Imperial County Department of Public Works Roofing Re-Seal.pdf
PDF 133 KB Posted
- Solicitation number
- 27-0027
- Issued by
- Imperial County, California
About this file
This Request for Quotation (RFQ) #27-0027 is issued by the Imperial County Department of Public Works in California for targeted preventative maintenance and leak mitigation services on an existing asphalt rolled roofing system located at Herbert Hughes Correctional Center. The scope of work encompasses re-sealing of Air Conditioning vents, outer roof edges, gravel stops, minimal parapet wall areas, plumbing and exhaust pipes, drainage systems including scuppers and downspouts, and mechanical penetrations. The work is divided into five phases: surface preparation and demolition, re-sealing AC vents and penetrations, roof edge and parapet wall remediation, pipe flashing and boot sealing, and drainage and downspout cleaning. A mandatory pre-bid walkthrough is scheduled for November 19, 2026 at 9:00 AM at the project location (328 Applestill Road, El Centro, California 92243), with the deadline for contractor questions at 5:00 PM that same day and responses due by November 23, 2026. Quotations must be submitted via the County of Imperial PlanetBids Vendor Portal no later than 2:00 PM on November 25, 2026.
Contractors must hold a valid California C-39 Roofing Contractor or B General Contractor's license, possess a Department of Industrial Relations (DIR) registration number, and provide certificates of insurance with their submissions. The quotation must be itemized with a total price for all labor, materials, equipment, and safety provisions required to complete the work. All sealants and materials must be 100% compatible with asphalt roll roofing, including SBS-modified flashing cement, polyurethane sealants, and asphalt-compatible liquid rubber. The County of Imperial reserves the right to reject any or all quotes and will award the project to the lowest responsible contractor. Upon completion, contractors must verify proper operation of all restored roofing components, drainage systems, and ductwork seals, remove all debris, and address any deficiencies identified during final inspection.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPERIAL COUNTY DEPARTMENT
OF PUBLIC WORKS
ROOFING RE-SEAL
REQUEST FOR QUOTATION
#27-0027
Point Of Contact:
Gabriela Loo
Imperial County Purchasing Department 1125 Main Street, El Centro, California 92243
(442)265-1866 procurement@co.imperial.ca.us
DUE DATE AND SUBMISSION REQUIREMENTS:
All required documents and bids are to be submitted via the
County of Imperial PlanetBids Vendor Portal:
https://vendors.planetbids.com/portal/64020/portal-home no later than 2:00PM on NOVEMBER 25, 2026.
QUOTES MUST BE SUBMITTED BY THE SPECIFIED DATE AND TIME.
QUOTES WILL NOT BE CONSIDERED IF RECEIVED AFTER THE
DUE DATE AND TIME.
November 13, 2026
PURPOSE AND BACKGROUND
The County of Imperial is soliciting quotations to perform targeted preventative maintenance and leak mitigation on an existing asphalt rolled roofing system. The contractor shall provide all labor, materials, equipment, and safety provisions necessary to properly prepare and re-seal the designated Air Conditioning (AC) vents, outer roof edges / gravel stop, minimal parapet wall areas, and plumbing/exhaust pipes.
I. SCOPE OF WORK
The scope of work is limited to the maintenance of the following components on the rolled roof:
• AC Vents & Mechanical Penetrations: All rooftop AC curb frames, electrical conduits, line sets, and utility penetrations.
• Roof Edges & Perimeter: The main outer perimeter edges, metal drip edges, gravel stops, and edge seams.
• Minimal Parapet Walls: The limited sections of vertical parapet transitions, wall seams, and flashing junctions.
• Roof Pipes: All plumbing vent stacks, gas exhaust lines, and furnace pipes.
• Drainage System: All roof scuppers, gutters, and downspouts.
Phase 1: Surface Preparation & Demolition
• Debris & Granule Removal: Thoroughly sweep and clean all work areas. Scrape away loose ceramic granules, dirt, mud, and organic growth along the perimeter edges, minimal parapets, and penetrations.
• Old Sealant Stripping: Carefully cut away and remove cracked, brittle, or failed existing tar, mastic, and silicone from target zones without tearing the underlying rolled roofing membrane.
• Substrate Inspection: Inspect the rolled roof along the edges and penetrations for buckling, blistering, or water saturation.
• If structural wood rot, deteriorated fascia/decking, or severely saturated/delaminated roll roofing is discovered, the contractor must include the cost to its quote during a walkthrough that will be done before submitting quotes.
Phase 2: Re-Sealing AC Vents & Penetrations
• Curb Sealing (Three-Course Method): Apply a heavy layer of SBS-modified flashing cement along the base joint where the AC curb meets the rolled roof. Embed a heavy-duty polyester or fiberglass reinforcement mesh into the cement, and apply a second top-coat of flashing cement over the mesh, feathering the edges flat.
• Utility Line Tightening: Seal the entry points of all refrigerant lines and electrical lines using a high-grade, non-sag polyurethane or asphalt-compatible sealant.
Phase 3: Roof Edge & Minimal Parapet Wall Remediation
• Perimeter Roof Edge Sealing: Inspect the entire outer edge of the roof. Clean and re-seal the critical seam where the rolled roofing meets the metal drip edge or gravel stop using the three-course method (flashing cement + fabric mesh + flashing cement) to prevent wind uplift and water back-logging.
• Minimal Parapet Transitions: For the small sections of parapet walls present, inspect the transition where the rolled roofing turns up the wall. Seal all split seams, lifting edges, and open laps using the three-course method.
• Termination Bars / Reglet’s: Clean out and re-caulk any termination bars or metal counter-flashing along the small parapet section using a premium exterior non-sag polyurethane sealant.
Phase 4: Pipe Flashing & Boot Sealing
• Flange Embedding: For existing metal or plastic pipe boots, scrape the flanges clean.
Apply a generous bed of flashing cement underneath the flange to seal it directly to the rolled roofing sheet.
• Target Patching: Install a rolled roofing "target patch" (collar) over the flange, embedding it tightly in roofing cement, and seal all outer perimeter edges using the three-course method.
• Collar Rehabilitation: Apply a thick, continuous bead of premium lap sealant or polyurethane around the top junction where the rubber/metal boot meets the PVC or metal pipe.
Phase 5: Drainage & Downspout Cleaning
• Debris Clearing: Remove all leaves, twigs, silt, and built-up roofing granules from all scuppers, gutters, and downspout openings.
• Downspout Flushing: Flush all downspouts with water to ensure they are completely clear and free flowing from the roof level to the ground exit points.
• Obstruction Removal: If a blockage is found inside a downspout, the contractor must snake or clear the pipe until full water drainage is restored.
Materials & Standards
• Compatibility: All sealants must be 100% compatible with asphalt roll roofing. Approved materials include SBS-modified flashing cement (wet/dry plastic roof cement), polyurethane sealants, and high-performance asphalt-compatible liquid rubber.
Cleanup
• Debris Blowout: Remove all scrap materials, mastic buckets, cleared downspout debris, and trash from the rooftop and surrounding property ground areas.
II. CALENDAR OF EVENTS
EVENT DATE
PRE-BID MEETING/WALKTHROUGH November 19, 2026 @ 9:00AM DEADLINE FOR PROPOSER QUESTIONS November 19, 2026 @ 5:00PM DEADLINE FOR QUESTION RESPONSES November 23, 2026 @ 5:00PM DEADLINE TO SUBMIT QUOTATIONS November 25, 2026 @ 2:00PM
III. PRE-BID MEETING/WALKTHROUGH
A MANDATORY site walkthrough will be held on for this solicitation. Information below:
Date: 11/19/2026 Time: 9:00AM Location: Herbert Hughes Correctional Center - HHCC Address: 328 Applestill Road, El Centro, CA 92243
Contact Person: Simon De La Rosa Title: Construction Technician
IV. CONTRACTOR’S RESPONSIBILITIES
The awarded Contractor shall be responsible for verifying all existing field conditions prior to commencing work. Any discrepancies between the existing conditions and the information provided in this scope of work shall be brought to the Facilities Department attention before proceeding with any work on site.
• Valid C-39 Roofing Contractor or B General Contractor’s License.
• DIR Registration No.
• Certificates of Insurance
V. QUOTATION REQUIREMENTS
The Contractor shall submit an itemized quotation plus total price of the following:
• Quotation
• C-39 or General Contractor License
• DIR #
• Certificate of Insurance
VI. COMPLETION REQUIREMENTS
Upon completion, the Contractor shall:
• Provide fully restored seals of the roofing components/utilities/ac’s etc.
• Verify proper operation of the gutters, drains scuppers etc.
• Ensure all ductwork seals are complete and properly sealed.
• Remove all debris and leave the work area clean.
• Demonstrate proper operation of the roofing system.
• Address any deficiencies identified during final inspection.
VII. QUOTATIONS DUE
Quotations shall be submitted through the County of Imperial PlanetBids Vendor Portal:
https://vendors.planetbids.com/portal/64020/portal-home no later than the date and time specified by the County of Imperial Purchasing Department located at 1125 Main Street, El Centro, California 92243.
VIII. REJECTION OF QUOTATIONS
The County of Imperial reserved the right to reject any or all quotes, or to waive any irregularities or informalities in any quotes pursuant to Public Contract Code, Section 20150.9. The award of the project, if made by the County of Imperial, will be the lowest responsible contractor.
IX. CONTACT PERSON
Any questions regarding this project shall be addressed to Gabriela Loo, Purchasing Supervisor, with the County of Imperial Purchasing Department by e-mail at procurement@co.imperial.ca.us, no later than 2:00PM on November 25, 2026.