SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
23G0221C01
DEPARTMENT OF HOMELAND SECURITY
FEDERAL LAW ENFORCEMENT TRAINING CENTERS
1131 CHAPEL CROSSING RD
GLYNCO GA 31524
70LGLY
Federal Law Enformcement Training Center
Building 99 Attention: Shannon Anthony 1131 Chapel Crossing Road Glynco GA 31524
Shannon Anthony 912-261-3630
1x 05/24/2023
70LGLY23RSSB00003
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This Request for Proposal will result in a Single Firm Fixed Price Contract Award for Building 221 Replace Exterior Gutters Downspouts Drain Lines and Collection
Boxes at, Federal Law Enforcement Training Center, Glynco GA.
This acquisition is a 100% total small business set-aside.
The Government will perform proposal analysis in accordance with Federal Acquisition
Regulation (FAR) 15.404 when evaluating the Offeror’s proposal.
The construction magnitude for this requirement is between $100,000 and
$250,000.00.
The contract duration will be for a period not to exceed 160 calendar days after issuance of Notice to Proceed.
The North American Industry Classification System (NAICS) Code for this solicitation shall be 236220, Commercial and Institutional Building Construction.
A site visit is scheduled for May 31, 2023 at 01:30pm at FLETC Building 200.
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
5 160 calendar days and complete it within ________________ ________________ calendar days after receiving
06/14/2023
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 76
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70LGLY23RSSB00003
All personnel not currently badged will need to complete and return Day Pass applications
(Attachment 12 Form 121-00-02 for all attendees no later than May 30, 2023, at 10:00am to the attention of the Mr. Emerson Floyd at
Emerson.Floyd@fletc.dhs.gov Upon arrival, attendees should report to the commercial gate a minimum of 30 minutes prior to the application screening process, then proceed to Building 200.
Delivery: 160 Days After Notice to Proceed
Delivery Location Code: FLETC GL
DEPARTMENT OF HOMELAND SECURITY
FEDERAL LAW ENFORCEMENT TRNG CTR
1131 CHAPEL CROSSING RD
ATTN: S. Anthony BLDG:99
GLYNCO GA 31524
0001 This is a Firm Fixed Price CLIN to Replace exterior gutters, downspouts, drain lines and collection boxes. This work will be performed at
FLETC Building 221 to direct stormwater away from building foundation.
Product/Service Code: Z1CZ
Product/Service Description: MAINTENANCE OF OTHER
EDUCATIONAL BUILDINGS
Offerors shall provide a statement of compliance with FAR 52.222-50, Combating Trafficking in
Persons, requirements and confirm subcontractors will accomplish a statement of compliance upon award.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
B - Supplies or Services/Prices
Clauses
See Continuation Sheet, Standard Form 1442. Also, please refer to Exhibit A for completion of the Bid Schedule and proposal breakdown.
C - Description/Specifications
This work involves the removal of existing gutters and downspouts and the installation of new gutters, downspouts and required hardware for installation. The Contractor shall perform work IAW contract: Drawings, specifications, reference documents and contract provisions. The Contractor shall provide all labor, material, equipment, and supervision required to accomplish the subject work.
See Section J, Attachment 1 for the complete technical requirements associated with this action.
D - Packaging and Marking
D.1 Packing and Marking
(a) All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the U. S. Government. Preservation, packaging and packing shall be in accordance with standard practices for commercial packaging.
(b) Government personnel are not authorized to accept deliveries for the contractor, nor are they responsible for off-loading shipments. A contractor representative must be present to accept deliveries.
D.2 Payment and Postage and Fees
a) The Contractor shall pay all postage and fees related to submitting information (including forms, reports, etc.) to the Contracting Officer.
E - Inspection and Acceptance
52.246-12 Inspection of Construction. (APR 1996)
52.246-21 Warranty of Construction. (MAR 1994)
F - Deliveries or Performance
F.1 Existing Furniture, Equipment, and Materials
The Contractor shall move all furniture, equipment, and materials for access to work.
Upon completion of work, such items shall be repositioned to their original location.
Personal items, computers, telephones, audio-visual equipment, and facsimile machines will be removed by the Government. All other items will be removed and replaced by the Contractor. Some offices are fully furnished and others are less congested. It will be the Contractor's responsibility to remove and replace, or if unable to remove the furniture, to cover and protect, all furniture for the duration of the task order.
Additional compensation may be negotiated for rooms that are considered “libraries’ or “volume storage areas.”
F.2 Occupancy of Premises
The premises may be occupied during the performance of the work.
F.3 Submittals & Preconstruction Conference
Submittals are due no later than 14 calendar days after award. For more information regarding submittals, please see Attachment 1, Scope of Work and Submittal Specifications.
Clauses
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 160 calendar days after the date the Contractor receives the notice to proceed.
The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-13 Time Extensions. (SEP 2000)
52.242-17 Government Delay of Work. (APR 1984)
G - Contract Administration Data
G.1 Accounting and Appropriation Data
Funds have been reserved for this acquisition. The accounting appropriation data applicable for this acquisition will be provided in any resulting contract.
G.2 Identification of Correspondence
All correspondence and data submitted by the Contractor under this contract will reference the contract number and title.
G.3 Contracting Officer
The Contracting Officer (CO) for award of the contract will be Shannon Anthony from the office listed below:
FLETC, Procurement Division Specialized Services Branch (SSB) Bldg 99, 1131 Chapel Crossing Road Brunswick, GA 31524
The Contracting Officer (CO) for administration of the contract will be Shannon Anthony.
G.4 Payment Office Address
Department of Homeland Security FLETC Finance Division/Contract Payments Building 66 (BFD) Glynco, Georgia 31524 (See G.8, Invoices)
G.5 Contracting Officer
The Contracting Officer has the overall responsibility for the administration of this contract. All communication pertaining to contractual or administrative matters under the contract shall be addressed to the Contracting Officer. The Contracting Officer alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, specifications, details and/or schedules. However, he may delegate certain other responsibilities to his authorized representatives.
G.6 Designation of Contracting Officer’s Representative
As indicated in Homeland Security Acquisition Regulation (HSAR) clause 3052.242-72, Contracting Officer’s Representative, the Contracting Officer will designate a Contracting Officer's Representative (COR) to perform functions under the contract such as review or inspection and acceptance of services, and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the Contractor within five working days after contract award. The designation letter will set forth the authorities and limitations of the COR under the action. The Contracting Officer cannot authorize the COR or any other representative to sign documents, such as contracts, contract modifications, etc., that require the signature of the Contracting Officer. In no event, will any matter deviating from the terms of this contract be effective or binding unless formalized by contractual documents executed by the Contracting Officer.
The Contracting Officer for this contract should be informed as soon as possible of any actions or inaction by the Contractor or the Government which could change any of the terms, conditions, or completion times stated in the contract. On all matters pertaining to contract terms, the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If a disagreement exists as to contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without contractual coverage could result in nonpayment.
G.7 Bonds – 52.228-1 Bid Guarantee (SEP 1996) (Not required for subject requirement)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be [20%] percent of the bid price or $3,000,000.00 the amount of the proposed price, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
G.8 Payment & Performance Bond (REQUIRED for subject requirement)
a. Performance and Payment bonds. The Contractor shall be required to provide both payment and performance bonds.
b. Penal sums. The penal sums of the performance and payment bonds shall equal one hundred percent (100%) of the contract price.
c. The Contractor shall furnish all bonds or alternative payment protection no later than ten (10) calendar days after receipt of the notice of award. The furnishing of bonds is a part of contract performance and failure to provide bonds within the time specified shall be grounds for default.
G.9 Individual Surety
a. As prescribed in FAR 28.200, individual sureties are acceptable for all types of bonds except position schedule bonds. In order for the Contracting Officer to determine the acceptability of individuals proposed as sureties, all bidders/offerors who submit bonds which are executed by individual sureties are required to furnish the following information in support of SF 28, Affidavit of Individual Surety, with the bond(s):
1. A complete description of real property offered, supported by proof of title, such as by title opinion or abstract of title, and a certified appraisal or tax assessment;
2. C.P.A. certified balance sheet(s) and income statement(s) with a signed opinion for each individual surety;
3. Independent certified appraisal of net value of property offered;
4. Independent Certification by licensed attorney or Title Company of liens or other encumbrances which exist against all property listed;
5. A current list of all other bonds on which the individual is a surety and bonds for which the individual is requesting to be a surety, together with a statement as to the percent completion of these bonded jobs.
6. Copy of latest Federal and State Income Tax returns including all schedules.
b. This information is necessary to enable the Government to evaluate the sufficiency of the surety. Failure to furnish this information may result in non-approval of the surety and a determination of non-responsibility.
G.10 Irrevocable Letter of Credit
As prescribed in FAR 28.204-3, an Irrevocable Letter of Credit is acceptable for all types of bonds, if all provisions of FAR 28.204-3 and FAR -14 are met. FAR -14 requires a specific format for the Irrevocable Letter of Credit and the letter from the Financial Institution confirming an Irrevocable Letter of Credit.
G.11 Invoices
a. All payments under this contract will be made by electronic funds transfer (EFT) in accordance with FAR 52.232.33, Payment by Electronic Funds Transfer—System for Award Management (See Section I). An invoice is a written request for payment under the contract for supplies delivered or for service rendered. Invoices shall cite the contract number, quantity, price, and total amount of invoice. The sample invoice forms will be given to the successful offeror at the Pre-Construction meeting after contract award. In accordance with FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts (Section I), the Contractor shall furnish proper certification required by paragraph (d) on progress payments.
b. Invoices shall be prepared by the Contractor and submitted and distributed as follows:
Primary Method: Via email to Shannon.Anthony@fletc.dhs.gov
Federal Law Enforcement Training Centers Procurement Division Bldg 99, Attn: Shannon Anthony 1131 Chapel Crossing Road Brunswick, GA 31524
c. The Government will pay all proper invoices per the provisions of FAR 52.232-5, Payments Under Fixed Price Construction Contracts, and FAR 52.232-27 Prompt Payment for Construction Contracts (see Section I).
d. Payment will be based on invoices submitted by the Contractor for satisfactorily completed work. Upon verification of work actually performed and receipt of a proper invoice and any required contractor submittals, invoices will be processed for payment.
e. Submission of the invoice certifies that all employees and subcontractors have been notified of the United State Government’s zero tolerance policy regarding trafficking in persons, and the actions that will be taken for violations of this policy.
G.12 Payment to Contractor
a. The Provisions of the clause entitled "Payment Under Fixed-Price Construction Contracts" prescribed in FAR 52.232-5 are supplemented as follows:
1. In preparation of estimates, the Contracting Officer (CO) may authorize materials delivered to the site and preparatory work done to be taken in to consideration if these items are specifically identified in the accepted Schedule of Values (SOV) (if applicable) for the contract. The CO will only authorize payment for stored materials in the SOV that are considered high value; long lead or difficult to obtain; or are specialty items specifically manufactured for this project. Standard construction materials such as CMU block, conduit, wire, paint, etc. will be paid for upon satisfactory installation of the material. Payment requests for authorized stored materials in the SOV must be accompanied by an invoice showing a detailed description, quantity, cost of the materials, and evidence of contractor payment for the materials. If payment is mailto:Shannon.Anthony@fletc.dhs.gov authorized, the Contractor will be paid the lesser of the material invoice amount, or the SOV line-item amount. Any remaining SOV line-item balance shall be redistributed to the material installation activity, or another activity as acceptable to the Contracting Officer. The Contractor remains responsible at all times for the proper storage and protection of all materials. Retention will be withheld from future payment applications for improperly stored materials for which the Contractor has been previously paid.
2. The FLETC will not normally authorize payment for material stored off-site. In the event the FLETC and the Contractor both agree that it is in interest of the project to consider payment for off-site material, the following conditions at minimum must be met:
a) Material properly stored in a bonded warehouse.
b) Submission of a paid invoice indicating the contractor has title to the material
c) Arrangements made for government representative to inventory the material
d) A defined material delivery date to the project
3. In accordance with FAR 52.232-5, Payments under Fixed-Price Construction Contracts, if the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved.
b. No payment request (invoice) will be processed by the Contracting Officer when the Contractor's payroll submittals and/or those of any subcontractor are not current. This means the Contracting Officer must have in hand payroll submittals for the prime Contractor and all subcontractors up through and including the week immediately prior to the date on the invoice. Any invoice received wherein the Contractor has not adhered to this policy will be promptly returned to the Contractor and will not be processed until payroll submittals are brought up to date by the Contractor.
G.13 Final Payment
Final payment will not be made until all work is completed and accepted, all submittals have been received and approved, warranties received, and final cleanup of the premises is accomplished.
G.14 Daily Report to Inspector
The Contractor’s Superintendent shall complete for each day and submit electronically daily, prior to 10 AM of the following day, Form FTC-FMD-42 (12/09), Daily Report to Inspector to the Government Project Manager, Building 200, FLETC, Glynco GA. The Daily Report should contain a clear accounting of the time, location, type and quantity of work that took place. All sections shall be filled out or a comment made indicating that “this does not apply at this time”. If the proper procedure is not followed, a “Contract Construction Compliance Notice” will accompany the returned document or in the case of no report, the “CCCN” will be your notification.
G.15 Special Note
Sections K, L and M of this solicitation will be physically removed from any resultant award; however; Section K will be deemed to be incorporated by reference.
Special Contract Requirements Clauses H - Special Contract Requirements
Clauses
H.1 DIRECTIVES, REGULATIONS, AND INSTRUCTIONS (JUL 2013)
a. The Contractor, its personnel, subcontractors, their personnel, and representatives shall become acquainted with and fully comply at all times with the Federal Law Enforcement Training Centers (FLETC) Regulations, Directives, and Instructions. Any individual shall be subject to removal from the Center for noncompliance.
b. In the event of a conflict between this contract and any FLETC Directive, Regulation or Instruction the contract prevails.
H.2 OPERATION ON THE FACILITY (JUL 2013)
H.2.1 Safety
a. The Contractor shall conduct the operation(s) under this contract in strict conformance with all FLETC safety directives and Federal, State, and local requirements and with all applicable provisions of 29 CFR Part 1910 and 1926 of the Occupational Safety and Health Act (OSHA).
b. The Contractor shall conform to all safety rules and requirements in effect on the award date of this contract and shall take such additional precautions as the Contracting Officer (CO) may reasonably require for safety and accident prevention purposes while performing any work under this contract. The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of Contractor and Government personnel performing in any way under this contract.
c. The Contractor shall make contract personnel available for Government furnished safety and occupational training for an estimate of two (2) hours to four (4) hours annually per individual. Government furnished training may include Quality, Safety and Occupational requirements.
H.2.2 Accident Reports
Within 24-hours of occurrence, the Contractor shall prepare a report of all job-related accidents and injuries occurring on FLETC property. The Contractor shall deliver the report to the Contracting Officer Representative (COR). The Contractor shall maintain an accurate record of all accidents resulting in personal injury, death, trauma, or occupational illness or disease; exposure to hazardous materials (asbestos, lead, etc);
and, all injuries reported on the Occupational Safety and Health Administration (OSHA) Form 300, Log of Work-Related Injuries and Illnesses.
H.2.3 Occupational Hazards
The Contractor shall comply with all elements of OSHA Safety and Health Standards and the FLETC Safety and Health Directives.
H.2.4 Fire Prevention
Contract personnel shall report fires immediately upon detection. The Contractor shall observe all OSHA, FLETC, and National Fire Prevention Association (NFPA) requirements for handling and storage of combustible supplies, materials, waste, and trash. If combustible materials are to be stored on the premises, the Contractor shall obtain Government approval, label the containers with the fire hazard potential of the materials and store the containers in fire-rated locking metal cabinets.
H.2.5 Traffic Regulations
Contractor and subcontractor personnel operating motor vehicles on the FLETC shall observe traffic regulations and posted speed limits except as defined elsewhere in this contract. The only exception to posted speed limits is passing jogging formations, when speed shall be reduced to 15 mph. Traffic laws are enforced on the Center and violations shall be assessed penalty points, which can result in revocation of driving privileges on Center.
H.2.6 Weapons
Contractor and subcontractor personnel are not permitted to bring privately owned firearms, weapons, or ammunition on the Center. This restriction includes handguns, rifles, shotguns, hunting bow and arrows, etc. All privately owned firearms, weapons, and ammunition must be surrendered/checked in at the main gate upon entry to the
FLETC.
H.2.7 Supervision of Contractor Personnel
The Contractor's personnel shall remain under the Contractor's direct supervision at all times. Although the Government will coordinate direction within the scope of the contract, detailed instructions for the Contractor's personnel's performance and supervision shall remain the sole responsibility of the Contractor.
H.3 MEDICAL TREATMENT
a. Only emergency medical care is available in Government facilities to Contractor personnel who suffer on-the-job injury. The Government will NOT perform physical examinations on Contractor personnel except as specified elsewhere in this contract.
Government emergency vehicles and medical personnel may be used as the first point of treatment in emergency situations affecting Contractor personnel suffering pain or whose life or limb may be in danger.
b. Transfer to other than Government medical treatment facilities shall be affected by the Local Rescue Squad or Security Vehicle as determined necessary by attending medical authorities. The Contractor shall render payment for care at the rates established by the CO as equitable with like services rendered in the local community.
Upon receipt of a statement of charges, reimbursement will be made by the Contractor as a credit to the next billing invoice. Cost of these emergency services shall be incurred and borne by the Contractor as non-reimbursable by the Government.
H.4 SUBCONTRACTING
The Government reserves the right to approve or disapprove subcontractors for any work required by this contract. The Contractor shall obtain the CO's written approval of all subcontractors and provide copies of approved subcontracts.
H.5 ORDER OF WORK
The Contractor shall arrange the work so that it will not cause interference with the normal conduct of Government business or with the progress of other Contractors' projects. The Contractor shall submit all work schedules for approval by the COR. The Contractor shall adhere to the established schedules.
H.6 OTHER CONTRACTS
The Government may award third party contracts for additional work at or near the site of work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the CO. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.
H.7 DISRUPTION OF CONTRACTOR WORK SCHEDULE
The Contractor shall promptly notify the CO and the COR when it appears that Government activities or personnel or other contractor's projects are hindering the effective execution of its work efforts.
H.8 RIGHTS OF THE GOVERNMENT TO PERFORM FUNCTIONS WITH ITS OWN
PERSONNEL
a. The Government reserves the right to perform or supplement performance of contract functions with Government personnel during periods of disaster, war emergencies, police actions, or acts of God. Such performance shall not constitute a breach of contract by the Government within the meaning of the contract clause entitled "Default".
b. The Contractor agrees under such circumstances to permit the Government to use any essential Contractor-furnished property. The Government will equitably compensate the Contractor for use of such property.
H.9 GOVERNMENT PERFORMANCE OF SERVICES DURING LABOR STRIKES
a. Because the services called for under this contract are of critical importance to the FLETC, the Government reserves the right to take over or supplement performance of this contract in the event of a labor strike by the Contractor's personnel which impairs the Contractor's ability to satisfactorily perform the contract. Under such circumstances and at the direction of the CO, the Contractor agrees not to interfere in any way with Government performance. The Contractor further agrees under such circumstances to permit the Government to use any essential contractor-furnished property. The Government will equitably compensate the Contractor for use of such property.
b. The Contractor will not be entitled to payment for any performance period, in part or in total, during which the Government assumes performance under this clause. This clause does not limit the Government's rights under any other clause of this contract, including but not limited to, "Default (Fixed-Price Supply and Services)", "Termination for Convenience of the Government (Fixed-Price)", and "Inspection of Services-Fixed- Price."
H.10 CONSERVATION
Contractor and subcontractor personnel shall actively participate in all energy conservation efforts and programs applicable to work performed under this contract.
The Contractor shall instruct its personnel and subcontractors in utilities conservation policies.
H.11 LABOR RELATIONS
a. The Contractor shall maintain satisfactory labor relations with its personnel.
Representatives of the Contracting Office will not participate in labor relation matters unless disputes develop that interfere with the proper performance of the contract, at which time the representative may endeavor to assist in settling the difficulty.
b. The Contractor shall provide the CO with a copy of any collective bargaining agreement applicable to personnel performing on this contract.
H.12 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE
AND CONSTRUCTION CONTRACTS
The Contractor shall provide a complete list of biobased products purchased to carry out the contract requirements. The list shall be provided to the point of contact listed in FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, on each anniversary date of award. The products list shall be organized into the following three categories: Biobased products, Green products and all other products. The Contractor shall list volume to be used and total cost for each individual product in each category.
H.13 PHOTOGRAPHY
No photography, of any nature, is allowed while on the FLETC without the written authorization of the CO. Submit photography requests to the CO at least two (2) business days prior to anticipated photo session.
H.14 CONDUCT OF PERSONNEL
The CO may require the Contractor to remove from the job site any individual under this contract for reasons of misconduct, security, suspected or found to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor and subcontractor personnel shall be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the Government. The CO has the authority to bar individuals from the installation. Such removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this performance work statement.
H.15 CONTRACTOR VEHICLES
a. All Contractor vehicles operated on Government property shall be in operable condition, maintained in good repair, and meet all local, State and Federal safety requirements. Vehicles found to be unsafe or unable to function as designed shall be removed from the job site immediately. Each vehicle operated by the Contractor under this contract shall, at all times, display a valid state license plate and safety inspection sticker, if applicable.
b. All Contractor vehicles shall be operated in accordance with the FLETC traffic regulations.
c. Should a vehicle fail to meet the standards, the Contractor shall be liable of any resultant delays (including jeopardizing their performance report rating on contract schedules).
d. The Contractor's name and telephone number shall be conspicuously legible on both sides of all Contractor vehicles and over-the-road equipment.
H.16 PERMITS
a. The Contractor shall without additional expense to the Government obtain all appointments, licenses, and permits required for the prosecution of the work and for compliance with all applicable Federal, State and local laws, regulations, and codes.
Evidence of such shall be provided to the CO upon request.
b. The Contractor shall ensure that all Contractor personnel who will be driving a vehicle in support of this contract possess required license, prior to driving that vehicle. This specifically includes personnel operating FLETC Government owned vehicles in the performance of roles.
H.17 ENVIRONMENTAL PROTECTION
The Contractor shall comply with all applicable environmental protection requirements including all Federal, State and local laws and regulations. All environmental protection matters shall be coordinated with the CO or designated representative. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by the Contractor, or contractor equipment, personnel, etc., the Contractor shall reimburse the Government for that portion of the fine and associated costs for which the Contractor is responsible.
H.18 ACCESS TO BUILDINGS
It shall be the Contractor's responsibility, through the COR, to obtain access to buildings and to arrange for each room/area to be opened and closed as necessary in performance of contract requirements. The Contractor shall be responsible for safeguarding all Government property and securing facilities, equipment, and materials at the end of each work period.
H.19 KEY CONTROL
a. Keys to include keyless entry cards or other similar control devices will be issued to the Contractor as appropriate. The Contractor shall receive, service, and account for all keys issued for use in the performance of this contract. The Contractor shall develop a system of key control and submit the written plan for the CO's approval five (5) days prior to contract start. This plan shall become a part of the quality control plan. The Contractor's plan shall ensure that all keys and lock combinations issued to the Contractor by the Government are not lost, misplaced, or used by unauthorized persons.
b. Neither the Contractor, nor any Contractor personnel, shall duplicate or fabricate any Government key in its custody. Should replacement keys be required, the Contractor shall submit a WRITTEN REQUEST to the COR. The Contractor shall report loss or unauthorized duplication of Government issued keys to the CO or his/her designated representative within 48 hours of learning of the loss or duplication by Contractor and subcontractor personnel.
c. The Contractor shall control access to all Government provided lock combinations to preclude unauthorized entry. The Contractor shall immediately notify the COR when lock combinations have been compromised.
d. Should the security of a facility become compromised by the loss of a key by Contractor personnel, the Contractor shall be responsible for replacement cost for rekeying of locks or lock replacements as determined appropriate by the CO. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced and replacement cost borne by the Contractor.
e. Contractor personnel shall not allow anyone the use of any Government key in their possession. They shall not open locked rooms or areas to permit entrance by persons other than Contractor personnel performing assigned duties. Any room unlocked by Contractor at the start of work shall not be left unattended during the service process and shall be re-locked by Contractor personnel after completion of their service duties.
H.20 DISCLOSURE OF INFORMATION
a. Neither the Contractor nor any contract personnel shall disclose, or cause to be disseminated, any information concerning the operations which could result in or increase the likelihood of the possibility of a breach of the FLETC (or its partner organizations) security or interrupt the continuity of its operations.
b. No Contractor personnel or representative shall provide any information related to the FLETC activities to any element of the media without the CO's prior written permission.
This prohibition includes publicity releases, recruitment notices, etc. All inquiries, comments, or complaints arising from or in connection with the performance of this contract shall be directed to the CO, if dissemination of official information may be required for resolution.
c. Under no circumstances shall the Contractor, or anyone acting on behalf of the Contractor, refer to the equipment or services furnished pursuant to the provisions of this contract in, or in connection with, any news release or commercial advertising, without first obtaining the explicit written consent of the CO.
d. Should any such reference appear in any news release or commercial advertising issued by or on behalf of the Contractor without such prior consent, the Government shall consider institution of all remedies available under the provisions of this contract.
Disclosure of information relating to this contract to any person not entitled to receive it, or failure to safeguard any sensitive information that may come to the Contractor or any person under his control, may subject the Contract, his agents, or employees to criminal liability under Title 18, Section 793 and 798, of the United States Code.
e. Deviations from, or violations of, any of the provisions of this paragraph will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and the individual(s) involved to a withdrawal of the Government's acceptance and approval of performance on the FLETC sites.
H.21 ADVERTISING OF AWARD
The Contractor shall not refer to awards in commercial advertising in such a manner as to state or imply that the product or service provided is endorsed or preferred by the Federal Government or is considered by the Government to be superior to other products or services.
H.22 DAMAGE REPORTS
In all instances where Government property or equipment is damaged by Contractor personnel, the Contractor shall submit a full written report of the facts and extent of such to the COR within 24 hours.
H.23 PROPERTY DAMAGE AND PERSONAL INJURIES
The Contractor shall assume full responsibility for any and all damages or claims for damage for injury to persons, property, or equipment which results from any service performed under this contract. The Contractor shall repair or replace to the satisfaction of the CO or his representative any surfaces, fixtures, furnishings, structures, equipment, material, or supplies which were damaged by Contractor personnel. The Contractor shall abide by the decision of the CO whether to repair or to replace items, property, or structures when damage is caused by any of the above. The Contractor shall accomplish such repair or replacement at no cost to the Government within five (5) business days following occurrence of the damage unless otherwise agreed upon by the CO.
H.24 INDEMNITY AND LIABILITY
a. The Contractor shall exercise reasonable care and use the Contractor's best efforts to prevent accidents, injury, or damage to all persons and property in and about the work and to the facility or part(s) thereof upon which work is done.
b. The Contractor shall indemnify and hold harmless the Government against any and all liability claims and costs for injury to any property (Government or otherwise) arising from the occupancy, use, service, operation or performance of work in connection with this contract resulting in whole or in part from the negligent acts or fault of the Contractor or any subcontractor, or any employee, agent or representative of the Contractor or any subcontractor.
c. The Government will in no way be responsible for damages or loss occasioned by fire, theft, and accident or otherwise to the Contractor's stored supplies, materials, equipment, or its personnel's personal belongings.
d. The Contractor shall indemnify the Government against any and all liability claims for injuries, or death of any person and for loss or damage to any property occurring in connection with the occupancy, use, service, operation, or performance of work in connection with this contract resulting from the negligent acts or fault of the Contractor, any subcontractor, any employee, agent, or representative of the Contractor or subcontractor.
H.25 CONTRACTOR LIABILITY FOR ACTS OF GOD
The Contractor shall not be held responsible for damages incurred as a result of an Act of God, including but not limited to: flood, lightning, hurricane, tornado, earthquake, and unusually severe weather conditions documented by the National Weather Service as differing from the norm for this geographical area. The Contractor shall take all necessary precautions or measures to protect Government property and equipment if warning is given. If the Contractor is found to be negligent in his efforts to minimize damages, the Government shall hold the Contractor liable for those damages and associated costs.
H.26 INSURANCE (JUL 2013)
a. The Contractor shall procure and maintain insurance at the Contractor’s expense during the term of the contract and any extensions. Before starting work under this contract, the Contractor shall certify to the CO in writing that the required insurance has been obtained. Within 10 days after the award of this contract, the Contractor shall furnish to the CO a certificate of insurance as evidence of the existence of the following insurance coverage in amounts not less than the minimum amounts specified below:
1) Comprehensive General Liability: $200,000 per person and $500,000 per accident for bodily injury and $50,000 per occurrence for property damage
2) Automobile Insurance: $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage
3) Standard Workers' Compensation and Employer's Liability Insurance in the minimum amount of $100,000.
b. The general liability policy shall name "The United States of America, acting by and through the Department of Homeland Security (DHS), Federal Law Enforcement Training Center (FLETC)" as an additional insured with respect to operations performed under this contract.
c. The Certificate of Insurance shall provide for a minimum of 30 days written notice to the CO by the insurance company prior to cancellation or material change in policy coverage.
H.27 HOLIDAYS
a. "Federal holidays" to be used to compute labor hours in the solicitation and contract, are:
New Year's Day Labor Day
Martin Luther King's Birthday Columbus Day
President's Day Veteran's Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
a) Any other day designated by Federal statute, Executive Order, or the President's proclamation.
b) When any holiday falls on a Saturday, the preceding Friday is observed. When any holiday falls on a Sunday, the following Monday is observed. Observance of such days by Government personnel shall not by itself be cause for an additional period of performance or entitlement of compensation except as set forth within the contract.
c) Occasionally Federal holidays will be declared normal training days and full Contractor support will be required. Notice of this requirement will be given to the Contractor at least one week in advance.
d) The Contractor shall NOT receive premium rates for any special declared holiday for Federal employees (e.g., national day of mourning for death of a former president).
H.28 HOURS OF OPERATION
Normal work hours are from 7:30 a.m. through 4:30 p.m., Monday through Friday unless otherwise defined in individual specification sections.
Notwithstanding the provisions of FAR clause 52.222-4, Contract Work Hours and Safety Standards Act – Overtime Compensation, work will NOT be permitted outside normal work hours, on Saturdays, Sundays, or federal holidays unless coordinated and approved by the Government Project Manager and Contracting Officer in advance. A request to work outside normal work hours must be submitted a minimum of two (2) working days in advance of the date on which such work is anticipated. The exclusion of work on Saturdays, Sundays, and holidays has been considered in computing the performance time of this contract.
H.29 PHYSICAL AND PERSONNEL SECURITY REQUIREMENTS (JUL 2013)
H.29.1 General Requirements
a. Contractor and subcontractor personnel in the performance of this contract or any representative of the Contractor entering the FLETC shall abide by all FLETC security regulations which may be in effect during the contract period. Any such individual(s) shall be subject to those security inspections which may be deemed necessary by the FLETC to ensure that no security violations occur during the course of the contract. It shall be the Contractor's responsibility to ensure that each applicant who is expected to perform on FLETC facilities or that requires routine access to FLETC facilities shall complete the most current versions of FLETC FTC-SEM-17 Badge Application Request form, U.S. Customs and Immigration Service (USCIS) Employment Eligibility Verification I-9, Office of Personnel Management (OPM) Declaration for Federal Employment form OF-306, and Federal Bureau of Investigation (FBI) Fingerprint Card FD-258 in order to undergo a suitability background investigation which will be either a fingerprint check, a National Agency Check with Written Inquiries (NACI) or a Minimum Background Investigation (MBI).
1) If an MBI or NACI investigation is required, Contractor and subcontractor personnel will be required to complete a Standard Form 85 (SF 85), Questionnaire for Non- Sensitive Positions, or SF 85P, Questionnaire for Public Trust Positions. An SF 85 is required to be filled out for a NACI. A NACI is performed on Contractor and subcontractor personnel who are considered low risk. An SF 85P is required to be filled out for an MBI. A MBI is normally conducted for Contractor and subcontractor personnel who are in a moderate risk position or have access to Sensitive But Unclassified (SBU) information in all its forms and markings.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .