This is a Scope of Work (SOW) document for the procurement of an air compressor system for Decker Creek Power Station, operated by City of Austin, Austin Energy, in Texas. The City of Austin seeks to procure a reliable air compressor to support plant operations, maintenance systems, and instrumentation. The compressor specifications call for an air-cooled, flooded screw-type unit with a rated capacity of 195 to 250 CFM at 125 psig discharge pressure, powered by approximately 185 kW at 480V, three-phase electrical supply. The system must include a PLC-based local control panel with remote monitoring capability via Modbus TCP/IP or Ethernet/IP, as well as pressure, temperature, vibration, and equipment status indicators. Deliverables include technical datasheets, certified drawings, installation and operation manuals, Factory Acceptance Test (FAT) reports, and recommended spare parts lists. Services required encompass Factory Acceptance Testing, commissioning and startup support, and operator and maintenance staff training. The document specifies compliance with applicable standards including API, ISO, NEC, and ASME, and requires submission of compressor specifications, drawings, and quality assurance and warranty terms to designated Austin Energy representatives.
The SOW includes a quote item sheet requesting pricing for three line items: the air compressor unit, startup and commissioning support, and compressor training, with a total not-to-exceed price to be provided by the vendor. No specific response deadline, contract term, or renewal options are stated in the document. There is no indication of set-asides, incumbent contractors, funding sources, or budget amounts. Bidders must submit all required documentation digitally to the three identified Austin Energy contacts and direct contractual questions to the City of Austin procurement department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFQ_1100_BAS1108_IFQ_PAC_1_v1.docx | DOCX document | |
| IFQ_1100_BAS1108_QUOTE_v1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work for Air Compressor October 11, 2026 Decker Creek Power Station
SOW Air Compressor Machinery
1. General Requirements
1.1 Scope
This Statement of Work is the scope of supply (procurement scope) for purchasing an Air Compressor, hereinafter Compressor, for Decker Creek Power Station. The objective is to provide reliable, compressed air to support plant operations, maintenance systems, and instrumentation as required.
1.2 Defined Terms
As used in this specification, each of the following terms shall have the meaning as set forth below.
| Engineer |
| The Engineer who developed this specification on behalf of Owner |
| OEM |
| The Entity that designed, manufactured, and furnished Owner’s existing equipment |
| Owner |
| City of Austin, Austin Energy, Decker Creek Power Station Staff, Purchaser, Buyer |
| SOW |
| Scope of Work |
| NEC |
| National Electric Code |
1.3 Document Submittal Requirements
All Documents required in this specification shall be digitally submitted to the following:
| Rogelio Zavala | rogelio.zavala@austinenergy.com |
| James Cox | james.cox@austinenergy.com |
| Maria Bernal Mora | maria.bernalmora@austinenergy.com |
1.3.1 Documents required with submittals
1.3.1.1 Compressor specifications demonstrating capabilities requested in section 2.
1.3.1.2 Compressor drawings to include dimensions of enclosure, outlet piping location and size, and approximate package weight, at minimum.
1.3.1.3 Quality assurance and Warranty terms
1.4 Communication
All digital correspondence pertaining to this specification shall include the persons listed in section 1.3 All questions regarding the Contract Requirements/Terms and Conditions shall be directed to City of Austin procurement department.
2. Specifications for Compressor
2.1 Compressor Package
• Air cooled, flooded screw type
• Rated capacity: Minimum 195 CFM / Maximum 250 CFM
• Discharge pressure: 125 psig
• Motor rating and voltage: ~185 kW / 480V / 3 phase
• Efficiency and duty cycle requirements
· Temperature, RH, Altitude (~75F, ~67-69% RH, ~606'11" altitude)
2.2 Controls and Instrumentation
• Local control panel with PLC‑based control
• Remote monitoring capability (Modbus TCP/IP, Ethernet/IP, etc.)
• Pressure, temperature, vibration, and equipment status indicators
2.3 Documentation Deliverables
• Datasheets and certified drawings
• Installation, operation, and maintenance manuals
• FAT test reports
• Recommended spare parts list (2-year and 5-year)
2.4 Services
• Factory Acceptance Test (FAT)
• Commissioning and startup support
• Training for plant operators and maintenance staff
2.5 Quality and Standards
• Compliance with applicable standards (API, ISO, NEC, ASME)
• Vendor quality assurance and warranty terms
3. Quote Item Sheet
| Quote Item |
| Description |
| Quote Item Cost |
| 1. |
| Air Compressor |
| 2. |
| Startup and Commissioning support |
| 3. |
| Compressor Training |
Total Cost for all Work Items
Total NOT TO EXCEED Quote Price (In Words) For All Work in Above Table:
Company Name:
Company Contact Phone Number:
Company Contact Fax Number:
Authorized Representative’s Name (Print)
Authorized Representative’s Signature:
Date:
Service Air Compressor 2 image1.jpeg
File details come from the government source that posted it. Updated .