This is a Draft Statement of Work (SOW) for implementing a Cloud Center of Excellence (CCoE) for the Indian Health Service (IHS), a component of the Department of Health and Human Services. The contract requires a comprehensive cloud infrastructure modernization program utilizing AWS GovCloud to establish centralized, secure, and automated cloud operations aligned with federal compliance frameworks including FedRAMP High Baseline, NIST 800-53 Rev 5, CISA's Zero Trust Maturity Model, and Executive Order 14028.
The scope encompasses eleven major capability areas: Cloud Landing Zone design with multi-account governance using AWS Control Tower; secure enclave provisioning for development, staging, and production workloads with hardened environments and FedRAMP-compliant services (EC2, S3, VPC, PrivateLink); automation and orchestration for ATO lifecycle management and continuous compliance reporting; ETL pipelines for log and event data ingestion with PHI/PII masking per HIPAA and FISMA standards; Large Language Model (LLM) enablement for on-premise or enclave-deployed inference supporting automated document generation (SSPs, SARs, RAR, POA&Ms); real-time compliance dashboards with risk analytics and natural language interfaces; Zero Trust Architecture implementation aligned with CISA ZTMM; security operations and monitoring via centralized SIEM, EDR, and vulnerability management; secure data vault with encrypted storage and AI-assisted classification; and role-based stakeholder toolkits with embedded help systems and customized training materials for ISSOs, analysts, auditors, and system owners.
The phased 12-month implementation is structured across three phases: Phase 1 (Foundation) focuses on Cloud Landing Zone deployment, baseline logging, and ETL setup by month 2; Phase 2 (Automation) implements compliance workflows, dashboards, and LLM integration by month 6; Phase 3 (Transition) delivers training, knowledge transfer, and operational readiness by month 8, with optional post-transition support through month 12. The contract is organized into five CLINs: CLIN 001 covers architecture and deployment; CLIN 002 addresses compliance automation and dashboarding; CLIN 003 includes LLM licensing and container deployment; CLIN 004 encompasses training and transition support; and CLIN 005 provides optional embedded resident architect support on a time-and-materials basis. All work must be performed remotely using IHS-approved virtual collaboration platforms, with all contractor personnel requiring Public Trust background clearances and NDAs. Performance metrics include timely deliverables (±10 business days), ATO documentation accuracy, security benchmark compliance, training satisfaction scores of 90% or greater, and risk dashboards with 24-hour maximum latency from telemetry sources. Reporting requirements consist of weekly status updates with risk registers, monthly executive dashboards with cost transparency, and quarterly performance and compliance reviews with stakeholders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IEE_Representation_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft Statement of Work (SOW)
Cloud Center of Excellence (CCoE) Implementation
Indian Health Service (IHS)
Division of Information Technology (DIT)
1. INTRODUCTION
The Indian Health Service (IHS), an agency within the U.S. Department of Health and Human
Services (HHS), is initiating a strategic modernization program to establish a Cloud Center of
Excellence (CCoE). The CCoE will utilize Cloud (GovCloud - FedRAMP) to centralize, secure, and automate cloud operations while supporting mission-critical health IT objectives.
This Statement of Work (SOW) outlines the tasks, deliverables, roles, and performance expectations for designing, implementing, and sustaining the CCoE in alignment with federal compliance frameworks including:
• FedRAMP (High Baseline)
• NIST 800-53 Rev 5
• Executive Order 14028
• OMB M-22-09, M-24-04
• CISA’s Zero Trust Maturity Model (ZTMM)
• Post Quantum Computing (PQC) Readiness meeting PQC Mandate Enablement
• Secure AI ready platform
2. BACKGROUND
IHS currently operates in a decentralized IT environment that contributes to fragmented infrastructure, inconsistent security enforcement, and risk exposure. GAO Report GAO-21-20 identified several deficiencies in cloud governance, visibility, and cybersecurity readiness.
To address these gaps, IHS will implement a secure Cloud GovCloud-based environment that consolidates infrastructure, automates security workflows, and incorporates role-based AI tools.
The CCoE will enable continuous compliance, reduce operational overhead, and support innovation across IHS facilities.
3. SCOPE OF WORK
The Contractor shall provide a comprehensive solution that includes, but is not limited to, the following capabilities:
• Cloud Landing Zone Design & Deployment o Multi-account Cloud architecture with governance controls o Use of Cloud Control Tower, Service Catalog, and Cloud Organizations o Identity and access management aligned with Zero Trust principles
• Secure Enclave Provisioning o Configured enclaves for development, staging, and production workloads o FedRAMP-compliant storage, compute, and networking (e.g., EC2, S3, VPC, PrivateLink) o Hardened environments using CIS benchmarks and Cloud best practices
• Automation and Orchestration o Automated workflows for ATO lifecycle management o Continuous POA&M generation, patch validation, and compliance reporting o Integration with SIEM (e.g., Splunk), SOAR tools, and Cloud Security Hub
• Data Engineering and ETL o Extract-Transform-Load (ETL) pipelines for ingesting and transforming log and event data o Integration with Cloud native telemetry (e.g., CloudTrail, GuardDuty) and third-party tools o Masking and classification of PHI/PII in compliance with HIPAA and FISMA
• Large Language Model (LLM) Enablement o On-premise or enclave-deployed LLMs for secure, role-based inference o AI-assisted document generation (e.g., SSP, SAR, RAR, POA&M) o Local semantic search and summarization of compliance materials o Use of containerized, GPU-accelerated inference in isolated VPCs
• Compliance Dashboards and Risk Analytics o Real-time compliance status dashboards for executive reporting o Dashboards showing ATO progress, open vulnerabilities, audit readiness o Integration with natural language interfaces for querying compliance data
• Zero Trust Architecture Implementation o Aligned with CISA Zero Trust Maturity Model (ZTMM) o Support for microsegmentation, encrypted remote access, and continuous validation o Maturity benchmarking and optimization across all ZTA pillars
• Security Operations and Monitoring o Centralized log aggregation and threat detection via SIEM o Endpoint Detection and Response (EDR), vulnerability management o Continuous diagnostics and mitigation (CDM) support
• Secure Data Vault and Metadata Governance o Encrypted storage with tagging and classification aligned with NIST 800-60 o Role-based tagging, automated metadata parsing, and retention policies o AI-assisted classification and redaction for secure document handling
• Stakeholder Support and Role-Based Toolkits o Interfaces and workflows tailored to ISSOs, POA&M Analysts, Auditors, System
Owners o Embedded help systems and LLM-based support assistants o Training materials and job aids customized per role
4. OBJECTIVES
The objectives of the Cloud Center of Excellence (CCoE) initiative are to modernize, secure, and automate IHS cloud operations across the enterprise, in alignment with federal mandates, audit recommendations, and the agency’s mission to improve healthcare delivery through digital transformation. This section outlines the business, technical, security, and strategic outcomes the initiative is expected to achieve.
4.1 Business Objectives
• Establish a centralized cloud governance model to address findings in GAO Report
GAO-21-20 and reduce operational fragmentation.
• Enable secure, compliant testing and deployment of mission-critical applications through standardized Cloud environments.
• Implement a cost accountability framework via a chargeback model supported by Cloud
Budgets and Cost Explorer.
• Reduce total cost of ownership through tool rationalization, license consolidation, and automation of manual compliance functions.
• Improve leadership visibility into risk posture, operational performance, and compliance status through real-time executive dashboards.
4.2 Technical Objectives
• Design and deploy a secure Cloud Landing Zone architecture with multi-account governance, VPC segmentation, and centralized identity and access management.
• Automate core compliance and operational workflows including:
o ATO package generation o POA&M lifecycle tracking o Patch deployment validation o Security incident ticketing and audit response
• Integrate telemetry, logs, and vulnerability scan results into a unified SIEM and dashboarding platform.
• Establish secure ETL pipelines from Cloud and third-party telemetry sources into centralized compliance dashboards and data lakes.
• Deploy GPU-enabled container environments for operating fine-tuned, enclave-hosted
LLMs in support of documentation generation, compliance analytics, and secure information retrieval.
4.3 Security and Compliance Objectives
• Achieve continuous compliance monitoring and FedRAMP alignment across deployed systems and workflows.
• Implement Zero Trust Architecture (ZTA) principles throughout the environment in accordance with CISA’s ZTMM framework.
• Provide role-specific support tools for ISSOs, Security Control Assessors, POA&M
Analysts, and System Owners, enhancing their efficiency and audit-readiness.
• Enable enclave-based LLMs to support automated generation of SSPs, SARs, SAPs, and other required documentation with no data egress.
• Monitor compliance posture in real-time through dashboards that provide insights into
ATO progression, vulnerability resolution, patch coverage, and audit gaps.
4.4 Strategic Outcomes
• Empower IHS leadership with defensible, data-driven insights into cybersecurity, operations, and cloud utilization.
• Institutionalize a scalable, repeatable cloud operations model that supports future IHS initiatives, including EHR modernization and AI-driven analytics.
• Reduce the burden on IHS security and compliance staff by automating routine workflows and documentation tasks using enclave-secured LLMs.
• Increase IHS agility in adopting and securing commercial-off-the-shelf (COTS) tools by establishing pre-authorization environments.
• Create a foundation for continual innovation by deploying cloud-native and AI-native technologies in a secure and governed manner.
5. PERIOD OF PERFORMANCE
One Year. All core implementation phases (enclave setup, automations, training) are to be completed within the Base Year.
6. PLACE OF PERFORMANCE
All work shall be performed remotely unless otherwise directed by the Contracting Officer. The
Contractor shall use IHS-approved virtual collaboration platforms for meetings, training, and reviews.
7. PHASED IMPLEMENTATION PLAN & DELIVERABLES
The CCoE shall be delivered in three integrated phases. Each phase builds on the previous to ensure secure design, operational automation, and sustainable cloud governance. All activities will comply with IHS, HHS, and federal cybersecurity mandates.
7.1 Phase 1: Foundation — Secure Enclave and Cloud Infrastructure
Deployment
Objective:
Establish the secure Cloud GovCloud infrastructure, deploy baseline logging, identity, and ETL capabilities, and prepare for authorization under FedRAMP and IHS-specific requirements.
Key Activities:
• Deploy Cloud Landing Zone using Cloud Control Tower and multi-account best practices
• Configure core services: EC2, S3 (Standard, Glacier IR, Deep Archive), IAM, VPC, and
PrivateLink
• Enable centralized logging, auditing, and threat detection with Cloud CloudTrail, GuardDuty, and Config
• Provision ETL servers and data pipelines to Splunk/Data Lake
• Deploy GPU-enabled container environments for local LLMs in isolated VPCs
• Draft core ATO documentation including SSP, SAP, RAR, and ConMon strategy
• Establish compliance governance alignment with NIST, ZTMM, and FedRAMP High
Deliverables:
• Cloud Landing Zone Architecture and Configuration Artifacts
• IAM and VPC Security Configuration Documentation
• Hardened ETL Server Deployment Package and Logging Setup
• Baseline Data Classification and Masking Policy
• Initial LLM Hosting Blueprint with Secure Container Deployment
• Draft ATO Documents: SSP, SAP, RAR, Continuous Monitoring Strategy
• Cloud Governance and Risk Register (Initial Baseline)
7.2 Phase 2: Automation — Compliance, Risk Visibility, and ATO Enablement
Objective:
Automate security workflows, compliance operations, and risk analytics; integrate dashboarding, vulnerability scanning, and AI-powered documentation assistance.
Key Activities:
• Configure automation engines for POA&M tracking, ATO artifact generation, and patch lifecycle management
• Integrate Cloud Security Hub, SIEM, SOAR, and ticketing systems (e.g., ServiceNow)
• Deploy real-time dashboards for ATO progression, risk indicators, and vulnerability metrics
• Train enclave-hosted LLMs on redacted historical data for audit RFI generation, SSP/POA&M summarization, and classification
• Conduct full UAT with compliance and security teams across workflows and dashboards
• Finalize all ATO documentation for formal submission
• Document governance procedures for automation use and LLM assistance
Deliverables:
• Validated Automation Playbooks for ATO, POA&M, Patch, and IR workflows
• Deployed Compliance Dashboards with Export/Reporting Capabilities
• Integrated SIEM/EDR/Vulnerability Dashboard and Alerting Interfaces
• Enclave-Based LLM Toolkits: Prompt Libraries, Summary Engines, Audit RFI Generator
• Peer-Reviewed Codebase and QA Documentation for Security Automations
• Completed ATO Package: SSP, SAP, SAR, POA&M Workbook
• UAT Report, Change Logs, and Final QA Sign-off
7.3 Phase 3: Transition — Training, Knowledge Transfer, and Operational
Readiness
Objective:
Ensure IHS personnel are fully equipped to operate, sustain, and enhance the CCoE platform through structured training, documentation, and role-specific toolkits.
Key Activities:
• Deliver role-specific training for ISSOs, System Owners, Engineers, Analysts, and
Auditors
• Provide instructional resources: slide decks, recordings, quick-reference guides
• Conduct operational exercises in staging environments to validate training comprehension
• Finalize SOPs for Cloud, ETL, automation workflows, and LLM-based compliance tooling
• Complete knowledge transfer and governance handoff with defined ownership and escalation paths
• Deliver final project documentation package and operational readiness checklist
Deliverables:
• Training Curriculum by Role (ISSOs, DevSecOps, Security Analysts, etc.)
• Admin Manuals, Reference Guides, and Recorded Training Sessions
• SOPs for Enclave Management, ETL, Compliance Automation, and LLM Use
• Knowledge Transfer Package with Architecture, Workflows, and Configuration Artifacts
• Operational Readiness Checklist and Transition Acceptance Memo
• Final Compliance Snapshot Report (ZTMM, NIST 800-53, FedRAMP metrics)
• Post-Implementation Sustainability and Improvement Plan
8. KEY PERSONNEL AND RESPONSIBILITIES
The Contractor shall provide the following Key Personnel, each of whom must possess demonstrated experience supporting U.S. public sector cloud security, automation, and compliance modernization initiatives. All proposed personnel must be fully cleared to the Public
Trust level or higher and shall remain assigned throughout the performance period unless otherwise approved by the Contracting Officer (CO) and Contracting Officer’s Representative
(COR).
9. CONTRACT LINE ITEM NUMBERS (CLINs) & MILESTONES
CLIN Structure
• CLIN 001 – Architecture & Deployment (Landing Zone, Enclave, Infrastructure)
• CLIN 002 – Automation Integration & Dashboarding
• CLIN 003 – LLM Licensing & Container Deployment
• CLIN 004 – Training & Transition Support
• CLIN 005 – Embedded Resident Architect Support (optional, T&M)
CLIN Description Mapped Deliverables Aligned
Milestones
CLIN
Architecture, Landing Zone, and Secure Enclave
Deployment
Cloud Landing Zone artifacts, IAM/VPC setup, Logging/Monitoring stack, ATO
Drafts
M1, M2, M3
CLIN
Compliance Automation &
Workflow Integration
Automation playbooks, POA&M engine, SIEM integration, ticketing flows M4, M5, M6
CLIN
LLM Licensing, Secure
Hosting, and Toolkits
LLM deployment containers, prompt libraries, audit RFI generator, classification engine
M4, M5, M6
CLIN
Training, SOPs, and
Knowledge Transfer
Role-based training materials, recorded sessions, SOPs, transition plan M7, M8
Milestone Schedule
This milestone table defines major delivery checkpoints across the three phases. Each milestone includes a brief description, expected deliverables, and target completion timeline (based on award date). This format is aligned with IHS procurement expectations.
Milestone Description Key Deliverables Target Date
M1 – Project
Kickoff
Formal launch of contract;
finalization of schedule, roles, access, and governance
Kickoff Briefing, WBS, Master Project Plan
Within 10 business days of award
M2 – Secure
Enclave
Deployment
Completion of Cloud Landing
Zone and baseline security infrastructure
Cloud Architecture Docs, ETL Servers, IAM/VPC
Configs
End of Month
Milestone Description Key Deliverables Target Date
M3 – Draft ATO
Package Submitted
Submission of draft ATO documents for internal review and updates
SSP, SAP, RAR,
ConMon, Risk Register
End of Month
M4 – LLM
Integration (Phase
1)
Initial deployment of LLMs in secure containers, focused on documentation and classification
LLM Hosting Plan, Redacted Prompt
Templates, SSP Draft
Generator
End of Month
M5 – Automation
Engine
Operational
Compliance workflows (ATO, POA&M, IR) operational with integrations and dashboards
Playbooks, Codebase, SIEM Integration, POA&M Tracker
End of Month
M6 – UAT and
ATO Package
Finalized
Completion of UAT for all dashboards, automations, and workflows; submission-ready
ATO
Final ATO Package, UAT
Report, QA Logs
End of Month
M7 – Training and
Transition
Execution
Training delivered across stakeholder roles, with documentation and environment access
Training Completion
Report, SOPs, Admin
Guides
End of Month
M8 – Operational
Readiness
Certification
Governance transition to IHS team, validation of full capability and compliance
Final Architecture
Bundle, OR Checklist, Governance Plan
End of Month
M9 – Post-
Transition Support
(Optional)
Periodic support, tuning, or incident response assistance as required by IHS
Support Logs, Performance Reports, Improvement Proposals
Months 9–12
(optional
CLIN use)
10. SECURITY, PRIVACY, AND COMPLIANCE REQUIREMENTS
All work must comply with the following:
• Data Sovereignty: All data remains in Cloud GovCloud (US), including LLM operations.
• Standards:
o FedRAMP High o NIST 800-53 Rev 5 o CISA Zero Trust Maturity Model (ZTMM) o EO 14028, OMB M-22-09, M-24-04
• Personnel: Public Trust background clearance required.
• Non-Disclosure: NDAs required for all Contractor personnel accessing sensitive IHS data.
11. PERFORMANCE METRICS AND REPORTING
Performance will be evaluated based on:
• Timeliness of deliverables (±10 business days)
• Accuracy and usability of ATO documentation
• Compliance of enclave with security benchmarks
• Training satisfaction scores (≥90% competency pass)
• Risk dashboards maintained with ≤24hr lag from telemetry source
Reporting Requirements
• Weekly: Status updates, risk registers, and action items
• Monthly: Executive dashboards and cost transparency reports
• Quarterly: Performance and compliance reviews with stakeholders
| Draft Statement of Work (SOW) |
| 1. INTRODUCTION |
| 2. BACKGROUND |
| 3. SCOPE OF WORK |
| 4. OBJECTIVES |
| 4.1 Business Objectives |
| 4.2 Technical Objectives |
| 4.3 Security and Compliance Objectives |
| 4.4 Strategic Outcomes |
| 5. PERIOD OF PERFORMANCE |
| 6. PLACE OF PERFORMANCE |
| 7. PHASED IMPLEMENTATION PLAN & DELIVERABLES |
| 7.1 Phase 1: Foundation — Secure Enclave and Cloud Infrastructure Deployment |
| 7.2 Phase 2: Automation — Compliance, Risk Visibility, and ATO Enablement |
| 7.3 Phase 3: Transition — Training, Knowledge Transfer, and Operational Readiness |
| 8. KEY PERSONNEL AND RESPONSIBILITIES |
| 9. CONTRACT LINE ITEM NUMBERS (CLINs) & MILESTONES |
| CLIN Structure |
| Milestone Schedule |
| 10. SECURITY, PRIVACY, AND COMPLIANCE REQUIREMENTS |
| 11. PERFORMANCE METRICS AND REPORTING |
| Reporting Requirements |
File details come from the government source that posted it. Updated .