IFPQ_Solicitation_32A0676.pdf
PDF 1014 KB Posted
- Solicitation number
- 32A0676
- Issued by
- Yuba County, Yuba City, California
About this file
This Invitation for Price Quote (IFPQ) #32A0676 is issued by the California Department of Transportation (Caltrans) for gutter replacement services at the Division of Equipment, Shop 3 in Marysville, Yuba County, California. The project involves removal and replacement of rain gutters, downspouts, and metal flashing at two main buildings (shop and warehouse) and two auxiliary roof structures. The work includes removing existing gutters and downspouts from approximately 1,046 linear feet of roofing across both buildings, installing new 24-gauge metal or thicker gutters and downspouts in the same locations, and furnishing all labor, materials, equipment, traffic control, permits, and incidentals necessary for completion. A mandatory site inspection is scheduled for January 6, 2026, at 10:00 a.m. at the project location. Written questions must be submitted by January 7, 2026, at 5:00 p.m., with final price quote submissions due by January 14, 2026, at 2:00 p.m. The proposed award date is January 21, 2026. The contract is estimated to commence on February 13, 2026, and expire on November 12, 2026, with work to be completed within six months of commencement.
This solicitation is restricted to certified Small Businesses (SB), Micro Businesses (MB), Small Businesses for public works (SB-PW), or Disabled Veteran Business Enterprises (DVBE) as required by Government Code Section 14838.7. The maximum bid amount is $461,000.00, with bids exceeding this threshold resulting in automatic rejection. State prevailing wages apply if the total bid exceeds $15,000.00. Bidders must hold a valid California Contractors State License Board C-39 (Roofing Contractor) license and maintain current Department of Industrial Relations registration. If the bid exceeds $25,000, a Payment Bond equal to 100 percent of the contract amount is required prior to work commencement. Required insurance includes Commercial General Liability ($1,000,000 per occurrence, $2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), and Workers' Compensation coverage with Caltrans named as additional insured. Caltrans must receive at least two price quotes from certified SB/MB or DVBE entities to proceed with award. All required documentation, including the Bid/Bidder Certification Sheet, Non-Collusion Declaration, Darfur Contracting Act Certification, and Bidder Declaration, must accompany the price quote submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
12/26/2025
Invitation for Price Quote (IFPQ)
IFPQ # 32A0676
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 32A0676 entitled Gutter Replacement in Yuba County. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Aimee Rosales California Department of Transportation (Caltrans) Email address: Aimee.Rosales@dot.ca.gov Phone: (279) 234-2336
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing and at a Site Inspection to be held on January 6, 2026 at 981 N Beale Rd, Marysville, CA 95901. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Aimee Rosales Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/
Invitation for Price Quote IFPQ Number 32A0676
A) Purpose and Description of Services
1. Contractor shall furnish all labor, parts, tools, materials, supplies, equipment, traffic control, permits, travel, and incidentals necessary to provide gutter replacement services to Caltrans.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. Bidder shall possess at the time of bid submittal and for the duration of the Agreement, a valid and current C-39 (Roofing Contractor) license issued by the California State License Board (CSLB).
2. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License
Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
3. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR).
Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.
4. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule
It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time (Pacific Time)
IFPQ available to prospective bidders 12/26/2025 Mandatory Site Inspection 1/6/2026 10:00 a.m.
Written Question Submittal 1/7/2026 5:00 p.m.
Final Date for Quote Submission 1/14/2026 2:00 p.m.
Proposed Award Date (estimate) 1/21/2026
2. Mandatory Site Inspection A. A mandatory site inspection is scheduled for 10:00 a.m., 1/6/2026, at 981 N Beale Rd, Marysville, CA 95901 for the purpose of discussing concerns regarding this IFPQ.
B. In the event a potential prime contractor is unable to attend the Mandatory Site Inspection, an authorized representative may attend on its behalf. The representative may only sign in for one
(1) company. Subcontractors may not represent a potential prime contractor at a site inspection.
C. All prospective contractors are to be assembled at Caltrans, 981 N Beale Rd, Marysville, CA 95901, at 10:00 a.m. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Failure to comply with these provisions may result in the rejection of your quote. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.
3. Reasonable Accommodation For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the site inspection to arrange for a reasonable accommodation.
4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by 1/7/2026.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 32A0676 . Questions must be sent to the following email:
Email: Aimee.Rosales@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
5. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.
6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five
(5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Yuba as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct https://caleprocure.com/pages/index,aspx https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
9. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and
34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work
B. Described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
C. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
12. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current C-39 (Roofing Contractor) license issued by the CSLB, for the type of work to be performed.
Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).
13. Subcontractors Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement. If a Subcontractor(s) is used, complete the Bidder Declaration (GSPD–05-105).
Bidder must ensure Subcontractor(s) shall have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a Subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of price quote. Contractor may only subcontract portions of the work to a qualified Department of General Services (DGS) Certified Small Business (SB)/Micro Business (MB)/SB for the purpose of Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE), with the same status of Contractor. No work may be subcontracted to any business not certified as a SB/MB/SB-PW or DVBE by DGS.
Contractor must ensure the Subcontractor(s) is DGS Certified SB/MB/SB-PW or DVBE and has all necessary licenses, permits, and/or certifications to accomplish its portion of the work.
14. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
15. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents..
16. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
17. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
18. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
19. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:
IFPQ Number: 32A0676
PRICE QUOTATION SUBMITTAL–DO NOT OPEN
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: Aimee.Rosales@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at Aimee.Rosales@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language
20. Evaluation and Selection
A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
21. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
22. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
23. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system,
b) Risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 32A0676 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1
ADM-1412 (REV. 9/2025)
Item Number
Estimated Quantity
Unit Of Measure Item Total
1 1 Lump Sum
All labor, parts, supplies, materials, equipment, tools, traffic control, permits, travel, and incidentals necessary to remove existing rain gutters, downspouts, and metal flashing, and to furnish and install new rain gutters, downspouts, and metal flashing as described in Exhibit A, Scope of Work.
Attachment 2
Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Bidder Declaration (GSPD 05105) Bidder Declaration
☐ Non-Collusion Declaration Non-Collusion Declaration
☐ Darfur Contracting Act Certification
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
☐ Payment Bond Payment Bond
☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3
Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 32A0676
Exhibit A
Public Works (State)
Scope of Work
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, parts, materials, supplies, tools, equipment, traffic control, permits, travel, and incidentals necessary to provide gutter removal and replacement services as described herein.
2. The services shall be performed in Yuba County at:
Division of Equipment, Shop 3 981 N Beale Rd.
Marysville, CA 95901.
3. Any reference to Caltrans Contract Manager shall also include his/her designee.
4. This Agreement will commence on February 13, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on November 12, 2026 (estimate). The services shall be provided during normal business hours Monday through Friday 7:00 a.m. to 3:30 p.m., excluding State holidays.
The parties may amend this Agreement as permitted by law.
5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
California Department of Transportation (Caltrans):
Contractor: TBD
Section/Unit: District 32/Equipment Project Manager:
Caltrans Contract Manager:
Address: 981 N Beale Rd., Marysville CA 95901
Address
Business Phone Number: Business Phone Number:
Email: Email:
6. Detailed Description of Work A. Contractor shall provide rain gutter and downspout replacement services for Caltrans Division of
Equipment Shop. The facility consists of two main buildings, the shop and the warehouse; and two (2) auxiliary roof structures. The shop building measures approximately 371 feet by 78 feet.
New gutters shall be installed on both sides of the building, with each side requiring approximately 371 linear feet of gutter. The shop building shall have a total of eleven downspouts, with six (6) located on the north side and five (5) on the south side. The warehouse building measures approximately 301 feet by 70 feet. New gutters shall be installed on both sides, with each side requiring approximately 301 linear feet of gutter. The warehouse shall have a total of 12 downspouts, with six (6) on each side placed in their existing locations. The auxiliary roof attached to the shop shall have approximately 78 linear feet of new gutter and one
Exhibit A
Public Works (State)
(1) downspout. This downspout may be placed at either end, with the gutter graded to ensure proper drainage. The auxiliary roof attached to the warehouse wash rack shall have approximately 75 linear feet of new gutter and one downspout, which shall be installed in the same location as the current downspout. All downspouts throughout the facility shall be approximately four (4) inches in diameter. See Shop 3 Gutter Site Map, Attachment 4.
B. Contractor shall remove and legally dispose of existing rain gutters, downspouts, and metal flashing without causing damage to the existing roof. All removed materials shall be legally disposed of at no additional cost to Caltrans.
C. Contractor shall furnish and install new perimeter metal flashing, rain gutters, and downspouts fabricated from 24-gauge metal or thicker.
1) Rain gutters and downspouts shall be installed in the same locations and be of the same size as existing, unless otherwise approved by Caltrans Contract Manager in his/her sole discretion.
2) Rain gutters, downspouts, and flashing shall be primed and painted using quality low volatile organic compound (VOC) latex paint. The final color shall be approved by Caltrans Contract Manager prior to purchase and installation.
3) Contractor shall be responsible for all paint touch-up and overspray cleanup for the duration of the Agreement.
4) All fasteners furnished and installed shall be stainless steel, factory-coated galvanized steel, or other corrosion-resistant steel.
D. Contractor shall verify all dimensions prior to purchasing materials. Should incorrect quantities be ordered due to Contractor’s failure to verify dimensions, Contractor shall purchase additional materials at its sole expense.
E. Contractor shall convene a pre-project meeting with Caltrans Contract Manager prior to commencement of work. This meeting shall establish work hours, material storage, inspection procedures, material colors, manufacturer warranties, and other pertinent project details. All discussions and agreements shall be documented, and copies distributed to all participants.
Contractor shall provide written notice of the meeting to all participants at least 72 hours in advance.
F. All work under this Agreement shall be completed within six (6) months after work begins, unless an extension is granted in writing by Caltrans Contract Manager.
7. Materials A. Contractor shall furnish all new materials required for completion of the gutter, downspout, and metal flashing replacement work. All materials shall conform to the Uniform Building Code (UBC) and applicable industry standards.
B. Materials shall be manufactured, handled, and installed in a workmanlike manner to ensure quality and durability. All materials and workmanship shall be subject to inspection and testing by Caltrans Contract Manager. Contractor shall provide material samples to Caltrans Contract Manager upon request at no cost.
C. Reports and records of inspections and material tests shall be made available to Caltrans Contract Manager upon request.
Exhibit A
Public Works (State)
D. All manufacturer warranties, guarantees, instruction sheets, and parts lists shall be provided to Caltrans Contract Manager prior to commencement of work.
8. Defective Materials All materials supplied by Contractor which Caltrans Contract Manager has determined do not conform to the requirements of this Agreement will be rejected whether in place or not. They shall be removed immediately from the work site, unless otherwise directed by Caltrans Contract Manager. No rejected material, the defects of which have been subsequently corrected, shall be used in the work, unless advance approval in writing has been given by Caltrans Contract Manager.
Upon failure of Contractor to comply promptly with any order of Caltrans Contract Manager regarding defective materials, Caltrans Contract Manager shall have authority to order the removal and replacement of rejected material and to deduct the cost thereof from any money due or to become due to Contractor.
9. Compliance All work performed and materials used by Contractor must be in compliance with applicable UBC and local codes. Work must also be in compliance with current industry standards. While it is not necessary to obtain building permits to perform the work on Caltrans-owned properties, the work may be subject to inspection by local code enforcement. The Caltrans General Maintenance Contract Inspector may also inspect the work completed by Contractor before acceptance of the work.
10. Workmanship A. Any work or material found to be substandard or out of compliance under Sections 7058 and
7059 (Business and Professions Code) by Caltrans Contract Manager, will subject the Contractor to a call back to redo the job and bring the job up to standard code. Any call back and any materials required will be at Contractor's sole expense.
B. If poor work by Contractor persists and necessitates a third "call back" to complete/correct jobs, Contractor is hereby advised this poor work record will constitute grounds for contract termination. If Contractor does not correct the work, Caltrans may hire another contractor to complete the work and the cost of the work shall be paid for by the original Contractor identified in this Agreement.
11. Work Site Clean-up A. No area is available for the exclusive use of Contractor. Contractor shall arrange with Caltrans
Contract Manager areas to store equipment and materials within the work site.
B. Tools shall not be cleaned nor shall cleaning liquids be disposed of in State sanitary facilities or sewers.
C. Contractor shall own and assume all responsibility for all litter, waste, debris, and similar materials arising from or produced by the work performed under this Agreement. Contractor shall clean and keep the area in orderly, safe, and clean condition, as applicable to the services in accordance with the Exhibit A, Scope of Work. If the work site is not left in a clean and orderly condition in the sole opinion of Caltrans Contract Manager, Contractor shall be called back to correct the condition at no additional charge to Caltrans.
Exhibit A
Public Works (State)
D. Contractor shall promptly remove such litter, waste, debris, and other materials produced during this work and legally dispose of them in accordance with applicable federal, state, county, city and municipal laws, ordinances, rules, and regulations. No litter, waste, debris, or other materials shall be deposited in any Caltrans dumpsters without advanced written permission of Caltrans Contract Manager.
E. Once Contractor takes possession of the materials, Contractor will take ownership of the materials and will dispose of or recycle them in a lawful manner in accordance with the Exhibit A, Scope of Work.
12. Final Clean-up Contractor shall leave the work site in a clean and neat condition. If the work site is not left in a clean and neat condition, Contractor shall be called back to clean the work site as required at its sole expense. No invoice shall be paid unless the site has been cleaned to the satisfaction of Caltrans Contract Manager. All debris generated by Contractor’s performance of the services, including any and all discarded parts or materials, shall be removed from work site upon completion of services each day, hauled away, and legally disposed of by Contractor, according to all local, State, and Federal laws.
13. Inspection and Acceptance for Payment Work is subject to inspection and acceptance by Caltrans Contract Manager. Caltrans Contract Manager shall have the ultimate responsibility and authority to determine whether Contractor satisfied all duties and obligations under this Agreement, including specifically whether Contractor delivered all work (i.e. product and deliverables or services) and whether Contractor’s work (i.e.
product and deliverables or services) satisfied all the applicable criteria in accordance with this Exhibit A, Scope of Work. Any work that needs corrections shall be at Contractor’s sole cost and expense. Failure to begin work and to complete work as required by this Agreement shall be considered grounds for termination of this Agreement for default in accordance with Exhibit D, Item 2, Termination.
14. Contractor’s Responsibilities A. Contractor shall ensure only qualified and competent personnel are permitted on the job site and the work is safely performed by the highest industry standards. Contractor shall take all necessary precautions to prevent injury or hazard to Caltrans employee(s) or the public.
B. Contractor shall comply with all applicable federal, state, county, city and municipal laws, ordinances, rules, and regulations which in any manner affect those engaged or employed in the work to be performed in this Agreement.
C. Contractor shall avoid causing unreasonable inconvenience to any person(s) doing business on Caltrans property. In the event Contractor’s operation creates a condition hazardous to the Caltrans property occupants or the general public, Contractor shall provide all applicable warning signs alerting to any dangerous conditions at Contractor’s own expense and without cost to Caltrans.
D. Contractor shall obtain and pay for all permits, licenses, registrations, and certificates required by local ordinances as applicable to this Agreement and its Exhibit A, Scope of Work.
Exhibit A
Public Works (State)
15. Character of Work Persons If subcontractor(s) or person(s) employed by Contractor appears to Caltrans Contract Manager to be incompetent or to act in an unprofessional, disorderly or improper manner, that person shall be removed immediately from the work site on the request of Caltrans Contract Manager and such person shall not be allowed to provide further service under this Agreement.
16. Discovery of Asbestos, Lead-based Paint, or Other Hazardous Substances/Materials A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor shall STOP WORK IMMEDIATELY. Contractor shall verbally notify Caltrans Contract Manager of these findings immediately and confirm verbal notification in writing within 24 hours. Contractor is not responsible for any work related to clean up or disposal of these substances.
B. Continuation of work shall not commence until Contractor has been authorized to do so in writing by Caltrans Contract Manager.
C. Should it become necessary to terminate work, Contractor shall be compensated only for work completed to Caltrans Contract Manager’s satisfaction. No payment shall be made for delay or lost profits anticipated for uncompleted work.
D. Failure to notify Caltrans Contract Manager of the discovery of asbestos, lead-based paint, or other hazardous substances/materials may result in immediate termination of the Agreement for default per Exhibit D, Item 2. Contractor shall be responsible for all damages arising from failure to disclose the discovery of any hazardous substances.
17. Warranty A. All materials and supplies shall be installed in a manner which ensures they maintain the manufacturer's warranty.
B. Upon completion and acceptance of work by Caltrans Contract Manager, Contractor shall provide a warranty for one (1) year against defects and deficient workmanship. Contractor shall guarantee all parts, components, and services that were provided under this Agreement.
18. Waste Disposal Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. seq.
Exhibit B
Public Works–State
Budget Detail and Payment Provisions
1. Invoicing and Payment
A. For services satisfactorily rendered and approved by Caltrans Contract Manager, and upon receipt and approval of the invoices, Caltrans agrees to compensate Contractor in accordance with the Price Quote Proposal, Attachment 1, and this Exhibit B.
Incomplete or disputed invoice(s) shall be returned to Contractor, unpaid, for correction.
B. Contractor will be paid a lump sum of TBD, in arrears, in full payment for all work and services performed under this Agreement.
C. The invoice shall include:
1) Agreement Number 32A0676
2) Dates of Service
3) Description of Work Performed
D. The invoice shall be submitted in triplicate to:
California Department of Transportation (Caltrans) Office/Unit Non-IT Contracts, 65 Attention: Contract Manager’s Name TBD 1727 30th St.
Sacramento, CA 95816
E. Contractor shall submit a certified copy of all payroll records for verification by Caltrans Contract Manager and/or designee with each invoice. Delinquent or inadequate certified payrolls or other required documents will result in the withholding of payment until such documents are submitted by Contractor.
2. Budget Contingency Clause A. It is mutually understood between the parties that this Agreement may have been written before ascertaining the availability of congressional or legislative appropriation of funds, for the mutual benefit of both parties in order to avoid program and fiscal delays that would occur if the Agreement were executed after that determination was made.
B. This Agreement is valid and enforceable only if sufficient funds are made available to Caltrans by United States Government or California State Legislature for the purpose of this program. In addition, this Agreement is subject to any additional restrictions, limitations, conditions, or any statute enacted by the Congress or the State Legislature that may affect the provisions, terms, or funding of this Agreement in any manner.
C. It is mutually agreed that if Congress or State Legislature does not appropriate sufficient funds for the program, Agreement shall be amended to reflect any reduction in funds.
D. Pursuant to Government Code Section 927.13, no late payment penalty shall accrue during any time period for which there is no Budget Act in effect, nor on any payment or refund that is the result of a federally mandated program or that is directly dependent upon the receipt of federal funds by a state agency.
E. Caltrans has the option to terminate the Agreement under the 30-day termination clause or to amend the Agreement to reflect any reduction of funds.
Exhibit B
Public Works–State
3. Prompt Payment Clause A. Payment will be made in accordance with,…