iHouse Apt 02 Phase 4 Drawings.pdf
PDF 41 MB Posted
- Attached to
- iHouse Apartment Construction
- Solicitation number
- SS75H70126R00026
About this file
These are Phase 4 Final Construction Documents for the iHouse Apartment Project located at Indian Route 6290, Tonalea, Arizona 86044, consisting of comprehensive architectural, civil, structural, mechanical, plumbing, fire protection, and electrical drawings issued August 13, 2024 by Johnson Smitthipong & Rosamond Associates, Inc. The project involves construction of a 19-unit apartment building (approximately 19,510 square feet) comprising efficiency units, one-bedroom units, two-bedroom units, and one ADA-accessible one-bedroom unit, along with supporting facilities including RV restrooms, RV laundry, and administrative office space. The construction encompasses a concrete post-tensioned slab-on-grade foundation system, wood frame construction with prefabricated roof trusses, standing seam metal roofing, stucco exterior finishes, and masonry veneer, designed to comply with the 2021 International Building Code, occupancy classification R-2, construction type V-B, and seismic design category B.
The project includes full site development with utility infrastructure (water, sanitary sewer, storm drainage), road extensions totaling approximately 1,309 linear feet with asphalt and concrete pavement, parking facilities, landscape improvements, and drainage control measures. Building systems include a fully sprinklered fire protection system with wet pipe sprinklers, HVAC systems with air handling units and condensing units for each unit, plumbing with individual water heaters and hot water recirculation, and electrical distribution with transformers and individual unit panels. The drawings specify materials such as Type L copper piping for domestic water, PVC for sanitary sewer, ceramic tile finishes in bathrooms and kitchens with quartz countertops, vinyl composition tile flooring, and fixture schedules including water-efficient plumbing fixtures. The project is designed for construction management by the Navajo Area Indian Health Service and adheres to Navajo Tribal utility standards and NTUA specifications for all utility installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW iHouse.pdf | ||
| A10 Attachment 1 IHS IEE Representation Form.pdf | ||
| iHouse Apt 03 Phase 4 Specifications.pdf | ||
| A10 Sources Sought iHouse.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDIAN HEALTH SERVICES
INSCRIPTION HOUSE HEALTH CENTER
Indian Rte 6290, Tonalea, AZ 86044 iHouse Apartment
Project No: 23-390
Issue Date: August 13, 2024
P H
A S
E
F in a l
C o n s tr u c ti o n
D o c u m e n ts
R
VI
H
P
S
N I
D
C E
I
A
A N
HE TL H
S
E
E
H
N M
E
A R
P
T O
F T
C D
SU
S
A
E
TAE L &H
N V
I S
E R
U M
A H
A
B
C
D
1 2 3 4 5
1 2 3 4 5
Sheet Number:
Sheet Title:
Checked By:
Drawn By:
Scale:
Project No:
Issue Date:
Consultants:
JOHNSON SMITTHIPONG &
ROSAMOND ASSOCIATES, INC.
5210 E Williams Cir Ste 600 Tucson, AZ 85711
(520) 547-7904 www.jsra.com
U. S.
DEPARTMENT OF
HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
NAVAJO AREA OFFICE
THIS DOCUMENT IS
NOT TO BE USED FOR
REGULATORY
APPROVAL, PERMIT, OR
CONSTRUCTION
Vernon Rosamond Arizona Lic #: 9793 Date:
ISSUED FOR INTERIM REVIEW
/1
/2
:3 :5
P
M
A u to d e s k D o c s /2
-3
I H
S i H o u s e
A p t v
/2
-3
A rc h i H o u s e
A p t
.r v t
G000
COVER SHEET
HARGREAVES
KADDOURA
23-390
8/13/24
PHASE IV (Final CD) iHOUSE APARTMENT
Tonalea, AZ 86044
8/13/24
No. Date Description
IN
D
IA
N
R O
U T
E
6SITE
PHOENIX
FLAGSTAFF
TUCSON
PROJECT
LOCATION
INSCRIPTION
HOUSE HEALTH
CENTER
R
VI
H
P
S
N I
D
C E
I
A
A N
HE TL H
S
E
E
H
N M
E
A R
P
T O
F T
C D
SU
S
A
E
TAE L &H
N V
I S
E R
U M
A H
A
B
C
D
1 2 3 4 5
1 2 3 4 5
Sheet Number:
Sheet Title:
Checked By:
Drawn By:
Scale:
Project No:
Issue Date:
Consultants:
JOHNSON SMITTHIPONG &
ROSAMOND ASSOCIATES, INC.
5210 E Williams Cir Ste 600 Tucson, AZ 85711
(520) 547-7904 www.jsra.com
U. S.
DEPARTMENT OF
HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
NAVAJO AREA OFFICE
THIS DOCUMENT IS
NOT TO BE USED FOR
REGULATORY
APPROVAL, PERMIT, OR
CONSTRUCTION
Vernon Rosamond Arizona Lic #: 9793 Date:
ISSUED FOR INTERIM REVIEW
/1
/2
:3 :5
P
M
A u to d e s k D o c s /2
-3
I H
S i H o u s e
A p t v
/2
-3
A rc h i H o u s e
A p t
.r v t
12" = 1'-0"
G001
INFORMATION
SHEET
HARGREAVES
KADDOURA
23-390
8/13/24
PHASE IV (Final CD) iHOUSE APARTMENT
Tonalea, AZ 86044
8/13/24
SHEET INDEX
Sht No Sheet Name
GENERAL
G000 COVER SHEET
G001 INFORMATION SHEET
G101 CODE SHEET
CIVIL
C001 NOTES SHEET
C002 UTILITY NOTES SHEET
C101 SITE PLAN
C201 GRADING PLAN
C301 UTILITY PLAN
C302 ROAD EXTENSION PLAN & PROFILE I
C303 ROAD EXTENSION PLAN & PROFILE II
C500 DETAILS I
C501 DETAILS II
C502 DETAILS III
C503 DETAILS IV
C504 DETAILS V
STRUCTURAL
S001 STRUCTURAL NOTES
S002 SPECIAL INSPECTIONS,I.O.D.
S121 FOUNDATION PLAN WEST
S122 FOUNDATION PLAN EAST
S123 PT LAYOUT WEST
S124 PT LAYOUT EAST
S151 ROOF FRAMING PLAN WEST
S152 ROOF FRAMING PLAN EAST
S501 TYPICAL DETAILS
S502 TYPICAL DETAILS
S503 TYPICAL DETAILS
S521 FOUNDATION DETAILS
S551 ROOF FRAMING DETAILS
S601 SCHEDULES
ARCHITECTURAL
A101 SITE PLAN
A121 OVERALL FLOOR PLAN & WALL TYPES
A122 FLOOR PLAN
A131 DIMENSION PLAN
A141 REFLECTIVE CEILING PLAN
A151 ROOF PLAN
A201 ELEVATIONS
A211 INTERIOR ELEVATIONS
A212 INTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A302 WALL SECTIONS
A303 WALL SECTIONS
A304 WALL SECTIONS
A411 ENLARGED FLOOR PLANS
A421 DIMENSION ENLARGED FLOOR PLANS
A501 EXTERIOR & DOOR DETAILS
A511 INTERIOR DETAILS
A512 INTERIOR DETAILS
A601 DOOR SCHEDULES 100 thru 110
A602 DOOR SCHEDULES 111 thru 130
A603 SIGNAGE SCHEDULE
A611 ROOM SCHEDULE
A612 FLOOR FINISH PLAN
A701 FURNITURE PLAN
A801 PERSPECTIVE VIEWS
A901 SPACE PROGRAM FLOOR PLANS
INTERIORS
I101 INTERIOR PAINT PLAN & FINISH SCHEDULE
FIRE PROTECTION
F001 GENERAL NOTES AND DETAILS - FIRE PROTECTION
F002 SPRINKLER DETAILS - FIRE PROTECTION
F201 FIRST FLOOR PLAN - FIRE PROTECTION
PLUMBING
P001 LEGENDS, NOTES AND SCHEDULES - PLUMBING
P002 SCHEDULES - PLUMBING
P201 FIRST FLOOR PLAN - PLUMBING
P401 PARTIAL FLOOR PLAN - PLUMBING SANITARY
P402 PARTIAL FLOOR PLAN - PLUMBING DOMESTIC
P501 RISERS - PLUMBING SANITARY
P502 RISERS - PLUMBING DOMESTIC MECHANICAL ROOMS
P601 DETAILS - PLUMBING
MECHANICAL
M001 SCHEDULE AND LEGEND - HVAC
M002 SCHEDULES - HVAC
M201 FIRST FLOOR PLAN - HVAC DUCTWORK
M301 PARTIAL FLOOR PLANS - HVAC
M401 DETAILS - HVAC
ELECTRICAL
E001 SCHEDULES, LEGENDS AND GENERAL NOTES - ELECTRICAL
E101 SITE PLAN - ELECTRICAL
E121 ELECTRICAL PLAN
E131 LOW VOLTAGE SYSTEMS PLAN
E141 FIRE ALARM SYSTEM PLAN
E401 PARTIAL ELECTRICAL PLANS
E601 ONE-LINE DIAGRAM - ELECTRICAL
E602 PANEL SCHEDULES - ELECTRICAL
E603 PANEL SCHEDULES - ELECTRICAL
BLK(G) BLOCK(ING)
BM BENCH MARK
BO BOTTOM OF
BOT BOTTOM
BRG BEARING
BRK BRICK
BSMT BASEMENT
BUR BUILT UP ROOFING
CMWP COMPOSITE METAL WALL PANEL
C CHANNEL
C/C CENTER TO CENTER
CAB CABINET
CB CHALK BOARD,CATCH BASIN
CEM CEMENT
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMTSCOMMENTS
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS OR CONTINUE
CORR CORRIDOR,CORRUGATED
CPT CARPET
CR CLEAN ROOM
CSK COUNTERSINK
CT CERAMIC TILE
CU CUBIC
CU FT CUBIC FOOT (FEET)
CW COLD WATER
D DEPTH
DEMO DEMOLISH, DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DITTO
DP DAMPPROOFING
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
DWC DRYWALL CHANNELS (HAT)
E EAST
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATION,ELEVATOR
EMER EMERGENCY
EP EPOXY PAINT
EPS EXPANDED POLYSTYRENE
EQ EQUAL EQUIP EQUIPMENT
ES EXPOSED STRUCTURE
EST ESTIMATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXC EXCAVAT(E)(ION)
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXT EXTERIOR
EIFS EXT. INSULATION FINISH SYSTEM
F FAHRENHEIT
FA FIRE ALARM
FAB FABRICATE
FD FLOOR DRAIN
FDN FOUNDATION
FE(C) FIRE EXTINGUISHER(CABINET)
FF FINISH FLOOR
FHC FIREHOSE CABINET
FHR FIREHOSE RACK
FIN FINSH(ED)
FL FLOOR
FLA FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF
FP FIREPROOF
FR FIRE RETARDANT
FRP FIBER REINFORCED PLASTIC
FT FOOT,FEET
FTG FOOTING
FUR FURRED(ING)
FUT FUTURE
GA GAGE,(GUAGE)
GALV GALVANIZED
GC GENERAL CONTRACT(OR)
GD GRADE
GL GLASS, GLAZING
GWB GYPSUM WALLBOARD
GYP GYPSUM
H(T) HEIGHT
HB HOSE BIBB
HC HOLLOW CORE
HDBD HARDBOARD
HD HEAVY DUTY
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING/VENTILATING/ AIR
CONDITIONING
HW HOT WATER
ICMWP INSULATED COMPOSITE METAL WALL
PANEL
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH(ES)
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JC JANITORS CLOSET
JST JOIST
JT JOINT
KD KNOCKED DOWN
KIT KITCHEN
KO KNOCK OUT
KP KICK PLATE
L LENGTH,LONG
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LF LINEAL FEET
LH LEFT HAND
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
LT LIGHT
LTWT LIGHTWEIGHT
LVR LOUVER
MAS MASONRY
MAX MAXIMUM
MATL MATERIAL
MED MEDIUM
MECH MECHANICAL
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MM MILLIMETER
MIN MINIMUM
MISC MISCELLANOUS
MO MASONRY OPENING
MOD MODULAR
MOV MOVABLE
MTD MOUNTED
MWP METAL WALL PANEL (SYSTEM)
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENTS
NTS NOT TO SCALE
NO NUMBER
OA OVERALL
OC ON CENTER(S)
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD,OPPOSITE HAND
OPG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PAINT(ED)
PAR PARALLEL
PART PARTITION
PART BD PARTICLE BOARD
PC PIECE
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PREFAB PERFORATE(D)
PERIM PERIMETER
PERP PERPENDICULAR
PF PREFABRICATED
PJ PANEL JOINT
PL PLASTER,PLATE,PROPERTY LINE
PLBG PLUMBING
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAL FOOT
PNL PANEL
PO POWER OPERATED
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTD PAPER TOWEL DISPENSER
PTR PAPER TOWEL RECEPTOR
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PLWD PLYWOOD
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
(R) RECESSED
R RADIUS,RISER ROUND
RA RETURN AIR
RB RESILIENT BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN
RE(F) REFERENCE
RELO RELOCATION
REPL REPLACE
RES RESILIENT
REV REVISION(S),REVISED
RF RIGID FIBERGLASS
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RRF ROLLED RUBBER FLOORING
REQ'D REQUIRED
RWL RAINWATER LEADER
S SEALED, SOUTH
(S) SURFACE MOUNTED
SC SOLID CORE, SEALED CONCRETE
SCHED SCHEDULE
SECT SECTION
SD STORM DRAIN
SDG SIDING
SF SQUARE FEET
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SL SHEET LINOLEUM
SM SHEET METAL
SP SOUNDPROOF
SPECS SPECIFICATIONS
SPKR SPEAKER
SPL SPECIAL
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STD STANDARD ST STEEL, STREET
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SEAMLESS VINYL
SW SWITCH
SWR SEWER
SYM SYMMETRY(ICAL)
T THICKNESS, TEE
TD TRENCH DRAIN
T&G TONGUE AND GROOVE
TB TACKBOARD TEL TELEPHONE
TEMP TEMPERATURE,TEMPORARY
TERR TERRAZZO
THK THICK(NESS)
TO TOP OF
TOC TOP OF CONCRETE
TOIL TOILET
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TV TELEVISION
TYP TYPICAL
U URINAL
UG UNDERGROUND
UL UNDERWRITERS LABORATORY
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VNR VENEER
VPL VENEER PLASTER
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W WIDTH, WIDE, WEST
W/ WITH
W/O WITHOUT
W/W WALL TO WALL
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WALL HUNG, WATER HEATER
WI WROUGHT IRON
WM WIRE MESH
WP WATERPROOFING
WR WATER REPELLENT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
YD YARD
ABBREVIATIONS PROJECT DIRECTORY
CODE DATA & STANDARDS
1. ALL DIMENSIONS GIVEN ARE TO FACE OF STUD. EXCEPTIONS AS INDICATED ON
THE DOCUMENTS.
2. LARGE SCALE DETAILS AND PLANS TAKE PRECEDENCE OVER SMALL SCALE
DRAWINGS.
3. CIVIL DRAWINGS FINISH FLOOR DATUM ELEVATION EQUALS ARCHITECTURAL
ELEVATION OF 0'=0" FOR EACH BUILDING INDEPENDANT OF OTHER BUILDINGS.
4. COORDINATE AND VERIFY ALL DIMENSIONS, OPENINGS AND CONDITIONS WITH
CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND ALL OTHER PERTINENT
DRAWINGS AND TRADES PRIOR TO CONSTRUCTION. NOTIFY ARCHITECT OF
DISCREPANCIES PRIOR TO FABRICATION AND INSTALLATION.
5. FIRE RATINGS SHALL BE MAINTAINED AT FIRE RATED PARTITIONS BY A U.L.
ASSEMBLY AT GAPS AND VOIDS CREATED BY PENETRATIONS, STRUCTURAL
MEMBERS AND INTERSECTIONS WITH ADJACENT SURFACES.
6. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES
AND REGULATIONS.
OWNER
NAVAJO AREA INDIAN HEALTH SERVICE
272 HIGHWAY 264
WINDOW ROCK, AZ 86515
CONTACT: ANTOINE PANTHER
PHONE: (928) 871-5823
ARCHITECT
JOHNSON SMITTHIPONG & ROSAMOND
5120 E. WILLIAMS CIR, SUITE 600
TUCSON, AZ 85711
CONTACT: DANIEL HARGREAVES
PHONE: (520) 547-7904
CIVIL ENGINEER
DOWL
4686 EAST VAN BUREN STREET, SUITE 175
PHOENIX, AZ 85008
CONTACT: RUDY ING
PHONE: (480) 753-0800
STRUCTURAL ENGINEER
SCHNEIDER & ASSOCIATES
STRUCTURAL ENGINEERS, INC
435 EAST 9TH STREET
TUCSON, AZ 85705
CONTACT: RON SCHNEIDER
PHONE: (520) 512-8183
ELECTRICAL/MECHANICAL ENGINEER
BERNHARD TME
2990 N SWAN RD., SUITE 227
TUCSON, AZ 85712
CONTACT: MARK ALVAREZ
PHONE: (520) 247-3443
OCCUPANCY R-2
CONSTRUCTION TYPE V-B
SEISMIC ZONE REFER TO STRUCTURAL
SPRINKLERS FULLY SPRINKLERED
GENERAL ARCHITECTURAL NOTES
PROJECT LOCATION
INTERNATIONAL BUILDING CODE 2021
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE
2017 NATIONAL ELECTRIC CODE
2010 ARCHITECTURAL BARRIERS ACT
2021 A/E IHS DESIGN GUIDE
2021 NFPA 101 - LIFE SAFETY CODE
2021 NFPA 72
2021 NFPA 10
2021 NFPA 13
2021 NFPA 20
2021 NFPA 22
2021 NFPA 24
GPS COORDINATES: 36.59716, -110.79115
16' - 0" 150' - 6"
34 sec
158' - 1"
36 sec 47' - 3"
11 sec
LEGEND
OCCUPANCY @ EXIT
EGRESS START (OR OPTION)
EGRESS PATH
EGRESS DIRECTION
EGRESS DISTANCE &
TRAVEL TIME
1/2 HOUR RATED WALL
R
VI
H
P
S
N I
D
C E
I
A
A N
HE TL H
S
E
E
H
N M
E
A R
P
T O
F T
C D
SU
S
A
E
TAE L &H
N V
I S
E R
U M
A H
A
B
C
D
1 2 3 4 5
1 2 3 4 5
Sheet Number:
Sheet Title:
Checked By:
Drawn By:
Scale:
Project No:
Issue Date:
Consultants:
JOHNSON SMITTHIPONG &
ROSAMOND ASSOCIATES, INC.
5210 E Williams Cir Ste 600 Tucson, AZ 85711
(520) 547-7904 www.jsra.com
U. S.
DEPARTMENT OF
HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
NAVAJO AREA OFFICE
THIS DOCUMENT IS
NOT TO BE USED FOR
REGULATORY
APPROVAL, PERMIT, OR
CONSTRUCTION
Vernon Rosamond Arizona Lic #: 9793 Date:
ISSUED FOR INTERIM REVIEW
/1
/2
:3 :5
P
M
A u to d e s k D o c s /2
-3
I H
S i H o u s e
A p t v
/2
-3
A rc h i H o u s e
A p t
.r v t
As indicated
G101
CODE SHEET
HARGREAVES
KADDOURA
23-390
8/13/24
PHASE IV (Final CD) iHOUSE APARTMENT
Tonalea, AZ 86044
8/13/24
1/16" = 1'-0"A1 CODE FLOOR PLAN 1/4" = 1'-0"
Code Legend
Applicable Codes and Standards:
2021 IBC -International Building Code 2017 National Electrical Code (NEC) 2021 IMC - International Mechanical Code 2021 IPC - International Plumbing Code 2021 IFC - International Fire Code 2021 IECC - International Energy Conservation Code
2021 NFPA 101
Chapter 30 Apartments 2010 Standards for Architectural Barriers Act
In addition to the above codes, the contractor is responsible for constructing the project so as to comply with all applicable referenced standards, including but not limited to:
NFPA (National Fire Protection Association) Codes:
10 - Standard for Portable Fire Extinguishers 13 – Sprinklers for Commercial Buildings 24 - Installation of Private Fire Service Mains and their Appurtenance 1142 - Standard on water Supplies for Suburban and Rural Fire Fighting Navajo Tribal Utility Authority (NTUA) Standard Details Navajo Nation EPA Regulations Navajo Nation Clean Water Act Navajo Nation Domestic Wastewater Regulations Navajo Nation Safe Drinking Water Act Navajo Nation Primary Drinking Water Regulation
1. Administration :
1. Multi-Family, Transient: IBC applies to the apartment building.
2. All construction is new
II. Definitions:
A. APARTMENT: NFPA Defines any building with three or more dwelling units as an apartment.
B. DWELLING UNIT: A single unit providing complete independent living facilities for one or more persons.
C. HABITABLE SPACE. A space in a building for living, sleeping, eating or cooking.
Bathrooms, toilet rooms, closets, halls, storage or utility spaces and similar areas are not considered habitable spaces.
III. Occupancy Class A. Apartment = IBC, R-2
IV. IBC Area & Construction Type A. Construction Type VB B. Area Limit per Sprinklered VB = R-2: 28,000sf C. 19 Apartment Units = 18,250sf (R-2)
V. Exterior Walls:
A. IBC – Table 602, Type VB construction, No fire resistance requirements when greater than 10’
VI. Light, Ventilation and Heating:
A. IBC 1204.2: Habitable rooms shall have a glazing area not less than 8% of the floor area.
VII. Minimum Room Areas:
A. IBC – 1207 Habitable space (other than kitchen) shall not be less than 7’ in any plan dimension.
VIII. Ceiling Height:
A. IBC 1207.2 Habitable spaces and corridors shall have a ceiling height of not less than 7 feet 6 inches above the finish floor. Bathrooms, toilet rooms, kitchens, storage rooms and laundry rooms shall have a ceiling height not less than 7 feet above finished floor. Exception: Sloping Ceilings
IX. Sanitation:
A. IBC – 1209.2.3 Shower and bathtubs with showers shall be finished with a nonabsorbent surface extending to a height of 6 feet above the drain inlet.
X. Glazing:
A. IBC – 2406 Individual glazed area, including glass mirrors, in hazardous locations shall comply with the IBC per table 2406.2 B. Hazardous locations include glazing in doors. Glazing adjacent to doors (lowest edge
24” AFF). Windows with lowest part of glazing less than 18” AFF.
XI. Emergency Escape and Rescue Openings:
A. NFPA 24.2.2.1 – Dwelling Units of 2 or more rooms, every sleeping room shall have one primary means of escape and a secondary means of escape.
1. Secondary Means of escape shall be an outside window or door not less than 5.7sf Clear height -24" Clear width 20". Sill height of not more than 44 inches AFF. Window shall be within 20ft of grade.
B. NFPA 30.2.1.2 – Apartment means of escape shall comply with Section 24.2.
C. IBC - 1030 Basements and every sleeping room shall have at least one operable emergency escape and rescue opening. Minimum Dimensions: Clear opening -5.7 s.f. Clear height -24" Clear width 20". Sill height of not more than 44 inches.
XII. Means of Egress:
1. IBC 1004 Occupant Load factor is 200 gross (2 Bedroom is largest unit at 830sf = 5) All
Units only require one means of egress.
2. IBC 1010.1 Means of Egress doors shall be clear width of 32”. Measurement shall be from door face to door stop when door is 90 degrees open.
3. IBC 1020.1 Corridors serving more than 10 occupants shall have a 30 minute rating if fully sprinklered.
4. IBC 1020.2 Hallways (Corridors) within the dwelling unit shall not be less than 36” clear.
XIII. Smoke Alarms A. NFPA 24.3.4.1 & 30.3.4.5, IBC 907.2.10.2 Smoke alarms shall be installed in each sleeping room, outside each sleeping area, and on each additional story.
B. NFPA 24.3.4.2 – Carbon Monoxide alarms or detectors shall be provided with dwelling units that have an attached garage.
XIV. insulation & Foam Plastic IBC 2603:
A. All foam plastic shall have a name spread index of not more than 75 and shall have a smoke-developed Index of not more than 450 when tested by ASTM E 84.
B. Foam plastic shall be separated from the interior of a building by an approved thermal barrier of minimum ½ inch gypsum wallboard or an approved thermal barrier material.
C. IBC 2603.4.1.7 Foam Filled Exterior doors in R2 are not required to have a fire protection rating
XV. Flame Spread and Smoke Density:
A. IBC 803.1.2 (Class C) Wall and ceiling finishes shall have a flame spread classification of not greater than 200 nor a smoke-developed index greater than 460 as tested by
ASTME84.
XVI. Dwelling Unit Separation:
A. NFPA 30.3.7.2 – Buildings protected by an approved automatic sprinkler system, each dwelling unit shall be separated by ½ hour fire resistive rating.
B. IBC 420.2 Walls separating Dwelling units shall constructed as fire partitions per 708.
C. IBC 708.3 Walls shall be 1hour unless Type VB construction with automatic sprinkler system shall be not less than ½ hour.
XVII. Moisture decay & Termites: N/A
XVIII. Accessibility:
A. IBC Chapter 11 refers to ICC A117.1. Accessible Units shall comply with the technical section of the 2010 ABA & ICC A117.1
XIX. Energy Efficiency IECC Chapter 4:
A. Climate zone: 5 B. Insulation and fenestration requirements by component (Table C402.4)
1. Fenestration U-factor. 0.30
2. Skylight U-factor: 0.55
3. Glazing SHGC: No Requirement
4. Roof R-Value: R30ci
5. Wood frame wall R-value: 20+3.8ci - or- 13+7.5ci
6. Slab R-value and depth: R20, 2ft
C. The building thermal envelope shall be durably sealed to limit infiltration. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. The following shall be caulked, gasketed, weather-stripped or otherwise sealed with an air barrier material, suitable film or solid material.
1. All joints, seams and penetrations.
2. Site-built windows, doors and skylights.
3. Openings between window and door assemblies and their respective jambs and framing.
4. Utility penetrations.
5. Dropped ceilings or chases adjacent to the thermal envelope.
6. Knee walls.
7. Walls and ceilings separating the garage from conditioned spaces.
8. Behind tubs and showers on exterior walls.
9. Common walls between dwelling units.
10. Other sources of infiltration.
D. Refer to mechanical, plumbing, and electrical drawings for systems compliance.
XX. Additional Requirements:
A. Refer to structural, mechanical, plumbing, and electrical drawings for discipline specific code requirements and compliance.
iHOUSE APARTMENT
PROJECT
INDIAN ROUTE 6290,
TONALEA, AZ 86044
E
H
N M
E
AR
P
T
OF
T
C D
SU
S
A
E
TAE L &H
N
VI
SER
UMA
H
RVI
HP
S
NI
D
91 55
CE
I
A
AN
HE TL H SE
A
B
C
D
1 2 3 4 5
1 2 3 4 5
Sheet Number:
Sheet Title:
Checked By:
Drawn By:
Scale:
Project No:
Issue Date:
SC
GSS
AS SHOWN
23-390
08/13/2024
No. Date Description
PHASE IV (FINAL CD)
Consultants:
JOHNSON SMITTHIPONG &
ROSAMOND ASSOCIATES, INC.
5210 E Williams Cir Ste 600 Tucson, AZ 85711
(520) 547-7904 www.jsrarchinc.com
U. S.
DEPARTMENT OF
HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
NAVAJO AREA OFFICE
480-753-0800
4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008
WWW.DOWL.COM
C001
NOTES SHEET
GENERAL NOTES
1. ALL CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF THE MARICOPA ASSOCIATION OF GOVERNMENTS' (MAG)
UNIFORM STANDARD SPECIFICATIONS AND DETAILS FOR PUBLIC WORKS CONSTRUCTION (MAG STANDARDS) AND THE NAVAJO TRIBAL UTILITY AUTHORITY (NTUA) TECHNICAL SPECIFICATIONS AND DETAILS UNLESS OTHERWISE NOTED.
2. THE OWNER, UTILITY AGENCY AND JURISDICTION HAVING AUTHORITY, AS APPLICABLE, SHALL BE NOTIFIED 24-HOURS PRIOR TO ANY CONSTRUCTION WORK. ANY WORK CONCEALED WITHOUT INSPECTION SHALL BE SUBJECT TO REMOVAL
AND REPLACEMENT AT THE CONTRACTOR'S/DEVELOPER'S EXPENSE.
3. AN APPROVED SET OF PLANS MUST BE AVAILABLE ON THE JOB SITE AT ALL TIMES. THE CONTRACTOR'S REPRESENTATIVE (CAPABLE OF COMMUNICATING WITH TRIBAL REPRESENTATIVES) SHALL BE ON THE JOB AT ALL TIMES THE WORK IS BEING
PURSUED.
4. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE EMERGENCY TELEPHONE NUMBERS TO THE NAVAJO TRIBE AND HAVE PERSONNEL AVAILABLE 24-HOURS A DAY TO RESPOND TO EMERGENCIES. IF TRIBAL AGENCIES ARE REQUIRED TO
RESPOND AND MAKE EMERGENCY REPAIRS ON BEHALF OF THE CONTRACTOR/DEVELOPER, THE
CONTRACTOR/DEVELOPER IS RESPONSIBLE TO REIMBURSE THE TRIBE FOR ALL COSTS INCURRED.
5. IT SHALL BE THE RESPONSIBILITY OF THE PERMITTEE TO ARRANGE FOR THE RELOCATION AND RELOCATION COSTS OF
ALL UTILITIES AND SUBMIT A UTILITY RELOCATION SCHEDULE.
6. THE PROCEDURES AND METHODS USED TO SAMPLE, TEST MATERIALS, AND REPORT TEST RESULTS WILL BE APPROVED BY TRIBAL AGENCIES. FOR ALL PHASES OF CONSTRUCTION, THE TYPE, SCHEDULING, FREQUENCY AND LOCATION OF ALL MATERIALS TESTING AND SAMPLING SHALL BY TRIBAL AGENCIES. ALL TEST RESULTS SHALL BE REPORTED DIRECTLY (IN WRITING) TO THE TRIBAL AGENCIES. FOR EACH PHASE OF CONSTRUCTION, TEST RESULTS (IN WRITING) MUST BE RECEIVED FROM THE TESTING LABORATORY, PRIOR TO START OF THE NEXT PHASE OF CONSTRUCTION.
7. THE CONTRACTOR MUST GIVE A LOCATION FOR WASTING EXCESS EXCAVATION MATERIALS AND A LETTER FROM THE
OWNER GIVING PERMISSION FOR DUMPING PRIOR TO STARTING ON-SITE CONSTRUCTION.
8. THE LOCATION OF UTILITIES SHOWN IS BASED ON INFORMATION AVAILABLE AT THE TIME OF DESIGN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY THE PRESENCE AND LOCATION OF ALL EXISTING OVERHEAD AND/OR UNDERGROUND UTILITIES THAT MAY INTERFERE WITH THIS CONSTRUCTION, WHETHER OR NOT SAID UTILITIES ARE SHOWN ON THE CONSTRUCTION PLANS FOR THIS PROJECT AND TO ADEQUATELY PROTECT AND
MAINTAIN ANY SUCH UTILITIES.
9. THE CONTRACTOR SHALL CONTACT BLUE STAKE (602) 263-1100 PRIOR TO CONSTRUCTION. IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO MAINTAIN CURRENT BLUE STAKE MARKINGS THROUGHOUT CONSTRUCTION.
10. THE CONTRACTOR MAY OBTAIN CONSTRUCTION WATER FROM THE LOAD OUT FACILITY LOCATED IN PEACH SPRINGS.
COORDINATE WITH TRIBAL PUBLIC SERVICES ON OPERATIONS AND PAYMENT.
11. CONTRACTOR IS RESPONSIBLE TO CONSTRUCT STABILIZED CONSTRUCTION ENTRANCES IN ORDER TO REDUCE OR
ELIMINATE THE TRACKING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAYS OR STREETS.
12. ALL DRAINAGE PROTECTIVE DEVICES SUCH AS SWALES, INTERCEPTION DITCHES, PIPES PROTECTIVE BERMS, CONCRETE CHANNELS OR OTHER MEASURES DESIGNED TO PROTECT IMPROVEMENTS, WHETHER EXISTING OR PROPOSED, FROM RUNOFF OR DAMAGE FROM STORM WATER, MUST BE CONSTRUCTED PRIOR TO THE CONSTRUCTION OF ANY
IMPROVEMENTS.
13. ANY AND ALL OBSTRUCTIONS WITHIN THE RIGHTS-OF-WAY AND EASEMENTS SHALL BE REMOVED BEFORE ANY
CONSTRUCTION IS COMMENCED.
14. ALL CONTRACTORS ARE RESPONSIBLE TO OBTAIN A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH FEDERAL AND STATE REGULATIONS, INCLUDING NOTICE OF INTENT (NOI), NOTICE OF TERMINATION, AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP), IF REQUIRED. A COPY OF THE NOI AND SWPPP SHALL BE AVAILABLE ON THE JOB SITE AT ALL TIMES IF REQUIRED. ALL SWPPP PLANS MUST INCLUDE THE NOI TRACKING NUMBER ADMINISTERED BY ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY (ADEQ) ON THE BOTTOM RIGHT HAND
CORNER OF THE SHEET, IF REQUIRED.
15. CONTRACTOR IS RESPONSIBLE TO OBTAIN THE NECESSARY 401 AND 404 PERMITS, IF REQUIRED.
16. CONTRACTOR SHALL OBTAIN ANY AND ALL PERMITS AS REQUIRED BY OTHER AGENCIES WHICH HAVE JURISDICTION AT
THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF THESE PERMITS AS SET FORTH
THEREIN.
17. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL JOB SITE SAFETY, INCLUDING BUT NOT LIMITED TO MEETING ALL
REQUIREMENTS OF OSHA AND ADOSH.
18. CONSTRUCTION WORK HOURS SHALL BE AS 6:00 AM TO 7:00 PM UNLESS OTHERWISE APPROVED BY TRIBAL
REPRESENTATIVES.
1. PROJECT APPROVAL BY THE NAVAJO TRIBE FOR COMPLIANCE WITH TRIBAL REQUIREMENTS SHALL NOT PREVENT THE TRIBAL REPRESENTATIVES FROM REQUIRING CORRECTION OF ERRORS FOUND TO BE IN VIOLATION OF ANY LAW, ORDINANCE, OR REQUIREMENTS FOR UTILITY CONSTRUCTION.
2. PROPER NOTIFICATION MUST BE MADE TO ALL AFFECTED RESIDENTS. THIS INCLUDES NOTIFICATION/INFORMATION SIGNS AND HANGING OF DOOR NOTICES. DOOR NOTICES SHALL BE DISTRIBUTED PRIOR TO BLUE-STAKING AND COMMENCING
NON-EMERGENCY WORK.
3. ALL WORK REQUIRING ASPHALT REPLACEMENT, CONCRETE REPLACEMENT OR RESURFACING WILL REQUIRE A FINAL INSPECTION WITH THE UTILITY COMPANY REPRESENTATIVE AT THE TIME OF COMPLETION. TEMPORARY PAVEMENT REPLACEMENT THAT USES COLD-MIX ASPHALT SHALL BE REPLACED NO LATER THAN 7-BUSINESS DAYS AFTER INITIAL
PLACEMENT. THIS ALSO INCLUDES PAVEMENT MARKINGS.
4. ALL POTHOLES FOR EXISTING UTILITY CROSSINGS OR SOIL BORINGS FOR FUTURE UTILITIES WILL BE REPAIRED WITH A
FULL DEPTH T-TOP PER MAG STANDARD DETAIL 212.
5. ALL TRENCHES IN EXISTING AND FUTURE PAVEMENT OR WITHIN 2 FEET OF BACK OF CURB ARE REQUIRED TO BE BACKFILLED AND WILL REQUIRE ABC COMPACTED TO 95% OR ½ SACK SLURRY CONTROLLED LOW-STRENGTH MATERIAL
PER MAG SECTIONS 604 AND 728.
6. ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY SHALL BE REPORTED TO THE TRIBAL PUBLIC WORKS AND THE PROPERTY OWNER. REPAIR AND/OR REPLACEMENT, IN KIND, SHALL BE COORDINATED WITH THE PROPERTY OWNER AND/OR TRIBAL
AUTHORITIES.
7. THE JOBSITE SHALL BE CLEANED OF ANY DEBRIS OR SPOILS RESULTING FROM THIS PROJECT AT THE COMPLETION OF THE
PROJECT.
8. THE UTILITY PROVIDER IS RESPONSIBLE FOR OBTAINING A NATION POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH FEDERAL AND STATE REGULATIONS, INCLUDING NOTICE OF INTENT (NOI), NOTICE OF TERMINATION (NOT), AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS NECESSARY.
1. THE JHA WILL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES OR FOR SAFETY PRECAUTIONS OR PROGRAMS UTILIZED IN CONNECTION WITH THE WORK. THIS IS THE CONTRACTOR'S SOLE RESPONSIBILITY. THE COR WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE WORK
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR OTHER EQUIPMENT OF MUD PRIOR TO ENTERING PUBLIC STREETS. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS, ALLAY DUST, AND TO TAKE WHATEVER MEASURES ARE NECESSARY TO ENSURE THAT ALL ROADWAYS AND ON-SITE PARKING LOTS/FIRE
LANES ARE MAINTAINED IN A CLEAN, MUD AND DUST-FREE CONDITION AT ALL TIMES.
3. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE UNDERGROUND UTILITY LOCATIONS AND/OR ELEVATIONS AS SHOWN ON THESE PLANS ARE BASED ON THE BEST INFORMATION AVAILABLE FROM UTILITY RECORDS AND OTHER DATA AS SUPPLIED TO THE OWNER AND JHA. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.
THERE MAY BE OTHER UNDERGROUND UTILITY LINES, SERVICE LINES, AND STRUCTURES PRESENT IN THE SUBJECT AREA.
THE CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST FORTY-EIGHT (48) HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IF EXISTING UTILITIES ARE FOUND TO CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE COR PRIOR TO PROCEEDING WITH WORK.
4. THE APPROPRIATE TRIBAL REPRESENTATIVES MUST APPROVE, PRIOR TO CONSTRUCTION, ANY ALTERATION OR VARIANCE FROM THESE PLANS. ANY PROPOSED VARIATIONS SHALL BE SHOWN ON CONSTRUCTION FIELD PRINTS AND TRANSMITTED
TO THE TRIBE FOR REVIEW.
5. ANY INSPECTION BY THE OWNER OR JHA SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR FROM ANY OBLIGATION TO PERFORM THE WORK IN STRICT COMPLIANCE WITH THE APPLICABLE CODES AND COMMUNITY REQUIREMENTS.
6. SHOULD THE CONTRACTOR ENCOUNTER AN EXISTING STRUCTURE (ABOVE OR BELOW GROUND) IN THE WORK FOR WHICH DISPOSITION IS NOT INDICATED ON THE PLANS, THE JHA AND TRIBAL REPRESENTATIVE SHALL BE NOTIFIED PRIOR TO DISTURBING SUCH STRUCTURE. THE DISPOSITION OF EXISTING STRUCTURES SO ENCOUNTERED SHALL BE DETERMINED
BY THE COR AND TRIBAL REPRESENTATIVE.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL CONSTRUCTION DEBRIS FROM THE SITE AND DISPOSING OF THE DEBRIS IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, AND LAWS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND PROPER DISPOSAL.
8. THE CONTRACTOR SHALL NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR OMISSION ON THE PLANS OR SPECIFICATIONS. IN THE EVENT THE CONTRACTOR DISCOVERS ANY APPARENT ERROR OR DISCREPANCY, HE SHALL IMMEDIATELY CALL UPON TRIBAL REPRESENTATIVES FOR HIS INTERPRETATION AND DECISION, AND SUCH DECISION SHALL
BE FINAL.
9. EXISTING SITE IMPROVEMENTS WHICH ARE DAMAGED OR DISPLACED BY THE CONTRACTOR'S OPERATIONS SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER, WHO SHALL APPROVE REPAIRS PRIOR TO CONSTRUCTION. THE OWNER MAY WITHHOLD FINAL
PAYMENT UNTIL REPAIRS ARE INSPECTED AND APPROVED.
10. THE CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS AND BENCHMARKS PRIOR TO COMMENCING WORK. THE
CONTRACTOR SHALL ALSO FIELD VERIFY LOCATION, ELEVATION, AND/OR SIZE OF EXISTING PIPE INVERTS, FLOOR ELEVATIONS, AND CURB OR PAVEMENT AT LOCATIONS WHERE MATCHING INTO EXISTING WORK. THE CONTRACTOR SHALL FIELD VERIFY HORIZONTAL CONTROL BY REFERENCING SHOWN DIMENSIONS OR COORDINATES TO KNOWN PROPERTY LINES AND NOTIFY THE JHA OF DISCREPANCIES IN EITHER VERTICAL OR HORIZONTAL CONTROL PRIOR TO PROCEEDING
WITH WORK.
11. PROPERTY CORNERS AND BENCHMARKS SHALL BE CAREFULLY PROTECTED. PROPERTY MONUMENTS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE AND AT NO ADDITIONAL COST TO THE
OWNER.
12. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE REDLINED MARK-UPS OF AS-BUILT CONDITIONS
TO THE JHA IN HARD COPY OR ELECTRONIC FORMATS.
STREET CONSTRUCTION NOTES
1. THE DENSITY REQUIRED WHEN TESTED AND DETERMINED BY AASHTO T99 METHOD "C", T167, T138, AND ASTM D2950 SHALL
MEET MAG SECTION 601, TABLE 601-2.
2. ALL BACKFILL, PAVEMENT AND SURFACE REPLACEMENT SHALL MEET THE REQUIREMENTS OF MAG STANDARD DETAIL
200-1 AND MAG SECTION 336. ALL TRENCHES SHALL MEET OSHA REQUIREMENTS.
3. ROADWAY EXCAVATION SHALL MEET THE REQUIREMENTS OF MAG STANDARD 205 MAG STANDARD 301 FOR SUBGRADE
PREPARATION.
4. CONTRACTOR SHALL REPLACE ANY INADEQUATE SUBGRADE MATERIAL WITH APPROPRIATE BACKFILL AS DIRECTED BY
THE COR.
5. AGGREGATE BASE SHALL MEET THE REQUIREMENTS OF MAG SECTION 310 AND SECTION 702, TABLE 702-1.
6. ALL ASPHALT CONCRETE PAVEMENT SHALL MEET THE REQUIREMENTS OF MAG SECTION 321, ASPHALT TO BE GRADE
PG-70-10, AND MAX AGGREGATE SIZE SHALL BE 3/4". PRIOR TO THE ASPHALT PAVING BEING PLACED, THE CONTRACTOR SHALL SUBMIT THE MIX DESIGN INCLUDING THE MARSHALL DENSITY THAT WILL BE USED FOR THE PROJECT. AT THE BEGINNING OF THE FIRST DAY'S PAVING, THE CONTRACTOR SHALL SAMPLE THE ASPHALT MIX FROM THE ROADWAY, SUBMIT TO A CERTIFIED MATERIALS LABORATORY FOR DETERMINATION OF THE ASPHALT CONTENT, GRADATION, AND MARSHALL DENSITY. ALL ASSOCIATED COSTS TO BE THE RESPONSIBILITY OF THE CONTRACTOR.
7. CONCRETE CURB AND GUTTER SHALL MEET THE REQUIREMENTS OF MAG STANDARD DETAIL 220 TYPE A AND AS
SPECIFIED HEREIN.
8. ALL POURED CONCRETE STRUCTURES SHALL MEET THE REQUIREMENTS OF MAG SECTION 505.
9. STREET SIGNING SHALL BE AS PER MOHAVE COUNTY STANDARD DETAILS 131-1,2. SEPARATE POSTS SHALL BE PROVIDED
FOR STREET AND STOP SIGNS.
10. PAVING CONSTRUCTION SHALL NOT START UNTIL ALL UTILITY WORK UNDER THE PROPOSED PAVED AREAS IS COMPLETED.
11. BASE COURSE SHALL NOT BE PLACED UNTIL SUBGRADE HAS BEEN APPROVED BY THE COR.
12. WORK ON THIS PROJECT WILL NOT BE CONSIDERED COMPLETED UNTIL ALL CURBS, SIDEWALKS AND PAVEMENTS HAVE
BEEN SWEPT CLEAN OF ALL AND DEBRIS AND ACCEPTED BY THE OWNER.
13. THE LOCATION OF ALL WATER VALVES, FIRE HYDRANTS AND SEWER MANHOLES SHALL BE REFERENCED DURING
CONSTRUCTION BY THE CONTRACTOR AT ALL TIMES AND ACCESSIBILITY MADE AVAILABLE TO THE LOCAL FIRE DEPT.
14. ALL UTILITY FACILITIES IN CONFLICT WITH THIS PROJECT SHALL BE RELOCATED AS REQUIRED BY THE CONTRACTOR. ALL
ACTIVITY SHALL BE COORDINATED WITH THE UTILITY COMPANIES AND DONE UNDER THEIR SUPERVISION AT NO EXTRA
COST TO THE OWNER.
15. EXISTING STREET AND TRAFFIC CONTROL SIGNS SHALL BE MAINTAINED DURING CONSTRUCTION AND BE RELOCATED BY
THE CONTRACTOR AS DIRECTED BY THE NAVAJO PUBLIC SERVICES DIRECTOR.
UTILITY CONSTRUCTION NOTES
JURISDICTION HAVING AUTHORITY (JHA) GENERAL NOTES
STORMWATER POLLUTION PREVENTION PLAN
1. THE CONTRACTOR IS REQUIRED TO DEVELOP, IMPLEMENT, AND MAINTAIN A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS AND NAVAJO NATION ENVIRONMENTAL PROTECTION AGENCY (NNEPA), SPECIFICALLY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION GENERAL PERMIT (CGP) REQUIREMENTS. THE PURPOSE OF THE SWPPP IS TO PREVENT STORMWATER POLLUTION AND MINIMIZE SEDIMENT RUNOFF INTO ADJACENT WATER BODIES AND THE
SURROUNDING ENVIRONMENT DURING ALL PHASES OF CONSTRUCTION.
2. REGULATORY COMPLIANCE - THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE SWPPP COMPLIES WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS, INCLUDING OBTAINING ANY NECESSARY PERMITS. FAILURE TO COMPLY WITH SWPPP REQUIREMENTS OR REGULATORY OBLIGATIONS MAY RESULT IN LEGAL PENALTIES, INCLUDING FINES, AND IS
SUBJECT TO ENFORCEMENT ACTION BY THE EPA OR OTHER REGULATORY AGENCIES.
3. ENGINEER'S REVIEW AND APPROVAL - THE SWPPP MUST BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE START OF CONSTRUCTION. NO CONSTRUCTION ACTIVITIES SHALL COMMENCE UNTIL THE SWPPP HAS BEEN APPROVED. THE CONTRACTOR IS RESPONSIBLE FOR ANY REVISIONS OR UPDATES TO THE SWPPP AS CONSTRUCTION
PROGRESSES AND SITE CONDITIONS CHANGE.
4. PLAN DEVELOPMENT - THE CONTRACTOR SHALL PREPARE A COMPREHENSIVE SWPPP BEFORE THE COMMENCEMENT OF
ANY CONSTRUCTION ACTIVITIES. THE SWPPP MUST INCLUDE, BUT IS NOT LIMITED TO:
A. SITE DESCRIPTION: INCLUDE A DESCRIPTION OF THE CONSTRUCTION ACTIVITIES, SITE LOCATION, TOPOGRAPHY, SOIL
TYPES, AND EXISTING DRAINAGE PATTERNS.
B. POLLUTION PREVENTION PRACTICES: DETAIL THE BEST MANAGEMENT PRACTICES (BMPS) TO CONTROL SEDIMENT, EROSION, AND POLLUTANTS AT THE SITE. BMPS MUST COVER ALL PHASES OF CONSTRUCTION AND INCLUDE
STRUCTURAL, VEGETATIVE, AND PROCEDURAL MEASURES.
C. SITE MAP: PROVIDE A DETAILED SITE MAP SHOWING LOCATIONS OF ALL STORMWATER CONTROLS, BMPS, STORMWATER OUTFALLS, AND POTENTIAL POLLUTION SOURCES.
D. INSPECTION AND MAINTENANCE: OUTLINE PROCEDURES FOR REGULAR INSPECTION, MAINTENANCE, AND REPAIR OF
BMPS, INCLUDING AFTER RAIN EVENTS.
E. PERSONNEL TRAINING: DESCRIBE TRAINING PROCEDURES FOR PERSONNEL RESPONSIBLE FOR SWPPP
IMPLEMENTATION AND MAINTENANCE.
F. RECORD KEEPING: MAINTAIN RECORDS OF ALL INSPECTIONS, MAINTENANCE, AND CORRECTIVE ACTIONS TAKEN TO
ENSURE COMPLIANCE WITH THE SWPPP.
5. BEST MANAGEMENT PRACTICES (BMPS) - THE CONTRACTOR IS REQUIRED TO IMPLEMENT THE FOLLOWING BMPS AT A
MINIMUM:
A. EROSION CONTROL MEASURES:
· SILT FENCES, STRAW WATTLES, AND SEDIMENT TRAPS SHOULD BE INSTALLED AROUND THE PERIMETER OF THE
CONSTRUCTION SITE AND AT SENSITIVE AREAS.
· STABILIZE EXPOSED SOIL AREAS WITH TEMPORARY OR PERMANENT VEGETATION, MULCHING, GEOTEXTILES, OR
EROSION CONTROL BLANKETS.
B. SEDIMENT CONTROL MEASURES:
· USE SEDIMENT BASINS, CHECK DAMS, OR SEDIMENT TRAPS TO CAPTURE RUNOFF AND SETTLE OUT SEDIMENT
BEFORE WATER EXITS THE SITE.
· INSTALL INLET PROTECTION MEASURES ON STORM DRAIN INLETS WITHIN AND ADJACENT TO THE SITE.
C. RUNOFF MANAGEMENT:
· DIVERSION CHANNELS, BERMS, AND OTHER STRUCTURES SHOULD BE CONSTRUCTED TO REDIRECT STORMWATER
AWAY FROM DISTURBED AREAS.
· IMPLEMENT TEMPORARY AND PERMANENT SEEDING, PLANTING, OR SODDING TO REDUCE THE VELOCITY OF
STORMWATER RUNOFF.
D. POLLUTION PREVENTION:
· STORE CHEMICALS, FUELS, AND OTHER HAZARDOUS MATERIALS IN DESIGNATED AREAS WITH SECONDARY
CONTAINMENT TO PREVENT SPILLS.
· ENSURE THAT CONSTRUCTION DEBRIS, WASTE MATERIALS, AND OTHER POLLUTANTS ARE PROPERLY DISPOSED OF
AND DO NOT ENTER STORMWATER RUNOFF.
6. COMPLIANCE AND MONITORING
A. INSPECTIONS: THE CONTRACTOR MUST CONDUCT REGULAR SITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS AND
WITHIN 24 HOURS AFTER A STORM EVENT THAT PRODUCES 0.5 INCHES OR MORE OF RAINFALL. INSPECTIONS MUST FOCUS ON THE EFFECTIVENESS OF THE BMPS AND IDENTIFY ANY DEFICIENCIES OR AREAS WHERE ADDITIONAL
MEASURES ARE NECESSARY.
B. CORRECTIVE ACTIONS: ANY DEFICIENCIES NOTED DURING INSPECTIONS MUST BE ADDRESSED IMMEDIATELY, AND
CORRECTIVE ACTIONS MUST BE DOCUMENTED IN THE SWPPP RECORDS.
C. REPORTING: THE CONTRACTOR SHALL SUBMIT INSPECTION REPORTS, RECORDS OF CORRECTIVE ACTIONS, AND ANY OTHER REQUIRED DOCUMENTATION TO THE ENGINEER FOR REVIEW. NON-COMPLIANCE WITH SWPPP REQUIREMENTS
MAY RESULT IN WORK STOPPAGE AND ENFORCEMENT ACTIONS.
8. FINAL PROJECT DOCUMENTATION - UPON COMPLETION OF THE CONSTRUCTION PROJECT, THE CONTRACTOR SHALL SUBMIT A FINAL REPORT DETAILING THE IMPLEMENTATION AND EFFECTIVENESS OF THE SWPPP, INCLUDING A SUMMARY OF INSPECTIONS, MAINTENANCE ACTIVITIES, AND ANY ISSUES ENCOUNTERED. THIS REPORT WILL BE PART OF THE
PROJECT'S FINAL DOCUMENTATION.
iHOUSE APARTMENT
PROJECT
INDIAN ROUTE 6290,
TONALEA, AZ 86044
E
H
N M
E
AR
P
T
OF
T
C D
SU
S
A
E
TAE L &H
N
VI
SER
UMA
H
RVI
HP
S
NI
D
91 55
CE
I
A
AN
HE TL H SE
A
B
C
D
1 2 3 4 5
1 2 3 4 5
Sheet Number:
Sheet Title:
Checked By:
Drawn By:
Scale:
Project No:
Issue Date:
SC
GSS
AS SHOWN
23-390
08/13/2024
No. Date Description
PHASE IV (FINAL CD)
Consultants:
JOHNSON SMITTHIPONG &
ROSAMOND ASSOCIATES, INC.
5210 E Williams Cir Ste 600 Tucson, AZ 85711
(520) 547-7904 www.jsrarchinc.com
U. S.
DEPARTMENT OF
HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
NAVAJO AREA OFFICE
480-753-0800
4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008
WWW.DOWL.COM
C002
UTILITY
NOTES SHEET
1. SANITARY SEWER SERVICE LATERAL CONSTRUCTION SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE LATEST STANDARDS, SPECIFICATIONS, AND DETAILS OF NTUA STANDARDS.
2. EXISTING UTILITIES ARE SHOWN BASED UPON THE BEST AVAILABLE INFORMATION AVAILABLE.
CONTRACTOR TO VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO
COMMENCING CONSTRUCTION.
3. ALL SANITARY SEWER SERVICE LATERAL MATERIAL AND MINIMUM COVER SHALL BE PER NTUA STANDARDS UNLESS OTHERWISE NOTED. ALL SANITARY SEWER LINES SHALL BE SDR-35 PVC IN
CONFORMANCE WITH ASTM D3034.
4. NO WATER PIPE SHALL PASS THROUGH OR COME INTO CONTACT WITH ANY PART OF A SEWER MANHOLE. THE MINIMUM HORIZONTAL SEPARATION BETWEEN WATER MAINS AND MANHOLES SHALL BE TEN FEET (10'), MEASURED FROM THE OUTSIDE OF THE WATER MAIN PIPE TO CENTER OF THE
MANHOLE.
5. ALL FILL MATERIAL IS TO BE PLACED AND COMPACTED PRIOR TO THE INSTALLATION OF PROPOSED
UTILITIES.
6. THE CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES 72 HOURS PRIOR TO CONNECTING TO
ANY EXISTING LINE.
7. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER MAINS, SANITARY SEWER, STORM DRAINS, AND GAS LINES (EXISTING AND PROPOSED), THE SANITARY SEWER SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING. THE WATER MAIN SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 24” CLEARANCE MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50).
8. ALL CONCRETE FOR ENCASEMENTS SHALL BE CLASS A AND HAVE A MINIMUM 28-DAY COMPRESSION
STRENGTH A 3,000 PSI.
9. THE FRAME AND GRATE ELEVATIONS OF EXISTING STRUCTURES SUCH AS, BUT NOT LIMITED TO, MANHOLES, VAULTS, AND ELECTRICAL BOXES, SHALL BE ADJUSTED AS NECESSARY TO BE FLUSH
WITH PROPOSED PAVEMENT OR FINISHED GRADE ELEVATION.
10. THE CONTRACTOR SHALL INSTALL CONTINUOUS TRACER WIRE FOR NON-METAL PIPE PER NTUA
STANDARDS.
11. THE CONTRACTOR SHALL PREPARE TRENCH BEDDING AND PROVIDE BACKFILL IN ACCORDANCE WITH
NTUA STANDARDS AND THE GEOTECHNICAL REPORT.
12. ELECTRICAL, COMMUNICATION, AND GAS UTILITY LINES SHOWN ON THE PLANS ARE FOR REFERENCE ONLY. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION REQUIREMENTS WITH
THE APPROPRIATE ENTITY FOR THESE UTILITY LINES. THE CONTRACTOR SHALL NOTIFY THE
ENGINEER OF ANY POTENTIAL CONFLICT THAT MAY ARISE WITH THE INSTALLATION OF THESE UTILITY
LINES.
13. "NTUA WATER AND WASTEWATER SPECIFICATIONS" REFERS TO NTUA TECHNICAL SPECIFICATIONS
FOR MATERIALS AND WORKMANSHIP FOR WATER AND WASTE WATER FACILITIES (2008).
14. WATER AND WASTEWATER SEPARATION REQUIREMENTS SHALL MEET THE REQUIREMENTS OF NTUA
WATER AND WASTEWATER SPECIFICATIONS TP 2.0 “WATER AND WASTEWATER LINE SEPARATION
REQUIREMENTS”. WHEN THE DUCTILE IRON WASTEWATER LINE IS INSTALLED, IT SHALL BE
POLYETHYLENE ENCASED AS REQUIRED BY TP 2.0 AND THE GEOTECHNICAL REPORT.
15. WATER SERVICE AND ALL COMPONENTS SHALL MEET THE REQUIREMENTS OF TP3.07 “WATER SERVICE
CONNECTIONS MATERIAL”. A SUMMARY BELOW FOR REFERENCE.
a. WATER SERVICE CONNECTION SHALL BE PE 200 PSI, CONFORMING TO ASTM D2239 EQUAL TO
DRISCOPIPE 5100 ULTRA-LINE.
b. SERVICE LINE FITTINGS SHALL BE NON-FLARE COMPRESSION CONNECTIONS BY MUELLER
INSA-TITE H-15426 OR APPROVED EQUAL.
c. SADDLES SHALL BE DOUBLE STRAPPED, DOUBLE BANDED, THREADS SHALL BE FIP. SADDLES
SHALL BE FORD S71 OR MUELLER H-13478.
d. CURB STOPS SHALL BE BRONZE ALLOY, QUARTER TURN FIPT X FIPT WITH STATIONARY
OPERATING ROD. MUELLER B-20287 OR FORD B11-444M.
e. CURB STOP BOX SHALL BE EXTENSION TYPE, CAST IRON WITH 1-1/2 UPPER SECTION. MUELLER H-10302 OR FORD TYPE PXL. FINISH ELEVATION SHALL BE SLIGHTLY ABOVE GROUND SURFACE.
AN 18” X 18” BY 4” DEEP REINFORCED CONCRETE COLLAR SHALL BE POURED AT EACH BOX.
f. WATER METERS SHALL RECORD FLOW FROM 14 GPM TO 20 GPM AND SHALL BE 5 8" X 3 4" SENSUS SR
MODEL WITH FROST PLATE. NOTE SR2 MODEL IS NOT ACCEPTED.
g. METER YOKE/COPPERSETTER SHALL BE FORD VB 72-12W-11-44 OR AY MCDONALD
20-212WX-DD-44. PRV SHALL BE WATTS SERIES 25AUB OR APPROVED EQUAL.
h. METER BOX SHALL BE 20 INCH DIAMETER, 30 INCH HIGH NOMETALLIC AND SHALL EXTEND 1-INCH
BELOW SERVICE LINE. METER BOX LID SHALL BE CAST IRON DOUBLE LID WITH 11-1/2 INCH
OPENING, PLASTIC INNERLID AND LOCKING OUTER LID WITH PENTAGON HEAD WORM TYPE LOCK, EQUAL TO CASTING MODEL M70.
i. DOMESTIC SHALL BE BRONZE ALLOY, QUARTER TURN CHECK, FIPT X FIPT WITH TEE HEAD, EQUAL
TO FORD B11-444 OR AY MCDONALD 610. PROVIDE VALVE BOX PER 3.07.11.
16. CONTRACTOR SHALL SUBMIT ALL MATERIALS TO ENGINEER AND NTUA FOR SUBMITAL APPROVAL
PRIOR TO START OF WORK.
17. SERVICE CONNECTIONS SHALL BE MADE USING SADDLE TAP TEES
18. PRESSURE TEST AND DISINFECTION SHALL MEET THE REQUIREMENTS OF TP 3.09 AND 3.10.
COORDINATE TESTING AND DISINFECTION WITH NTUA TO ALLOW FOR TEST OBSERVATION.
19. CONTRACTOR SHALL PREPARE A "CONNECTION SCHEDULE" SHOWING THE LOCATIONS AND DATES OF
THE PROPOSED CONNECTIONS. ANY PORTIONS OF THE SYSTEM THAT REQUIRE ISOLATION OR THAT WILL RESULT IN INTERRUPTION SHALL BE COORDINATED WITH NTUA. CONTRACTOR SHALL PROVIDE AFFECTED HOUSING RESIDENTS WITH 48 HOUR NOTICE STATING DATE TIME OF INTERRUPTION AND
TIME OF RE-ESTABLISHMENT OF SERVICE.
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH NTUA TECHNICAL SPECIFICATIONS FOR
MATERIALS AND WORKMANSHIP FOR WATER AND WASTEWATER FACILITIES, MARCH 2002.
2. CONTRACTOR SHALL OBTAIN APPROVED PERMISSION TO TAP (PTT) FORM PRIOR TO TAPPING
EXISTING WATER AND SEWER MAIN.
3. CONTRACTOR SHALL COORDINATE WITH NTUA PRESENT AT THE SITE TO VERIFY LOCATION, DEPTH, SIZE AND TYPE OF UNDERGROUND UTILITIES.
4. CONTRACTOR TO COORDINATE WITH NTUA REGARDING WATER SHUT OFF WITH AT LEAST 3 DAYS ADVANCE NOTICE TO ISOLATE LINE(S), TO NOTIFY AFFECTED CUSTOMERS AND TO MINIMIZE OUTAGE
TIME PRIOR TO CONNECTION OF NEW WATER SERVICE.
5. UNLESS OTHERWISE DIRECTED, ONLY AUTHORIZED NTUA STAFF WILL BE ALLOWED TO CLOSE/OPEN
WATER VALVES FOR ANY CONNECTIONS TO EXISTING LINES AND FOR THE USAGE OF WATER.
6. ROUGH GRADING SHALL BE COMPLETED WITHIN 1/10 OF A FOOT OF PLAN GRADE PRIOR TO
INSTALLING WATER AND WASTEWATER UTILITIES.
7. COORDINATE WITH LOCAL UTILITY PROVIDERS FOR ANY REMOVAL OF EXISTING FACILITIES PRIOR TO
CONSTRUCTION.
8. CONTRACTOR SHALL PROTECT EXISTING UTILITIES IN PLACE. CONTRACTOR SHALL RESTORE AT OWN
EXPENSE ANY DAMAGE TO EXISTING UTILITIES.
9. ALL WATER MAINS SHALL BE POLYVINYL CHLORIDE (PVC) PRESSURE PIPE WITH A MINIMUM OF 200 PSI
PRESSURE CLASS UNLESS SPECIFIED OTHERWISE.
10. A WARNING/DETECTABLE MARKING TAPE SHALL BE INSTALLED AT 12" MINIMUM AND 18" MAXIMUM ABOVE THE WATER AND SEWER PIPE. MARKING TAPE SHALL CONSIST OF ONE LAYER OF ALUMINUM FOIL LAMINATED BETWEEN TWO COLORED LAYERS OF INERT PLASTIC FILM. THE LAMINATION BOND SHOULD BE STRONG ENOUGH THAT THE LAYERS CANNOT BE SEPARATED BY HAND. TAPE SHALL BE A MINIMUM OF 5 MILS THICK AND 6 INCHES WIDE. TAPE SHALL BEAR A CONTINUOUS, PRINTED MESSAGE EVERY 16 TO 36 INCHES WARNING OF THE INSTALLATION BURIED BELOW. TAPE SHALL BE TERRA TAPE, LINETEC, OR AS APPROVED BY NTUA.
11. DEFLECTION (VERTICAL OR HORIZONTAL) OF PIPES IS PERMITTED AND SHALL CONFORM TO AMERICAN WATER WORKS ASSOCIATION (AWWA) JOINT DEFLECTION FOR AWWA PRESSURE PIPE AND
AT 80% OF MANUFACTURER'S RECOMMENDED MAXIMUM DEFLECTION, WHICHEVER IS MORE
STRINGENT. A COPY OF THE MANUFACTURER'S RECOMMENDATION SHALL BE SUBMITTED TO NTUA.
12. PIPES SHALL NOT BE BACKFILLED (INCLUDING BEDDING MATERIAL ABOVE THE SPRING LINE OF THE PIPE) UNTIL THE CONSTRUCTION HAS BEEN INSPECTED AND APPROVED FOR BACKFILLING BY A NTUA
REPRESENTATIVE.
13. CONTRACTOR IS TO PURCHASE AMI WATER METER(S) WITH MODULE(S) AT LOCAL NTUA DISTRICT
OFFICE.
14. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF ALL UTILITIES TO OWNER AND NTUA IN HARD
COPY AND DIGITAL FORMAT.
15. HYDROSTATIC TESTING, FLUSHING AND CHLORINATION (SHALL BE CONDUCTED IN ACCORDANCE WITH
NTUA TECHNICAL SPECIFICATIONS FOR MATERIALS AND WORKMANSHIP FOR WATER AND
WASTEWATER FACILITIES, MARCH 2002) SHALL BE COORDINATED WITH NTUA AT LEAST 3 DAYS IN ADVANCE. NTUA REPRESENTATIVE SHALL BE PRESENT TO RECORD THE INFORMATION AND CERTIFY
THE TESTING.
16. UTILITY CONSTRUCTION ACCEPTANCE AND UTILITY TRANSFER: CONTRACTOR SHALL SCHEDULE A FINAL OR PRE-FINAL INSPECTION WITH NTUA HEADQUARTERS ENGINEERING AND LOCAL DISTRICT OFFICE, OWNER AND GENERAL CONTRACTOR AT THE END OF CONSTRUCTION. DOCUMENTS SHALL BE PROVIDED BY THE CONTRACTOR AS FOLLOWS: AS-BUILT DRAWING, APPROVED PTT, HYDROSTATIC TESTING RESULTS, BACTERIOLOGICAL TESTING RESULTS, MATERIALS SUBMITTALS AND COST OF PLANT. PLEASE FOLLOW THE NTUA TECHNICAL SPECIFICATIONS FOR MATERIALS AND WORKMANSHIP
FOR WATER AND WASTEWATER FACILITIES, MARCH 2002, SECTION TP 5.0.
17. THE CONTRACTOR/ENGINEER SHALL PROVIDE WARRANTY ON ALL NEW WATER AND WASTEWATER FACILITIES AGAINST DEFECTS IN MATERIALS, WORKMANSHIP AND FOR ANY DESIGN DEFICIENCIES, ERRORS AND OMISSIONS FOR THE PERIOD OF ONE YEAR WHEN THE FACILITIES WERE INSPECTED, ACCEPTED AND APPROVED.
18. CONTRACTOR SHALL PROVIDE 48 HOUR NOTICE TO RESIDENTS, ENGINEER, AND NTUA FOR ALL
SERVICE INTERRUPTIONS.
1. PROVIDE 10' MINIMUM HORIZONTAL SEPARATION IN SEPARATE TRENCHES BETWEEN WATER AND SEWER SERVICES, PAST THE BUILDING PLUMBING. PROVIDE 5' MINIMUM HORIZONTAL SEPARATION BETWEEN WATER SERVICE AND OTHER UTILITIES. FOR WATER AND SEWER CROSSING. PROVIDE A MINIMUM OF 12" VERTICAL CLEARANCE, PIPE O.D. TO PIPE O.D. IF WATER SERVICE CROSSES OTHER
UTILITIES, ALL STIPULATIONS FOR THE OTHER UTILITY MUST BE MET.
2. BUILDING PLUMBING, WATER AND SEWER SERVICES TO BE INSTALLED IN ACCORDANCE WITH THE
NATIONAL PLUMBING CODE ADOPTED BY THE NAVAJO NATION.
3. WATER SERVICES SHALL HAVE A MINIMUM COVER OF 36" AND SHALL BE INSTALLED IN CONFORMANCE
WITH NTUA STANDARDS.
4. SADDLES SHALL BE SINGLE STRAP/BAND TYPE, FOR STEEL PIPE O.D. PVC. SADDLES SHALL BE DOUBLE STRAP/BAND TYPE, FOR D.I., A.C., OR C-900 PIPE. ON EXISTING 2" PIPING, A 2" X 1" PVC TEE SHALL BE
USED. CONTACT NTUA HEADQUARTERS ENGINEERING ON PIPING SMALLER THAN 2".
5. PROVIDE THE AS-BUILT SWING TIE INFORMATION FOR THE TAP POINT AND OTHER APPURTENANCES
INSTALLED.
6. THE WATER METER SHALL BE CENTERED AND SET A MAX. OF 24" BELOW THE TOP OF THE METER BOX
COVER.
7. THE METER CAN SHALL BE LOCATED JUST BEYOND THE SIDEWALK AT THE PROPERTY LINE OR WITH
OWNER'S PERMISSION A MINIMUM OF 10' FROM THE BUILDING.
8. WATER SERVICE LINES ARE LIMITED TO A MAXIMUM OF 200'. IF THE PRESSURE AT THE HOME SITE IS ABOVE 70 PSI, INSTALL THE APPROPRIATE TANDEM COPPERSETTER WITH AN INDIVIDUAL PRV (ITEM 8A).
9. USE FIELD MARKERS WHERE APPROPRIATE.
10. SUBMIT CONSTRUCTION COST OF NEW INSTALLATION UP TO AND INCLUDING THE METER. INDICATE AS
FOLLOWS:
A. MATERIAL COST,
B. LABOR COST,
C. EQUIPMENT COST,
D. TOTAL CONSTRUCTION COST
1. PROVIDE 10' MINIMUM HORIZONTAL SEPARATION IN SEPARATE TRENCHES BETWEEN THE WATER AND SEWER SERVICES. PROVIDE 5' MINIMUM HORIZONTAL SEPARATION BETWEEN THE SEWER SERVICE AND OTHER UTILITIES. IF SEWER SERVICE CROSSES OTHER SERVICES, SEE NTUA CROSSING POLICY
OR CONTACT NTUA HEADQUARTERS ENGINEERING.
2. SEWER CLEANOUTS ARE REQUIRED ON ALL BENDS IN EXCESS OF 45° AS PER PLUMBING CODE ADOPTED BY THE NAVAJO NATION. MODIFY MATERIAL LIST ACCORDINGLY AFTER CONSULTING WITH
NTUA HEADQUARTERS ENGINEERING.
3. ADDITIONAL SEWER CLEANOUTS ARE REQUIRED ON SEWER SERVICES LONGER THAN 50' AS PER UNIFORM PLUMBING CODE ADOPTED BY THE NAVAJO NATION. MODIFY MATERIAL LIST ACCORDINGLY AFTER CONSULTING WITH NTUA HEADQUARTERS ENGINEERING. EACH ADDITIONAL CLEANOUT IS AT THE CUSTOMERS EXPENSE INSTALL AT LEAST ONE CLEANOUT AS REQUIRED BY NOTE 2. IF CUSTOMER REQUEST FEWER AND REALIZES THIS VIOLATES NAVAJO TRIBAL CODE, THEN INSTALL PER THE
CUSTOMER'S REQUEST AND SO NOTE ON THE INDIVIDUAL AS-BUILT, NTUA RECOMMENDS THAT
CLEANOUTS BE SPACED NO MORE THAN 100'.
4. PROVIDE PROPOSED ELEVATION AT WALL. PROVIDE 6 IN. DIAMETER SLEEVE IF PIPING PENETRATES WALL OR 4 IN. DEPTH OF SAND BETWEEN FOOTING AND TOP OF PIPING IS BELOW THE FOOTING.
ORDER ASTM D-1785 SCH. 40 PIPE WITH LENGTH AS NEEDED FOR THE SLEEVE. CONTACT N.T.U.A.
HEADQUARTERS ENGINEERING ON PIPING SMALLER THAN 2 IN. IN SIZE.
5. STATE THE EXISTING PIPE TYPE AND O.D. (E.G. ASTM D-3034, SDR 35, PVC, 8. 40"). SADDLE IS TO HAVE
A GASKET SEAL OR 0-RING AND NON-CORRODIBLE STRAP SECURING SYSTEM.
6. MINIMUM SLOPE OF 1/4 INCH PER FOOT (2%) OR CONTACT N.T.U.A. HEADQUARTERS ENGINEERING.
7. BACKFILL IS TO BE HAND TAMPED (NO-MECHANICAL) AND COMPACTED IN 6 INCH LAYERS FOR AT
LEAST 12 IN. ABOVE PVC PIPE. INSTALL PER ASTM D-2321 AND UNIFORM PLUMBING CODE ADOPTED BY
THE NAVAJO NATION.
8. PROVIDE THE AS-BUILT AND SWING TIES FOR THE TAP POINT.
9. THE MATERIAL LIST SHALL BE MODIFIED IF A FIELD MARKER OF THE TAP POINT IS TO BE INSTALLED.
UNDER THE AS-BUILT TIE INFORMATION. PROVIDE THE SURFACE DESCRIPTION OF THE TAP POINT (E.G.
OPEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .