This Invitation for Price Quote (IFPQ 12A2383) is issued by the California Department of Transportation (Caltrans) for restroom remodel and repairs services at District 12, Caltrans Marine Way Maintenance Station in Irvine, Orange County. The project encompasses comprehensive renovation of five restroom areas: one men's locker room restroom, one women's locker room restroom (both including shower areas), one smaller men's restroom, one smaller women's restroom, and one men's shower room. The scope of work includes removal and installation of flooring, wall tiles, countertops, sinks, faucets, fixtures, toilet partitions, toilets, urinals, shower doors, exhaust fans, LED lighting, outlets, mirrors, and benches, along with painting, repairs, and final cleanup. All labor, materials, permits, disposal, and incidentals are the contractor's responsibility. Written questions must be submitted by May 21, 2026, with price quote submissions due by May 28, 2026 at 12:00 p.m. Pacific Time. The estimated award date is May 28, 2026. The contract term commences June 30, 2026 (estimated) and expires July 1, 2027 (estimated), with work performed during normal business hours Monday through Friday, 6:00 a.m. to 3:30 p.m., excluding state holidays.

This solicitation is restricted to certified small businesses (SBs), including micro businesses (MBs), SBs for public works purposes (SB-PW), or Disabled Veteran Business Enterprises (DVBEs), with a maximum bid amount of $484,000. Prevailing wage requirements apply if the total bid exceeds $15,000. Bidders must possess a valid Class B General Building Contractor license from the California Contractors State Licensing Board and maintain current Department of Industrial Relations registration. A Payment Bond equal to 100 percent of the contract amount is required if the bid exceeds $25,000, due prior to work commencement. Certificate of Insurance proving appropriate coverage limits must be submitted within 10 working days of award notification. The contract includes a one-year warranty against defects and deficient workmanship. Caltrans reserves the right to reject all price quotes for reasonable cause and requires at least two price quotes from certified SBs/MBs or DVBEs before award authorization. Subcontracting is not permitted under this agreement. No additional provisions exist for unforeseen items or additional work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30TH STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

May 14, 2026

Invitation for Price Quote (IFPQ)

IFPQ 12A2383

Notice to Prospective Contractors

You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 12A2383 entitled, Restroom Remodel and Repairs in Orange County. In submitting your quote, you must comply with the instructions found herein.

“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $484,000.00,to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a Disabled Veteran Business Enterprise (DVBE). A bid over $484,000.00 will result in rejection of your bid due to non-responsiveness.”

This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.

In the opinion of Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:

Kae Saechin California Department of Transportation (Caltrans) Email address: kae.saechin@dot.ca.gov Phone: (916) 662-9665

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing, in accordance with the Questions and Answers portion of this IFPQ. See Section C1, Time Schedule, for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT

LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.

Sincerely, Kae Saechin Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:kae.saechin@dot.ca.gov

Invitation for Price Quote IFPQ Number 12A2383

A) Purpose and Description of Services

1. Contractor shall agrees to provide to California Department of Transportation (Caltrans) Restroom Remodel and Repairs as described herein.

Contractor shall provide all labor, materials, parts, supplies, equipment, tools, permits, travel, disposal, and incidentals necessary to repair, remodel, and upgrade the restrooms, including the shower areas.

2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. By submitting its bid, bidder certifies, under penalty of perjury, that its Contractors State License

Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.

2. Bidder shall possess at the time of quote submittal, continuously thereafter, and for the duration of the Agreement, a valid and current Class B, General Building Contractor license issued by the California Contractors State Licensing Board (CSLB).

3. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR).

Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.

4. At time of quote submittal, continuously thereafter, and for the duration of the Agreement, bidder shall be a certified small business, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE) registered with the California Department of General Services (DGS).

5. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the bidder’s bid deemed non-responsive.

C) Price Quotation Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFPQ available to prospective bidders 05/14/2026 Written Question Submittal 05/21/2026 Final Date for Quote Submission 05/28/2026 12:00 p.m.

Proposed Award Date (estimate) 05/28/2026

2. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by May 21, 2026.

B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 12A2383. Questions must be sent to the following email:

Email: kae.saechin@dot.ca.gov

C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website https://caleprocure.com. It is the responsibility of the bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the IFPQ’s schedule of events and dates/times. Bidder can contact the Contract Analyst named above.

3. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $484,000.00. A bid amount more than $484,000.00 will be deemed non-responsive and will be rejected.

4. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.

5. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

6. State Prevailing Wages State General Prevailing Wage Rates will apply for the County(ies) of Orange as described in the Proposed Form of Agreement, Exhibit B. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

7. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.

mailto:kae.saechin@dot.ca.gov https://caleprocure.com/ https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

8. Motor Carrier Permit Requirements

A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and 34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Proposed Form of Agreement, Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).

B. The MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

9. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).

B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.

C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

D. If Contractor lists Subcontractor who is believed to be performing work that is not subject to the registration requirements, written confirmation from DIR must be obtained and submitted with the proposal to validate the bid.

10. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current Class B, General Building Contractor license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).

11. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

12. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.

13. Bonds

Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

14. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying a Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

15. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.

16. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the Darfur Contracting Act Certification form.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).

17. Price Quote Submittal A. The Price Quote should be emailed as described below. All price quotes must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.

B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:

IFPQ Number: 12A2383

PRICE QUOTATION SUBMITTAL

C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.

D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

E. Email to: kae.saechin@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email of any extensions.

G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.

H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.

mailto:kae.saechin@dot.ca.gov

Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.

J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.

Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at kae.saechin@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.

L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.

M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.

N. Caltrans reserves the right to reject all price quotes for reasonable cause.

O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.

P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) and Contractor Certification Clauses (CCC 04/2017) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.

18. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.

B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.

C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:

individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more mailto:kae.saechin@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.

19. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.

B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.

C. Antitrust Provisions

1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.

3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).

D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.

E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

20. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

21. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder / Offeror must notify the State in writing if it:

1) Intends to provide GenAI as a deliverable to the State; or

2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:

a) Functionality of a State system,

b) Risk to the State, or

c) Contract performance.

Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 12A2383 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1

ADM-1412 (REV. 9/2025)

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit Of Measure Item

Unit Price (Price Per

Unit of Measure)

Total (Estimated Quantity X Unit Price)

1 1 Lump Sum

All labor, materials, parts, supplies, equipment, tools, permits, travel, disposal, and incidentals necessary to repair, remodel, and upgrade one (1) men's locker room restroom, one (1) women's locker room restroom, which includes the shower areas, one (1) smaller men's restroom, one (1) smaller women's restroom, and one (1) men’s shower room, per STD 213, Exhibit A, Scope of Work.

1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.

3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.

4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.

Total Proposal $

Attachment 2

Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

☐ Attachment 1 – Price Quote Proposal (ADM-1412)

☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet

☐ Non-Collusion Declaration Non-Collusion Declaration

☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification

☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Payment Bond Payment Bond

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 3

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.

2. The term of this Agreement is:

Contractor Name TBD Agreement Number 12A2383

Exhibit A

Public Works (State)

Scope of Work

1. Contractor agrees to provide to the California Department of Transportation (Caltrans)

Restroom Remodel and Repairs as described herein.

Contractor shall provide all labor, materials, parts, supplies, equipment, tools, permits, travel, disposal, and incidentals necessary to repair, remodel, and upgrade the restrooms, including the shower areas. There is no provision for additional work or unforeseen items.

2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.

3. The services shall be performed at District 12, Caltrans Marine Way Maintenance Satiation (MS), located at 6641 Marine Way, Irvine, CA 92618 in Orange County.

4. Any reference to Caltrans Contract Manager shall also include his/her designee.

5. This Agreement will commence on June 30, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on July 1, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday 6:00 a.m. to 3:30 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.

6. This Agreement cites specific portions of the most current version of the Caltrans 2025 Standard Plans and Specifications (including revisions), herein collectively referred to as the “Standard Specifications”. The Standard Specifications can be accessed via the Internet at:

https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications. Only the sections of the Standard Specifications cited in this Agreement are requirements and are hereby incorporated by this reference as if attached to this Agreement. All other portions of the Standards Specifications are not applicable to this Agreement.

7. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans):

Contractor: TBD

District 12/Maintenance Project Manager:

Caltrans Contract Manager: TBD Address: 1750 East 4th Street, Suite 100 Santa Ana, CA 92705

Address:

Business Phone Number: Business Phone Number:

Email: Email:

https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications

Exhibit A

Public Works (State)

8. Detailed Description of Work:

Contractor shall upgrade, repair, and remodel one (1) men's restroom and one (1) women's restroom located in the locker room, including the shower areas. Additionally, one (1) smaller men's restroom, one (1) smaller women's restroom, and one (1) men’s shower room. Refer to Attachment 4, Floor Plans, for the location of restrooms. Refer to Attachment 3, Site Photos, for reference.

There is no provision for additional work or unforeseen items. Contractor shall obtain written approval from Caltrans Contract Manager prior to the purchase and/or installation of any equivalent product(s). To request approval, Contractor shall submit a substitution request including specification sheet(s) for the proposed equivalent(s).

A. Women’s Locker Room Restroom

1) Contractor shall remove the existing flooring and install new 16” x 16” slip-resistant porcelain tile in the restroom and shower areas. The tile color shall be approved in writing by Caltrans Contract Manager.

2) Contractor shall remove existing wall tiles and install new 12” x 24” wall tiles in the restroom and shower areas. The tile color shall be approved in writing by Caltrans Contract Manager. For exact dimensions and layout, refer Attachment 4, Floor Plans.

3) Contractor shall remove and legally dispose of all items that are being replaced, except for items specifically identified in this Scope of Work as requiring retention or reinstallation.

4) Contractor shall remove the existing countertop and sinks and install a new countertop of the same size with three (3) new sinks from Kohler or an equivalent mounted in it. The desired color of the countertop is dark and shall be approved in writing by Caltrans Contract Manager. In addition, Contractor shall remove one (1) existing wall-mounted Americans with Disabilities Act (ADA) sink and replace it with a new ADA-compliant sink from Kohler or an equivalent.

5) Contractor shall remove the existing four (4) faucets and install four (4) new chrome touchless faucets by Moen company or equivalent. Contractor shall retain the existing faucets and shall not discard them. All removed faucets shall be delivered to the Maintenance Supervisor for storage.

6) Contractor shall remove three (3) existing touchless soap dispensers, and the two (2) existing touchless paper towel dispensers during construction and reinstall them upon completion.

7) Contractor shall remove three (3) existing wall-mounted paper towel dispenser and mirror combinations and install three (3) new wall-mounted mirrors over the sinks, sized to cover the areas of the existing paper towel dispensers and mirrors, refer to Attachment 2, Current Restrooms, Item A. In addition, Contractor shall replace one (1) existing wall-mounted ADA mirror with a new ADA-compliant mirror of the same size.

8) Contractor shall remove two (2) existing wall-mounted trash cans during construction and reinstall them upon completion.

9) Contractor shall remove and dispose of the existing wall-mounted feminine hygiene

Exhibit A

Public Works (State) product dispenser and install a new one.

10) Contractor shall remove the existing toilet partition panels and doors for four (4) toilets and install new ones for all four (4) toilets. New partitions shall be from Bradley company or equivalent.

11) Contractor shall remove the existing four (4) wall mounted toilets and install new ones from Kohler company or equivalent.

12) Contractor shall remove the existing toilet tissue dispensers and wall-mounted toilet seat cover dispensers during construction and reinstall them upon completion.

13) Contractor shall relocate the toilet tissue dispensers in three (3) toilet stalls to appropriate locations to ensure the stall doors can open completely, refer to Attachment 2, Current Restrooms, Item B.

14) Contractor shall remove the existing shower valve, showerhead, and related fixtures, and install new ones from Kohler company or an equivalent. The upgrade shall include furnishing and installing a complete, functional shower unit, including all necessary plumbing and finishes.

15) Contractor shall remove the existing shower door and install a new framed glass shower door with a frosted privacy finish, including all necessary hardware, caulking, and adjustments for proper operation, from Kohler Company or an approved equivalent.

16) Contractor shall remove the existing floor-mounted bench, wall-mounted hooks, and stainless steel in-wall shelf in the shower area, and install new ones. Additionally, Contractor shall replace the fold-up ADA bench and stainless steel ADA grab bars with new ADA-compliant ones matching the existing sizes.

17) Contractor shall remove the existing shower curtain and curtain rod and install a new framed tempered glass panel partition with a frosted privacy finish and door to provide separation between the shower and bathroom areas.

18) Contractor shall remove the wall-mounted air freshener dispenser, soap dish, and loudspeaker as shown in Attachment 2, Current Restrooms, Item A.

19) Contractor shall remove the existing exhaust fans and install new ones.

20) Contractor shall remove the existing lighting fixtures and install new light-emitting diode (LED) lighting fixtures.

21) Contractor shall install a new light switch with motion sensor.

22) Contractor shall remove the existing ground fault interrupter (GFI) outlets and install new ones and move the outlets as needed.

23) Contractor shall perform any necessary repairs to walls and ceilings. Contractor shall repaint all existing painted surfaces and ceilings using BEHR products or an approved equivalent in high-gloss white.

24) Contractor shall paint the two (2) restroom entrance doors in high gloss dark blue similar to the existing finish.

25) Contractor shall install soft closers on the two (2) restroom entrance doors to ensure smooth and quiet closing.

Exhibit A

Public Works (State)

26) Contractor shall patch any holes in the bathroom walls.

B. Men’s Locker Room Restroom

1) Contractor shall remove the existing flooring and install new 16" x 16" slip-resistant porcelain tile in the restroom. The tile color shall be approved in writing by Caltrans Contract Manager.

2) Contractor shall remove existing wall tiles and install new 12” x 24” wall tiles in the restroom. The tile color shall be approved in writing by Caltrans Contract Manager.

For exact dimensions and layout, refer Attachment 4, Floor Plans.

3) Contractor shall remove and legally dispose of all items that are being replaced, except for items specifically identified in this Scope of Work as requiring retention or reinstallation.

4) Contractor shall remove the existing countertop and sinks and install a new countertop of the same size with four (4) new sinks from Kohler or an equivalent mounted in it. The desired color of the countertop is dark and shall be approved in writing by Caltrans Contract Manager. In addition, Contractor shall remove one (1) existing wall-mounted ADA sink and replace it with a new ADA-compliant sink from Kohler or an equivalent.

5) Contractor shall remove the existing five (5) faucets and install five (5) new chrome touchless faucets by Moen company or equivalent. Contractor shall retain the existing faucets and shall not discard them. All removed faucets shall be delivered to the Maintenance Supervisor for storage.

6) Contractor shall remove four (4) existing touchless soap dispensers, and two (2) existing paper towel dispensers during construction and reinstall them upon completion.

7) Contractor shall remove four (4) existing wall-mounted paper towel dispenser and mirror combinations and install four (4) new wall-mounted mirrors over the sinks, sized to cover the areas of the existing paper towel dispensers and mirrors (refer to Attachment 2, Current Restrooms, Item A). In addition, Contractor shall replace one (1) existing wall-mounted ADA mirror with a new ADA-compliant mirror of the same size.

8) Contractor shall remove two (2) existing wall-mounted trash cans during construction and reinstall them upon completion.

9) Contractor shall remove the existing toilet partition panels and doors for five (5) toilets and existing partitions for three (3) urinals and install new ones for all five (5) toilets and three (3) urinals. New partitions shall be from Bradley company or equivalent.

10) Contractor shall remove the existing five (5) wall mounted toilets and three (3) existing porcelain urinals and install new ones from Kohler company or equivalent.

11) Contractor shall remove the existing toilet tissue dispensers and wall-mounted toilet seat cover dispensers during construction and reinstall them upon completion.

12) Contractor shall remove and dispose the wall-mounted air freshener dispensers.

13) Contractor shall remove the existing exhaust fans and install new ones.

Exhibit A

Public Works (State)

14) Contractor shall remove the existing lighting fixtures and install new LED lighting fixtures.

15) Contractor shall install a new light switch with motion sensor.

16) Contractor shall remove the existing GFI outlets and install new ones and move the outlets as needed.

17) Contractor shall perform any necessary repairs to walls and ceilings. Contractor shall repaint all existing painted surfaces and ceilings using BEHR products or an approved equivalent in high-gloss white.

18) Contractor shall paint the two (2) restroom entrance doors in high gloss dark blue similar to the existing finish.

19) Contractor shall install soft closers on the two (2) restroom entrance doors to ensure smooth and quiet closing.

20) Contractor shall patch any holes in the bathroom walls.

C. Men’s Shower Room

1) Contractor shall remove the existing flooring and install new 16" x 16" slip-resistant porcelain tile. The tile color shall be approved in writing by Caltrans Contract Manager.

2) Contractor shall remove the existing shower valve, showerhead, and related fixtures, and install new ones from Kohler company or an equivalent. The upgrade shall include furnishing and installing a complete, functional shower unit, including all necessary plumbing and finishes.

3) Contractor shall remove the existing shower door and install a new framed glass shower door with a frosted privacy finish, including all necessary hardware, caulking, and adjustments for proper operation, from Kohler Company or an approved equivalent.

4) Contractor shall remove the existing floor-mounted bench, wall-mounted hooks, and stainless steel in-wall shelf in the shower room, and install new ones. Additionally, Contractor shall replace the fold-up ADA bench and stainless steel ADA grab bars with new ADA-compliant ones, matching the existing sizes.

5) Contractor shall remove the existing exhaust fans and install new ones.

6) Contractor shall remove the existing lighting fixtures and install new LED lighting fixtures.

7) Contractor shall install a new light switch with motion sensor.

8) Contractor shall remove the existing GFI outlets and install new ones and move the outlets as needed.

9) Contractor shall retain the existing wall-mounted mirror.

10) Contractor shall paint the shower room entrance door in high gloss dark blue similar to the existing finish.

11) Contractor shall replace the existing door handle and lock on the shower room door with a new one, refer to Attachment 2, Current Restrooms, Item D.

Exhibit A

Public Works (State)

12) Contractor shall perform any necessary repairs to walls and ceilings. Contractor shall paint ceilings using BEHR products or an approved equivalent in high-gloss white.

13) Contractor shall install soft closer on the shower room entrance door to ensure smooth and quiet closing.

D. Men’s Small Restroom

1) Contractor shall remove the existing flooring and install new 16" x 16" slip-resistant porcelain tile in the restroom. The tile color shall be approved in writing by Caltrans Contract Manager.

2) Contractor shall remove the existing wall tiles and install new 12” x 24” wall tiles in the restroom. The tile color shall be approved in writing by Caltrans Contract Manager. For exact dimensions and layout, refer to Attachment 4, Floor Plans.

3) Contractor shall remove and legally dispose of all replaced items, except for items specifically identified in this Scope of Work as requiring retention or reinstallation.

4) Contractor shall remove the existing countertop and sink and install a new countertop of the same size with one (1) new sink from Kohler or an equivalent mounted in it. The desired color of the countertop is dark and shall be approved in writing by Caltrans Contract Manager.

5) Contractor shall remove the existing faucet and install one (1) new chrome touchless faucet by Moen company or equivalent. Contractor shall retain the existing faucet and shall not discard it.

6) Contractor shall remove one (1) existing touchless soap dispenser, and one (1) existing paper towel dispenser during construction and reinstall them upon completion.

7) Contractor shall remove (1) existing wall-mounted paper towel dispenser and mirror, and install a new wall-mounted mirror over the sink, sized to cover the area of the removed dispenser and mirror (similar to what is shown in the locker room restrooms in Attachment 2, Current Restrooms, Item A).

8) Contractor shall remove one (1) existing wall-mounted trash can during construction and reinstall them upon completion.

9) Contractor shall remove the existing partition panels and door for one (1) toilet and the existing partition for one (1) urinal and install new ones. New partitions shall be from Bradley company or equivalent.

10) Contractor shall remove the existing one (1) wall-mounted toilet and one (1) porcelain urinal and install new ones from Kohler or equivalent.

11) Contractor shall remove one (1) existing toilet tissue dispenser during construction and reinstall it upon completion and relocate that to appropriate location.

12) Contractor shall remove one (1) existing toilet seat cover dispenser during construction and reinstall them upon completion.

13) Contractor shall remove the existing exhaust fans and install new ones.

14) Contractor shall remove the existing lighting fixtures and install new LED lighting fixtures.

Exhibit A

Public Works (State)

15) Contractor shall install a new…