II MEF SACO Updated PWS v1.pdf

PDF 221 KB Posted

Attached to
II MSB Substance Abuse Control Officer Administrative Support Services Sources Sought
Solicitation number
M6700126ZZ0007
Issued by

About this file

This is a Performance Work Statement (PWS) for administrative support services to the II Marine Expeditionary Force Support Battalion's Substance Abuse Program at Camp Lejeune, North Carolina.

The contractor shall provide one qualified employee to support the uniformed Substance Abuse Control Officer (SACO) with administrative, logistical, and technical services. Key responsibilities include: performing logistical preparation for drug testing activities; compiling programmatic data and draft reports; assisting Urinalysis Program Coordinators with software portals; maintaining liaison with the drug testing laboratory; coordinating with the installation Drug Demand Reduction Coordinator; maintaining training records and compliance metrics; managing policy documentation; preparing specimen shipping manifests; maintaining alcohol breathalyzer equipment inventory and calibration logs; and performing administrative scheduling and facility coordination. The contractor is explicitly prohibited from being appointed as SACO, UPC, or official Urinalysis Observer; signing official Chain of Custody documents; making command recommendations regarding discipline or medical referrals; or directing uniformed personnel. Work performance is based at Building H24, Camp Lejeune, NC 28542, with standard hours of Monday–Friday 0800–1600 (40 hours weekly), though approximately six times monthly field work may require adjusted hours, and approximately monthly Saturday work may be required. The contract includes a 12-month base period (August 1, 2026–July 31, 2027) and four optional 12-month renewal periods through July 31, 2031.

Performance standards are evaluated using a 90% Acceptable Quality Level across timeliness, quality, and accuracy dimensions, with surveillance conducted monthly through random observation. The contractor must maintain internal quality control procedures, comply with DODI 1010.01, DODI 1010.16, SECNAV 5300.28E, and MCO 5300.17, and possess SACO, UPC, and Alcohol Screening Program Coordinator certifications. Contractor personnel require Defense Biometrics Identification System (DBIDS) registration and base access clearance. A transition plan allowing 30 days for orderly handoff to any successor contractor is required at contract completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Substance Abuse Program Administrative Support Services for

II Marine Expeditionary Force Support Battalion

DISTRIBUTION: DoW COMMUNITY ONLY

1.0 OBJECTIVE

This Performance Work Statement (PWS) is to provide for a non-personal service contract to provide administrative, logistical, and technical support services to II Marine Expeditionary Force Support Battalion (II MSB) uniformed, appointed Substance Abuse Control Officer (SACO). The Contractor shall assist the SACO in the execution of the Marine Corps Substance Abuse Program in accordance with MCO 5300.17A, but shall not assume the duties, responsibilities, or authority of the SACO. The Government shall not exercise any supervision or control over the contract service provider performing the services herein. Such contract service provider shall be accountable solely to the Contractor who, in turn is responsible to the Government.

2.0 BACKGROUND

II Marine Expeditionary Force Support Battalion’s (II MSB) mission is to provide and coordinate combat service support, security and administrative services to the Marine Expeditionary Force Command Elelment (MEF CE) or Marine Expeditionary Brigade Command Element (MEB CE) and MIG HQTRS in order to sustain command and control of MAGTF operations. The Marine Corps Substance Abuse Program (SAP) is designed to maximize operational readiness and personnel health through the prevention, identification, and treatment of substance misuse. At the unit level, the Substance Abuse Control Officer (SACO) is the commander’s primary advisor and executor of this program, prinicpally responsible for prevention training, managing the urinalysis and alcohol screening programs, and facilitating treatment referrals. The primary responsibility of the contractor is to provide administrative, logistcal, and technical support services to the II MSB Substance Abuse Control Officer (SACO).

3.0 SCOPE/ TASKS

3.1 Perform logistical preparation for drug testing activities, including printing speciment labels, reserving/ preparing the testing facility, and organizing necessary consumable supplies.

3.2 Compile programmatic data, metrics, and draft reports regarding the drug testing program for the uniformed SACO to review and present to the Commanding Officer.

3.3 Assist Urinalysis Program Coordinators (UPCs) with the administrative utilization ofdrug testing software portals under the SACO’s supervision.

3.4 Maintain liason with the drug testing lab to assist with logistical discrepancies associated with the urinalysis program.

3.5 Coordinates wuth installation Drug Demand Reduction Coordinator to facilitate administrative aspects of the Medical Review Process.

3.6 Maintain annual substance abuse training records and develops draft drug testing reports identifying trends program effectiveness; maintains records for drug testing; and maintains files and reports.

3.7 Track unit compliance metrics and training completion rates using approved databases, identifying statistical discrepancies or overdue training for the SACO’s review.

3.8 Maintain a digital library of current policies and regulations; draft proposed updates to local administrative instructions for the SACO’s final approval and signature.

3.9 Provide comprehensive administrative and data-entry support to the SACO in the daily operations of the unit’s Substance Abuse and Drug Testing Programs.

3.10 Maintain administrative checklists and Standard Operating Procedure (SOP) binders to assist the

SACO and Urinalysis Program Coordinators (UPCs) in executing collections according to regulations.

3.11 Maintain inventory, maintenance records, and calibration logs for forensic alcohol brethalyzer equipment, ensuring devices are adminstratively prepared for use by authorized uniformed personnel

3.12 Perform administrative scheduling, roster generation, and facility deconfliction for substance abuse training and testing activities, as directed by the SACO.

3.13 Prepare speciment shipping manifests and package boxes for the SACO or UPC’s final physical inspection, chain-of-custody verification, and official signature prior to shipment to the Navy Drug Screening Laboratory (NDSL).

3.14 Perform duties in accordance with DODI 1010.01, DODI 1010.16, SECNAV 5300.28E, and

MCO 5300.17.

3.15 Perform other routine administrative and clerical duties directly related to the Substance Abuse Program, as assigned by the SACO or Executive Officer, provided they do not constitute inherently military functions.

4.0 EXPLICIT LIMITATIONS OF DUTIES

To maintain compliance with MCO 5300.17A, the Contractor is explicitly prohibited from:

- Being appointed as the unit SACO, UPC, or official Urinalysis Observer

- Signing official Chain of Custoday documents (e.g. DD Form 2624) as the certifying official or releasing authority.

- Making command recommendations regarding disciplinary actions, administrative separations, or medical treatment facility (MTF) referrals.

- Directing, ordering, or tasking uniformed military personnel.

5.0 PLACE OF PERFORMANCE, HOURS OF OPERATION, AND PERIOD OF PERFORMANCE

5.1 Place of Performance: The work to be performed under this contract will be at BLDG H24, Julian C. Smith Street, Camp Lejeune, NC 28542.

5.2 Hours of Operation: Monday through Friday: 0800-1600. The standard work week for federal employees is 40 hours per week. The standard 40 hour week is defined as five (5) days a week, eight

(8) hours a day.

Scheduling: Within the first week of the Contractor’s start work date, a proposed work schedule (hours of the day, dates--excluding Federal holidays) will be submitted for review and approval by the Government. The Government will review and discuss this proposed schedule, and may propose modifications to ensure built-in flexibility to accommodate seasonal conditions or environmental requirements. Most of the time, work will be performed within a 40-hour work week during normal business hours (Start 7:00 or 7:30 a.m. to 4:00 or 4:30 p.m., with half-hour lunch break provided, Monday-Friday, excluding Federal holidays.) Sometimes, however, (approximately six times per month), field work may require adjusted time frame for the eight hour day, if environmental phenomena or events require monitoring or coordination outside normal business hours. Possibly as frequently as once-a-month, work will be performed on a Saturday. When this is required, the normal 40-hour work week will be adjusted to account for the Saturday work period.

Holidays: For purposes of scheduling work the Contractor is advised that access to the Government installation may be restricted on Federal Holidays.

The following are observed Federal holidays:

(a) New Year’s Day 1 January

(b) Martin Luther King Day Third Monday in January

(c) Presidents Day Third Monday in February

(d) Memorial Day Last Monday in May

(e) Juneteenth Day 19 June

(f) Independence Day 4 July

(g) Labor Day First Monday in September

(h) Columbus Day Second Monday in October

(i) Veterans Day 11 November

(j) Thanksgiving Day Fourth Thursday in November

(k) Christmas Day 25 December

5.3 Period of Performance

The resultant contract will include a Base Period of 12 months and four (4) 12-month option periods to be exercised at the Government's discretion.

Base Period: 1 August 2026 through 31 July 2027 Option Year 1: 1 August 2027 through 31 July 2028 Option Year 2: 1 August 2028 through 31 July 2029 Option Year 3: 1 August 2029 through 31 July 2030 Option Year 4: 1 August 2030 through 31 July 2031

6.0 DELIVERABLES

The Contractor shall provide an adequate employee with the necessary administrative, logistical, and technical support expertise to ensure the performance of work is in accordance with the tasks and direction as outlined by this Performance Work Statement.

6.1 Performance Requirements

6.1.1 Personnel shall have knowledge of the operating procedures of the Marine Corps substance abuse prevention, treatment, urinalysis, and Command level programs.

6.1.2 Personnel shall have knowledge and expertise to perform duties in accordance with

DODI 1010.01, DODI 1010.16, SECNAV 5300.28E, and MCO 5300.17.

6.1.3 Personnel shall be capable of speaking, writing, reading, and understanding the English language.

7.0 QUALITY ASSURANCE SURVEILLANCE PLAN

7.1 Purpose

This Quality Assurance Surveillance Plan (QASP) has been developed to provide the standard of surveillance for this Services requirement. The Contracting Officer (KO) will appoint an individual at the time of award as the COR. COR Contact information is also provided in the award. The COR will also serve as the Quality Assurance Evaluator (QAE) and will use this QASP to ensure the standards of the contract are being met. The COR/QAE will be referred to as the COR throughout this QASP.

7.2 Performance Standards

The QASP provides a systematic method to evaluate the service the Contractor is required to furnish.

The COR will assess the Contractor’s performance to ensure the Contractor is performing up to the specified standards. The standards for the Performance Work Statement (PWS) are included in this QASP. The standards for this procurement are subjective since specific metric-driven standards are not appropriate.

7.3 Management and Oversight

The QASP is based on the premise that the Contractor, and not the Government, is responsible for the management and any Quality Control action required to meet the terms of the contract. The performance requirements recognize that the Contractor is not a perfect manager and that unforeseen requirements and uncontrollable problems do occur. Good management and use of an adequate Quality Control Plan will allow the Contractor to operate within specific performance requirements. QASPs are designed to be objective, fair, and consistent in evaluating Contractor performance against the provided standards.

7.4 Acceptable Quality Levels (AQLs)

AQLs have been established in the PRS and provide performance standards that the Contractor will meet in performing the contract. In the event the Contractor does not meet the established AQLs, the KO has the right to exercise the negative incentives stated in this QASP.

7.5 Methods of Surveillance/ Evaluation

The COR will evaluate the contractor’s performance using one or more of the following surveillance methods:

a. 100% Inspection: Inspection where specified characteristics of performance are examined and tested to determine conformance with defined requirements in the Performance Work Statement

(PWS).

b. Random Inspection: Sampling method in which each unit of the population has an equal chance of being selected.

c. Customer Surveys and Feedback: A review method where customers and end users are surveyed to provide to provide input on specific service levels.

7.6 Negative Incentives

If any of the performance requirements do not meet the AQL set in the PRS table, the COR shall document the discrepancy(s) and shall notify the Contractor promptly, and the KO, on a monthly basis, for appropriate action. When the performance is below the AQL standard, the Government may implement negative incentives that include: increased surveillance, reduction in contract price, decision not to exercise next option, increased Contractor reporting, and/or documentation of contractor’s failure to meet performance requirements in the Contractor’s Performance Assessment Reporting System (CPARS).

7.7 Notification

The COR will notify the KO and CS, in writing, of unacceptable quality levels. The CO will promptly provide written notification of discrepancies on a monthly basis, or immediately if the situation significantly affects the well-being of the project. The Contractor will be given the opportunity to respond, in writing, to each discrepancy.

7.8 Response

The Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within ten (10) working days after receipt of the KO’s notification. The Contractor should cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.

7.9 Records

The COR will maintain contract surveillance files as directed by the KO. Surveillance files will include, as a minimum, the following documentation for this Firm-Fixed Priced contract:

a. COR designation and appointment letters

b. A copy of the contract and all contract modifications

c. QASP, Quality Control Plan, and any other monitoring tools, checlists, etc.

d. All correspondence including KO notifications and the Contractor’s responses

e. Surveillance reports and a summary of the surveillance logs prepared by the

COR and submitted to the KO annually.

f. Copies of deficiency reports that may be submitted in support of unacceptable performance identified during the performance period by the COR, or when there is a significant change in the assessment in one or more evaluation areas.

g. Annual in-progress reviews conducted and entered into CPARS.

7.10 Ratings

The following criteria will be used for performance evaluations: Exceptional, Satisfactory, Marginal, or Unsatisfactory. Upward or downward arrows may be used to indicate an improving or worsening trend insufficient to change to the assessment status.

a. Exceptional. Indicates performance clearly exceeds contractual requirements. The area of evaluation may contain a few minor problems for which corrective action appears highly effective.

b. Satisfactory. Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.

c. Marginal. Indicates performance meets contractual requirements. The area of evaluation contains one or more serious problems for which corrective actions have not yet been identified, appear only marginally effective, or have not been fully implemented.

d. Unsatisfactory. Indicates the contractor is in danger of not being able to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains one or more serious problems for which the corrective actions appear ineffective.

7.11 Documentation

Documentation used and referenced to perform surveillance will consist of monthly reports, contractor plans and procedures, schedules, customer feedback and contract data requirements.

a. Recording Observations. The COR shall use Surveillance Logs to record information on scheduled observations and deficiencies noted. Each observation is recorded on the log. The documents then become a formal record for reference. The contractor is to be told each time that a deficiency is found during scheduled observations. The COR makes a notation on the Surveillance Log of the date and time the deficiency was discovered, then, the COR asks a contractor site manager to initial the notation, documenting notification of the deficiency only.

b. Potential Unacceptable Performance. The COR must identify the specific service that is unacceptable and the possible causes, and ask a number of questions which if answered, will probably pinpoint the source of the problem.

c. Documenting Unacceptable Performance. The COR must attempt to resolve the problem with the contractor. The original log and the attempted solution (along with an evaluation of results) are forwarded to the Contracting Officer through the COR. Based on the severity of the discrepancy and the success of the solution, the COR will notify the KO. The contractor shall complete a response to the unacceptable evaluation if requested by the KO or by its own choice.

7.12 Taking Action

The COR may evaluate the contractor’s performance and document any non-compliance, but only the KO may take action against the contractor for an unacceptable rating. When the contractor’s performance is unacceptable and a formal action is indicated, the COR will determine what action is appropriate for the specific circumstances and make a recommendation to the KO.

7.13 Documentation

The COR retains a copy of all inspection schedules and surveillance activity logs during the course of the contract, and forwards them for inclusion in the contract file at the end of the surveillance period. However, when a specific service becomes unsatisfactory during a surveillance period, the inspection documentation supporting the contract discrepancy report is forwarded to the KO.

8.0 PERFORMANCE REQUIREMENTS SUMMARY

PERFORMANCE

OBJECTIVE

PERFORMANCE

REQUIREMENTS

ACCEPTABLE

QUALITY

LEVEL (AQL)

SURVEILLANCE

METHOD /

FREQUENCY

INSPECTOR

INCENTIVE

The contractor and shall accomplish the general tasks identified in PWS

3.0 and related sub-tasks that support the goals of the stated position in a manner that ensures quality data, completeness of information, and addresses resource concerns

In accordance with

PWS

90%

- Timeliness

-Quality -Accuracy

Observation

Random /Monthly

COR

Exercise Option

The contractor and subcontractor shall adhere to all state and federal laws, and Marine

Corps rules and regulations.

In accordance with PWS. Abides by all laws and regulations

No state or federal violations; 95% adherence to base regulations. 2 or less minor base infractions that do not result in loss of work or work stoppage

The contractor and subcontractor shall not perform unsafe acts to could cause harm to themselves or others and does not violate base safety regulations.

In accordance with PWS and abides by all base safety regulations and regulations identified by the environmental staff

90% Accident

Free

The contractor and subcontractor shall meet scheduled deadlines and deliver products in the time requested.

In accordance with

PWS

90%

- Timeliness

-Quality -Accuracy

Observation Random /Monthly COR Exercise

Coordination Meetings

A meeting will be held a minimum once-a-week to define work requirements, discuss the progress of on-going projects, identify any issues that may have arisen the week before, and to coordinate activities with other natural

90%

- Timeliness

-Quality -Accuracy

Observation Random /Monthly COR Exercise resources staff members.

Weekly Progress

Reports

Due on last day of each work week, normally a Friday, The report will consist of a short written document detailing each major task activity completed or in-progress.

90%

- Timeliness

-Quality -Accuracy

Observation Random /Monthly COR Exercise

Option

8.1 Standards for Acceptance of Deliverables

Deliverables will be completed in correct format; free of grammatical errors; on time; compliant with best science standards and/or SOPs, rules, regulations, and/or laws pertinent to any task requiring a deliverable; and satisfactorily addresses objective(s) of the assigned activity. When revisions or corrections are required, the Project Officer or Alternate will return the deliverable package to the Contractor with written instructions, indicating necessary revisions/corrections. The Contractor shall make necessary revisions/corrections, at no additional cost to the government, and re-submit to the MSB Adjutant or alternate. All draft and accepted deliverables remain the property of the government.

Note: If any of the acceptable performance levels is not met on a given deliverable, the contractor and government project officer will discuss the nature of the less than acceptable performance, and indicate that if improvement is not immediately made, the contractor may face a substandard performance rating on record for future government work or face the possibility of contract termination.

9.0 GOVERNMENT OWNED PROPERTY

10.0 SPECIAL ADMINISTRATIVE INFORMATION

10.1 Required Education/ Skills/ Certifications

Knowledge of the operating procedures of the Marine Corps substance abuse prevention, treatment, urinalysis, and Command level programs.

Substance Abuse Control Officer (SACO) Certification Urinalysis Program Coordinator (UPC) Certification Alcohol Screening Program Coordinator (ASP-C) Certification

10.2 Non-Disclosure Agreements

All Contractors receiving access to Government data or data from another Contractor through this contract must provide a signed non-disclosure agreement prior to commencing work. The original agreement shall be submitted to the KO and CS and a copy shall be submitted to the Contracting Officer’s Representative (COR). All non-disclosure agreements shall be signed by all Contractors involved in this effort and returned within five (5) business days after receipt of award or within five (5) business days of onboarding of new incoming contractor. “Business day” as used in the context of this paragraph means normal Government working hours between the hours of 0900 and 1500, Monday to Friday, excluding weekends and observed holidays as described above.

10.3 Key and Access Policy

Key Control: The Contractor shall establish and implement methods of making sure any keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by contractor who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor in an amount bilaterally agreed to. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor in an amount bilaterally agreed to.

The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas or personnel authorized entrance by the Contracting Officer.

10.4 Visitor Control

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

10.5 Identification of Contractor Employees

All contractors attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor will wear badges in the performance of this service.

10.6 Post Award Conference/ Periodic Progress Meetings

The Contractor agrees to attend any post award conference convened by the Government. The TOC and Government personnel may meet periodically with the contractor to review the contractor's performance. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

10.7 Transition Plan

The Contractor agrees to attend any post award conference convened by the Government 15 days prior to start of performance.

10.7.1 Phase-In/ Phase Out Period

To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have contractors on board, during the phase in/ phase out periods. At the end of the existing contract period, if the incumbent contractor is not selected the incumbent contractor shall provide any information such as Standard

Operating Procedures (SOP), processes, and/or files etc. to the new incumbent for up to thirty (30) days. The activities shall include but will not be limited to such functions as:

• Transfer of knowledge, experience, and lessons learned to the new contractor.

• A period where all deliverables are recompiled to ensure they work as delivered.

• Assistance in start-up to ensure no service disruption and a smooth transition

• Appropriate transfer of property, documentation, or personnel, as agreed to between the parties (including but not limited to, devices, equipment, databases, and systems).

• Phase-in activities shall also include contractor attendance at program reviews, participation in working groups, briefings, on-site communications, and full disclosure of technical, cost, and programmatic information.

• The plan shall also include a training program for contractor and a date for accepting responsibilities for each division of work described in the plan.

10.7.2 Transition-Out

The Contractor shall develop and deliver to the Government a transition out plan, allowing 30 days for an orderly transition to any potential new Contractor for these services to ensure the level and quality of services are maintained. This transition plan shall include digital and hard copies of the following:

• Documentations, operating procedures and other resources, including but not limited to, devices, equipment, databases and systems.

• A training program to be conducted with the incoming vendor and a date for transferring responsibilities for each division of work described in the plan.

• Provide written confirmation to the Contracting Officer, Contracting Specialist, and Contracting Officer’s Representative via email that they and all its employees have transferred and are no longer in possession of any U.S. Government Data and Information including, but not limited to, all copies, portions, data files and other related information created of generated by the Contractor under this effort or provided by the government.

11.0 QUALITY CONTROL PLAN

11.1 Internal Review. A description of the internal review process including who shall perform the review; the frequency; the method, and a listing of the service under review. The Contractor shall accomplish all work with adequate internal controls and review procedures, which shall be put in place by the Contractor to eliminate conflicts, errors, and omissions, and ensure technical accuracy.

11.2 Compliance. The Contractor shall comply with all requirements of the performance work statement and documents attached or referenced.

11.3 Approach and Procedures. To Communicate with the Government, handling corrective action without dependence upon Government direction; and identifying and implementing potential improvements to the program service and capabilities.

11.4 Inspection. Quality control inspection system covering all contract services. It must specify areas to be inspected on both a scheduled or unscheduled basis and the frequency of the inspections.

It must specify how inspections are to be conducted, e.g. random, visual, customer complaint, etc.

The Contractor shall perform inspections, maintain quality control, and provide the COR with paper copies upon completion.

11.5 Personnel Qualifications. The name(s) and qualification of the individual(s) tasked to perform quality control inspections and the extent of their authority.

11.6 Deficiencies. A method of identifying and reporting deficiencies in the quality of services performed and taking corrective action before the level of performance becomes unsatisfactory.

12.0 QUALITY ASSURANCE MONITORING

12.1 The Government will evaluate the Contractor's performance each time service is performed by appointed personnel, known as Contracting Officer Representatives (COR) or Task Order Manager (TOM), to monitor performance to ensure services are received. The COR will also evaluate the Contractor's performance through scheduled on-site inspections of the Contractor's quality control program. The COR may inspect each task as scheduled or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections. Likewise, the Government may decrease the number of quality control inspections if merited by performance.

12.2 The Contractor shall conduct internal reviews of program performance by using the approach and benchmarks delineated in the QCP. The Contractor shall provide the results of these evaluations to the Government quarterly. The Government will be responsible to perform periodic Quality Assurance inspections on work accomplished by any technician.

12.3 A file of all quality control inspections, and any corrective actions required shall be maintained by the Contractor and made available to the Government when requested.

13.0 CONTRACTING OFFICER’S REPRESENTATIVE (COR)

13.1 The COR for the Government will monitor the contractor’s performance to ensure completed services are done in accordance with this performance work statement.

13.2 Responsibilities. Performs surveillance and inspection of services required under this contract.

The COR determines the adequacy of Contractor performance per contract specifications; acts as the COR to ensure compliance with contract performance requirements; and advises the Contract Administrator of any factors that may cause work performance delays. The COR cannot authorize deviations from contract requirements and specifications.

13.3 The COR information is provided below:

(WILL BE PROVIDED AT THE TIME OF AWARD)

14.0 BASE ACCESS

Contractors, and/or delivery drivers, must have in their possession: the contract number, delivery/service address, and sponsor’s contact information in order to gain initial access to the base.

(The sponsor for this requirement will be provided at the time of award.)

Sponsor:

Phone Number:

Email:

14.1 Contractors

Contractors must be registered in the Defense Biometrics Identification System (DBIDS). It is the Contractors responsibility to ensure all their employees and or subcontractors are properly registered within DBIDS. The Contractor and its employees shall be subject to all traffic, security, and registration regulations for contractor and vehicles on Marine Corps Base Camp Lejeune.

14.2 DBIDS Issuance Requirements

14.2.1 Contractors who have filled out the SECNAV 5512/1 and have been vetted for access and cleared through the security manager’s office aboard MCB Camp Lejeune, NC will proceed to the visitor’s center to be issued their DBIDS credential.Pre-enrollment is required for issuance at https://dbidsglobalenroll.dmdc.mil/preenrollui/#!/.

14.2.2 Valid Vehicle Registration and Valid Vehicle Insurance

14.2.3 Two forms of Identification (Driver’s License, Social Security Card, VA ID Card, Passport)

14.2.4 Have the QR code with you. This may be printed from the from the pre-enrollment process

14.3 DBIDS credentials

14.3.1 DBIDS credentials will be valid for the duration of your contract, not to exceed three years. However, re-vetting of individuals information will occur each year.

14.3.2 Contractors requiring access for over 60 days will receive a credential valid for up to one year.

14.3.3 Contractors requiring access for less than 60 days will receive a temporary paper pass.

14.3.4 Contractor Common Access Card (CAC) Eligibility: Contractor personnel authorized CACs are exempt from DBIDS enrollment.

14.3.5 If you have additional questions regarding base access, Contractor CACs, or DBIDS requirements, contact the Contractor Vetting Office (CVO). The CVO is in Bldg. 818 adjacent to the Camp Lejeune Main Gate on Holcomb Blvd, just off NC Highway 24.

The CVO is open Monday through Friday from 6 a.m. to 2 p.m. and closed on weekends and holidays.

Contractor Vetting Office - Appointments: 910-451-5977 Contractor Vetting Office - Questions: 910-451-0284/0289 Vetting Office Email: lejeunecontractorvetting@usmc.mil DBIDS email: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

14.3.6 Contractors will report to the Contractor Vetting Office (CVO) to confirm their access requirements, undergo a background check, and receive their credential/pass.

* PLEASE NOTE: Individuals with active warrants may be subject to arrest on the spot.

https://dbidsglobalenroll.dmdc.mil/preenrollui/#!/ mailto:lejeunecontractorvetting@usmc.mil https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

File details come from the government source that posted it. Updated .