II.S-1. Solicitation - SPMYM426Q3455 - Amendment.pdf
PDF 2 MB Posted
- Attached to
- PLATE
- Solicitation number
- SPMYM426Q3455
About this file
This is a Request for Quote (RFQ) for commercial products issued by the Defense Logistics Agency (DLA) Maritime as a Women-Owned Small Business (WOSB) set-aside procurement.
The solicitation seeks one square foot of HSLA-80 steel plate, 1.000 inch thick, conforming to specification T9074-BD-GIB-010/0300, for manufacture of a bumper bracket plate component (PC 94 of drawing 7286408). The material must comply with NAICS code 332999 with a 750-employee size standard. The item is designated as QA-4 with a seven-day acceptance timeframe and must be delivered to Pearl Harbor Naval Shipyard IMF (DoDAAC N32253) by July 8, 2026. The contracting specialist is Angela Morrelli, reachable at 808-473-8000 extension 4278 or angela.morrelli.civ@us.navy.mil. The offer due date and time are July 2, 2026, at 12:00 PM. First article testing is required unless waived if purchased through Electric Boat Corporation (CAGE 96169). The procurement incorporates supply chain traceability documentation requirements, manufacturing phase-out notifications, correction of nonconforming packaging or marking provisions, tailored logistics support purchasing reviews, and mercury exclusion clauses. Offers must demonstrate exact product compliance, include CAGE code, DUNS number, SAM registration status, and tax ID; pricing should be based on commercial catalog/published price lists or documented sales history. Payment will be made via government purchase card or Wide Area Workflow (WAWF) electronic submission. Award will be made to the lowest-priced, technically acceptable offeror demonstrating capability to meet specifications and required delivery schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clauses Full Text Provisions and Clause.pdf | ||
| I.S-1. Combined Synopsis Solicitation - Unrestricted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Section A - Solicitation/Contract Form
PLATE
SPMYM426Q3455
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
PLATE, 1.000" THK, HSLA 80, T9074-BD-GIB-010/0300,
TY2, GR-HSLA-80, APPX A, PN 21-94-HSLA1000M OF
DWG 7286408 (H462-0412).
FOR MANUFACTURE OF BUMPER BRACKET PLATE PC
94 OF DWG 7286408.
ORDERING DATA:
A) NAVSEA TECHNICAL PUBLICATION: BASE
MATERIALS FOR CRITICAL APPLICATIONS:
REQUIREMENTS FOR LOW ALLOY STEEL PLATE,
FORGINGS, CASTINGS, SHAPES, BARS, AND HEADS OF
HY-80/100/130 AND HSLA-80/100 (REVISION 2); T9074-
BD-GIB-010/0300; DTD 18DEC2012
B) GRADE HSLA-80
C) N/A
D) FIRST ARTICLE TESTING REQUIRED IAW PARA 4.3;
BUT WILL BE WAIVED IF PURCHASED THROUGH
ELECTRIC BOAT CORPORATION, CAGE 96169
E) THRU F) N/A
G) DIMENSIONS IAW PARA 4.5.2
H) COMMERCIAL PACKAGING IAW ASTM-D3951-18
ADDITIONAL ORDERING DATA:
A) APPENDIX A (24645) STEEL PLATE, SHEET, OR COIL,
AGE-HARDENING ALLOY, STRUCTURAL, HIGH YIELD
STRENGTH (HSLA-80 AND HSLA-100);
B) TYPE 2, GRADE HSLA-80
C) THRU P) N/A
MOD IS: EB-5664 AND T9074-BD-GIB-010/0300 IN LIEU OF
MIL-S-24645.
Pricing Arrangement: Firm Fixed Price
ACRN: AA
PR Number: N3225326PR01475 PR Line Item Number: 0001
1 Square Foot
Section C - Description/Specifications/Statement of Work
Requirements
PLATE
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD C02 DLAD PROC NOTE C02 (Oct 2025)
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
DLAD C03 DLAD PROC NOTE C03 (Oct 2025)
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)
(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer. (2) Supply Chain Traceability Documentation
(i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number;
manufacturing source; manufacturing source's Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.
(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- AvoidanceProgram/).
(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.
(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
DLAD C01 DLAD PROC NOTE C01 (Oct 2025)
C01 Superseded Part Numbered Items (FEB 2025) When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.
DLAD C18 DLAD PROC NOTE C18 (Oct 2025)
C18 Shipping Instructions for Export and U.S. Territories (SEP 2024)
(1) Mail Instructions for shipments to container consolidation points (CCPs): Contact the Government Transportation Office for the Contract Administration Office: either DCMA for DCMA administered awards or DLA Distribution for awards administered by the issuing office. See Block 7 of Department of Defense (DD) form 1155 (page 1 of an order) to obtain shipping instructions for release to the carrier.
(2) Shipments to container consolidation points (CCPs): (a) Prepare shipments directed to a CCP shown with each individual CLIN on Schedule Continuation Sheet(s) in accordance with instructions provided within this contract for Preparation for Delivery.
(b) Contact the Transportation Officer for shipping instructions for the following CCP shipments: (i) Cargo requiring refrigeration/temperature control.
(ii) Classified or sensitive items requiring signature control.
(iii) When dimensions of an item or package exceed 456 inches (38 feet) long by 89 inches wide by 88 inches high, or weight exceeds 10,000 pounds. Cargo cannot exceed any one of the dimensions or the weight.
(iv) When volume or weight constitutes a full SEAVAN load for each activity code.
(v) Hazardous material such as material, which is flammable, corrosive, combustible, explosive, toxic, radioactive, unduly magnetic, or which contains oxidizing agents.
(vi) Type 1 shelf-life items,
(vii) TP1 and 2 (IPD 01-08) with RDD of 999, 777, or 555.
(3) The contractor shall furnish the above data no later than five (5) days prior to the scheduled shipment date for shipments weighing less than 10,000 pounds which will not be tendered as a carload or truckload
(4) The contractor may not ship prior to furnishing required data, regardless of weight.
(5) The contractor must clearly identify in invoices when shipment is made by air.
(6) The carrier must research the Transportation Facilities Guide (TFG) on the consignee to get information on who to contact to make delivery appointments. The carrier should schedule appointments as soon as they are given the load via the Carrier Appointment System (CAS)/prelodge desk prior to delivery of freight shipments (other than small parcels). Bills of Lading must be annotated with pertinent TFG data and carrier appointment times.
(7) The contractor will comply with the paragraph (6) and ship in accordance with instructions furnished by the Transportation office. The Transportation Officer will furnish the addresses of aerial terminals, as required. (Parcel post shipments will not be made to water or air terminals).
(8) Ship in accordance with instructions furnished by the Transportation office. The Transportation Officer will furnish the addresses of Aerial terminals, as required. (Parcel post shipments will not be made to water or air terminals).
DLAD C14 DLAD PROC NOTE C14 (Oct 2025)
C14 Correction of Nonconforming Packaging or Marking (MAY 2020).
(1) The Government may correct nonconforming packaging or marking for receipts of DLA- owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking.
The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor's expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies. *****
DLAD C08 DLAD PROC NOTE C08 (Oct 2025)
C08 Tailored Logistics Support Purchasing Reviews (FEB 2017)
(1) From the commencement of performance of this contract until 3 years after the final contract payment, the contractor must allow the contracting officer, ACO, Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and any other duly authorized representative of the contracting officer access to all records and information pertaining to those items or services for which the Government is relying on the contractor's purchasing system to determine that competition was obtained or to justify that prices are fair and reasonable. The contractor must maintain records subject to this clause for not less than 3 years after the contract final payment.
(2) The contracting officer may conduct reviews of purchased items or services provided under this contract regardless of dollar value that meet the criteria in paragraph (1) to ascertain whether the contractor has obtained the best value. The contractor must obtain competition to the maximum extent practicable for all purchases. Prior to purchasing any supplies or services, the contractor must solicit a competitive quotation from at least two independently-competing firms. For other than sole source items, the request for quotations must, to the maximum extent practical, solicit offers from different manufacturers or producers. If the contractor is unable to obtain quotes for competing items from two or more independently-competing firms, the contractor must retain documentation supporting its rationale for selection of the suppliers solicited and selected and its determination that the price was fair and reasonable. The contractor is responsible for maintaining this documentation for all sole source/non-competitive actions. The following price reasonableness and documentation requirements are applicable to all purchases, regardless of dollar value: (i) A price is reasonable if it does not exceed a price incurred by a prudent person in the conduct of competitive business. The contracting officer will examine the prices with particular care in connection with buys that may not be subject to effective competition restraints. The contractor's price will not be presumed to be reasonable. If an initial review of the facts results in a challenge of a specific price by the contracting officer or the contracting officer's representative, the burden of proof must be upon the contractor to establish that the price is reasonable under the standards in FAR Subpart 15.4 and FAR 31.201-3.
(ii) The contractor must keep the documentation to a minimum, but must retain data supporting the purchases either by paper or electronically. At a minimum, price quotations and invoices must be retained. Should the contractor receive an oral price quotation, the contractor must document who the supplier or subcontractor is by complete name, address, telephone number, price, terms and other conditions quoted by each vendor. Price quotes for supplies must be broken down by individual items, shipping costs, and any other included expenses. Price quotes for incidental services which are not pre- priced in the contract must include labor hours and costs or prices, as applicable, including the total price of the job, individual pricing for the portions of the work if applicable, materials, and all other elements of cost, overhead, and profit. This price breakdown documentation must be made for each subcontractor performing work on this contract.
(3) When applicable, if the contractor is purchasing from subcontractors or other sources and receives a discount or rebates, the contractor must immediately pass these savings to the Government in the contract price and invoice for payment. The contractor is required to use diligence in the selection of the most economical method of delivery of the product or services by selecting a best value method of delivery based on the urgency and nature of the work or product required. When labor hours are involved in the work to be accomplished and the contractor has not already pre-priced the effort to use its own labor force, the contractor must provide the labor at rates required by the contract (for example, Service Contract Act or Davis-Bacon Act rates) or at rates based on competition if mandatory rates are not required by the contract.
(4) If the contracting officer determines that the purchased product or service is unreasonably priced, the contractor must refund to the Government the amount the contracting officer determines is in excess of a reasonable price. The contracting officer must notify the contractor in writing in accordance with FAR 32.604 Demand for Payment, giving the basis for the determination and the amount to be refunded. The contractor must make the refund payment in accordance with directions from the contracting officer, and must provide proof of the refund payment to the contracting officer. The contracting officer may collect the amount due using all available means in accordance with FAR Subpart 32.6. FAR 52.232-17, Interest, is applicable to payments not made within 30 days of the demand for payment. Any disputes arising under this provision must be handled in accordance with the "Disputes" clause of this contract.
C7F758 MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT (Oct 2025)
MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT (LC-2, JAN 2013)
1. Mercury or mercury compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.
Supplier shall certify that all items furnished under this contract are free of mercury or mercury compounds.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD E08 DLAD PROC NOTE E08 (Oct 2025)
E08 First Article Testing Requirements (MAR 2025)
(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.
(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price. The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.
(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.
(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a--
(i) Major change to the technical data;
(ii) Lapse in production for a period in excess of 90 days; or
(iii) Change in the place of performance (manufacturing facility), manufacturing process, material used,drawing, specification or source of supply.
(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.
(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:
(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:
(i) Contract number(s), date(s), and issuing Government agency or agencies.
(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.
(iii) Engineering control document/change number of item previously furnished.
(b) There have been no changes to manufacturing processes, tooling, or place of performance. (c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).
(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).
(6) Contractor-Performed FAT.
(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209- 3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.
(b) For test report preparation and delivery of contractor FAT, the contractor shall-- (i) Use the data item description DI-NDTI-80809B report format.
(ii) Mark the test report with the following: "First article test report - Contract number: [insert contract number] and lot/item number: [insert lot/item number].
(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e., WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:
Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award. (B) For awards issued by DLA Land (SPE7L), submit the report to the following address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990, Columbus, OH 43218-3990, or email to: Land.FAT.Monitor@dla.mil.
(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O.
Box 3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.
(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.ml. If report file exceeds email limitations, submit to the following address: DLA Troop Support, Attention: First Article Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111.
(7) The contractor shall--
(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;
(b) Maintain and make available all records evidencing those details at the Government's request. (c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA. (8) Government-performed FAT. The contractor shall--
(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.
(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.
(c) Prepare the shipping container(s) by marking the external packages in bold letters, "First Article Exhibits - Do Not Post to Stock," adjacent to the MIL-STD-129 (latest revision) identification markings. (d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.
(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.
(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.
(g)Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).
(h)Send an email with subject titled "Notification of Test Exhibits [insert Government Lab DODAAC]" to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.
(i) DLA Land & Maritime - DSCCProdVerif@dla.mil
(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil
(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.
(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with
FAR 52.209-4.
DLAD E05 DLAD PROC NOTE E05 (Oct 2025)
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246- 3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, "Product Verification Test Samples - Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]" adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package: (a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Material is a QA-4 and has a 7-day acceptance timeframe.
DoDAAC: N32253 CountryCode: USA
PEARL HARBOR NAVAL SHIPYARD IMF
667 SAFEGUARD ST SUITE 100, PEARL HARBOR HI 96860-5033
PEARL HARBOR, HI 96860-5033
UNITED STATES
Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil Telephone: 808-473-8000x4961
Section F - Deliveries or Performance
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery Requested By Delivery Date 08 Jul
1 Square Foot
Ship To DoDAAC: N32253 CountryCode: USA
PEARL HARBOR NAVAL SHIPYARD IMF
667 SAFEGUARD STREET, BLDG 167-1 RECV 808-
473-8000X4961
PEARL HARBOR, HI 96860-5033
UNITED STATES
Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil Telephone: 808-473-8000x4961
FoB Details Contractor Destination
Section G - Contract Administration Data
ACRN LOA Total Amount
AA
^^^017^2026^2026^^1804^000^^260^D^1B4B^^^^^7B4B^17008711^050120^700SH^A00010157210^^130137939
2^6100.3260^^00000-00-LOCAL00^
USD 0.00Line Item PR/MIPR - PR Line Item# CIN Amount
CLIN 0001 N3225326PR01475 - 0001 USD 0.00
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____
Issue By DoDAAC ____
Admin DoDAAC ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD G01 DLAD PROC NOTE G01 (Oct 2025)
G01 Additional Wide Area Workflow (WAWF) Information (AUG 2017) Contractors shall include the Transportation Control Number (TCN) and carrier shipment tracking information when submitting the DD250/iRAPT Receiving Report in Wide Area Workflow (WAWF) in order to assist with material inspection and acceptance. *****
Section H - Special Contract Requirements
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD H15 DLAD PROC NOTE H15 (Oct 2025)
H15 Transporter proof of delivery (TPD) (JAN 2021)
(a) Definition. As used in this procurement note, transporter proof of delivery (TPD) means a commercial document that is generated by the Contractor and/or the Contractor's transporter of supplies and that is signed by the Government customer in order to document delivery of supplies under this contract/order. Examples of TPD are United Parcel Service (UPS) or Federal Express (FEDEX) delivery tracking reports. TPD documentation must include a customer signature, or visibility of the name of the customer who signed.
(b) When this procurement note is included in the contract or order, the Government may use TPD, in combination with adequate Contractor documentation cross-referencing the TPD to the specific supplies provided, as a basis for accepting the supplies. TPD with adequate supporting documentation satisfies the receipt report requirement and, coupled with acceptance, allows the Government to initiate the payment process, if all other applicable payment conditions are satisfied.
(c) To facilitate the payment process, the Government will initiate a request for the Contractor to provide TPD when the customer has not provided receipt acknowledgement to the buying activity. If TPD is requested and the Contractor agrees to provide it, the documentation must include the customer signature, or visibility of the name of the customer who signed, and as much of the following information as possible:
(1) Contract number or order number;
(2) Contract line item number (CLIN);
(3) Unit price;
(4) Quantity of items;
(5) Extended price;
(6) National stock number (NSN);
(7) Delivery date;
(8) Recipient organization's name and address;
(9) Receiving activity Department of Defense activity address code (DoDAAC);
(10) Requisition document number (and suffix, when applicable);
(11) Shipment number;
(12) Invoice number; and
(13) Location where the carrier made delivery (activity name, building number, city, state). (d) Process for submitting TPD documentation.
(1) Enter wide area workflow (WAWF) using the ``history folder,'' enter the appropriate contract data, and recall the receiving report (RR);
(2) Click on "attachment." Browse and upload the TPD and any additional Contractor documentation required to provide the information identified in paragraph (c) of this procurement note. (Attachments created in any Microsoft Office product or in PDF format are acceptable.); and
(3) Click on "submit."
(e) Responsibility for supplies.
(1) Title to the supplies passes to the Government after delivery to the point of first receipt by the Government and subsequent acceptance.
(2) Notwithstanding any other provision of the contract, order, or blanket purchase agreement, the Contractor shall:
(i)Assume all responsibility and risk of loss for supplies not received at destination, damaged in transit, or not conforming to purchase requirements;
and (ii)Replace, repair, or correct those supplies promptly at the Contractor's expense, if instructed to do so by the Contracting Officer within 180 days from the date title to the supplies vests in the Government.
DLAD H10 DLAD PROC NOTE H10 (Oct 2025)
H10 Exception to the Requirement for (DCAA) DLA Controlling Authority Approval (MAY 2024) The OEM or OCM asserts within its offer or otherwise confirms in writing to the contracting officer prior to award that it does not require access to DLA export-controlled technical data or information, and it will provide items that conform to the current revision of the applicable technical data.
If the offeror is a dealer or a distributor offering an item produced by an OCM, an OEM or OEM or OCM authorized manufacturer to complete performance, the offeror must,
(A) Have DLA controlling authority approval; and
(B) Provide documentation from the OEM or the OEM authorized manufacturer writing to the contracting officer prior to award that the OCM, OEM or the OEM authorized manufacturer it does not require access to export-controlled technical data or information and that it is offering items that conform to the current revision of applicable technical data; or
(C) Surplus offerors must have DCAA and meet the requirements of procurement note C04, Unused Former Government Surplus Property (see 11.390 (a)). The Contracting Officer must contact the product specialist to validate the item meets all current revision requirements for procurement note C04.
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038)
Feb 2026
52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026- O0038)
Feb 2026
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.223-23 Sustainable Products. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026 52.240-93 Basic Safeguarding of Covered Contractor Information Systems. (Deviation 2026-O0038) Feb 2026
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026- O0038)
Apr 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
(DEVIATION 2024-O0013 REVISION 1)
May 2024 Deviation 2024-O0013 May 2024
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.232-7010 Levies on Contract Payments. Dec 2006 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.209-3 First Article Approval-Contractor Testing. (Deviation 2026-O0038) (Feb 2026)
FIRST ARTICLE APPROVAL-CONTRACTOR TESTING (FEB 2026) (DEVIATION 2026-O0038)
[ ]Contracting Officer inserts details
(a) The Contractor shall test unit(s) of Lot/Item as specified in this contract. At least calendar days before the beginning of first ____ ____ ____ article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within calendar days from the date of this contract to [____ ____ insert address of the ] marked "FIRST ARTICLE TEST REPORT: Contract No. , Lot/Item No. ." Within calendar Government activity to receive the report ____ ____ ____ days after the Government receives the test report, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing.
All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government will take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer will, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(End of clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far/ [Insert one or more Internet addresses]https://www.acquisition.gov/dfars ____
(End of clause)
DFARS Clauses Incorporated by Full Text
252.211-7003 Item Unique Identification and Valuation. (Jan 2023)
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
(a) . As used in this clause- Definitions
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means-
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .