This document is a Performance Requirements Summary Table for a DARTS (Data Acquisition and Recording Telemetry System) development and implementation contract. The table outlines detailed performance objectives, standards, and monitoring methods across multiple contract sections including system development, test preparation, installation, test conduct, data management, maintenance, deliverables, and integration analysis for submarine-related technology. Key performance areas include adapting the DARTS system for USS VIRGINIA and COLUMBIA Class submarines, upgrading hardware and software for NPES or C5I Systems, conducting system demonstrations, installing and removing equipment, maintaining databases, processing test data, and supporting Conventional Prompt Strike (CPS) weapon system integration. The contract requires 90-95% compliance across various technical and operational standards, with monitoring primarily conducted through government feedback from Project Managers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660426RB6000002.pdf | ||
| II.E.7. Attachment 7 - 25-0208_C25 DARTS Section L - Revision 1 - FINAL.pdf | ||
| N6660426RB6000001.pdf | ||
| II.E.8. Attachment 8 - 25-0208_C25 DARTS Section M - FINAL.pdf | ||
| II.E.7. Attachment 7 - 25-0208_C25 DARTS Section L - FINAL.pdf | ||
| II.E.5. Attachment 5 - List of Approved Key.pdf | ||
| II.E.3. Attachment 3 - Incidental Govt Property.pdf | ||
| II.E.1. Attachment 1 - N6660426RB600 DD254.pdf | ||
| II.E.6. Attachment 6 - NUWCDIVNPT Cost Proposal Spreadsheet_Dec 2025.xlsx | XLSX spreadsheet | |
| II.E.2. Attachment 2 - GFP PIEE Attachment - GFPN6660426RB600_2.pdf | ||
| N6660426RB600 - FINAL.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v1.3_JANUARY2023
Performance Requirements Summary Table
Requirement (Task number and title from SOW/PWS)
CDRL
(if applicable)
Performance Objective Performance
Standard
Acceptable Quality Level
(AQL)
Monitoring Method
4.1
DARTS
DEVELOPMENT
CDRL A001
CDRL A002
CDRL A009
CDRL A00C
CDRL A00F
Adapt the DARTS system as required to support installation on board USS VIRGINIA, COLUMBIA Class, and in-service submarines being constructed or going through a post shakedown availability (PSA).
Changes are technically and operationally sound and compatible with platforms.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A001
CDRL A002
Upgrade the DARTS hardware and software as needed for NPES or C5I Systems.
Modifications and upgrades provide improvement.
Interfaces function properly.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.2
TEST
PREPARATION
N/A
Identify the data collection requirements for test events and prepare a DARTS variant to support those test events.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
N/A Maintain Configuration Management of each DARTS variant in use.
Database is accurate and complete.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A003
Conduct DARTS demonstrations at specified facilities in preparation for test events.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A004
Deliver test plans and procedures prior to each at-sea test.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.3
INSTALLATION
AND REMOVAL
CDRL A006
CDRL A008
Install DARTS on specified submarines.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A006
CDRL A007
CDRL A008
Coordinate TEMPALT’s as needed to support installation and removal of
DARTS.
No installation delays.
Platform approvals made in advance.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A006
CDRL A007
Accommodate DARTS removal and shipping.
Classified Security and all approved schedules maintained.
Standard is met 90% of the time
Government feedback from Project Managers upon review and execution of services provided.
4.4
TEST CONDUCT
AND TEST
TRAINING
CDRL A001
CDRL A002
CDRL A005
Conduct testing of DARTS during dockside and at-sea test periods, to include training NUWC Test Team members on DARTS operation and maintenance.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.5
DATA
MANAGEMENT,
ANALYSIS AND
REPORTING
N/A Maintain two databases for test data.
Databases contain required System data completely and accurately.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
N/A Maintain accountability for all test data.
Mandated System data is recorded and is correct.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
v1.3_JANUARY2023
CDRL A008
Process and analyze data collected. Analyze data and maintain DARTS hardware and software configurations needed to support tasking.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A008
CDRL A009
Deliver test reports after each at-sea test.
Reports are delivered according to schedule and provide mandated metrics.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.6
MAINTENANCE
AND STORAGE
N/A Provide DARTS maintenance services including Systems updates.
Engineering services provided are technically accurate.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
N/A Provide for off-hull storage of the DARTS system when it is not in operational use.
Accountability for equipment maintained.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
N/A Mobile office at test sites will accommodate all DARTS system maintenance.
Budget constraints maintained. Full functionality provided.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.7
DELIVERABLES
CDRL A00C
CDRL A00F
Provide detailed DARTS software definition documentation as defined in
FAR 52.227-20
Deliverable products are technically accurate and customer acceptable.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.8
CONVENTIONAL
PROMT STRIKE
(CPS) WEAPON
SYSTEM AND
PAYLOADS
INTEGRATION
ANALYSIS
CDRL A001
CDRL A002
Identify requirements, upgrade DARTS, attend CPS working groups, provide test plan comments, execute data collection.
CPS data collection updates are sound and capture all required data.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A002
CDRL A003
CDRL A004
Test preparation, test conduct, test coordination, test equipment configuration and installation, and data acquisition for NPES.
Ensure proper objective quality evidence (OQE) is obtained.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
4.9
CYBERSPACE/CY
BER
WORKFORCE
(CWF)
CDRL
A00D
Submit a monthly CWF report status required certifications and fulfillment status and new hire information.
Deliverable products are technically accurate and customer acceptable.
Standard is met 95% of the time.
Government receipt and inspection of CDRLs.
5.0
PROGRESS
REPORTS
CDRL
A00A
Submit a Monthly Report documenting technical progress and tracking program milestones.
Deliverable products are technically accurate and customer acceptable.
Standard is met 90% of the time.
Government feedback from Project Managers upon review and execution of services provided.
CDRL A00B
Submit Training Completion Status Report and Limited Audience Training Applicability Lists.
Deliverable products are technically accurate and customer acceptable.
Standard is met 95% of the time.
Government feedback from Project Managers upon review and execution of services provided.
7.0
GOVERNMENT
FURNISHED
PROPERTY
CDRL A00E
The contractor shall adhere to DFARS Clause 252.245–7005 for the management and reporting of Government Property and shall use the GFP Module of the Procurement Integrated Enterprise Environment (PIEE) as specified in the clause. In addition, the Contractor shall prepare and submit a Government Property (GP) Inventory Report to capture GFP status.
The Contractor shall prepare and submit a Government Property (GP) Inventory Report to capture GFP status as required.
Standard is met 95% of the time.
Government receipt and inspection of CDRLs.