Industrial Water Treatment PWS.doc
DOC document 523 KB Posted
- Attached to
- Industrial Water Treatment Federal contract opportunity
- Solicitation number
- FA8601-21-R-0024
About this file
This performance-based work statement outlines industrial water treatment services required at Wright-Patterson Air Force Base. The contractor shall provide all personnel, equipment, materials, labor, treatment chemicals, laboratory support, and consultation services to treat cooling towers, package boilers, high temperature hot water systems, central steam and heating plants, heat exchangers, and closed loop hot water and chilled water systems. Services include weekly testing and inspections, quarterly and annual reports, monitoring and maintaining water quality standards, and responding to non-routine testing requests within four business days. The contractor must comply with all federal, state, and local regulations in performing these services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT
(PWS)
TO
PERFORM INDUSTRIAL WATER TREATMENT
WRIGHT-PATTERSON AFB, OHIO
15 Jan. 2021 I.
DESCRIPTION OF SERVICES
1.0. SCOPE
1.1. The contractor shall provide services for industrial water treatment of cooling towers, package boilers, high temperature hot water(HTHW) central heating plant, central steam plant, heat exchanger heating systems (hot water and steam) and closed loop systems (hot water and chilled water) at Wright-Patterson Air Force Base (WPAFB). The contractor shall provide all personnel, equipment, materials, labor, treatment chemicals, laboratory support, and consultation services for the performance of the contract. This shall include delivery of materials to point of use sites (WPAFB personnel handle no materials). The contractor shall perform in accordance with all federal, state, and local regulations.
1.2. FREQUENCY OF SERVICE & TEST REQUIREMENTS
1.2.1. The following chart shows the frequency of service and testing requirements. The frequency of service listed is only applicable during the period of operation of the system, i.e.
heating systems are normally operational in the winter (Oct - May) weather dependent and cooling systems are generally operational during the summer (June – Sept) weather dependent. If months change, contractor will be notified by the Contracting Officer Representative (COR). The operational period for each system is listed on Appendix B and C. Required reports are described in Paragraph 1.2.10.
PWS reference
| Cooling Towers |
| Package Boilers and Heat Exchangers |
| Building 20770 |
| Report |
frequency
| 1.2.2 |
| Water treatment |
| As required |
| As required |
| As required |
| Quarterly (Referenced in Para. 1.2.10.2) |
| 1.2.2.1 |
| Routine testing |
| Weekly |
| *Weekly |
| Daily |
| Weekly (Referenced in Para. 1.2.10.1) |
| 1.2.2.2 |
| Non routine testing |
| As required |
| As required |
| As required |
| Weekly (Referenced in Para. 1.2.10.1) |
| 1.2.3 |
| Monitoring |
| Weekly |
| Weekly |
| Daily |
| Quarterly (Referenced in Para. 1.2.10.2) |
| 1.2.4 |
| Inspections |
| Weekly |
| Weekly |
| Weekly |
| Weekly (Referenced in Para. 1.2.10.1) |
| 1.2.5 |
| Reviews and analysis |
| Ongoing |
| Ongoing |
| Ongoing |
| Annual (Referenced in Para. 1.2.10.3) |
| 1.2.6 |
| Studies |
| As required |
| As required |
| As required |
| Annual (Referenced in Para. 1.2.10.3) |
* Perform testing daily in facilities 10840, 10271, 30013, 31240, 34019, 31251, & 20774.
1.2.2. METHOD OF TREATMENT
1.2.2.1. The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating and cooling water systems.
1.2.2.2. Water treatments shall be performed weekly on each system in building 20770, 10271, and 30013:
1.2.2.2.1. Add Reverse Osmosis pre-treatment chemicals (pre-treat 100 antiscalant and sodium metabisulfite 38%), weekly.
1.2.2.2.2. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly.
1.2.2.3. Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system used weekly.
1.2.2.4. Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor’s responsibility to ensure all safety precautions for chemicals have been taken.
1.2.3.
TESTS
1.2.3.1. Routine Testing. The routine tests performed accordingly to chart in 1.2.1 at each facility. Contractor shall provide the following information as listed in Appendix B and C: Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total Alkalinity, PH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Chlorides, Calcium Hardness, Free Mineral Acid, Sulfite, Iron and Copper. The contractor shall submit documentation results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1.
1.2.3.1.1. Daily water tests and treatment for each operating system in building 20770 shall contain:
1.2.3.1.1.1. Orthophosphate (PO4) (Operating Boiler’s water)
1.2.3.1.1.2. Sodium Sulfite (SO3) (Operating Boilers)
1.2.3.1.1.3. P-Alkalinity (Operating Boiler’s water)
1.2.3.1.1.4. Conductivity (Micromhos/cm) (Operating Boiler’s water and Feed Water)
1.2.3.1.1.5. Total Hardness, pH, iron, and conductivity (Feed Water, A & B Line Condensate, High Pressure Drip, Condensate from Bldg. 20080, 1 through 4 Sodium Softeners, Condensate Polishers inlets (2) and outlets (2), and Reverse Osmosis)
1.2.3.1.1.6. Salt level in Brine Tank plus add salt to sample cooler sodium softener.
1.2.3.1.1.7. Add neutralizing amine blend to condensate treatment tank
1.2.3.1.1.8. Determine gallons/day feed rate for sodium polymethacrylate and add to proper tank with proper adjustments to feed rate.
1.2.3.1.1.9. Add sodium sulfite in chemical feed tank for feedwater treatment.
1.2.3.1.1.10. Add sodium hexametaphosphate, caustic flake, and adjustments for feed rates to boiler chemical feed tanks.
1.2.3.1.1.11. Add 38% sodium bisulfite to day tanks for chlorine removal upstream of RO machines.
1.2.3.2. Non-Routine Testing. Non-routine tests shall be performed only at each facility with prior approval of COR. The contractor shall perform and analyze within four (4) workdays from the time of initial request and submit a report accordingly to paragraph 1.2.10.4.
1.2.3.2.1. Metallurgical analyses to determine causes of failures.
1.2.3.2.2. Resin Analysis on ion exchange equipment.
1.2.3.2.3. Embrittlement analysis of boiler water.
1.2.3.2.4. Stream purity analysis.
1.2.3.2.5 Contactor shall provide “third-party” testing of all new or repaired boiler or chilled/cooling water systems per Base Facility Standard, Wright-Patterson AFB, Ohio. See section 5.8 (Water Treatment) of Appendix H. Contractor shall insure all installed or repaired systems have been adequately flushed and pretreated with IWT chemicals before initial system start-up to insure system passivation and protection from corrosion.
1.2.4. STANDARDS. The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. The contractor shall maintain a Langelier Saturation Index (LSI) of 2.00-2.50 for acid modified systems and 2.50-3.00 for non-acid modified systems within the chemically treated water. The LSI shall be calculated and reported weekly during the service trip. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 mmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dipslide culture test. The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1.
1.2.4.1. The following standards apply to operating systems (Steam, HTHW, Chilled Water, Hot Water) at WPAFB and shall be on contractors report:
1.2.4.1.1. Phosphate (PO4) = 10 – 20 PPM
1.2.4.1.2. P-Alkalinity (CaCO3) = 300 – 600 PPM
1.2.4.1.3. Sulfite (SO3) = 20 – 40 PPM
1.2.4.1.4. Neutralized Conductivity (mmhos/cm): 1000-1500
1.2.4.1.4.1. Gas Boilers (1000 – 1500) or (3000 – 3500) if reverse osmosis is bypassed
1.2.4.1.4.2 Coal Boilers (1000-1500) or (3000-3500) if reverse osmosis is bypassed (Base Year)
1.2.4.1.5. Boiler PH = 11.0 – 12.0 PPM
1.2.4.1.6. Condensate PH = 8.0 – 9.0 SU
1.2.4.1.7. Sodium Softeners (Hardness Maximum)
1.2.4.1.7.1. 0 – 5 PPM if condensate polishers are in service
1.2.4.1.7.2. 0 – 1 PPM if condensate polishers are being bypassed
1.2.4.1.8. Condensate polisher hardness = 0 – 1 PPM
1.2.4.1.9. RO Makeup Conductivity (mmhos/cm): < 50
1.2.4.2. Closed Loops (Low Temperature HWH and Chilled Water) Contractor shall clean and replace filter-feeder bags.
1.2.4.2.1. Low Temperature Hot Water Heat (HWH) – the following standards apply
1.2.4.2.1.1. Nitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron and copper.
1.2.4.2.2. Chilled Water – the following standards apply:
1.2.4.2.2.1. Nitrite = 600-900 ppm as nitrite. Test and record pH, conductivity, iron, copper and glycol freeze point.
1.2.4.3 HTHW standards apply: Test and record pH, conductivity, sulfite, iron and hardness.
Note: The contractor shall maintain systems within the standards listed in paragraph 1.2.4.
1.2.5.
MONITORING. The contractor shall inspect, monitor and document each facility listed in Appendix B, C, D, E and F to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR.
1.2.5.1. Scale formation onto waterside surfaces
1.2.5.2. Corrosion of waterside metal surfaces
1.2.5.3. Slime producing bacteria within the bulk water (dipslide test)
1.2.5.4. Make-up water rate
1.2.5.5. Bleed-off/Blowdown rate
1.2.5.6. Chemical treatment feed rates
1.2.6.
INSPECTIONS.
1.2.6.1. The contractor shall perform weekly inspections of the cooling tower, package boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of sidestream filters installed on cooling towers. Adjustments shall be made to backwash timing and frequency. Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR.
1.2.6.2. The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line.
1.2.6.3. The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location. Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes.
1.2.6.4. The contractor shall inspect the internal tube surfaces of heat transfer equipment with a video probe and report findings to the COR.
1.2.6.5. The contractor shall be able to perform inspections through an elliptical opening of 11x15 inches.
1.2.7.
REVIEWS AND ANALYSIS. The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including sidestream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic database of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals.
1.2.7.1. The contractor shall document results and recommendations for purposes of long range planning. Documentation shall be IAW Section 1.2.10.3 and provided to COR.
1.2.7.2. The contractor shall provide actual values of: Bleedoff/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values and make recommendations to the government to optimize operations. Documentation shall be IAW Section 1.2.10.3.
1.2.7.3. The contractor shall document the collectings and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to
COR.
1.2.7.4. Condensate Quality Profile. A Quality Profile shall be created and documented for each condensate stream. Information and targeted performance guidelines shall include:
1.2.7.4.1. pH (properly cooled)
8.0 – 9.0
1.2.7.4.2. Iron
<0.10 ppm
1.2.7.4.3. Conductivity
< 50 mmhos/cm This data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR.
1.2.8.
STUDIES. The contractor shall perform and document the following studies as requested by the COR.
1.2.8.1. Corrosion Studies. Documented Corrosion studies shall include: installing coupon racks, maintain continuous exposure periods or 30-90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate (<5.00 mpy) and Copper Corrosion Rate (<.50 mpy). Boiler and heat exchange systems shall be maintained IAW American Society of Mechanical Engineers (ASME) standards.
1.2.8.2. Flow Rate and Elusion Studies. The contractor shall provide flow rate and elusion studies on ion exchange equipment to evaluate: Operation, Mechanical Status and Efficiency.
1.2.8.3. Deaerator Studies. The contractor shall perform deaerator studies to evaluate the operation and maintenance status of deaerators. Studies shall include dissolved oxygen, pressure relationships, temperature, and equipment inspections.
1.2.9.
BOILER FEEDWATER (BFW)
1.2.9.1. The contractor shall evaluate the overall Boiler Feedwater (BFW) program for compliance with American Society of Mechanical Engineers (ASME) control parameters and operational procedures, Federal and State of Ohio Environmental Protection Agency regulations and environmental compliance issues. The contractor shall inform the government orally and in writing quarterly and annually of all compliance problems associated with the operation of the industrial water treatment program.
1.2.9.2. Evaluate and report, the boiler feed water characteristics to establish baseline data within the first month of contract.
1.2.9.3. Prepare a written value comparison for WPAFB between the BFW baseline data and ASME guidelines. Written corrective action plan shall be prepared to bring the out-of-compliance boiler feed water BFW streams into compliance with the ASME guidelines and baseline data as listed below.
1.2.9.3.1. Steam Boiler Systems (0 - 300 psig)
1.2.9.3.1.1. Total Iron
< 0.10 ppm
1.2.9.3.1.2. Total Hardness
< 1.00 ppm
1.2.9.3.1.3. Total Copper
< 0.05 ppm
1.2.9.3.2. Steam Boiler Systems (301 - 450 psig)
1.2.9.3.2.1. Total Iron
< 0.05 ppm
1.2.9.3.2.2. Total Hardness
< 0.30 ppm
1.2.9.3.2.3. Total Copper
< 0.025 ppm
1.2.9.4. The boiler water treatment program shall meet the ASME guidelines, (No chelants shall to be utilized).
1.2.9.5. Maximum cycles of concentration (no cycles to exceed 50) based on the following ASME Guidelines:
1.2.9.5.1. 0 - 300 psig (no turbine drives)
1.2.9.5.1.1. Silica
< 150 ppm
1.2.9.5.1.2. Total Alkalinity
< 700 ppm*
1.2.9.5.1.3. Specific Conductance (uS/cm)
< 7,000 uS*
1.2.9.5.1.4. (with no neutralization @ 25 degrees C)
· With acceptable steam purity - no carry over.
1.2.9.5.2. 301 - 450 psig (with turbine drives) (Bldg. 20770)
1.2.9.5.2.1. Silica
< 90 ppm
1.2.9.5.2.2. Total Alkalinity
< 300 ppm*
1.2.9.5.2.3. Specific Conductance
< 3,000 uS* (With no neutralization @ 25 degrees C)
· With acceptable steam purity - no carry over.
1.2.9.6. The contractor shall calibrate Government chemical feed and control equipment to maintain water chemistry within industry specifications. Calibration of all monitoring equipment shall be performed accurately and at specified frequency. The calibration results shall be documented and available to COR as requested.
1.2.10. REPORTS AND OTHER DOCUMENTS. The contractor shall send a copy of reports to the Contracting Officer Representative (COR)/Contracting Officer (CO) with a courtesy copy to Operations and Maintenance Chief. All urgent problems regarding maintenance of water treatment parameters shall be discussed with the COR/CO on the day of discovery referenced in
1.2.10.1. All reports shall be submitted electronically to the government.
1.2.10.2. Weekly reports. The contractor shall prepare a written report each week. This report shall describe the results of routine tests (Section 1.2.3.1), the results of system inspections (Section 1.2.6). The reports shall contain recommendations and written proposed corrective actions. The contractor shall review the report with the COR/CO within seven (7) calendar days of data collection.
1.2.10.3. Quarterly reports. The contractor shall prepare a quarterly written report, accurately and on time, due by the 15th of Jan, Apr, Jul, and Oct. This report shall describe conditions of each water system. The reports shall include those items discussed in Section 1.2.5and the effectiveness of the treatment program and any areas of concern/problems incurred with recommendations for correction. The report shall include all chemical usage by the contractor.
The contractor shall conduct meeting with all government organizations effected and go over the Quarterly report.
1.2.10.4. Annual Reports. An annual report shall be compiled and submitted by 1 Nov of each year, for each industrial water system. Each report shall describe sampled trends throughout the year, start and end conditions, and those items identified in Sections 1.2.7 through 1.2.9 and Section 1.2.11. The report shall include total yearly chemical usage by the contractor. The contractor shall conduct meeting with all government organizations effected and go over the annual report.
1.2.10.5. Non-Routine Testing Reports. The contractor shall prepare a written report that is accurate and on time, due within (7) days of data collection. The non-routine tests are identified in Section 1.2.3.2.1, 1.2.3.2.2, 1.2.3.2.3, and 1.2.3.2.4.
1.2.11.
DOCUMENTS
1.2.11.1. The contractor shall annually prepare detailed written operating instructions for performance of both off-line and on-line cleaning of mechanical equipment associated with the cooling systems.
1.2.11.2. Provide to COR annually written guidance, of the controlled procedures prior to testing new water treatment chemicals, equipment and technologies.
1.2.12. CONTROL CHARTS. The contractor shall quarterly provide to the COR control charts with limits based on Cooling Technology Institute CTI guidelines and ASME standards.
1.2.12.1. The contractor shall review charts COR with government personnel quarterly.
1.2.12.2. Control Charts shall specify the recommended control ranges. A contingency plan of action shall be submitted quarterly to COR for periods when the system is not in proper control.
1.3. QUALITY CONTROL. The contractor shall establish and maintain a complete Quality Control Plan (QCP) to ensure the requirements of this contract are met. Contractor shall develop and implement procedures to identify, prevent and ensure non-concurrence of defective services.
A QCP shall be provided to the Contracting Officer within 30 days after contract award and as changes occur. The quality control plan is subject to revisions, by the Contracting Officer, and shall be accomplished (at no cost to the government) to ensure quality service. Contractor compliance with the QCP will be monitored by the government. Records of quality control shall be made available, at anytime to the government.
1.3.1. QUALITY ASSURANCE
1.3.1.1. Performance Evaluation Meetings. The contractor shall conduct quarterly meetings with the government to discuss long range plans, technical recommendations and the effectiveness of the water treatment programs. The contractor shall coordinate with the COR to organize and schedule meetings, during normal duty hours (0715 -1600).
1.3.2. VEHICLES. Contractor shall transport personnel and materials from issue points to points-of-use. WPAFB personnel transport no material.
1.3.3. MATERIAL
1.3.3.1. Compatibility: The contractor shall only use chemicals that have no detrimental effect on the equipment. Chemicals shall be used in accordance with manufacturer's instructions.
1.3.3.2. Contractor shall maintain a current listing of quantities, safety data sheets (SDS) and Spill Plan of each chemical stored. Current inventory listing for each storage location shall be prominently displayed at each site.
1.3.3.2.1. The following products are not permitted for use at WPAFB:
1.3.3.2.2. Chromate-containing water treatment products.
1.3.3.2.3. Molybdate-containing water treatment products (prohibited for water treatment, acceptable as a testing agent).
1.3.3.2.4. Ozone Depleting Substances (ODS)-containing water treatment products.
1.3.4. EQUIPMENT DESIGN. Contractor shall evaluate IWT equipment “design” submittals/proposals and provide guidance/recommendations to Civil Engineering.
1.3.5. CONTRACTOR EMPLOYEES
1.3.5.1. The contractor shall provide a primary and alternate person to represent the contractor for implementation and application of various boilers, cooling tower and chilled water treatment programs on Base. The contractor shall provide a primary person to provide technical advice in regards to the circumstances at hand. A designated alternate(s), shall act for the contractor when the Primary is unavailable. The designation of the Primary and alternate person shall be submitted in writing to the Contracting Officer (CO) prior to contract performance. The contractor shall provide telephone numbers for the primary and alternate for after normal duty hours.
1.3.5.2. The contractor shall respond to service calls during normal duty hours which are 0715 – 1600 HRS, Monday through Friday within two (2) hours from the time of notification.
Emergencies or after normal duty hours (1601 – 0714) and Saturday and Sunday, the contractor personnel shall meet within four (4) hours from the time of notification.
1.3.5.3. The contractor shall furnish an identifying badge, which shall include as a minimum, the person's name, name of the contractor, and the words "Industrial Water Treatment." Each employee shall wear the badge on the outer clothing and the badge shall be visible at all times.
1.3.5.4 The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval in accordance with DOD 5500.7-R, Joint Ethics Regulation. In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities.
1.3.6.
WORK HOURS
1.3.6.1. Normal Hours. The contractor shall perform the services required under this contract during the following hours: 0715-1600 HRS, Monday through Friday. The contractor may work, with prior approval of the Contracting Officer's representative, extended hours to ensure timely completion of work at no additional cost to the government.
1.3.6.2. After Normal Duty Hours. The contractor shall provide support after normal duty hours (1601-0714 weekdays and weekends) if required.
1.3.6.3. Seasons. The heating season (winter) is from 1 October to 31 May and the cooling season (summer) is from 1 June to 30 September. The actual dates are based on temperature. If changes in dates occur, the government will notify the contractor.
1.3.7. RECOGNIZED HOLIDAYS. Except for emergencies, the contractor is not required to provide service on the following government-observed holidays:
New Year January 1st Martin Luther King’s Birthday
3rd Monday in January President’s Day
3rd Monday in February Memorial Day
Last Monday in May Independence Day
July 4th Labor Day
1st Monday in September Columbus Day
2nd Monday in October Veteran’s Day
November 11th Thanksgiving Day
4th Thursday in November Christmas Day
December 25th
1.3.7.1. When a holiday falls on a Saturday, the preceding Friday shall be considered a holiday.
When a holiday falls on a Sunday, the following Monday shall be observed. If a task, falls on one of the above listed holidays, the contractor shall perform said task on the next workday immediately following the holiday.
1.3.8. BASE CLOSURE
1.3.8.1. In the event the base commander determines it necessary to close the base due to adverse weather, a base or local disaster, security problems or other events, the following local radio and television stations will be notified:
Television Stations - WHIO 7
WDTN 2
WKRC 12
WKEF 22
Radio Stations - AM - WHIO 1290 FM - WHKO 99.1 WFCJ 93.7
WONE 980 WTUE 104.7 WCDR 90
WBNS 1460 WMMX 107.7 WROU 92.1
KRC 550 WLQT 99.9 WLSN 106.5
WING 1410 WGTZ 93 WXEG 103.9
WCKY 1530 WING 102.9 FOX 92.5
WGNZ 1110 WBNS 97.1 WVMX 94.1
WLW 700 WBTT 94.7 WEBN 102.7
WTVN 610 WBZI 95.3 WBZI 95.3
WIZE 1360 WYSO 91.3 KISS 107.5
1.3.8.2. The contractor shall not receive any other form of notification of a base closure from the government. The contractor shall notify all employees.
1.3.9. CONTINUATION OF ESSENTIAL DoD CONTRACTOR SERVICES
DURING CRISIS. All services to be performed under the contract have been determined to be non-essential for performance during crisis. Contractor shall support an activation, exercise of contingency plans outside the normal duty hours, or crisis. The Base could be closed because of security problems or other events. Should one of these situations occur, the Contracting Office would determine which services are required during the crisis.
1.3.10. FIRE PREVENTION
1.3.10.1. The contractor shall comply with all requirements of the National Fire Codes and Air Force Instruction 91-301, Air Force Occupational and Environmental Safety Plan, Fire Prevention and Health (AFOSH).
1.3.10.2. The contractor shall not weld or use any flame apparatus without obtaining clearance from the fire inspector. The fire inspector may be contacted by phone, (937) 257-6933. The contractor shall notify the fire inspector 24 hours in advance of the intended use of any flame apparatus. The contractor shall, when using flame apparatus, provide fire protection devices, such as non-combustible coverings and fire extinguishers and take other precautions, as directed by the fire inspector.
1.3.11. DAILY CLEAN UP
1.3.11.1. The contractor shall keep the storage and work areas clean of all debris on a daily basis or more often as required. All empty containers and drums shall be removed from the points-of-use or IP by the contractor. All spill containers shall be kept clean.
1.3.12. ENVIRONMENTAL PROTECTION
1.3.12.1. Contractor is responsible to follow requirements in WPAFB Section 01 02 20 (General Environmental Protection Requirements), see attachment 4.
1.3.12.1.1. The following Submittals from WPAFB Section 01 02 20 are required:
1.3.12.1.2. Item A. Written identification of contractor’s environmental coordinator and alternate, and phone numbers. See part 3.01, Contractors Environmental Coordinator, paragraph B. This is required within 5 days of the award of contract.
1.3.12.1.3. Item I. Site Specific Spill Plan. See part 3.08, Spill Prevention, Control, and Reporting, paragraph A. This is required within 5 days of the award of contract and to be reviewed annually.
1.3.12.1.4. Item K. A current Resource Conservation and Recovery Act (RCRA) training certificate for employee handling hazardous waste site. See part 3.10, Hazardous Waste Management paragraph B.
1.3.12.1.5. If at any time the scope of work changes, the contractor must follow the requirements under the required submittal that is applicable.
1.3.13. SECURITY FORCE AND FORCE PROTECTION
1.3.13.1. Emergency phone number is 911.
1.3.13.2. If using a cell phone, use (937) 257-9111
1.3.13.3. Non-Emergency – Police (937) 257-5841/Fire (937) 257-3033 2.0.
SERVICES SUMMARY.
| Performance Objective |
| PWS Para |
| Performance Threshold |
| Methods of Assessment |
| Remedy |
SS #1 - Water Treatment.
Water in cooling towers and heating systems maintain the proper chemistry for operations 1.1.
| Water is properly treated 98% of the time. |
| Periodic |
| RE-PERFORMANCE |
SS #2 - Provide Industrial Water Treatment Reports.
Supply accurate reports.
| 1.2. |
| No more than 2 errors per month. |
| 100% |
| RE-PERFORMANCE |
SS #3 - Provide Industrial Water Treatment Reports.
Reports are submitted on time.
| 1.2. |
| No more than 1 error per month. |
| 100% |
| RE-PERFORMANCE within two days |
*The procedures set forth in the Inspection of Services Clause will be used to remedy all deficiencies. The re-performance times will be based upon sensitivity of the issue.
3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1. GENERAL. The government will provide, without cost, the facilities, equipment, materials, and/or services listed below.
3.1.2.
PROPERTY.
3.1.2.1. Storage Facilities. The government will provide storage at Buildings 20051 and 30013 for equipment and materials not to exceed a thirty (30) day supply. The government will not be responsible for the protection or loss of any equipment and materials. The contractor shall obtain written approval from 88 ABW/CEP before storing equipment or chemicals.
3.1.2.2. Test Laboratories. The government will provide the contractor use of Government Test Laboratories areas in buildings 31240, 30013, and 20770. The contractor shall provide all materials and supplies needed for testing. Contractor shall maintain current Material Safety Data Sheet (MSDS) for all test reagent chemicals. Contractor’s use of these facilities shall not interfere with Government operations.
3.2. UTILITIES.
3.2.1.
Contractor must provide written request prior to use of government utilities. This written request must be approved by the COR before the contractor uses any Government utilities.
3.3. PHYSICAL SECURITY. The contractor shall safeguard all government property provided for contractor's use. At the end of each work period, all government facilities, equipment and materials shall be secured. The contractor shall conform to all local regulations, for safeguarding the government furnished facility and material contained therein.
3.3.1. Key Control. The contractor shall establish and implement accountability methods of ensuring all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued to them by the government.
3.3.2. The contractor shall report, the same day, upon loss to the COR occurrences of a lost or duplicated key to the office that issued the key.
3.3.3. Lost Keys. In the event keys, other than master keys, are lost or duplicated, the contractor shall contact, the same day, C.O., regarding rekey or replace the affected lock or locks without cost to the government. The government has the option to replace the affected lock or locks or perform rekeying and deduct the cost of such from the monthly payment due the contractor.
3.3.4. The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor's employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in work in those areas.
3.4 PROTECTION OF GOVERNMENT PROPERTY AND PERSONNEL
3.4.1. The contractor shall accomplish the work in accordance with the provisions of Federal, State, and Ohio Industrial Commission and American Standard Safety Code for Building Construction, American Standard Association, applicable parts of Air Force, Base Safety and Fire Prevention regulations and instructions. The COR shall assist in matters of safety to ensure compliance with all contract safety requirements.
3.4.2. Damages of any nature caused by contractor shall be repaired or replaced by the contractor at no expense to the Government. If the contractor does not satisfactorily repair or replace the damaged property, the Government reserves the right to make the necessary corrections. The contractor shall reimburse the Government for consequential damages and for all materials and labor expended for the corrections.
3.4.3. The contractor shall furnish, and place, barricades to maintain traffic. All access drives and doors shall be clear at all times.
4.0 GENERAL INFORMATION
4.1 VOLUNTARY PROTECTION PROGRAM (VPP)
APPLICABILITY: This section of the PWS applies to "Applicable Contractors" as defined below.
4.2 DEFINITIONS:
Applicable Contractor. A contractor whose employees worked at least 1,000 hours at the site in any calendar quarter within the last 12 months and is NOT directly supervised by the applicant (installation).
Days Away, Restricted, and or Transfer Case Incident Rate (DART). The number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
Total Case Incidence Rate (TCIR) - Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
Voluntary Protection Program - The Voluntary Protection Program (VPP) promotes effective worksite-based safety and health. In the VPP, management, labor, and OSHA establish cooperative relationships at workplaces that have implemented a comprehensive safety and health management system. Approval into VPP is OSHA’s official recognition of the outstanding efforts of employers and employees who have achieved exemplary occupational safety and health.
4.3 REQUIREMENTS – VOLUNTARY PROTECTION PROGRAM
Wright Patterson AFB is in the process of pursuing VPP recognition and has already been recognized under the OSHA Voluntary Protection Program (VPP). VPP impacts all "applicable contract tors" operating on Air Force Installations.
The contractor shall be responsible for ensuring their employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. The contractor shall follow the safety and health rules of the installation or VPP site. Detailed information on VPP is available on the OSHA website at: http://www/osha.gov/dcsp/vpp/index.html.
It is the contractor's sole responsibility for compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596). The contractor shall submit a Safety and Health Plan and corresponding site safety checklist to the Contracting Officer not later than 10 calendar days after contract award. The contractor's plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in contractor work areas. The plan shall:
· Demonstrate a management commitment to employee safety and health;
· Identify the application of the safety and health plan to subcontractors;
· Identify the roles and responsibilities of the following individuals with respect to safety and VPP: Management, Supervisors, Employees, and Safety Coordinator;
· Identify applicable safety rules and regulations;
· Include a worksite hazard analysis to include base-line hazard identification and required control measures;
· Include a job site analysis to include hazards of tasks required to control measures;
· Identify employee safety and health training requirements and the documentation process;
· Include a workplace inspection frequency, to include identifying the individual conducing the inspections;
· Include employee hazard reporting procedures;
· Identify individual(s) responsible for corrective action of hazards;
· Identify first aid/injury procedures;
· Identify procedures for accident investigation and reporting;
· Identify emergency response procedures; and
· Identify the process for tracking controlled hazards in contractor work areas.
The contractor shall submit their Total Case Incidence Rates (TCIR) and Days Away, Restricted, or Transfer (DART) rates and OSHA Form 300A annually to the Contracting Office for consolidation and submission as part of the installation's annual VPP Safety and Health Management report. TCIR and DART rates are due by the 15th of January of each year.
The contractor's Quality Control Plan shall identify the processes and procedures the contractor will use to track compliance with the Safety and Health Plan, and the process and procedures that will be used to correct violations.
4.3.1 The contractor shall establish these VPP requirements for all subcontractors who qualify as applicable contractors under the resulting contract.
4.4 LABOR HOURS DATABASE. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year.
Contractors may direct questions to the Contractor Manpower Reporting Application (CMRA) help desk.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
Appendix A
TECHNICAL DEFINITIONS.
1. Tests. Regular on-site system sampling conducted during each service visit.
2. Surveys. A detailed inspection or review.
3. Scale. A hard coating or layer of chemical materials on internal surfaces of cooling tower systems or boiler pressure parts.
4. Metallurgical Analysis. Testing that determines the cause of metal deterioration in cooling tower systems or boiler pressure parts.
5. Langelier Saturation Index (LSI). A scale that determines whether cooling water is corrosive or scale forming. Useful range is from -3.00 to 3.00.
6. Welch-Allyn fiber optic inspection. A high-level inspection system that examines tube bundles in great detail to determine if gross deficiencies in water treatment exist.
7. High Temperature Hot Water (HTHW). Heating system water that is generally circulated at temperatures from 320 to 440 degrees.
8. Condensate. Condensed water resulting from the removal latent heat from steam.
9. Deaerator Oxygen Analysis. A study to determine the oxygen removal efficiency of the deaerator. The collected data assists in predicting the potential for oxygen related problems in the feedwater and boiler system(s).
10. Embrittlement Analysis. A study of the embrittling characteristics of the boiler water.
11. Controlled Limits. Operating parameters (boundaries)
12. Elution Studies on Ion Exchange Equipment. A series of tests conducted on the softeners, dealkalizers or demineralizers to determine the efficiency of the regeneration cycle. The collected data is evaluated by drawing an elution curve. The information reveals the regenerate concentrations at all stages of the cycle.
13. Steam Purity Analysis. A study monitoring the quality of the steam being produced to determine the steam purity.
14. Corrosion Studies on Feedwater/Condensate Systems. A study to determine the corrosion rates of the pre-boiler systems. The collected data provides information relating to the corrosion protection provided by the chemical treatment program.
15. Quantitative Deposit Analysis. A study to determine the composition of a deposit.
16. Resin Analysis. A study generally performed to determine the efficiency of zeolite resin in water.
Appendix B . Cooling tower tonnage and location.
| Building Number |
| Capacity in Approx Tons |
| Sidestream Filters |
| Acid or |
Softwater Blend Tower Treatment Operation
| 10262 |
| 2450 |
| Acid |
| Year Round |
(Jan-Dec)
| 10262/10266 |
| Chilled Water Closed Loop |
Summer (June-September)
| 10271 |
| 1000 |
| Acid |
| Year Round |
| 10800 |
| 100 |
| DX unit installed 4/28/11 |
| Summer |
| 10800 |
| Chilled Water Closed Loop |
| 10825 |
| 180 |
| Softwater Blend |
| Summer |
| 10825 |
| Chilled Water Closed Loop |
Summer
| 10826 |
| 130 |
| Softwater Blend |
| Summer |
| 10826 |
| Chilled Water Closed Loop |
Summer
| 10827 |
| 155 |
| DX unit installed 5/16/11 |
| Summer |
| 10827 |
| Chilled Water Closed Loop |
Summer
| 10840 |
| 1400 |
| Acid |
| Year Round |
| 10840 |
| 1400 |
Year Round
| 10840 |
| 1250 |
Year Round
| 10856 |
| Chilled Water Closed Loop |
Year Round
| 10856 |
| 1725 |
| X |
| Acid |
| Year Round |
| 11420 |
| 60 |
| DX unit |
| Summer |
| 20008 |
| Fluid Cooler |
Year Round
| 20028 |
| 250 |
| X |
| Softwater Blend |
| Summer |
| 20032 |
| 150 |
| X |
| Softwater Blend |
| Summer |
| 20051 |
| 1300 |
| X |
| Softwater Blend |
| Summer |
| 20051 |
| Chilled Water Closed Loop |
Summer
| 20051 |
| Chilled Loop Lay-up Service |
Inhibitor applied for Winter months
| 20052 |
| 250 |
| Softwater Blend |
| Summer |
| 20481 |
| Chilled Water Closed Loop |
Summer
| 20481(IMAX) |
| 300 |
| DX unit |
| Summer |
| 20481(IMAX) |
| Chilled Water Closed Loop |
Summer
| 20489 |
| 400 |
| X |
| Softwater Blend |
| Summer |
| 20494 |
| Chilled Water Closed Loop |
Summer
| 20494 |
| 500 |
| X |
| Softwater Blend |
| Summer |
| 20497 |
| 400 |
| Softwater Blend |
| Summer |
| 20497 |
| Chilled Water Closed Loop |
Summer
| 20571 |
| 250 |
| Softwater Blend |
| Summer |
| 20559 |
| 1030 |
| X |
| Acid |
| Year Round |
| 20559 |
| Chilled Water Closed Loop |
Summer
| 20640 |
| 355 |
| Softwater Blend |
| Summer |
| 20640 |
| Chilled Water Closed Loop |
Summer
| 20641 |
| 200 |
| Softwater Blend |
| Summer |
| 20641 |
| Chilled Water Closed Loop |
Summer
| 20642 |
| 300 |
| X |
| Softwater Blend |
| Summer |
| 20644 |
| 2@215 each |
| Softwater Blend |
| Year Round |
| 20644 |
| Chilled Water Closed Loop |
Year Round
| 20646 |
| Chilled Water Closed Loop |
Summer
| 20676 |
| 2@250 each |
| X |
| Acid |
| Year Round |
| 20676 |
| Chilled Water Closed Loop SGI |
Year Round
| 20676 |
| Chilled Water Closed Loop |
| Softwater Blend |
| Year Round |
| 20802 |
| 3@890 |
Softwater Blend
| 20802 |
| Chilled Water Closed Loop |
| 26933 |
| Chilled Water Closed Loop |
Summer
| 30001 |
| 300 |
| Softwater Blend |
| Summer |
| 30001 |
| Chilled Water Closed Loop |
Summer
| 30070 |
| 135 |
| Softwater Blend |
| Summer |
| 30070 |
| Chilled Water Closed Loop |
| 31250 |
| 187 Air |
Cooled Unit
Summer
| 34067 |
| 20 |
Summer
| 34014 |
| 10 |
Summer
| 34014 |
| 60 |
Summer
| 30022 |
| 60 |
Summer
| 30152 |
| 120 |
Summer
| 30110 |
| 20 |
Year Round
| 30110 |
| 70 |
Summer
| 30206 |
| 100 |
Summer
| 30209 |
| 60/80 |
Summer
| 30142 |
| 60 |
Summer
The first digit of the building number represents the area of WPAFB.
1 & 3 represent area A, and 2 represent area B. The last 4 digits are the actual building number.
Appendix C Boiler and Heat Exchanger tonnage and location.
| Facility |
| Function |
| Medium |
| Potential |
| Fuel |
| Operation |
| 10262 |
| Command HQ |
| Steam |
Unit #1
| 12 psi |
| 75 hp |
| Gas |
| Year round |
Unit #2
| 12 psi |
| 75 hp |
| Gas |
| Year round |
| 10271 |
| Area “A” Heat Plant |
| Steam |
Unit #1
| 70 psi |
| 1074 hp |
| HTHW |
| Winter (Oct – May) |
Unit #2
| 70 psi |
| 1074 hp |
| HTHW |
| Winter |
| Unit #3 |
| Convertor disconnected 2009 |
| 70 psi |
| 1074 hp |
| HTHW |
| Winter |
| 10278 |
| Pest Control |
| HW Heating Loop |
| 10286 |
| Pass & Registration |
| HW Heating Loop |
| 10293 |
| Recycling |
| HW Heating Loop |
| 10296 |
| CATM Range |
| HW |
Unit # 1
| 150 psi |
| 10 hp |
| Steam |
| Winter |
Unit # 2
| 150 psi |
| 10 hp |
| Electric Boiler |
| Summer |
(June – September)
| 10295 |
| Security Forces Building |
| HW |
| Steam |
| Winter |
| Unit #1 |
| Heat Exchanger |
| 8 psi |
| 1,919,000 BTUH |
| Steam |
| Winter |
| Unit #2 |
| Heat Exchanger |
| 8psi |
| 1,919,000 BTUH |
| Steam |
| Winter |
Boiler
| DHW |
| 1,600,000 BTUH |
| Gas |
| Summer |
| 10825 |
| Base VOQ |
| HW |
Unit #1
| 70 psi |
| 125 hp |
| HTHW |
| Winter |
Boiler
| DHW |
| 999,000 BTUH |
| Gas |
| Summer |
| 10826 |
| Base VOQ |
| HW |
Unit #1
| 70 psi |
| 125 hp |
| HTHW |
| Winter |
Boiler
| DHW |
| 999,000 BTUH |
| Gas |
| Summer |
| 10827 |
| Base VOQ |
| HW |
Unit #1
| 70 PSI |
| 125 hp |
| HTHW |
| Winter |
Boiler
| DHW |
| 999,000 BTUH |
| Gas |
| Summer |
| 10822 |
| NAIC |
| Steam |
| 15 psi |
| 135 hp |
| Gas/Fueloil |
| Winter |
| 10829 |
| NAIC |
| Steam |
Unit #1
| 70 psi |
| 125 hp |
| Gas |
| Summer |
| 10840 |
| Base Medical Center |
| Steam |
Unit #1
| 15 psi |
| 119 hp |
| HTHW |
| Winter |
Unit #2
| 15 psi |
| 119 hp |
| HTHW |
| Winter |
Unit #3
| 15 psi |
| 119 hp |
| HTHW |
| Winter |
Unit #4
| 70 psi |
| 298 hp |
| HTHW |
| Winter |
Unit #5
| 70 psi |
| 400 hp |
| Gas |
| Summer |
Unit #6
| 70 psi |
| 400 hp |
| Gas |
| Summer |
| 10849 |
| O Club/Dodge Gym |
| Steam |
Unit #1
| 50 psi |
| 125 hp |
| Gas |
| Year round |
Unit #2
| 50 psi |
| 125 hp |
| Gas |
| Year round |
| 10893 |
| Twin Base Golf Club |
| HW |
Unit #1
| 160 F |
| 22 hp |
| Gas |
| Winter |
| 11403 |
| Childcare (Pickled) |
| HW Heating Loop |
| 11420 |
| A. F. Band Unit |
| HW |
Unit #1
| 180 F |
| 11.2 hp |
| Gas |
| Winter |
| 11440 |
| MCRC ADMIN Building |
| HW |
Boiler
| 1,100,000 BTUH |
| Gas |
| Winter |
DHW Tank #1
| DHW |
| 199,900 BTUH |
| Gas |
| Year Round |
DHW Tank #2
| DHW |
| 199,900 BTUH |
| Gas |
| Year Round |
| 11455 |
| Comm Group |
| HW |
Unit #1
| 180 F |
| N/A |
| Gas |
| Winter |
| 20070 |
| DET 13 |
| HW |
Unit #1
| 180 F |
| 50 HP |
| Steam |
| Winter |
HW
| 20103 |
| 88 AMDS/SPTG |
| 160-180 F |
| 300HP |
| Gas |
| Winter |
| 20494 |
| Museum |
| HW |
Unit #1
| 160 F |
| 280 HP |
| Gas |
| Winter |
| 20497 |
| Museum |
| HW |
| Gas |
| Winter |
| 20470 |
| AFIT Model Shop |
| Steam |
Unit # 1
| 15 Psi |
| 118.5 hp |
| Gas |
| Winter |
| 20481 |
| A. F. Museum |
| HW |
Unit #1
| 160 F |
| 125 hp |
| Gas |
| Winter |
Unit #2
| 160 F |
| 92 hp |
| Gas |
| Winter |
Unit #3
| 160 F |
| 92 hp |
| Gas |
| Winter |
| 20489 |
| IMAX Theater |
| HW |
Unit #1
| 160 F |
| 57 hp |
| Gas |
| Year round |
| 20553 |
| AFMC Complex |
| HW |
| Service as common HW loop with 20559 |
| 180 F |
| 500hp |
| Gas |
| Winter |
| 20559 |
| AFMC Complex |
| HW |
Unit #1
| 180 F |
| 500 hp |
| Gas |
| Winter |
Unit #2
| 180 F |
| 500 hp |
| Gas |
| Winter |
| 20570/20571 |
| Acquisition/Fitness Center |
| HW |
| Heat/Exchanger |
| Steam |
| Winter |
| 20614 |
| CE B- Shop |
HW Heating Loop
Winter
| 20630 |
| Child Care Center |
| HW |
Unit # 1
| 160 F |
| 20 HP |
| Gas |
| Year Round |
Unit #2
| 160 F |
| 20 HP |
| Gas |
| Year Round |
| 20642 |
| AFIT/CC |
| Steam |
| 125 psi |
| 8 hp |
| HW |
| Winter |
| 20643 |
| AFIT |
| HW |
| Heat/Exchanger |
| Steam |
| Winter |
| 20646 |
| AFIT |
| HW |
| Heat/Exchanger |
| Steam |
| Winter |
| 20675 |
| Occupational Health |
| HW |
| Center |
| 145 F |
| 6 HP |
| Gas |
| Year Round |
| 20676 |
| Humidification Softener |
Year Round
| 20802 |
| IT Complex |
| HW |
| Heat/Exchanger |
| Steam |
| Winter |
Unit #1
| 2645 MBH |
| 125 PSIG |
Unit #2
| 2645 MBH |
| 125 PSIG |
| 26933 |
| Page Manor School |
| HW |
Unit #1
| 160 F |
| 20 hp |
| Gas |
| Winter |
Unit #2
| 160 F |
| 20 hp |
| Gas |
| Winter |
| 30002 |
| Perimeter HWH Loop |
| 30003 |
| Mechanical room in front of Finance/Supply (bldg 1) |
| Steam |
Unit #1
| 40 psi |
| 447 hp |
| HTHW |
| Winter |
Unit #2
| 40 psi |
| 447 hp |
| HTHW |
| Winter |
| 30013 |
| Transportation Mgm’t |
| Steam |
Unit #1
| 25 psi |
| 400 hp |
| HTHW |
| Winter |
| 30013 |
| Area “C” Heat Plant |
| Steam |
Unit #1
| 80 psi |
| 2238 hp |
| HTHW |
| Winter |
Unit #2
| 80 psi |
| 2238 hp |
| HTHW |
| Winter |
| 30069 |
| Base Laundry |
| Steam |
Unit #1
| 15 psi |
| 296 hp |
| HTHW |
| Winter |
| 30070 |
| Trans, OSI, Campus |
| Steam |
Unit #1
| 15 psi |
| 183 hp |
| HTHW |
| Winter |
Treat HW Heating Loop
| 30095 |
| 88 SPTG |
| Steam |
| 13 HP |
| HTHW |
| Winter |
Unit #1
150 PSI
| 30169 |
| 88 SFS |
| Steam |
| 42 HP |
| HTHW |
| Winter |
150 PSI
| 30208 |
| Transportation |
| Steam |
Unit #1
| 15 psi |
| 72 hp |
| HTHW |
| Winter |
| 30247 |
| Hazardous Material Storage Facility |
| HW |
| 125psi |
| 8 hp |
| HTHW |
| Winter |
| 30255 |
| Base Supply |
| Steam |
Unit #1
| 15 psi |
| 180 hp |
| HTHW |
| Winter |
| 30257 |
| Base Supply |
| Steam |
Unit #1
| 80 psi |
| 466 hp |
| HTHW |
| Winter |
| 30884 |
| PMEL |
| HTHW |
Unit #1
| 160 F |
| 80 hp |
| Gas |
| Summer |
Unit #2
| 160 F |
| 100 hp |
| HTHW |
| Winter |
| Added |
| Softener August 2013 |
| 31214 |
| Dining Hall |
| Steam |
Unit #1
| 100 psi |
| 60 hp |
| Gas |
| Summer |
Unit #2
| Convertor |
| HTHW |
| Winter |
| 31227 |
| MWR Hobby Shop |
| HW |
Unit #1
| 180 F |
| 3,000 MMBH |
| HTHW |
| Winter |
| 31250 |
| Commissary/Exchange |
| HW |
| 120 F |
| 1759 MBH |
| Gas |
| Winter |
| 120 F |
| 1759 MBH |
| Gas |
| Winter |
| 34004 |
| 445 Th ALW |
| Steam |
| 13 HP |
| HTHW |
| Winter |
Unit #1
50 PSI
| 34006 |
| Squadron Ops |
| HW |
| Heat/Exchanger |
| HTHW |
| Winter |
| 34007 |
| Fuel Cell Hanger |
| HW |
| Heat/Exchanger |
| HTHW |
| Winter |
34014
| Unit # 1 |
| 89th & 356th Air Lift Sq |
| HW |
| Heat/Exchanger |
| HTHW |
| Winter |
| 34016/34015 |
| Hangers |
| HW |
| Heat/Exchanger |
| HTHW |
| Winter |
| 34019 |
| West Ramp Plant |
| HTHW |
Unit #1
| 410 F/ |
| 448 hp |
| Gas |
| Winter |
Unit #2
| 350 psi |
| 448 hp |
| Gas |
| Winter |
Unit #3
| 448 hp |
| Gas |
| Winter |
| 34023 |
| NASIC |
| HTHW |
| 400 psi |
| 5 hp |
| HW |
| Winter |
| 150 psi |
| 5 hp |
| Electric Boiler |
| Summer |
| 34042 |
| NASIC |
| Steam |
| 20 HP |
| HTHW |
| Winter |
Unit #1
300 PSI
| 34066 |
| Munitions Storage |
| HW |
Unit #1
| 170 F |
| 13.4 hp |
| DL1 |
| Winter |
| 34067 |
| Munitions Storage |
| HW |
| Unit #1 |
| Replacement installed 2009 |
| 170 F |
| 16 hp |
| DL1 |
| Winter |
1 & 3 represent area A, and 2 represent area B. The last 4 digits are the actual building number.
Appendix D Heat System Description.
Building 20770 Equipment
1. Boilers:
a. Two gas fired, 120,000 pound per hour, water tube, 400 PSIG
b. Two gas fired, 80,000 pound per hour, water tube, 125 PSIG
2. Softeners:
a. 4 sodium zeolite softeners
b. 2 Condensate polishers
c. 2 Reverse Osmosis Units
d. 1 Boiler Sample Softener
3. Condensate Return:
a. One condensate receiver
4. Deaerators:
a. One 450,000 pound per hour, spray and baffle type
b. One 332,500 pound per hour, spray and baffle type
5. Feedwater Pumps:
a. Three steam turbine pumps
b. Two electric driven pumps
6. Chemicals Used:
7. Sodium hydroxide ( Caustic Soda Flake)
a. Sodium hexametaphosphate (Glassy)
b. Sodium sulfite ( Dry Powder)
c. Morpholine (Liquid)
d. Cyclohexamine (Liquid)
e. Sodium polymethacrylate (Liquid)
f. Sodium Metabisulfite (Liquid)
g. Bulk Softener Salt Building 20080 Equipment
1. Condensate return:
a. One condensate hot well tank
b. One vacuum receiver, pump
c. One high pressure return receiver, pump
d. One pump return receiver, pump
e. Two high volume condensate return pumps Heat System Description.
Building 1240 Equipment
1. Three 80 Million BTU Gas Fired International – Lamont Controlled Circulation Generators, One 80 Million BTU Gas Fired Generator, High Temperature Water supply (HTHW) at a set temperature of 440 degrees Fahrenheit under a Nitrogen Pressurization System.
2. The make up system consists of two Sodium Softeners, one D A tank, two storage tanks, one make up pump, and two emergency pumps.
3. Estimated gallons of water:
A system – 16,000 Gal B system – 100,000 Gal C system – 85,000 Gal Plant – 15,000 Gal Total - 216,000 Gallons Need daily chemistry checks HTHW Chemistry Limits
PH 9.5 – 10.5
Sulfite 50-100 PPM J-Poly M540 1 pint per 1000 gallons of make-up after on line Check salt level in brine tank Check ph level in bldg 1251 Softener hardness: 0-1 ppm Iron: Record Chemicals: Sodium sulfite, Caustic flake, J-Poly M540, Bulk delivery salt.
Outage period in summer, HTHW systems need to be treated for lay-up Service.
Building 34019 Three 130 Million Gas fired – High Temperature Water supply (HTHW) at a set temperature of 440 degrees Fahrenheit under a Nitrogen Pressurization System.
The make-up system consists of two Sodium Softeners, one D A tank, two storage tanks, one make up pump, and two emergency pumps.
Estimated gallons of water:
Plant – 15,000 Gal Total - 216,000 Gallons
Need daily chemistry checks
HTHW Chemistry Limits
PH 9.5 – 10.5
Sulfite 50-100 PPM
J-Poly M540 1 pint per 1000 gallons of make-up after on line
Check salt level in brine tank
Softener hardness: 0-1 ppm
Iron: Record
Chemicals: Sodium sulfite, Caustic flake, J-Poly M540
Outage period in summer, HTHW systems need to be treated for lay-up Service.
Building 30013 and 10271 Building 30013 and 10271 use a Reverse Osmosis Unit system. The Reverse Osmosis Units need inspected as well as the separate softener needs checked and supplied with salt.
Building 10262, 10840 and 10271 Acid Containment Areas.
Building 10262, 10840 and 10271 have acid containment areas that shall be tested prior to draining rain water. PH range is 6.5 -9.0.
Appendix E Filter Feeders WPAFB Chilled & Glycol Systems
| BUILDING |
| SYSTEM |
| Operation |
| Frequency |
| Filter Feeder |
| 10262-10266 |
| Chilled |
| Year-round |
| Monthly |
| Yes |
| 10825 |
| Duel Temp |
| Summer |
| Monthly |
| Yes |
| 10826 |
| Duel Temp |
| Summer |
| Monthly |
| Yes (3) |
| 10827 |
| Duel Temp |
| Summer |
| Monthly |
| Yes |
| 20051 &SSFx |
| Chilled |
| Summer |
| Monthly |
| 20070 |
| CL |
| Summer |
| Monthly |
| Yes |
| 20494 |
| CL |
| Summer |
| Monthly |
| Yes |
| 20559 |
| Chilled |
| Year round |
| Monthly |
| Yes |
| 20571 |
| Chilled |
| Summer |
| Monthly |
| 20641 |
| Chilled |
| Summer |
| Monthly |
| 20642 |
| Chilled |
| Summer |
| Monthly |
| 20644 |
| Chilled |
| Summer |
| Monthly |
| Yes |
| 20646 |
| Chilled |
| Summer |
| Monthly |
| 20676 |
| Chilled |
| Year-Round |
| Monthly |
| Yes |
| 20676 |
| SGI Loop |
| Year-Round |
| Monthly |
| Yes |
| 20677 |
| Closed condenser loop |
| Summer |
| Monthly |
| (1/4' by-pass line from 20676 chilled loop installed by CE shop to allow small 20677 condenser loop to get a low flow of treated water) |
| 30001 |
| Chilled |
| Summer |
| Monthly |
| Yes |
| 30030 |
| Dual Temp |
| Year Round |
| Monthly |
| Yes |
| 30110 |
| CLL |
| Summer |
| Monthly |
| Yes |
| 30110 |
| CLS |
| Summer |
| Monthly |
| 30142 |
| Chilled |
| Summer |
| Monthly |
| Yes |
| 30152 |
| Chilled |
| Summer |
| Monthly |
| 30206 |
| Chilled |
| Summer |
| Monthly |
| 30209 |
| Chilled |
| Summer |
| Monthly |
| 31250 |
| Chilled |
| Summer |
| Monthly |
| Yes |
| 34012 |
| HWH |
| Summer |
| Monthly |
| 34012 |
| Chilled |
| Summer |
| Monthly |
| 34014 |
| CLS |
| Summer |
| Monthly |
| 34014 |
| CLL |
| Summer |
| Monthly |
| 34067 |
| Chilled |
| Summer |
| Monthly |
1 & 3 represent area A, and 2 represent area B. The last 4 digits are the actual building number Appendix F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .