II.G-2. Attachment 2 RIR_QAP_W04260_R3 #21.pdf
PDF 144 KB Posted
- Attached to
- Cable Pulleys Federal contract opportunity
- Solicitation number
- N6660423Q0343
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| II.G-1. Attachment 1 VIR_W04260 #21.pdf | ||
| II.G. N6660423Q0343P00001.pdf | ||
| CDRL A001-A005 (signed).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TAHEF-Form-No. 008 Rev A
04-14-2021
TAHE FACILITY
NETC, BLDG. 6
NEWPORT, RI 02841
TAHE FACILITY QUALITY PROVISIONS
RECEIPT INSPECTION REPORT
PART NUMBER / DRAWING NUMBER
8-52-142M-1, 8-52-142M-2 8-52-159M-2, 8-52-143M-1 8-52-143M-2
Rev
PART NOMENCLATURE
276 CDU/Cable Pulley & Cable Pusher
SOURCE:
S/N:
CONTRACT:
N66604-
PURCHASE ORDER: PURCHASE REQUEST: WORK ORDER:
W04260
OUTSIDE SERVICES SOW:
SALES ORDER:
Future Builds
QTY RECEIVED SAMPLE SIZE** UNIT ORDER IS FOR:
276 CDU
ORDER IS FOR INVENTORY
PURCHASE NON-TACTICAL OUTSIDE SERVICE
New Manufacture
CHARACTERISTIC MEASURED / VERIFIED
FINDINGS
ACCEPT REJECT DISPOSITION - REMARKS
THE FOLLOWING QUALITY
DOCUMENTATION/INFORMATION/INSTRUCTIONS
MUST BE PROVIDED/ADHERED TO:
P/N: 8-52-142M-1 QTY: 5
P/N: 8-52-142M-2 QTY: 10
P/N: 8-52-159M-2 QTY: 5
P/N: 8-52-143M-1 QTY: 3
P/N: 8-52-143M-2 QTY: 2
Certificate of Compliance: that items were manufactured in accordance with all applicable instructions and specifications.
Required (A001)
Mercury Free Statement: document certifying that mercury and mercury containing compounds were not intentionally added to nor came in contact with hardware or supplies furnished under this work order.
Required (A002)
Certificate of Analysis of raw material stating that it meets the specifications identified.
Required (A003)
Domestically Sourced Material: all raw material must be sourced domestically or from a qualified country per DFARS Part 225:
Foreign Acquisition.
Required (A004)
Product Identification: identification must appear on external surfaces of items or packages. (Military specifications will be provided upon request).
Required
P/N: 8-52-142M-1 QTY: 5; P/N: 8-52-
142M-2 QTY: 10 – Mark IAW Note 5 on drawing 8-52-142M per MIL-
STD-130
P/N: 8-52-159M-2 QTY: 5 – Mark IAW Note 5 on drawing 8-52-159M per MIL-STD-130
P/N: 8-52-143M-1 QTY: 3; P/N: 8-52-
142M-2 QTY: 2 – Mark IAW Note 5 on drawing 8-52-143M per MIL-
STD-130
Process Certification: that items were manufactured in accordance with special processes identified.
Required
P/N: 8-52-142M-1 QTY: 5; P/N: 8-52-
142M-2 QTY: 10 – Heat treat per Note 2, Lubri-bond per Note 6 on drawing 8-52-142M
P/N: 8-52-143M-1 QTY: 3; P/N: 8-52-
143M-2 QTY: 2 – Heat treat per Note 2 on drawing 8-52-143M (A005)
Special Packaging Requirements: protect parts to prevent damage during handling and transportation.
Required
TAHEF-Form-No. 008 Rev A
04-14-2021
8-52-142M_32386_FN_C; 8-52-159M_32386_FN_B; ASME B46.1-2019_2020-06-30; ASME
Y14.100-2017_2017-11-14; ASTM A582-A582M-21_2021-11-01; MIL-STD-130N_CHG-
1_2012-11-16; SAE AMS5659_REV-T_2021-10-01; 8-52-143M_32386_FN_A
RIR_QAP_W04260; VIR_W04260
**SAMPLING PERFORMED IN ACCORDANCE WITH ANSI/ASQ Z1.4 GENERAL INSPECTION LEVEL II
TOTAL ACCEPTED
TOTAL REJECTED
INSPECTOR
DATE
| TAHE FACILITY |
| RECEIPT INSPECTION REPORT |
File details come from the government source that posted it. Updated .