IHS1514809- Bidsheet.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Sewer Service Line Shawnee, OK
Solicitation number
RFQ1514809
Issued by

About this file

This document is a Bid Sheet for a Sewer Tap and Sewer Service Line Installation project issued by the Indian Health Service (IHS) in Shawnee, Oklahoma. The solicitation (RFQ1514809) is a 100% Indian Owned set-aside under NAICS code 237110, with an estimated award amount under $25,000. The project requires furnishing and installing a new sewer tap, service line, fittings, cleanout, and backflow preventer, with a 60-calendar day performance period from Notice to Proceed. Vendors must submit a comprehensive quote including a fixed-price quote on SF18 form, technical specifications, two relevant past performance references, and an Indian Economic Enterprise Representation Form. Quotes will be evaluated on an acceptable/non-acceptable basis, ranked by price, and the award will be made to the lowest-priced, technically acceptable offeror. Response deadline is August 1, 2025, at 5:00 p.m. CST, with questions due by July 25, 2025.

View the file

Other files

File Type Posted
SF18-95a Request for Quote.docx DOCX document
IHS1514809 Site Map .pdf PDF
Construction Clauses-DEVIATION FEB 2025.docx DOCX document
IHS IEE Representation Form_Jan 2022_508 Compliant.pdf PDF
IHS1514809 -SOW Sewer Service Lines-3307-F.Nash.docx DOCX document
ok35.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet

Sewer Tap/Sewer Service Line InstallationThis block for OEH use
703 E. Independence
Shawnee, OK 74804Date rec'd:
Phone: (405) 214-4200
FAX: (405) 214-4210
PARTICIPANT:218 W. 35th St. Shawnee, OK3306ID Number24-F96Project No.
Vendor :(vendor to insert vendor name)
ITEMDESCRIPTIONEstimated QuantityUNITUNIT PRICETOTAL COST
1.)Furnish and Install New Tap and Saddle1LS.
2.)Furnish and Install Sewer Service Line & Fittings100FT.
*Sewer service line shall be 4" PVC Sch-40
*Partial Line Replacement, some of existing line is new PVC"
3.)Furnish and Install 2 way Cleanout & back Flow Preventor1Ea.
*Unless city code requires other*

*Contractor will be responsible for all required fees and permits for sewer tap and sets along with sewer service line installation. *

*Work should be performed in accordance to all District or City specifications along with the attached IHS "Sewer Service Line Scope of Work." *

Total image1.emf