This is a draft Purchase Description (PD) for the Improved Maritime Ballistic Plate (IMBP), a protective body armor component designed for U.S. Navy forces conducting Visit, Board, Search and Seizure (VBSS) and Anti-Terrorism (AT) operations. The IMBP is available in six sizes (X-Small through X-Large) and provides ballistic protection against 5.56mm and 7.62mm rifle rounds when integrated into the Maritime Armor System (MAS) or Naval Security Forces (NSF) Tactical Vest (NTV). The plate is classified as a critical safety item and is controlled by Naval Sea Systems Command under PMS 408 Expeditionary Missions.

The specification establishes comprehensive construction, operational, environmental, and performance requirements. Construction requirements mandate uniform areal density, proper assembly bonding, and cover materials that mitigate spall and environmental degradation. Operational requirements specify weight thresholds (ranging from 3.0 to 5.4 lbs depending on size), ease of insertion into compatible vests, dimensional conformance to specified drawings, maximum 1.0-inch uniform thickness, black coloring, and specific labeling including Data Matrix codes for unique identification. Environmental requirements mandate testing for weatherometer resistance, temperature extremes (-60°F to +160°F), fluid resistance (JP-8, oil, salt water), altitude exposure, temperature shock, and neutral buoyancy. Performance requirements include V50 ballistic limit measurements at 0-degree obliquity, V0 ballistic resistance, back face deformation limits (44mm maximum), and shatter gap resistance testing. The specification requires First Article Testing (FAT) conducted in two parts—DOT&E compliance testing and additional threat testing—plus ongoing Lot Acceptance Testing (LAT) using ANSI/ASQ Z1.4-2008 sampling plans. Testing protocols are detailed in multiple appendices covering ballistic testing procedures, workmanship and dimensional tolerance grading, buoyancy verification, and classified threat matrices.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INCH-POUND

NQ/PD 26-01

10 April 2026

DRAFT

PURCHASE DESCRIPTION

BODY ARMOR, IMPROVED MARITIME BALLISTIC PLATE (IMBP)

This purchase description (PD) is approved for use by all Departments and Agencies of the Department of Defense (DOD). Recommended improvements, simplifications, or reductions in paperwork are encouraged and should be directed to the preparing activity.

1. SCOPE

1.1 Scope. This purchase description covers the requirements for an Improved Maritime Buoyant Plate (IMBP) to provide protection against rifle threats for U.S. Navy forces while performing Visit, Board, Search and Seizure (VBSS) and Anti-Terrorism (AT) duties. When placed in the Maritime Armor System (MAS), Naval Security Forces (NSF) Tactical Vest (NTV) or other compatible armor systems, the IMBP will provide protection from specific 5.56mm and 7.62mm rifle rounds. The IMBP is a critical safety item.

1.2 Classification. IMBP shall be one type in the following sizes:

X-Small (XS), Small-Short (SS), Small (SM), Medium (MD), Large (LG), and X- Large (XL).

Controlled by: Naval Sea Systems Command Controlled by: PMS 408 Expeditionary Missions CUI Category: CTI Distribution/Dissemination Control: Distribution D POC: PMS 408 Expeditionary Missions

Comments, suggestions, or questions on this document should be addressed to Program Manager Expeditionary Missions, 1333 Isaac Hull Ave, Washington Navy Yard, DC 20376.

Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at https://assist.dla.mil.

Commented [DM1]: ENHANCED? (EMBP)

Commented [DM2R1]: Remove buoyancy from name because of test results, Maritime Armor Plate (MAP)?

Commented [DM3R1]: Improved Maritime Ballistic Plate

(IMBP)?

CUI

2. APPLICABLE DOCUMENTS

2.1 General. The documents listed in this section are specified in sections 3 and 4 of this purchase description. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements, whether or not they are listed.

2.2 Government Documents.

2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the solicitation or contract.

DEPARTMENT OF DEFENSE SPECIFICATIONS

CO/PD 04-19 - Personal Armor, Enhanced Small Arms Protective Insert (ESAPI) MIL-DTL-32075 - Label: For Clothing, Equipage, and Tentage (General Use) MIL-STD-130 - Identification Marking of U.S. Military Property

MIL-STD-662 - V50 Ballistic Test for Armor MIL-STD-810 - Environmental Engineering Considerations and

Laboratory Tests

MIL-STD-3027 - Performance Requirements and Testing of Body

Armor

NQ/PD 16-03 - Body Armor, Maritime Armor System (MAS) NQ/PD 23-01 - Body Armor, Naval Security Forces (NSF) Tactical Vest (NTV)

(Copies of these documents are available upon request).

2.2.2 Other Government Documents, Drawings, and Publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation.

Commented [DM4]: All of these can be listed under DOD SPECS and be in alpha/numeric order

Commented [MC5R4]: Agreed

Commented [DM6]: If we specifically call out F, then it excludes future revisions of MIL-STD-662

DRAWINGS

Drawing Numbers:

2-6-0588 REV A7; Enhanced Small Arms Protective Insert, Size; X-small 2-6-0589 REV A7; Enhanced Small Arms Protective Insert, Size; Small 2-6-0594 REV A2; Enhanced Small Arms Protective Insert, Size Small Short 2-6-0590 REV A7; Enhanced Small Arms Protective Insert, Size; Medium 2-6-0591 REV A7; Enhanced Small Arms Protective Insert, Size; Large 2-6-0592 REV A7; Enhanced Small Arms Protective Insert, Size; X-large

TEST OPERATING PROCEDURES

TOP 10-2-210 Ballistic Testing of Hard Body Armor Using Clay Backing

(Requests for USATECOM TOP 10-2-210 shall be made to Commander, US Army Aberdeen Test Center, ATTN: TEDT‐AT‐SL‐T, 400 Colleran Road, Aberdeen Proving Ground, MD 21105‐5059)

GUIDES

Security Classification Guide (SCG) for Soldier Protection System (SPS) & Associated Soldier Protective Equipment (SPE) V19.0 dated 03 Sep 2019

(Copies of drawings, publications, and other Government documents required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity.)

DIRECTOR, OPERATIONAL TEST & EVALUATION (DOT&E)

4-27-10 Standardization of Hard Body Armor Testing 7-2-10 Standard for Lot Acceptance Ballistic Testing of Hard Body Armor

2.3 Non-Government Publications. The following documents forms a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are those cited in the solicitation or contract.

AMERICAN ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC)

AATCC Method 169 - Weather Resistance of Textiles

(Applications for copies should be addressed to the American Association of Textile Chemists and Colorists, PO Box 12215, Research Triangle Park, NC 27709-2215 or

Commented [DM7]: Update with latest and greatest we get from Army

Commented [C(8R7]: I will get the exact name of the Threat Code annex we are using, but I think it is a temp or supplemental document.

CUI

www.aatcc.org)

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM D792 - Specific Gravity and Density of Plastics by Displacement ASTM D1141 - Standard Practice for the Preparation of Substitute Ocean

Water ASTM D2563 - Standard Recommended practice for Classifying Visual

Defects in Glass Reinforced Plastic Laminate Parts ASTM D2584 - Ignition Loss of Cured Reinforced Resins ASTM D2863 - Measuring the Minimum Oxygen Concentration to Support

Candle Like Combustion of Plastics (Oxygen Index) ASTM D3951 - Standard Practice for Commercial Packaging ASTM E29 - Standard Practice for Using Significant Digits in Test Data to Determine Conformance with Specifications

(Copies of these documents are available online at www.astm.org or from ASTM International, 100 Bar Harbor Drive, West Conshohocken, PA 19428-2959.)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI/ASQ Z1.4-2008 - Sampling Procedures and Tables for Inspection by Attributes

(Copies of this document are available online at www.asq.org or from the American Society for Quality, P.O. Box 3005, Milwaukee, WI, 53201-3005.)

NATIONAL INSTITUTE OF JUSTICE (NIJ)

NIJ 0101.07 - Ballistic Resistance of Body Armor

(Copies of this document are available online at http://www.justnet.org/ or from NLECTC4 National, 2277 Research Blvd., M/S 8J, Rockville, MD 20850.)

2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence over TOP and TOP takes precedence over MIL-STD-662. However, for V50 testing, MIL-STD-662 takes precedence over TOP. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 First Article. First Article Testing (FAT) is a requirement for IMBP. Samples shall be subjected to FAT in accordance with paragraph 4.1.1.

Commented [DG9]: This isn’t cited anywhere in the PD

Commented [DM10R9]: If we’re not talking about it, why are we referencing? Is citing the TOP enough?

Commented [DG11]: This isn’t cited anywhere in the PD

Commented [DG12R11]: This is cited in TOP 10-2-210 for Fluid resistance verification as part of ballistic testing, but we may need to cite in Appendix E should we deem it necessary to test buoyancy in sea/salt water versus freash water (which could impact results).

Commented [DG13R11]: MBP is test in distilled water (but buoyancy isn’t measured (go/no go if it floats)

Commented [DM14R11]: ASTM D 1141 is called out in MAS and NTV PDs in the ballistic test conditions sections but not in the buoyancy section, recommend we either keep the reference for all or remove from all

Commented [DM15R11]: If we’re not talking about it, why are we referencing? Is citing the TOP enough?

Can’t hurt to leave in

Commented [DM16]: These astm methods were listed in MBP

PD

Commented [C(17R16]: Dave may have pulled the ASTM's based on the materials of the new plate. I am just realizing, I don't exactly know if the materials are different.

Commented [DM18]: NIJ standard was in MBP PD, update with latest and greatest NIJ

Commented [C(19R18]: I agree with keeping this in bc we use 44.0mm BFD from this.

CUI

3.2 Construction. The materials selected by the contractor shall be capable of meeting all the performance, operational and environmental requirements specified herein.

3.2.1 IMBP Cover. The IMBP cover materials shall mitigate frontal spall, increase durability, and decrease environmental deterioration of the underlying components configuration. The cover material shall cover the entire front and back outer surface and all side edges. The cover, including all edges, shall be free of cuts, holes, tears, abraded areas, wrinkles, bubbles or creases. The cover shall not exhibit any areas of under adherence. There shall be no visible peeling, wrinkles, bubbles or creases of the cover before or after any operating environment conditioning when verified in accordance with section 4.5.

3.2.1.1 Covering of Components by Spray Coating. The IMBP shall exhibit uniform coverage of any spray coated material. The finished plate shall exhibit no smears and/or clumps on the exposed surfaces or spray coated material, nor exhibit any under covered areas on exposed surfaces.

3.2.2 Assembly of Components by Bonding. The IMBP shall exhibit no evidence of under adherence between layers or components. The finished IMBP shall exhibit no smears and or clumps from excess bonding agent visible on the exposed surfaces when verified in accordance with 4.2.

3.3 Production Data. The following information, determined during production, shall be made a matter of record and shall be furnished on request to the contracting official.

This data shall be identified with the serial number of the body armor.

a. Data generated during inspection or other protocols per quality system/quality validation plan. This includes, but is not limited to, weight, thickness and dimensional measurements.

b. Supplier lot information and traceability for all component parts identified in the technical data package. This shall include material compliance forms signed by the contractor, each sub-contractor or material supplier.

c. Operational, ownership and environmental test data generated by the contractor on the IMBP.

d. Ballistic performance test data generated under all first article, conformance and validation testing as described in paragraph 4.8.

e. For traceability, every IMBP shall be durably marked in such a fashion as to be traceable from production through to the ballistic test records for that lot of IMBPs. The serial number shall be marked on the outside face within 1 inch

Commented [DM20]: I think this is meant to reference 4.5 operating requirements

Commented [C(21R20]: Agreed - good catch!

Commented [DM22]: Mention RFID here?

Commented [C(23R22]: hmm, not sure. Was that what Dave wanted for plates moving forward?

Commented [KK24R22]: Although we don’t know exactly how we will implement RFID, we do intend to transition to that technology for inventory management across the board.

Theoretically, if a tri-wall of armor (or anything we manage) comes in from the vendor, RFID would allow us to know every plate in that box without opening it up. I have also discussed with Desiree how we could have NTV manufacturers incorporate RFID into NTV (eventually).

Commented [C(25R22]: I don't know if we can afford, especially if it doesn't come to fruition. Is there a way we can get a cost estimate? Also, who pays for the warehouse equipment and installation?

Commented [KK26R22]: We are still working out details and don’t have cost estimates at the moment. While there may/will be an upfront investment, we will be able to provide you an accurate (99%) wall to wall inventory in as little as a day vs 2 weeks with questionable accuracy.

It will come to fruition, it has to, and will result in long term cost savings for annual wall to wall, inventory receipt etc.

Commented [C(27R22]: Two weeks... ahh Kevin you are such a jokester - We are still waiting on the 2024 inventory. I think we are about five months away from a two-year turnaround time.

Commented [DM28R22]: Leave this paragraph as is for now.

Revise once we have more info about RFID

Commented [KK29R22]: Annual inventory has not been our strong suit to be sure. I was referring to conducting the physical inventory which has historically taken 2 weeks. You are spot on that the 2024 is WAY overdue from completion. We are going to change that.

Commented [KK30R22]: At least include language that gives the option of going to RFID. The PWS should be written accordingly.

Commented [DM31R22]: Provide RFI stickers as GFM to the manufacturer, adhere behind sticker on flat surface?

Commented [DG32R22]: This particular paragraph is referring to marking on the actual ceramic strike face prior to plate assembly.

CUI

of the lower edge of any ceramic component (if used) before it is fired. It shall be marked by inscribing, embossing, or with high temperature resistant inorganic ink after firing with permanent marking to a maximum depth of

0.010 inch so that the serial number will be legible when the cover is stripped mechanically or by the use of a solvent. Solvents, fuels and other liquids shall not affect the serial number markings. It is desirable to have ceramic cores marked to be traceable by radiographic analysis as well. If inscribed, it will be done on the outer 0.25 inches of the plate.

3.4 Workmanship. The finished IMBP shall conform to the quality of product established by this purchase description. Utmost care shall be taken during fabrication to ensure quality workmanship and safety of the service person using the item. All materials to be used in the construction of the IMBP shall conform to all material requirements in this purchase description and internal specifications, unless otherwise specified.

Manufacturing practices shall be capable of consistently yielding product that conforms to all requirements in this purchase description and internal specifications for the body armor and their components. Continual improvement shall also be a constant focus of the manufacturing practice. All component materials shall be properly marked and identified and shall be protected properly during storage.

Materials shall be produced and integrated to extend durability and provide consistency of appearance throughout plate life. All components to be assembled shall be thoroughly cleaned of all foreign matter. Surfaces to be bonded shall be properly prepared in a manner which will ensure a proper bond capable of meeting the applicable performance requirements. The required adhesive(s) shall be applied uniformly over the entire contact areas of the components to be joined to eliminate delamination between materials. Material layers shall be free of contaminants (such as, but not limited to: Foreign Object Debris (FOD) (media not associated with the technical data package), loose fragments of component materials, operator elements not part of component materials. Any IMBP ceramic (if used) must be free of cracks.

Defective conditions within the IMBP shall not exceed the limits identified in Table D.1 (Appendix D). This section is applicable to all material or components of the IMBP whether furnished by the Prime Contractor or by any of their suppliers or sub-contractors. In any case of material, process, or equipment change desired to be made by the Contractor, the written consent of the Government shall be obtained before making the change. Additional testing may be required prior to implementation of the change to verify product performance. (See section 4 for verification).

3.4.1 Uniform Areal Density. The IMBP shall provide uniform areal density

(materials coverage) throughout the entire surface area. The only exception shall be when edge materials are used to protect the plate from side impact (e.g., foam) to increase the durability. Material no thicker than 0.10 inches (2.54 mm) may be used for this purpose. Materials shall extend from edge to edge to provide uniform thickness throughout the entire surface area of the IMBP. “Patches,” “clamps,” and other materials with partial or interrupted

CUI

coverage of the IMBP surface area shall not be acceptable. Materials shall not cause interference with Non-Destructive Test Equipment (NDTE) (e.g., radiographic inspection or computed tomography). If ceramic materials are used, the ceramic shall have uniform edges. To reduce sharp edges, an abrasive device or other equipment may be used to clean the edges in production. Uniform areal density shall be verified in accordance with paragraph 4.2.2.3.

3.5 Operational Requirements. IMBP are neutrally buoyant, multi-curve, hard armor plates intended for use in multiple armor systems. Each IMBP shall meet the following user-oriented requirements (see paragraph 4.5).

3.5.1 Ease of Insertion. The IMBP shall be able to easily slide into and out of the corresponding sized Maritime Armor System (MAS) and Naval Security Forces (NSF) Tactical Vest (NTV) plate pockets. No special training, equipment or tools will be required to insert the IMBP into the plate pocket (see paragraph 4.5.1).

3.5.2 Weight. The finished IMBP threshold (maximum) and objective (desired) weights are outlined in Table 1 (rounded to the nearest 0.1 lb) (see paragraph 4.5.2).

Table 1. IMBP Maximum Weight

Size Threshold Weight (lbs)

Objective Weight (lbs)

X-Small 3.00 2.40 Small-Short 3.10 2.80 Small 3.60 3.00 Medium 4.20 3.40 Large 4.80 4.00 X-Large 5.40 4.60

3.5.3 Dimensional Measurements. The IMBP shall conform to all measurements, tolerances, radius and edge chamfers as specified in drawings listed in paragraph 2.2.2 (see paragraph 4.5.3). Appendix D outlines applicable out of tolerance grading scale for determination of acceptance.

3.5.4 Thickness. The IMBP in finished form shall have a maximum 1.0-inch uniform thickness throughout. The variability of the local thickness on any part shall not exceed 1/8 inch (see para. 4.5.4).

3.5.5 IMBP Color. All outer areas of the IMBP shall be colored Black and be a good match to the standard sample (see paragraph 4.5.5).

Commented [DM33]: Add CT-scan here?

Commented [C(34R33]: I don't see what it would hurt

Commented [KK35]: I don’t recall if we know that these weights, for the respective volume of plate, will result in positive buoyancy.

Commented [C(36R35]: I know for a fact the Small-Short is a SWAG (don't ask me how I know). The rest are accurate for the Threshold.

Commented [DM37R35]: NCTRF has all sizes of plates to get dry weight and buoyancy, will update once we get the results

Commented [DG38]: Keeping X-Small incase other services are interested. We can discuss further, but test matrix does include it.

Commented [DG39]: Need to get weights for Small short

Commented [DG40]: Specify shade?

Commented [DM41R40]: specify the “standard sample” from par. 4.5.5

3.5.6 Labels/Markings. All labels and markings shall be approved by NAVSEA prior to production. (See paragraph 4.5.6).

3.5.6.1 Strike Face Labels. The size identification of the IMBP shall be clearly displayed centered on the front surface 1.5 inches below the top edge in all capital characters 0.5 inch high (i.e. MEDIUM). A permanent label or marking shall be centered on the front/strike face, 3.0 ± 0.25 inches from the top clearly displaying “STRIKE FACE”. All characters will be 0.50-inch height. The words “HANDLE WITH CARE” shall be printed in characters 0.5-inch-high at 6.5 ± 0.25 inches below the top edge and centered on the front face surface.

3.5.6.2 Unique Identification and Instruction Label. As a threshold the IMBP shall have a combination unique identification (UID) and markings or label with the following detailed requirements:

a. The Human Readable Information (HRI) contents of the UID label shall be as follows:

1. Name of Ballistic Plate

2. Size

3. National Stock Number (NSN) / Contract Number / Lot

Number / Serial Number / Date of Manufacture / Manufacturer Commercial and Government Entity (CAGE) code / Design Code

b. Machine Readable Information (MRI) contents of the UID label shall consist of one ECC 200 compliant Data Matrix code containing:

CAGE code of manufacturer, Lot Number, Serial Number, Date of Manufacture, NSN, and Design Code. The tag/label shall comply with the following:

1. Data Matrix Construct: The Data Matrix shall be encoded per

MIL-STD-130 using only the data identifiers (DI) and criteria shown below. The following DI sequence shall be maintained in the order listed below:

• Cage=17V followed by cage code

• Lot=1T followed by lot number

• Serial number=S followed by serial number

• Date of production = 16D followed by production date, YYYYMMDD

• National stock number=N followed by the NSN.

• Part number = 1P followed by design code (the design code

Commented [DG42]: This is probably where we want to include RFID requirements.

CUI

may be up to 13alpha-numeric characters (plus only dashes “-” as special characters))

• Construct Example:

• [)>RS06GS17V52969GS1TE034GSS328185GS16D20080

215GSN8470-01-520-7370GS1PABC-123RSEOT

2. Data Matrix Geometry: Data Matrix codes shall be a square

ECC200 matrix per ISO 16022. Individual Cell size (element size) of the code shall be between 0.020 and 0.023 inches. A quiet zone of 0.5 inches of Black label/tag material is required around the Data Matrix code.

c. The instruction markings or label shall include the appropriate designation for each plate as to placement of the plate in relation to the body when worn. Each marking or label shall be centered on the rear of the ballistic plate so it may be easily read when the plate is extracted from a plate pocket. The contents of the instruction label shall include the following verbiage:

1.“THIS SIDE AGAINST BODY” on the rear of the ballistic plate.

2.“Remove loose dirt from surface with a cloth or soft brush.”

3.“The Lightweight Plate is unserviceable if any of the following conditions are present:

• Outer cover is damaged exposing inner materials.

• Plate is cracked (e.g., audible rattling when shaken).

• Cracking is felt or heard when 0.50 in (12.7 mm) perimeter of plate is firmly pinched.

• Creaking or squeaking is heard when twisted by hand.

• Composite is delaminating (backing materials are separating).

• Plate has been hit by a bullet or fragment.”

d. The color of the label shall be black with white lettering/marking. All plate label and spall colors shall be approved by NAVSEA prior to production.

e. The plate markings or label shall remain durable, legible, and affixed to the rear of the ballistic insert during field use under all environmental conditions. The label shall be of sufficient strength to withstand repeated abrasion during field use and cleaning when verified in accordance with the weatherometer conditioning in paragraph 4.7.1.

f. The plates shall be delivered with unique item identifiers in accordance with the current version of DFARS clause 252.211-7003., “Item Unique Identification and Valuation”, ANSI MH10.8.2-2013, “Data Identifier and Application Identifier Standard” and MIL-STD-

Commented [DM43]: The numbering/lettering here seems off because it goes a-f then picks up at d again

Commented [MC44R43]: Yeah I agree, but it isn’t wrong and I am not sure how to fix/change? Open to suggestions

Commented [DM45R43]: Maybe use bullet points instead?

Commented [C(46R43]: I am fine with that, assuming it aligns with formatting requirements.

130, “Identification and Marking of U.S. Military Property.”

1. AS9132 and AIM DPM grading platforms will not be allowed for this project. Contractor must provide the contracting officer with at least two verification reports per plate size for each FAT and LAT.

Verification shall be on the end item, not a standalone label. If using laminates or overcoats the label must be verified after placing the laminate or overcoat on the label or tag. No exceptions are allowed. Proof of Verification is subject to inspection at the time of shipment.

2. Validation: Validation checks of the UID must be performed on a routine basis. Contractor is responsible for encoding the UID per above guidelines and the latest revision of MIL-STD-130. Proof of Validation is subject to inspection at the time of shipment.

3. Placement of the UID label/tag: The center of the Data Matrix code on an x and y axis will hereinafter be referred to as the centerline of the UID label/Tag. The UID label/tag will be placed on the back side (opposite the strike face) of the item. The centerline of the UID label/tag will be left-right centered on the item, positioned 2 inches from the bottom edge. A tolerance of ±

0.25 inches in each direction will be allowed. The entire plate area within 3.0 inches of the bottom of the plate must be clear of any other labels or markings at all times. Additional non UID information and logos required by this product description must appear above the 3-inch featureless zone.

3.5.7 Health and Safety. The IMBP shall be non-hazardous (non-explosive and have no toxicological or electromagnetic radiation effects) to the individual wearing the IMBP.

3.5.7.1 Personnel Hazard. The vendor shall visually inspect that IMBPs are free of sharp edges, foreign materials, burrs or any other conditions that may cause an injury to the user. The vendor shall demonstrate that the IMBP will not cause injury to the user, or surrounding sailors, when ballistically tested (paragraph 4.8).

3.5.7.2 Magnetic Influence. There shall be no magnetic influence on a compass at any distance from the IMBP (paragraph 4.5.7.2).

3.6 Ownership and Support. (See paragraph 4.6)

Commented [DM47]: Unclear what the exact reference here is

Commented [DM48]: Personnel or personal?

Commented [DM49R48]: personnel

CUI

3.6.1 Durability. The IMBP shall be able to withstand two drops using a moment arm fixture at a height of 48.0-inches onto a concrete surface without any detrimental effects to ballistic performance, major surface characteristics or physical properties. A 10.0 ± 0.1 lbs weighted object shall be attached to the rear surface of the IMBP sample (see paragraph 4.6.1). The weight of the moment arm and straps shall be 8.5 ± 0.5 lbs.

3.7 Operating Environment Requirements. Unless otherwise stated, ballistic validation testing will be performed against threats outlined in Appendix A and Appendix B.

Ballistic performance shall not be degraded from exposure to the environmental conditions specified below.

3.7.1 Weatherometer Resistance. The finished IMBP after being subjected to the weatherometer resistance testing shall exhibit no evidence of cracking, blistering, color change, separation of edging (if used) or ballistic degradation when conditioned in accordance with paragraph 4.7.1.

3.7.2 Temperature Extreme. The IMBP shall provide structural and ballistic protection when exposed to temperatures ranging from -60 ºF to +160 ºF when conditioned in accordance with paragraph 4.7.2.

3.7.3 Fluid Resistance. The IMBP shall maintain structural and ballistic integrity after contamination with Jet Propellant 8 (JP-8), oil, and immersion in salt water for a period of two (2) hours each at 70 degrees ± 10 degrees Fahrenheit (see paragraph 4.7.3).

3.7.4 Altitude. The IMBP shall meet all performance requirements from sea level to 15,000 feet (ft.) altitude. No structural, visible, operational degradation, or safety hazard shall occur when the IMBP is exposed to a pressure change equivalent to a change in altitude from 40,000 ft. to 15,000 ft. (12192 meters (m) to 4572 m) at a rate of 1500 ft./min - 2000 ft./min (457.2 m/min - 609.6 m/min) (see paragraph 4.7.4).

3.7.5 Temperature Shock. The IMBP shall meet all performance requirements after exposure to temperature changes between the high and low operating temperature extremes; temperature shock shall occur within a five minute period when conditioned in accordance with paragraph 4.7.5.

3.7.6 Buoyancy. The IMBP shall have a buoyancy of greater than or equal to zero when tested per 4.7.6 and Appendix E.

3.8 Performance Requirements. (See paragraph 4.8)

Commented [DM50]: Where did this requirement come from?

2 hours doesn’t sound like much time, ESAPI is 2 hours copy/paste?

Commented [DM51R50]: Should it be longer than 2 hours because IMBP designed to go in the water

Commented [DM52R50]: What is realistic time for exposure?

Man overboard, flooded compartments

Commented [M(53R50]: Reference MIL-STD-3027 and TOP 10-2-210C.

Commented [DM54R50]: Leave as 2 hours, precedent for 2 hours, we’ve used before

CUI

3.8.1 Area of Coverage. The IMBP will provide uniform materials coverage throughout the entire surface area of the IMBP. If backing materials are used, the backing materials must extend from edge to edge to provide uniform thickness throughout the entire surface area. The IMBP shall have uniform areal density throughout the entire surface area. “Patches”, “clamps”, materials with partial coverage of the IMBP surface area shall not be acceptable. Any cuts with open gaps and/or slits on any materials are not allowed. The government has the option to reject plates with imperfections visible in radiographic images (x-rays). If ceramic materials are used, the ceramic shall have uniform edges without “edge breaks” or “chamfers”. To reduce sharp edges, sandpaper or a scouring pad may be used to clean the edges in production.

3.8.2 Required V50 Ballistic Limit. The IMBP will yield the minimum V50 ballistic limit measurements at 0-degree obliquity when tested per paragraph 4.8.6 with the specified test projectiles as per Appendix A and Appendix B.

3.8.3 V0 Ballistic Resistance. The IMBP will provide ballistic resistance as specified in Appendix B when tested per paragraph 4.8.7.

3.8.4 Back Face Deformation. The IMBP back face deformation shall be tested in accordance with and meet the requirements of paragraph 4.8.9 and Appendix B.

3.8.5 Shatter Gap Resistance. The IMBP will provide ballistic resistance against shatter gap per paragraph 4.8.10 and Appendix B.

4 VERIFICATION

4.1 Classification of Testing. The testing requirements specified herein are categorized as First Article Testing (FAT) and Lot Acceptance Testing (LAT) as specified in Table 2.

Table 2. Requirements and Verifications

CHARACTERISTICS REQUIREMENT

PARAGRAPH

VERIFICATION

PARAGRAPH

First Article Test (FAT)

Lot Acceptance Testing (LAT)

Construction Requirements 3.2 4.2 IMBP Cover 3.2.1 4.2.2 X X Assembly of Components by Bonding

3.2.2 4.2.2 X X**

Workmanship Requirements 3.4 4.4 Areal Density 3.4.1 4.4 X X** Operational Requirements 3.5 4.5 Ease of Insertion 3.5.1 4.5.1 X X** Weight 3.5.2 4.5.2 X X

Commented [DM55]: Double check reference

Commented [MC56R55]: Did Dave’s comment resolve or should we add the specific paragraphs for each of the highlighted characteristics?

Commented [DM57]: Double check reference, paragraphs don’t match

Commented [MC58R57]: Did Dave’s comment resolve or should we add the specific paragraphs for each of the highlighted characteristics?

CUI

Dimensional measurements 3.5.3 4.5.3 X X Thickness 3.5.4 4.5.4 X X IMBP Color 3.5.5 4.5.5 X X**

Labels/markings 3.5.6 4.5.6 X X** Health and Safety 3.5.7 4.5.7 Personnel Hazard 3.5.7.1 4.5.7.1 X CoC Magnetic Influence 3.5.7.2 4.5.7.2 X X**

Ownership and Support Requirements

3.6 4.6

Durability 3.6.1 4.6.1 X NA Operating Environment 3.7 4.7 Weatherometer 3.7.1 4.7.1 X NA Temperature Extreme 3.7.2 4.7.2 X NA Fluid Resistance 3.7.3 4.7.3 X NA Altitude Test 3.7.4 4.7.4 X NA Temperature Shock 3.7.5 4.7.5 X NA Buoyancy 3.7.6 4.7.6 X X

Performance Requirements 3.8 4.8 Area of coverage 3.8.1 4.8 X NA Req V50 Ballistic Limit 3.8.2 4.8.6 X X*** V0 Ballistic Resistance 3.8.3 4.8.7 X X Back Face Deformation 3.8.4 4.8.9 X X Shatter Gap Resistance 3.8.5 4.8.10 X X***

Notes:

X - Testing required CoC - Certificate of Conformance to Include data ** - Test or inspection to be performed at vendor facility *** - The government may elect to perform testing at their discretion NA - Not Applicable

4.1.1 First Article Testing (FAT). The government reserves the right to perform any of the tests set forth in this specification where such tests are deemed necessary to ensure supplies and services conform to prescribed requirements. When a FAT is required, it includes all of the verifications listed in Table 2 unless otherwise specified in the contract.

4.1.2 Lot Acceptance Testing (LAT). LAT sample test size shall be determined using ANSI/ASQ Z1.4-2008, Special Inspection Level S-4, AQL of 4, single sampling plans for normal inspection. LAT of IMBP shall include those applicable examinations and tests outlined in Table 2. Refer to Appendix C for LAT Protocol.

4.2 Requirements and Verifications. Table 2 delineates performance requirements and the associated verification methods.

Commented [GDCUPUW(59]: Believe this is covered since we provide drawings and verify dimensional accuracy.

CUI

4.2.1 Order of Testing. Performing the various testing (operating, ownership & support, operating environment, and performance) can occur in any order.

4.2.2 Verification Methods. The types of verification methods included in this section are visual inspection, dimensional measurements, sample tests, component properties analysis and similarity to previously approved or previously qualified designs.

4.2.2.2 Verification Using Standard Samples. Use standard samples to verify colors with visual inspections.

4.2.2.3 Uniform Areal Density. Dry lay-up for each design shall be examined to visually ensure the plates exhibit uniform areal density (no overlap or underlay, uniform material lengths, and thicknesses, etc.).

4.3 Responsibility for Compliance. Production items shall meet all requirements specified in section 3. The supplier shall establish and maintain documented procedures for inspection and testing activities in order to verify that the specified requirements for the product are met. The required inspection, testing and the records to be established shall be detailed in a quality plan available to the government as specified in the contract or procuring activity. The inspection set forth in this specification shall become part of the contractor’s overall inspection procedures or quality system. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection as part of the manufacturing operations is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.

4.4 Workmanship and Areal Density. Dry Lay ups for each design will be examined prior to production of any test plates or production plates to visually ensure the plates exhibit uniform areal density (no unnecessary overlap/underlay, uniform material lengths and thicknesses, etc.). Radiographic images (x-rays) of complete end items will be taken digitally or by the use of x-ray film. Radiography shall include the entire strike face area of the plate with the radiograph taken from a frontal or rear view. Defects will be classified in per Table D.1 (Appendix D) and grading criteria for acceptance of defects is outlined in Appendix D. The Government reserves the right to change the shot pattern to target any and all anomalies, defective conditions or contaminants highlighted in x-ray. If a failure is observed when tested in accordance with sections 4.6, 4.7, and 4.8 the items shall be rejected regardless of defect classification specified in Table 2. Visual end item

Commented [DM60]: I think this is supposed to be Table 2, Table 3 is defects

CUI

inspection shall take place to ensure the entire plate is covered completely with no rips, tears, cuts, blistering or separation between the materials.

4.5 Operational Requirements. Complete each test in this paragraph.

4.5.1 Insertion. One barehanded person shall demonstrate insertion of the appropriately sized IMBP into the Naval Security Forces (NSF) Tactical Vest (NTV) plate pockets without tools or special aids. Perform insertion into Government furnished carrier in a maximum of 30 seconds.

4.5.2 Weight. Take physical weight measurements of all IMBPs to ensure that weights do not exceed those presented in paragraph 3.5.2 Table 1. The finished IMBPs shall be weighed to the nearest 0.1 pound.

4.5.3 End Item Dimensions. Take physical measurements of all IMBP to show that all measurements conform to dimensions and tolerances in Drawings specified in paragraph 2.2.2. Appendix D outlines applicable out of tolerance grading scale for determination of acceptance

4.6.3.1 Physical measurements of all submitted IMBPs will be obtained using an ATOS Scanbox with a FANUC Robot M-20iA and an ATOS Triple Scan Sensor to show that all measurements conform to the dimensions and tolerances per drawings outlined in paragraph

2.2.2. In the event of system failure, a laser scanning device (e.g., FARO arm) may be used in lieu of the ATOS Scanbox to measure the physical dimensions of the submitted IMBPs.

4.5.4 Thickness. All IMBPs will be measured for thickness using an ATOS

Scanbox with a FANUC Robot M-20iA and an ATOS Triple Scan Sensor.

All measurements will be recorded to the nearest 0.01 inch. Thickness will be measured near the center (at least 3.5 inches from any edge) and near each of the six corners (1/4 to 1 inch from the edge) of each IMBP. If required, precision calipers may be used in lieu of the ATOS Scanbox to measure thickness of the submitted IMBPs.

4.5.5 IMBP Color. Visually inspect the IMBPs for similarity to the standard sample color of black as specified by the contract.

4.5.6 Labels.

4.5.6.1 Visually inspect for legible, permanent labels on the back face surfaces. Visually inspect that labels contain Human Readable Information (HRI) listed in paragraph 3.5.6. The durability of label markings shall be checked with the following procedures:

Commented [DM61]: Keep ESAPI name here because ESAPI drawing?

Commented [DG62]: Insert RFID here ?

CUI

a) A representative area of the label markings shall be rubbed by hand for 15 seconds with a cotton cloth soaked in distilled water.

b) The same area shall then be rubbed by hand for 15 seconds with a cotton cloth soaked with denatured alcohol (methylated spirit).

c) Finally, the same area shall then be rubbed by hand for 15 seconds with a cotton cloth soaked in isopropyl alcohol.

4.5.6.2 Using appropriate IUID data matrix reader, verify UID construct data elements are per 3.5.6.2.

4.5.7 Health and safety. Complete the verifications in this paragraph.

4.5.7.1 Personnel Hazard. Visually inspect that the items are free of conditions that will cause potential injury to the user. All the material comprising the end item shall be examined by the Government to assess non-explosive, toxicological, and electromagnetic radiation effects. The Contractor shall provide Material Safety Data Sheets (MSDS) to the Government for all materials comprising the end item.

4.5.7.2 Magnetic Influence. The IMBP shall be tested for magnetic influence using magnetic and lensatic compasses. The IMBP shall not cause any deviation of the compass needle.

4.6 Ownership and Support Requirements. Perform the verification in this paragraph.

4.6.1 Durability. Demonstrate durability by performing impact test as outlined in TOP 10-2-210.

4.7 Operating Environment Requirements. Perform each verification in this paragraph then perform ballistic testing in accordance with Appendix B. All test items shall be pre-conditioned for 24 hours at 70oF±10oF at relative humidity of 30%±10% prior to being subjected to subsequent conditioning.

4.7.1 Weatherometer Resistance. The IMBP shall be tested for weather resistance as outlined in TOP 10-2-210.

4.7.2 Temperature Extreme. IMBP will be tested after exposure to temperature per TOP 10-2-210.

4.7.3 Fluid Resistance. IMBP will be tested after fluid exposure to Salt Water, Lubricating oil and F-24 as outlined in TOP 10-2-210.

4.7.4 Altitude Test. IMBP will be tested after simulated altitude exposure per

CUI

TOP 10-2-210.

4.7.5 Temperature Shock. IMBP will be tested after temperature cycling as outlined in TOP 10-2-210.

4.7.6 Buoyancy Test. IMBP buoyancy will be measured per Appendix E.

4.8 Performance Requirements. Complete each test in this paragraph.

4.8.1 Ballistic Test Criteria. For all V50 BL and V0 acceptance tests the information outlined in TOP 10-2-210, Section 5, is required by the government to validate performance

4.8.2 Projectile Velocity Determination. Projectile velocity determination will be per TOP 10-2-210.

4.8.3 Weapon Mounting Configuration. Weapon mounting configuration will be

4.8.4 Environmental Test Conditions. Environmental test conditions will be per

TOP 10-2-210.

4.8.5 Projectile Yaw. Projectile yaw determination will be per TOP 10-2-210.

4.8.6 V50 BL. See Appendix A and Appendix B.

4.8.6.1 PP and CP for V50. Complete and partial penetrations will be determined based on the definitions provided in paragraph 6.3.

4.8.6.2 V50 Test Sample Mounting. Unless otherwise stated the following conditions shall be performed during V50 testing. The IMBP shall be secured to the clay-mounting block with the impact side perpendicular to the line-of-flight of the projectile. Testing will be performed in accordance with MIL-STD-662 except partial and complete penetrations will be determined based on definitions provided in paragraph 6.3.

4.8.7 Ballistic V0 Testing. Ballistic V0 testing of IMBP shall be conducted on a recurring basis per paragraph 3.8.3 and Appendix C.

4.8.7.1 V0 Determination for Acceptance. For V0, the minimum velocities as stated in Appendix B will be the requirement.

4.8.8 Impact Location. See Appendix A.

Commented [DG63]: We should probably remove the “C” from all of these to prevent issues for future revisions to the TOP

Commented [DM64R63]: Concur!

4.8.9 Back Face Deformation (BFD) Measurement. BFD Measurements will be

4.8.9.1 BFD Measurement Process. The clay material shall be contoured to the back face curvature provided by the Lightweight Plate before ballistic testing. This buildup shall use additional clay backing material conditioned in the same manner as the clay material fixture. Both the shootpack and Lightweight Plate shall be strapped or taped to the curved surface of the clay material. BFD shall be measured from the original undisturbed surface of the clay backing material to the post-impact surface with the reference direction perpendicular to the front surface (facing the line-of-fire) of the box. BFD measurements shall be conducted for all shots.

Indentation measurements shall utilize laser scanner measurement instruments, which provide a means to accurately establish the difference between the original undisturbed clay surface, and the post-impact surface. The BFD measurement is the maximum-distance-length, which is the length of the longest line segment parallel to the reference direction between the pre-impact clay surface and the post-impact (BFD) clay surface, where the reference direction is defined to be perpendicular to the front surface (facing the line-of-fire) of the box containing the clay backing material.

Deformations shall be recorded in mm to the nearest tenth digit following standard ASTM E29 “Standard Practice for Using Significant Digits in Test Data to Determine Conformance with Specifications” (“Five-even” rule)(Rounding Method) (i.e. 48.050 = 48.0, 44.051 = 44.1 and 47.950 = 48.0)

4.8.10 Shatter Gap Testing. Per Appendix B, mounting per TOP 10-2-210.

5 PACKAGING

5.1 Packing. For acquisition purposes, the contract or order shall specify complete packaging requirements. When DOD personnel perform material packaging, those personnel need to contact the responsible packaging activity to ascertain requisite packaging requirements. The Inventory Control Point packaging activity within the Military Department of defense Agency, or within the Military Department’s Systems Command, maintains packaging requirements. Packaging data retrieval is available from the managing Military Department’s or defense Agency’s automated packaging files, CD-ROM products, or by contacting the responsible packaging activity.

6 NOTES

Commented [G(65]: Roll these into Appendix D

Commented [G(66R65]: Believe I was thinking we roll the results into Appendix D; just need to make sure we update any references to Table 3.

(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)

6.1 Intended Use. The IMBP is intended for use in the Naval Security Forces (NSF) Tactical Vest (NTV) and the Maritime Armor System (MAS) by Force Protection (FP) personnel and Visit Board Search and Seizure (VBSS) teams. The IMBP will provide multi hit protection against specified small arms.

6.2 Acquisition Requirements. Acquisition documents should specify the following:

a) Title and date of this document.

b) When first article, and pre-production items are required.

c) Color required.

d) Size tariff.

e) Contractually approved ballistic package(s) to include package name, complete description, and FAT acceptance letter.

6.3 Ballistic Testing Definitions. MIL-STD-3027 shall be used for definition references only. In the case of a conflict between MIL-STD-3027 and this document, this purchase description shall take precedence. The following definitions are provided to assist in understanding the test procedures:

Over-Velocity. Striking velocity that is higher than the specified threat requirement.

Under-Velocity. Striking velocity that is lower than the specified threat requirement.

Complete Penetration (CP) for Acceptance Testing. A complete penetration will have occurred when the projectile, fragment of the projectile or fragment of the armor material is imbedded or passes into the clay backing material used to measure transient deformation. Paint or fibrous materials that are emitted from the back of the test specimen and rests on the outer surface of the clay impression are not considered a complete penetration.

Fair Impact. A projectile that impacts the armor within the specified velocity and yaw shot spacing requirements, will be considered a fair impact.

Partial Penetration PP(P). Any fair impact that is not a complete penetration shall be considered a partial penetration.

Crown. Location of the intersection of three different curvatures vicinity the center of the upper third of the plate.

Areal Density (AD). A measure of the weight of the ballistic filler of the armor panel per unit area, usually expressed in pounds per square foot (lb/ft2) or kilograms per square meter (kg/m2)

CUI

of surface area.

Obliquity. A measure, normally in degrees, of the extent to which the impact of a projectile on an armor material deviates from a line normal to the target. Thus, a projectile fired perpendicular to an armor surface at 0 degrees obliquity.

Spall. Fragmentation of the bullet or target material which is projected from the impact surface or rear surface of the target.

Yaw. Projectile yaw is the angular deviation of the longitudinal axis of the projectile from the line of flight at a point as close to the impact point on the target as is practical to measure.

V50 Ballistic Limit (BL). In general, the velocity at which the probability of penetration of an armor material is 50 percent.

6.4 Government Loaned Property. Contact the contracting official if necessary for the loan of property required to verify conformance with paragraph 3.5.1.

6.5 Drawings and Materials. See Paragraph 2.2.2.

6.6 National Stock Numbers. The following are the National Stock Number (NSN) or

Navy Item Control Number (NICN) assigned for IMBP.

Table 3. IMBP NSN Data IMBP Size NSN X-Small TBD Small-Short TBD Small TBD Medium TBD Large TBD X-Large TBD

Commented [DM67]: These are MBP nsn’s. IMBP will need their own

APPENDIX A

IMBP Testing Protocol

V50 Ballistic Limit Measurements

V50 ballistic limit testing of IMBPs shall be conducted as per paragraph 4.8.6 of this PD and MIL-STD-662. The IMBP will yield the minimum V50 ballistic limit as outlined in Table A.1 below. Threats and supporting information are outlined in Appendix F.

Table A.1: V50 Ballistic Limit Protocol Threat Shots Per Plate

RED 3

ORANGE 3

YELLOW 3

GREEN 3

BLUE 3

Ballistic limit measurements will be performed on the actual IMBP. Shot spacing for any part of impacted round should be no closer than 0.75-inches from an edge and each subsequent shot shall be spaced 5.0-6.0 inches from any previous shot.

V50 Calculation: The arithmetic mean of three (3) Partial Penetration (PP’s) and three (3) Complete Penetrations (CP’s) within a 125 ft/sec velocity spread or four (4) Partial Penetration (PP’s) and four (4) Complete Penetrations (CP’s) within a 150 ft/sec velocity spread yield the minimum allowable V50 BL determination that will be accepted as reliable test results.

If 6 partial penetrations occur that are above the minimum V50, the plate demonstrates a V50 above the minimum, the plate passes, and that V50 test is terminated. All shots’ velocities are recorded.

V0 Ballistic Resistance

Ballistic V0 testing of IMBP shall be conducted on a recurring basis per paragraph 3.8.3 and

4.8.7. Appendix B outlines IMBP V0 performance requirements.

The ballistic V0 testing of IMBP shall have a minimum of 3 impacts (2 impacts at 0-degree obliquity and 1 impact at 30-degree obliquity). The first two shots must be fired at 0-degree obliquity and the third shot at 30-degree obliquity.