geotechnical investigation and engineering services to provide site soil information for design. The A-E is expected to perform Architect – Engineer Services identified in FAR 36.601-4 for a variety of professional services to support the design and construction of existing and new facilities, infrastructure improvement projects, and other missions in support of TAM.
TBD
PLANNED INDEFINITE DELIVERY CONTRACTS
TOTAL
CAPACITY
PLANNED
SCOPE ADVERTISE/AWARD
Design ITR SATOC for CENTCOM A-E Services $9M
The proposed services are for the independent review of a variety of Architect/Engineer designs for various military and civil works projects primarily within Saudi Arabia, Qatar, Bahrain, and Kuwait, and other countries in the CENTCOM AOR mission boundaries.
TBD
Prefabricated Concrete Elements
Construction $50M
Procuring and delivering prefabricated concrete structures and elements from Israel Ministry of Defense (IMOD) approved vendors throughout the country of Israel. The Government will use the SATOC to order prefabricated elements of the following type:
security rooms, shelters, modular protected structures, military protected spaces, corridor elements, staircase elements, t-walls, and foundations. Each type of unit required under this contract is currently being produced by the vendors on the approved list using specifications previously provided to those vendors by IMOD. The contractor will be responsible to source quotes from vendors, place orders in accordance with Government requirements, inspect the various prefabricated elements to ensure compliance with IMOD standards, transport, and offload them at a government directed drop off point. The Contractor will not be responsible for site prep or installation, including utility hook-ups.
Award 3Q25
EG-B-HDO O&M SATOC Services $8M TBD Award 4Q25
PLANNED INDEFINITE DELIVERY CONTRACTS
Construction
Mr. Paul Holcomb, P.E.
Chief, Construction Division
Construction Leadership
Base Access
Combating Trafficking in Persons (CTIP)
Partnering
Safety
Updated: September 2023
CONSTRUCTION - AGENDA
Mr. Paul C. Holcomb, P.E., Division Chief, Construction Division Paul.C.Holcomb@usace.army.mil
Mr. Neal R. Thibault, Deputy Division Chief, Construction Division Neal.R.Thibault@usace.army.mil
Mr. Carlos Estrella, P.E., Branch Chief, Quality Assurance Carlos.Estrella@usace.army.mil
Mr. Harry H Kye, Branch Chief, Contract Administration Harry.H.Kye@usace.army.mil
Mrs. Elisa A Beck, P.E.; Area Engineer (ACO), QATAR AO Elisa.A.Beck@usace.army.mil
Ms. Shannon L. Geoly, P.E., Area Engineer (ACO), SAUDI AO Shannon.L.Geoly@usace.army.mil
Mr. Gregory M. Schulz, P.E., Area Engineer (ACO), ISRAEL AO Gregory.M.Shulz@usace.army.mil
Updated: September 2023
TAM CONSTRUCTION LEADERSHIP
UNCLASSIFIED
mailto:Paul.C.Holcomb@usace.army.mil mailto:Neal.R.Thibault@usace.army.mil mailto:Carlos.Estrella@usace.army.mil mailto:Harry.H.Kye@usace.army.mil mailto:Elisa.A.Beck@usace.army.mil mailto:Shannon.L.Geoly@usace.army.mil mailto:Gregory.M.Shultz@usace.army.mil
One of Contractors biggest challenge
All contractors will most likely require a Host Nation Gate Pass and or a US Military gate pass
Both the US Military and Host Nation Countries will have their own distinct work ethic
USACE has no control over the US Military or Host Nation gate pass approval process.
− USACE office will assist as much as it can but ultimately falls on
Contractor to ensure they are following security protocol
Process could take up to 90 days to complete so planning ahead of time is imperative
Updated: September 2023
CONSTRUCTION – BASE ACCESS
• ZERO TOLERANCE!
• CTIP Compliance plan (Your Plan) require the contractor to submit its CTIP compliance plan in its Notice to Proceed Submittal Package
• Quarterly inspections ( announced and unannounced)….INDICATORS!
• Interviews of employees…(Freedom)
• Visual inspections of working/living conditions
• DOCUMENTS: Identification/Passports/Medical Cards
• Wages
• Safety
• VIOLATIONS may result in…
• Removal of Contractor or Subcontractor Employee
• Require the Contractor to Terminate a Subcontract
• Suspend Contract Payments
• Terminate the Contract for Default or Cause
• Recommend Suspension or Debarment
Updated: September 2023
CONSTRUCTION – COMBATTING TRAFFICKING IN PERSONS (CTIP)
UNCLASSIFIED Updated: July 2023
Partnering is a teamwork approach to achieving success. Composed of representatives from each stakeholder organization in a project. Doing business based upon TRUST, DEDICATION to common goals, and an UNDERSTANDING of each other’s expectations and values
BEST PRACTICES:
− Foster trust, open communication and teamwork − Bring up issues early and follow through with them − Develop realistic schedules − Ensure quality of material and workmanship − Demand and enforce a safety standard program − Plan for success and work the plan − Minimize changes − Document, document, document − Be transparent
C O
N
TR
AC
TO
R
PROJECT SUCCESS
Updated: September 2023
CONSTRUCTION – POST AWARD PARTNERING
NUMBER ONE PRIORITY!!!
Provide a safe work environment for contractors, customers, and government personnel both while building projects and in non-work settings.
Provide job specific plans that incorporates how you will function in accordance with EM 385-1-1.
Have a CERTIFIED safety professional to ensure plans are developed and are being implemented.
Report all mishaps to include any near misses.
Updated: September 2023
CONSTRUCTION - SAFETY
• Near Misses identify potential hazards, implement corrective actions, and foster a proactive safety culture.
• High Risk Activities – Load Handling Equipment (Crane/Lift Plans), Excavations, Fall Protection, Dive Operations, etc.
Updated: September 2023
CONSTRUCTION – SAFETY LEADING INDICATORS
FY24 Near Miss Hazard Trends
Engineering
Mr. Edward “Ted” Upson, P.E., PMP Chief, Engineering Division
ENGINEERING LEADERSHIP
Chief, Engineering Division
Edward (Ted) Upson, P.E., PMP 540-665-4062
Edward.O.Upson@usace.army.mill
Building Systems Branch Mr. Samuel George, P.E.
540-665-3632 Samuel.A.George@usace.army.mil
Design Management Branch Ms. Cynthia Darlington, P.E.
540-665-3933 Cynthia.L.Darlington@usace.army.mil
Technical Services Branch Mr. David Rackmales, P.E.
540-665-3607 David.N.Rackmales@usace.army.mil
Site & Building Design Branch Ms. Mary A. Billings, P.E.
540-665-2686 Mary.A.Billings@usace.army.mil
Deputy Chief, Engineering Division Mr. Ramin Sabet, P.E.
540-665-3993 Ramin.F.Sabet@usace.army.mil
Planning and Requirements Branch Mr. Sean Martin, AICP, PMP
540-665-5032 Sean.L.Martin@usace.army.mil
CoS for Non-Permanent Facilities Mr. Dale Hartmann, P.E.
540-665-2684 Dale.R.Hartmann@usace.army.mil
Planning
GIS
AE Contract Management
Structural Architect
Civil Geotech
Interior Design
Cost Specifications
CADD/BIM/ProjectWise
Design Managers
CoS Value Engineering
Design Quality
Electrical Mechanical
Fire Protection Communications
MIDDLE EAST DISTRICT PROGRAM
Programs and Project Management Division Mr. Joseph R. Behr, PMP Deputy Chief, Programs and Project Management Division
- TAM Programs and Project Management Leadership
- Program Overview by Country Bryton Johnson: Kuwait, Iraq, Syria, and Central Asian States
TAE Leadership Portfolio Summary Tri Slide (TAE may not have for all of these countries) Opportunities
Joseph Zaraszczak: Kuwait, Lebanon Portfolio Summary Tri Slide Opportunities
Matthew Reagan: Saudi Arabia Portfolio Summary Tri Slide Opportunities
John Plummer: Jordan, UAE, Qatar, Bahrain Portfolio Summary Tri Slide Opportunities
Peter DeMattei: Israel Portfolio Summary Tri Slide Opportunities
Brian Ball: Egypt, Services and Procurements Portfolio Summary Tri Slide Opportunities
Updated: September 2023
PROGRAMS AND PROJECT MANAGEMENT -
AGENDA
Mr. Joseph “Joey” R. Behr, PMP Acting Deputy for Programs and Project Management
(DPM)
Joseph. R.Behr@usace.army.mil
Mr. Joseph L. Zaraszczak, PMP Branch Chief Joseph.L.Zaraszczak@usace.army.mil Kuwait, Lebanon
Mr. Matthew S. Reagan, PMP Branch Chief Matthew.S.Reagan@usace.army.mil Saudi Arabia
Khaled M. Masoud, PhD, P.E., PMP Forward Regional Program Manager Khaled.M.Masoud@usace.army.mil
Mr. David A. Colberg, RA Branch Chief David.A.Colberg@usace.army.mil Saudi Arabia MOD Transformation
Mr. Joseph “Joey” R. Behr, PMP Deputy DPM Joseph.R.Behr@usace.army.mil
Mr. John G. Plummer Branch Chief John.G.Plummer@usace.army.mil Jordan, Bahrain, UAE, & Qatar
Mr. Brian H. Ball, P.E., PMP Branch Chief Brian.H.Ball@usace.army.mil AOR Services and Procurements, Egypt
Mr. Peter A. DeMattei, PMP Branch Chief Peter.A.DeMattei@usace.army.mil Israel
Mr. Gerald J. Dabkowski Branch Chief Gerald.J.Dabkowski@usace.army.mil Project Controls
Updated: February 2024
UNCLASSIFIED
TAM PPMD LEADERSHIP
UNCLASSIFIED
mailto:thomas.k.waters@usace.army.mil mailto:Joseph.L.Zaraszczak@usace.army.mil mailto:Matthew.S.Reagan@usace.army.mil mailto:Khaled.M.Masoud@usace.army.mil mailto:David.A.Colberg@usace.army.mil mailto:lora.m.carroll@usace.army.mil mailto:John.G.Plummer@usace.army.mil mailto:Brian.H.Ball@usace.army.mil mailto:Peter.A.Demattei@usace.army.mil mailto:Gerald.J.Dabkowski@usace.army.mil
VIET Q. NGUYEN, P.E., PMP
DEPUTY FOR PROGRAMS AND PROJECT MGMT
IRAQ, SYRIA, CENTRAL ASIAN STATES, AND
KUWAIT MILCON, O&M, AND DCA
JOSEPH L. ZARASZCZAK, PMP
BRANCH CHIEF
KUWAIT FMS, LEBANON
UNCLASSIFIED Updated: September 2023
Mr. Viet Nguyen, P.E., PMP Deputy for Programs and Project Management Division viet.q.nguyen@usace.army.mil
Mr. Stephen Rumple Program Manager Kuwait Programs stephen.t.rumple@usace.army.mil
Mr. Sean McNeil Program Manager
CTEF/FMS/FMF/IIS
sean.t.mcneil@usace.army.mil
Mr. Chimeadu Ewoh OIR Program Manager Chimeadu.a.ewoh@usace.army.mil
Mr. Christopher Beard Environmental Chief christopher.g.beard@usace.army.mil
Ms. Jessamyn Fluitt Acting Base Camp Master Planning Lead jessamyn.m.fluitt@usace.army.mil
Updated: September 2023
TAE PPMD LEADERSHIP
UNCLASSIFIED
mailto:viet.q.nguyen@usace.army.mil mailto:stephen.@usace.army.mil mailto:sean.t.mcneil@usace.army.mil mailto:Chimeadu.a.ewoh@usace.army.mil mailto:christopher.g.beard@usace.army.mil mailto:jessamyn.m.fluitt@usace.army.mil
Ms. Yvette Walker, District Chief of Contracting yvette.walker@usace.army.mil
Ms. Shayla Lucas, Business Operation shayla.j.lucas@usace.army.mil
Ms. Valerie Murphy, Contracting Officer valerie.e.murphy@usace.army.mil
Mr. Peter Smith, Contract Specialist Peter.s.smith@usace.army.mil
Ms. Nikisha Cook, Contract Specialist nikisha.l.cook@usace.army.mil
Mr. Joseph Warby, Contract Specialist joseph.d.warby@usace.army.mil
Updated: September 2023
TAE CONTRACTING LEADERSHIP
UNCLASSIFIED
mailto:yvette.walker@usace.army.mil mailto:shayla.j.lucas@usace.army.mil mailto:valerie.e.murphy@usace.army.mil mailto:Peter.s.smith@usace.army.mil mailto:richard.w.bonnell@usace.army.mil mailto:ikisha.l.cook@usace.army.mil mailto:joseph.d.warby@usace.army.mil
Mr. Eddie Johnson, Engineering and Construction Division Chief edwin.c.johnson@usace.army.mil
Vacant, Deputy E&C Division Chief @usace.army.mil
Mr. Russell Wahlay, Chief of Construction russell.wahley@usace.army.mil
Ms. Kimberley Edwards, Acting Chief of Engineering kimberly.d.edwards@usace.army.mil
Mr. William Kiddy, Area Engineer william.w.kiddy@usace.army.mil
Updated: September 2023
TAE ENGINEERING & CONSTRUCTION LEADERSHIP
UNCLASSIFIED
mailto:edwin.c.johnson@usace.army.mil mailto:marshand.j.whittington@usace.army.mil mailto:russell.wahley@usace.army.mil mailto:kimberly.d.edwards@usace.army.mil mailto:william.w.kiddy@usace.army.mil
Iraq & Syria: TAE is the Life-Cycle Project Management (Cradle-to-Grave) support for CJTF-OIR in Iraq & Syria. Assist requiring activities (RA) with development of requirements for project execution using Planning, Design, Contracting, & Construction capabilities for both OMA and CTEF Programs
Central and South Asia (CASA): USACE Design & Construction in support Integrated Country Plan, Partner Nation Disaster Management Capability Assessment and Training, and Partner Nation Natural Disaster Recovery Subject Matter Expert Exchange
UNCLASSIFIED Updated: September 2023
PPMD IRAQ/SYRIA/STANS
CURRENT PROGRAM - KUWAIT
Mission by Category
$1,162M
DCA-K Program: $490 M Active Construction $46 M
Pre-Award $-
Design $-
Potential $443 M
TAE Active Construction Contracts (Contract Values): $74 M P2 452564 - Marine Construction & Repairs $24 M
P2 460809 - Unaccompanied Officers Quarters, $22 M
P2 508870 - Underground Electric Lines, Buehring $6 M
P2 503982 - ARTC Search House $1 M
P2 502151 - ERCIP, ZN4 Microgrid Controller, 1.25 MW $13 M
P2 498103 - UMMCA Vehicle Maintenance Facility (TEMF), Buehring $9 M
TAM Active Construction Contracts (Contract Values): $244 M P2 443309 - KU-B-UMG PATRIOT Sites $56 M
P2 470098 - KU-B-HAU Artillery Camp Upgrades $30 M
P2 369882 - Construct Care and Preservation Facility $26 M
P2 461243 - KU-B-HBD PEB HAZMAT Maintenance Facility $14 M
P2 476074 - KU-B-HBB Construct Logistics Warehouses $22 M
P2 480088/480569 - KU-P-SBG Super Hornet Procurement B $52 M
P2 480570 - KU-P-SBG Super Hornet Procurement C $26 M
P2 485040 - KU-B-UMP Maint & Repair Svcs, Apache Support $8 M
P2 443309 - KU-B-UMG PATRIOT Replacement of HVAC $8 M
P2 494192 - KU-P-LDA Fixed Dive Recompression Chamber $2 M
P2 497741 - KU-B-HBL Construct/Renovate Warehouses, 35th BDE $40 M
TAM Projects in Design (PA Values): $289 M P2 480573 - KU-B-SBG Super Hornet Procurement D M
P2 480549/480566/492701 - KU-P-SBG Super Hornet Procurement E M
P2 509974 - KU-B-UXF Construct Apache Alert Facilities M
P2 474252 - KU-B-HBB Camp Al Mujandeen (Design Only) M
TAE Projects in Design (PA Values): $64 M P2 517917 - B550N Renovations M
P2 500390 - ERCIP Zn1 Pad17 Hybrid Microgrid, Buehring FY26 M
P2 518100 - Waste Water System Repair, CBKU M
P2 TBD - Entry Control Point (ECP-1) Upgrades, CBKU M
P2 TBD - Entry Control Point (ECP-2) Upgrades, CBKU M
P2 TBD - B152 Renovations, CAKU M
P2 TBD - SAFE Barracks, CBKU M
TAE Projects in Pre-Award (CWE Values): $109 M P2 516718 - Kuwait MATOC M
P2 504376 ERCIP Hybrid Renewable Resilient Energy, Arifjan FY23 M
P2 506498 ERCIP ARTC Microgrid 13, Buehring FY24 M
P2 517131 PAHP Airfield Repair (Asphalt) M
P2 518099 - Bldg 404A Fire Suppression Repairs, CBKU M
P2 542181 - Weather Shelter 3, CBKU M
P2 521350 - Weather Shelter 4, CBKU M
P2 521349 - Weather Shelter 5, CBKU M
TAM Projects in Design (PA Values): $594 M P2 480573 - KU-B-SBG Super Hornet Procurement D M
P2 480549/480566/492701 - KU-P-SBG Super Hornet Procurement E M
P2 509974 - KU-B-UXF Construct Apache Alert Facilities M
P2 474252 - KU-B-HBB Camp Al Mujandeen (Design Only) M
P2 515113 - KU-B-UYG NASAMS Sites M
FMS Program: $5,343 M Active Construction $216 M
Pre-Award $78 M
Design $594 M
Potential $4,455 M
MILCON/O&M/ERCIP Program: $364 M Active Construction $61 M
Pre-Award $109 M
Design $64 M
Potential $131 M
POTENTIAL PROGRAM - KUWAIT
Mission by Category
5,029M
DCA-K Program: $443 M Hot Cargo Pad, AASAB M
Tactical Airlift Ramp, AASAB M
ARCENT FWD HQ, CAKU M
Aircraft Maintenance, North, CBKU M
Aircraft Maintenance, South, CBKU M
Billeting, 150 Pax, CAKU M
Dormitory #1, 700 PAX, AASAB M
Billeting, 150 Pax, CAKU M
Dormitory #2, 700 PAX, AASAB M
Dining Facility, 1000 PAX, CBKU M
Dining Facility, AASAB M
C-130 Maintenance Shop, AASAB M
C-130 AGE Maintenance Shop, AASAB M
C-130 Squadron Operations/AMU, AASAB M
Waste Water System Expansion, CBKU M
Dining Facility, 500 PAX, CBKU M
Dining Facility, 1000 PAX, CAKU M
Vehicle Search Area (VSA) Road, Cargo City M
Electrical Connection, AASAB M
MILCON/O&M: $131 M
MCA Dining Facility, 1000 PAX, CBKU, FY26 M
MCA Unaccompanied Personnel Housing 150 PAX, CAKU, FY26 M
MCA Dining Facility, 1000 PAX, CAKU, FY27 M
MCA Unaccompanied Personnel Housing 150 PAX, CAKU FY27 M
MCA Waster Water System Expansion, CBKU, FY27 M
DCA-K Program: $490 M Active Construction $46 M
Pre-Award $-
Design $-
Potential $443 M
FMS Program: $5,343 M Active Construction $216 M
Pre-Award $78 M
Design $594 M
Potential $4,455 M
MILCON/O&M/ERCIP Program: $364 M Active Construction $61 M
Pre-Award $109 M
Design $64 M
Potential $131 M
FMS Program - Offered (OED): $1,552 M P2 510438 - KU-B-HBN Ras Al Ard O&M & Enh Svcs (31 DEC 24) M
P2 510446 - KU-B-HBF Const Services Case (31 DEC 24) M
P2 515112 - KU-B-HBJ KMOD HQ Complex (28 FEB 25) M
P2 510445 - KU-B-HBQ Const Behaith Naval Base (5 NOV 24) M
P2 517593 - KU-B-HBS Const Warba Naval Base (5 NOV 24) M
P2 517594 - KU-B-HBT Const Ras Algaid Naval Base (5 NOV 24) M
FMS Program - In Development: $1,517 M P2 510440 - Construct MTCC 2 M
P2 510442 - KU-B-HBR Const KNB Sec Upgrade, Exp M
P2 510448 - KU-B-HBP Ras Al Ard Nav Base for Onsh Log M
P2 472118 - KU-P-SBG Super Hornet Additional Facilities (Amend) M
P2 517443 - Clinical Simulation Laboratory M
P2 TBD - KU-B-HBO MTCC1 Operational Enhancements M
FMS Program - Pre-LOR: $1,386 M Caracal Beddown Facilities M
P2 513018 - HTV Maint Facilities (Replacement for KU-B-UYB) M
Failaka Naval Base (On Hold per KMOD) M
KU-D-DAB Radars/Gap Fillers/Long Range (Amend) M
KU-B-UMG PATRIOT Potential Case Mod M
Helipads at Falcon Range - Udari M
KU-P-GHK KAF Metrology Calibration Lab Improvements M
Relocation of KC-130J Aprons/Shelters M
Country Fund Type Project Type Project Name Magnitude Range Design Strategy
Design Start (FY /Quarter)
Construction Acquisition Strategy
Advertise /(FY /Quarter) Scope Summary
Kuwait DCA Design & Construction APS Surveillance BLDG $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 KUWAIT MATOC FY25/Q3 Design & Construction of APS Surveillance Bldg
Kuwait DCA Design & Construction BLDG 550N C2 Facility $5,000,000 to
$10,000,000 D-B-B / USACE FY24/Q3 KUWAIT MATOC FY25/Q1 Design & Construction of C2 Facility
Kuwait DCA Design & Construction Barrack 1 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of Barrack 1
Kuwait DCA Design & Construction CRTF BN HQ $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of
CRTF BN HQ
Kuwait DCA Design & Construction Power Plant #12 Generator $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of Power Plant #12 Generator
Kuwait DCA Design & Construction ECP 1 Upgrade $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 KUWAIT MATOC FY25/Q3
Design & Construction of ECP 1 Upgrade
Kuwait DCA Design & Construction
ECP 2 Upgrade $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 KUWAIT MATOC FY25/Q3
Design & Construction of ECP 2 Upgrade
Kuwait DCA Design & Construction Ring 4 LV Substation Connections $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design& Construction of Ring 4 LV Substation Connections
Kuwait DCA Design & Construction ECP 1 to Aspen Paving $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of ECP 1 to Aspen Paving
Kuwait DCA Design & Construction Barracks 2, 3, 4, 5 $10,000,000 to
$25,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of Barracks 2, 3, 4, 5
Kuwait DCA Design & Construction CRTF Maintenance Facility 2 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of CRTF Maintenance Facility 2
Kuwait DCA Design & Construction ULZ Weather Shelter 6 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of ULZ Weather Shelter 6
UNCLASSIFIED Updated: September 2023
U.S. Occupancy MILCON, O&M, Defense Cooperation Agreement (DCA) Foreign Military Occupancy Foreign Military Sales (FMS), Foreign Military Financing (FMF)
TAE PPMD OPPORTUNITIES – KUWAIT
MILCON, O&M, HOST NATION
Strategy
Design Start (FY /Quarter)
Construction Acquisition Strategy
Advertise /(FY /Quarter) Scope Summary
Kuwait DCA Design & Construction ULZ Weather Shelter 6 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of ULZ Weather Shelter 6
Kuwait DCA Design & Construction ULZ Weather Shelter 7 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of ULZ Weather Shelter 7
Kuwait DCA Design & Construction CRTF Co HQ 1 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of CRTF Co HQ 1
Kuwait DCA Design & Construction CRTF Co HQ 2 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of CRTF Co HQ 2
Kuwait DCA Design & Construction CRTF Co HQ 3 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of CRTF Co HQ 3
Kuwait DCA Design & Construction CRTF Co HQ 4 $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3 Design & Construction of CRTF Co HQ 4
Kuwait MILCON Design & Construction Zone 4 MWR Prime Power Conn. $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3
Design & Construction of Zone 4 MWR Prime Power Conn.
Kuwait MILCON Design & Construction Pad 20-30 Generator Consolidation $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3
Design & Construction of Pad 20-30 Generator Consolidation
Kuwait MILCON Design & Construction FY25 Generator Consolidation $1,000,000 to
$5,000,000 D-B / USACE FY25/Q1 Likely Full & Open FY25/Q3
Design & Construction of aFY25 Generator Consolidation dining facility in Kuwait
UNCLASSIFIED Updated: September 2023
U.S. Occupancy MILCON, O&M, Defense Cooperation Agreement (DCA) Foreign Military Occupancy Foreign Military Sales (FMS), Foreign Military Financing (FMF)
TAE PPMD OPPORTUNITIES – KUWAIT
MILCON, O&M, HOST NATION
JOSEPH L. ZARASZCZAK, PMP
BRANCH CHIEF
KUWAIT FMS, LEBANON
Lebanon Snapshot
- $100M+ potential future program over the next five years. Design work at Beirut Naval Base, Hamat AB, and the Aqoura National Training & Operations Center (ANTOC).
Kuwait Snapshot - − An active $1.1B design and construction program and $5B in potential future work consisting of primarily Foreign Military Sales (FMS) but also Military Construction (MILCON which includes the Energy Resilience and Conservation Investment Program (ERCIP)), Operations & Maintenance (O&M), and Defense Cooperation Agreement (DCA) programs.
− USACE Transatlantic Expeditionary District (CETAE) is responsible for overall execution of the Kuwait program. The USACE Middle East District (CETAM) manages the Kuwait FMS part of the program.
PPMD Kuwait/Lebanon
PPMD Opportunities – Lebanon
Country Fund Type Project Type Project Name Magnitude Range Design Strategy
Design Start (FY /Quarter)
Construction Acquisition Strategy
Advertise /(FY /Quarter) Scope Summary
Lebanon FMF Design & Construction Improve Hamat AB Phase 1 $10,000,000 to
$25,000,000 In-House COMPLETE Full & Open FY25 / Q1 Rebuild runway & emergency access road.
Lebanon FMF Design & Construction
Restore Beirut Naval Base Phase 1A
$10,000,000 to $25,000,000 A-E COMPLETE Full & Open FY24 / Q3
Shore-to-ship utilities with 3 wet & dry hotel stations along Pier 1 to support the new Cyclone class vessels.
Install new electrical distribution facility, vessel fuel tanks & fueling station, cast in place perimeter wall, cast in place guard towers, new secondary entrance for emergency use, rebuild a new primary entry control point, & a new 3 story cast in place medical clinic.
Lebanon FMF Design & Construction
Restore Beirut Naval Base Phase 1B
$25,000,000 to $100,000,000 A-E COMPLETE Full & Open FY26 / Q1
Continue to rebuild the Beirut Naval Base using the Lebanese Armed Forces Master Plan. Facilities will include Base HQ, Navy HQ, Slipway, Boat Yard, etc.
Lebanon FMF Design & Construction Improve Hamat Air Base, Phase 2 $25,000,000 to
$100,000,000 TBD FY25 / Q3 Full & Open FY26 / Q3
Improve Hamat Air Base using the Lebanese Armed Forces Master Plan. Facilities will include Air Traffic Control Tower, Rotary Wing Hangar, Aircraft Fuel Point, Taxiways, Squadron Operations Building, etc.
PPMD Opportunities – Kuwait FMS
Country Fund Type Project Type Project Name Magnitude Range Design
Strategy Design Start (FY
/Quarter)
Construction Acquisition Strategy
Advertise
/(FY
/Quarter) Scope Summary
Kuwait FMS Design & ConstructionKU-P-SBG, Super Hornet Proc D $25,000,000 to
$100,000,000 A-E COMPLETE Full & Open FY24/Q4
Design-Bid-Build construction contract for (1) five new sunshades sized for one aircraft each, associated taxiway and apron and demolition of existing apron space; and (2) four new hangar facilities each housing two aircraft loaded with munitions and ready for immediate deployment.
Kuwait FMS Design & ConstructionKU-P-SBG, Super Hornet Proc E $25,000,000 to
$100,000,000 A-E COMPLETE Full & Open FY25/Q1
Design-Bid-Build construction for
(1) new intermediate level aircraft engine maintenance shop with open maintenance spaces and individual shops; (2) new intermediate level airframes maintenance shop; and (3) new squadron operations facility sized to house operational and administrative spaces
Kuwait FMS Design & ConstructionKU-B-UXF, Apache Support Facilities $100,000,000 to
$250,000,000 USACE /A-E FY24/Q2
Program may be executed via various acquisition strategies: Kuwait
JOC, MATOC &
Full & Open
FY25/Q3
New construction includes the Apache Alert Hangars, Mission Squadron Operation Facility, Longbow Crew Trainer Facility, Apache Alert Mission Ready Magazine, Apache Logistics Readiness Center Aviation Facility, Apache Maintenance Supply Warehouse, Rotary Wing Taxiway and Power.
Strategy
Design Start (FY /Quarter)
Construction Acquisition Strategy
Advertise /(FY /Quarter) Scope Summary
Kuwait FMS Design & Construction
Renovation of the Missile Assembly Disassembly Facility (MADF)
$5,000,000 to
$10,000,000 TBD FY24/Q4 TBD FY25/Q4
Renovate existing MADF.
Includes slab on grade removal replacement & replacement of interior non-load interior bearing walls & other improvements.
Kuwait FMS Design & Construction
KU-B-UYG, Air Defense Systems, Multiple Locations (NASAMS)
$250,000,000 to $500,000,000 TBD FY25/Q2 Full & Open FY26/Q2
Services to include planning, design, emergency infrastructure, facility support for new facilities, material acquisition, & operations & maintenance for all facilities that support NASAMS.
Located at various locations throughout Kuwait.
Kuwait FMS Various KU-B-HBF, Blanket Construction Case $100,000,000 to $250,000,000
USACE/A-E
(Projects not identified at this time)
FY25/Q2
- To be determined after identification of size & complexity of projects are known.
- Program may be executed via various acquisition strategies: Kuwait
JOC, MATOC &
Full & Open.
FY26/Q1
Provides for all program support tasks, including but not limited to, overall program management, planning, design, building & execution, quality assurance, contract award & management, reviews & other building & technical services as required by KMOD.
PPMD Opportunities – Kuwait FMS
Country Fund Type Project Type Project Name Magnitude Range Design
Strategy Design Start (FY
/Quarter)
Construction…