IFPQ_10A2848.pdf
PDF 2 MB Posted
- Solicitation number
- 10A2848
- Issued by
- San Joaquin County, San Joaquin City, Stockton City, California
About this file
This is an Invitation for Price Quote (IFPQ) issued by the California Department of Transportation (Caltrans) for concrete replacement services at its District 10 office complex in Stockton, California, located in San Joaquin County. The project requires the excavation, disposal, and reconstruction of concrete walkways and crossover paths across five designated areas at the Caltrans facility (1976 E. Dr. Martin Luther King Jr. Boulevard, Stockton, CA 95205). The total work includes removing and replacing approximately 311 linear feet of concrete walkways ranging from 4 to 6 feet in width and 4 inches in thickness, with new concrete constructed with wire mesh reinforcement in accordance with 2025 Caltrans Standard Specifications. An optional site inspection is scheduled for December 16, 2025, at 10:00 a.m., with written questions due by December 18, 2025, at 5:00 p.m. Price quotations must be submitted by December 23, 2025, at 5:00 p.m., with an estimated award date of January 12, 2026. The contract term is estimated to commence February 1, 2026, and expire January 31, 2027, with work to be performed during normal business hours Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding state holidays. Subcontracting is not permitted under this agreement.
This solicitation is restricted to certified Small Businesses (SB), Microbusinesses (MB), Small Businesses for the purpose of public works (SB-PW), or Disabled Veteran Business Enterprises (DVBE), with a maximum bid cap of $461,000.00 under Government Code Section 14838.7. Bidders must hold a current C-8 (Concrete Contractor) license from the California Contractors State Licensing Board and valid Department of Industrial Relations registration at the time of submittal and throughout the contract term. Prevailing wage requirements apply if the total bid exceeds $15,000.00, with all applicable wage rates published by the Director of Industrial Relations for San Joaquin County. If the bid exceeds $25,000.00, a payment bond equal to 100 percent of the contract amount is required prior to work commencement. Insurance requirements include commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability ($1,000,000 combined single limit), and workers' compensation with statutory limits. The contract will be awarded to the responsible bidder submitting the lowest responsive price quote that meets all specifications and requirements. Caltrans must receive a minimum of two price quotes from certified SB/MB or DVBE firms to proceed with award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
December 5, 2025
Invitation for Price Quote (IFPQ)
IFPQ # 10A2848
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 10A2848 entitled Concrete Replacement Services, Stockton, CA – San Joaquin County. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00, to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Laura Heberle California Department of Transportation (Caltrans) Email address: laura.heberle@dot.ca.gov Phone: (279) 234-2526
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing and at a Site Inspection to be held on December 15, 2025. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Laura Heberle Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:laura.heberle@dot.ca.gov
Invitation for Price Quote IFPQ Number 10A2848
A) Purpose and Description of Services
1. Contractor shall furnish all labor, tools, equipment, parts, materials, supplies, permits, travel, and incidentals necessary to provide concrete replacement services to Caltrans.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. Bidder shall have at time of submittal and for the duration of this Agreement a current and valid C-8 (Concrete Contractor) license issued by the California Contractors State Licensing Board (CSLB).
2. Bidder shall possess at the time of bid submittal and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.
3. By submitting its bid, Bidder certifies, under penalty of perjury, that its CSLB license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
4. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule
It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time (Pacific Time)
IFPQ available to prospective bidders 12/05/2025 Optional Site Inspection 12/15/2025 10:00 a.m.
Written Question Submittal 12/17/2025 5:00 p.m.
Final Date for Quote Submission 12/23/2025 5:00 p.m.
Proposed Award Date (estimate) 01/12/2026
2. Optional Site Inspection A. An optional site inspection is scheduled at 10:00 a.m. on December 15, 2025, 1976 E. Dr.
Martin Luther King Jr. Boulevard, Stockton, CA 95205 for the purpose of discussing concerns regarding this IFPQ.
B. In the event a potential prime contractor is unable to attend the optional site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one
(1) company.
C. All prospective contractors are to be assembled at Caltrans, 1976 E. Dr. Martin Luther King Jr.
Boulevard, Stockton, CA 95205, at 10:00 a.m. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.
3. Reasonable Accommodation
For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the site inspection to arrange for a reasonable accommodation.
4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by 5:00 p.m. on December 17, 2025.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 10A2848. Questions must be sent to the following email:
Email: laura.heberle@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
5. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.
6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of San Joaquin as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
mailto:laura.heberle@dot.ca.gov https://caleprocure.com/pages/index,aspx https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
9. Mandatory Organic Waste Recycling
Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and
34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
12. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current C-8 (Concrete Contractor) license issued by the CSLB, for the type of work to be performed.
Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).
13. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
14. Non-Collusion Declaration for Public Works
Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.
15. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
16. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
17. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.
18. Darfur Contracting Act
A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
19. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by
Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL, as shown in the following example:
IFPQ Number: 10A2848
PRICE QUOTATION SUBMITTAL–DO NOT OPEN
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: laura.heberle@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
mailto:laura.heberle@dot.ca.gov
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at laura.heberle@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.
20. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
mailto:laura.heberle@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
21. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
22. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
23. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting
A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system,
b) Risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 10A2898 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1
ADM-1412 (REV. 9/2025)
Contractor’s Name (Please Print):
Item Number
Estimated Quantity
Unit Of Measure Item
Total
1 1 Lump Sum
All labor, tools, equipment, parts, materials, supplies, permits, travel, and incidentals necessary to excavate, dispose, reconstruct and create cement walkways and crossover path on the District Office campus per STD 213, Exhibit A, Scope of Work. $
Note: Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
Attachment 2
Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Non-Collusion Declaration Non-Collusion Declaration
☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification
☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
Payment BondPayment Bond
Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3
Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 10A2848
Exhibit A
Public Works (State)
Scope of Work
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, tools, equipment, parts, materials, supplies, permits, travel, and incidentals necessary to excavate, dispose, reconstruct, and create sections of walkways as described herein.
2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.
3. The services shall be performed at 1976 E. Dr. Martin Luther King Jr. Boulevard, Stockton, CA 95205.
4. Any reference to Caltrans Contract Manager shall also include his/her designee.
5. This Agreement will commence on February 1, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on January 31, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday 8:00 a.m. to 5:00 p.m., excluding State holidays.
The parties may amend this Agreement as permitted by law.
6. This Agreement cites specific portions of the most current version of the Caltrans 2025 Standard Plans and Specifications (including revisions), herein collectively referred to as the “Standard Specifications”. The Standard Specifications can be accessed via the Internet at:
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications. Only the sections of the Standard Specifications cited in this Agreement are requirements and are hereby incorporated by this reference as if attached to this Agreement. All other portions of the Standards Specifications are not applicable to this Agreement.
7. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval from Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
California Department of Transportation (Caltrans):
Contractor: TBD
Section/Unit: District 10/Administration Project Manager:
Caltrans Contract Manager: TBD
Address 1976 E. Dr. Martin Luther King Jr.
Boulevard, Stockton, CA 95205
Address
Business Phone Number: Business Phone Number:
Email: Email:
8. Pre-Work Planning Meeting and Timeline A. Contractors shall begin work within five (5) business days of receiving a written approval notification or Notice to Proceed (NTP) by Caltrans Contract Manager. Failure to begin work within five (5) business days, or to execute the work within the time frame agreed upon, shall be https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Exhibit A
Public Works (State) considered grounds for termination of this Agreement in accordance with Exhibit D, Item 2, Termination.
B. After receiving the NTP from Caltrans Contract Manager, Contractor shall contact Caltrans Contract Manager to schedule a mutually agreed upon date for the Pre-Work Meeting and walk through to discuss the process steps and schedule of work performance.
C. The Pre-Work Meeting shall be held within five (5) days of the NTP.
D. Caltrans Contract Manager will discuss and pre-approve the schedule and dates for work to be completed within the time frame provided in this Agreement. All work scheduling shall be coordinated with Caltrans Contract Manager.
9. Detailed Description of Work A. Contractor shall be responsible for assuring all underground utilities are properly marked and located prior to demolition of existing concrete or asphalt. During demolition of existing concrete or asphalt, Contractor shall avoid damage to slabs/curbs, vegetation, structures etc. that are to remain in place. Any damage caused by Contractor to existing slabs/curbs, vegetation, structures etc. during demolition process, shall be repaired and/or replaced at Caltrans Contract Manager’s discretion, and at no additional cost to Caltrans.
B. Contractor shall provide all labor, tools, equipment, parts, materials, supplies, permits, travel, and incidentals necessary to perform the following:
1) Location: Building 1, East walkway (See Attachment A, and Attachment B, Area 1).
Contractor shall remove, and legally dispose of 120 feet (120’) long by six feet (6’) wide by four inches (4”) thick of walkway. Contractor shall remove the existing concrete path, level the ground to meet grading requirements in accordance with 2025 Standard Specifications 24-2.03F Finish Grading, and replace with new concrete walkway of the same measurements, a minimum of four inches (4”) deep with wire mesh reinforcement in accordance with 2025- Standard Specifications 52-1.02D to ensure code compliance.
Contractor shall be responsible for verifying all measurements.
2) Location: Building 1, East pedestrian entrance walkway (See Attachment A, and Attachment B, Area 2). Contractor shall remove, and legally dispose of 35 feet (35’) long by five feet (5’) wide by four inches (4”) thick of walkway. Contractor shall remove the existing concrete path, level the ground to meet grading requirements in accordance with 2025- Standard Specifications 24-2.03F Finish Grading, and replace with new concrete walkway of the same measurements, a minimum of four inches (4”) deep with wire mesh reinforcement in accordance with 2025- Standard Specifications 52-1.02D to ensure code compliance. Contractor shall be responsible for verifying all measurements.
3) Location: Building 9, East walkway (See Attachment A, and Attachment B, Area 3).
Contractor shall remove, and legally dispose of 115 feet (115’) long by five feet (5’) wide by four inches (4”) thick of walkway. Contractor shall remove the existing concrete path, level the ground to meet grading requirements in accordance with 2025- Standard Specifications 24-2.03F Finish Grading, and replace with new concrete walkway of the same measurements, a minimum of four inches (4”) deep with wire mesh reinforcement in accordance with 2025- Standard Specifications 52-1.02D to ensure code compliance.
Contractor shall be responsible for verifying all measurements.
Exhibit A
Public Works (State)
4) Location: Building 1, North parking lot walkway (See Attachment A, and Attachment B, Area 4). Contractor shall remove, and legally dispose of 30 feet (30’) long by five feet (5’) wide by four inches (4”) thick of walkway. Contractor shall remove the existing concrete path, level the ground to meet grading requirements in accordance with 2025- Standard Specifications 24-2.03F Finish Grading, and replace with new concrete walkway of the same measurements, a minimum of four inches (4”) deep with wire mesh reinforcement in accordance with 2025- Standard Specifications 52-1.02D to ensure code compliance.
Contractor shall be responsible for verifying all measurements.
5) Location: Building 1, North parking lot crossover path (See Attachment A, , and Attachment B, Area 5). Contractor shall remove, and legally dispose of 11 feet (11’) long by five feet (5’) wide by four inches (4”) thick of walkway. Contractor shall remove the existing concrete path, level the ground to meet grading requirements in accordance with 2025- Standard Specifications 24-2.03F Finish Grading, and replace with new concrete walkway of the same measurements, a minimum of four inches (4”) deep with wire mesh reinforcement in accordance with 2025- Standard Specifications 52-1.02D to ensure code compliance. Contractor shall be responsible for verifying all measurements.
10. Site Conditions A. Contractor shall visit the job site and become familiar with the existing conditions. Contractor shall be responsible for knowledge of the site conditions.
B. Information on any applicable drawings provided is approximate only. Minor deviations found necessary during the progress of construction to conform to actual locations shall be made by Contractor at no additional cost to Caltrans.
C. Should any error, discrepancies, or doubt arise as to the intent and purpose of this Agreement, Contractor shall immediately contact Caltrans Contract Manager for further instructions before proceeding.
11. Additional Contractor Requirements A. Contractor shall inform Caltrans Contract Manager of any code changes related to the service.
Contractor shall only do the specific work that is authorized by Caltrans Contract Manager.
B. Contractor is expected to be able to work in a professional, competent manner without direct supervision by Caltrans Contract Manager.
C. If Contractor fails to begin work in the time required, this shall be considered default and be grounds for termination of this Agreement pursuant to Exhibit D, Item 2, Termination.
D. It is understood and agreed that any and all work assigned pursuant to this Agreement is to be performed in accordance with the requirements of this Agreement.
12. Code of Conduct
A. Contractor and its employees shall be aware they are working on Caltrans property and be courteous and respectful at all times.
B. Contractor and its employees shall refrain from using loud voices, inappropriate language and shall conduct themselves in a professional manner at all times.
C. Caltrans guidelines and policies - It is the duty of Contractor and its staff to read and adhere to Caltrans policies and directives, available to Caltrans staff including, but not limited to the
Exhibit A
Public Works (State)
Director’s Policy (DP) 3-Health and Safety, DP 18-Workplace Violence Prevention, Deputy Directive (DD) 8-Drug Free Workplace, DD 22-Weapons Prohibited on Caltrans Buildings and Caltrans Property, DD 49-Sexual Harassment Prevention.
D. If any person employed by Contractor appears to Caltrans Contract Manager to be incompetent or to act in a disorderly, unsafe, or improper manner, that person will be removed from the premises immediately and will no longer be employed on this Caltrans Agreement, unless agreed in advance by Caltrans Contract Manager.
E. If Contractor’s employees display any behavior that Caltrans Contract Manager deems inappropriate or offensive, Caltrans Contract Manager shall have the right to request that employee be removed from doing further work on this Agreement by Contractor
13. Public Safety A. While concrete related work is being performed, Contractor shall post signs and barriers to prevent Caltrans employees or the public from entering the workspace. The signs and barriers shall be approved by the Caltrans Contract Manager.
B. If any person employed by Contractor appears to Caltrans Contract Manager to be incompetent or to act in a disorderly, unsafe, or improper manner, that person will be removed from the premises immediately and will no longer be employed on this Caltrans Agreement, unless agreed in advance by Caltrans Contract Manager.
C. If Contractor’s employees display any behavior that Caltrans Contract Manager deems inappropriate or offensive, Caltrans Contract Manager shall have the right to request that employee be removed from doing further work on this Agreement by Contractor.
14. Damages to State Property A. In the event that any Caltrans property is damaged as a result of the actions of Contractor or its employees, Contractor shall repair, at its sole expense, the damage which has occurred as a direct result of Contractor or its employees in performing the services.
B. Repair efforts must be performed in a manner which ensures all warranties are maintained for any products that are damaged.
15. Contractor’s Responsibilities A. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed to the highest industry standards.
B. Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s) and/or to the general public and shall avoid causing any unreasonable inconvenience to any person doing business on Caltrans property.
C. Contractor shall be responsible for any and all liability imposed by law or Agreement for any damage to any person resulting from any causes whatsoever during the performance of these services.
D. Contractor shall conduct its operation as to avoid damage to the property of Caltrans or to adjacent property. If any property is damaged due to Contractor's operation(s), such property shall be replaced or restored at Contractor's sole expense and to the satisfaction of Caltrans.
E. Contractor shall conduct its operations in such a manner that existing facilities, surfacing, installations, and utilities, shall remain in place, and will not be damaged.
Exhibit A
Public Works (State)
F. All access areas, including lawn and concrete sidewalks, shall be protected by Contractor from Contractor's materials and equipment.
G. Contractor shall obtain and pay for all permits and licenses, regulations and certifications required by local ordinances.
H. Contractor shall plan its work to minimize interference with Caltrans staff, other Contractor's working at the facility, and the public.
16. Delivery, Storage and Handling A. Materials shall be delivered to the job site in the manufacturer’s original unopened packages clearly labeled with manufacturer’s name and identification numbers.
B. Materials shall be stored in strict accordance with the manufacturer’s printed storage requirements and protected from adverse weather conditions.
C. Material shall be handled in such a manner as to prevent damage.
D. Damaged materials shall be replaced at Contractor's sole expense.
17. Areas for Contractors Use A. No area is available within the work areas for the exclusive use of Contractor.
B. Contractor shall arrange with Caltrans Contract Manager for storage areas for equipment and materials within the Caltrans Facility.
18. Temporary Utilities
Contractor may obtain electrical power and water from existing Caltrans electrical power and water outlets within the project limits free of charge for the Agreement operations, provided such utility services are in service and are not required by Caltrans for other purposes.
19. Sanitary Facilities A. Caltrans owned sanitary facilities will be available for use by Contractor's personnel during normal working hours and when operational.
B. Contractor shall not use sanitary facilities or sewers to clean tools or dispose of cleaning liquids.
20. Work Site Clean-up A. Contractor shall own and assume all responsibility for all litter, waste, debris and similar materials arising from or produced by the work performed under this Agreement.
B. Contractor shall clean and keep the area in orderly, safe, and clean condition, including but not limited to spills and smudges.
C. If the work site is not left in a clean and orderly condition, Contractor shall be called back to correct the condition at no extra charge to Caltrans.
D. Contractor shall promptly remove such litter, waste, debris and other materials produced during this work and legally dispose of them at no additional cost to Caltrans.
E. No such litter, waste, debris and other materials shall be deposited in any Caltrans dumpster without advance written permission of Caltrans Contract Manager.
Exhibit A
Public Works (State)
F. Such litter, waste, debris, and other materials are not expected to include hazardous waste.
However, if hazardous waste is encountered, Contractor shall notify Caltrans Contract Manager for removal of the hazardous waste.
G. Once Contractor takes possession of the materials, Contractor shall take ownership of the materials and shall dispose of or recycle the materials in a lawful manner.
H. Contractor's bid shall include the cost to dispose of or recycle the materials and Contractor shall be responsible for such disposal and recycling costs.
21. Inspection and Acceptance for Payment A. It is the responsibility of Contractor to notify Caltrans Contract Manager that the work is complete and ready for inspection. Work is subject to inspection and acceptance by Caltrans Contract Manager.
B. Caltrans Contract Manager will have the ultimate responsibility and authority to determine whether Contractor’s satisfied Contractor’s duties and obligations under the Agreement, including specifically whether Contractor delivered all work product and deliverables and whether Contractor’s work product and deliverables satisfied all of the applicable contract requirements (including acceptance criteria or tests).
C. Approval of work constitutes approval for payment and not transference or termination of Contractor’s responsibility to perform work in accordance with the terms of the Agreement, and any work that needs corrections shall be at Contractor's sole cost and expense in a timely manner.
D. Regardless of any prior inspections and acceptances of work during the term of this Agreement, all work is subject to final inspection and approval by Caltrans Contract Manager. The operation of the equipment by Caltrans does not constitute an acceptance of completed work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .