IFPQ_07A6316.pdf
PDF 578 KB Posted
- Solicitation number
- 07A6316
About this file
Summary: Invitation for Price Quote (IFPQ) for Eyewash Station Services
This Invitation for Price Quote (IFPQ) 07A6316 is issued by the California Department of Transportation (Caltrans), Division of Procurement and Contracts, for eyewash station removal and replacement services at nine maintenance facilities throughout Los Angeles County. The scope of work includes removing and legally disposing of 17 existing eyewash stations and installing 18 replacement eyewash stations (17 replacements plus one new installation) at designated Caltrans maintenance locations in Cerritos, Florence, Bellflower, Rosemead, East Los Angeles, Pomona, Diamond Bar, Monrovia, and Whittier. The work must comply with the latest California Building Code and ANSI/ISEA Z358.1-2014 Performance requirements and includes installation of water heaters, water lines, mixing valves, trenching, backfill, and concrete/asphalt repair as necessary. The solicitation requires written questions by February 17, 2026, at 5:00 p.m. Pacific Time, with final price quote submission deadline of February 24, 2026, at 5:00 p.m. The estimated award date is March 3, 2026. The contract is estimated to commence on April 1, 2026, and expire on March 31, 2027, with services to be performed during normal business hours Monday through Friday from 6:30 a.m. to 3:30 p.m., excluding State holidays.
This solicitation is restricted to certified Small Businesses (SB), Microbusinesses (MB), Small Businesses for public works purposes (SB-PW), or Disabled Veteran Business Enterprises (DVBE) with Department of General Services certification. The maximum allowable bid is $461,000, with prevailing wages required if the total bid exceeds $15,000. Bidders must possess a valid Class A General Engineering Contractor or C 36 Plumbing Contractor license from the California Contractors State Licensing Board and current Department of Industrial Relations registration. Caltrans must receive a minimum of two price quotes from certified SB/MBs or DVBEs before award. Required submittals include a completed Price Quote Proposal (ADM-1412), Bid/Bidder Certification Sheet, Non-Collusion Declaration, Darfur Contracting Act Certification, California Civil Rights Laws Certification, proof of DGS certification, DIR registration documentation, and valid contractor license documentation. Payment bonds are required if the bid exceeds $25,000, and insurance requirements include commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability ($1,000,000 combined single limit), and workers' compensation with statutory limits. No subcontracting is permitted under this agreement. The contract includes comprehensive prevailing wage, payroll record, apprenticeship employment, and other labor compliance requirements applicable to public works projects.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
February 9, 2026
Invitation for Price Quote (IFPQ)
IFPQ 07A6316
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 07A6316 entitled Eyewash Station Services in Los Angeles County. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00,to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a Disabled Veteran Business Enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Matthew Stephens California Department of Transportation (Caltrans) Email address: Matthew.Stephens@dot.ca.gov Phone: (279) 234-2331
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing, in accordance with the Questions and Answers portion of this IFPQ. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Matthew Stephens Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:Matthew.Stephens@dot.ca.gov
Invitation for Price Quote IFPQ Number 07A6316
A) Purpose and Description of Services
1. Contractor shall furnish all labor, tools, incidentals, complete plans, equipment, disposal, travel, inspector fees, and other fees necessary to remove and replace eyewash stations to Caltrans.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. By submitting its bid, bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
2. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR).
Caltrans will verify bidder’s DIR registration.
3. Bidder shall be a certified Small Business (SB) or a Disabled Veteran Business Enterprise (DVBE) with the Department of General Services (DGS).
4. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule
It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time (Pacific Time)
IFPQ available to prospective bidders 02/09/2026 Written Question Submittal 02/17/2025 5:00 p.m.
Final Date for Quote Submission 02/24/2026 5:00 p.m.
Proposed Award Date (estimate) 03/03/2026
2. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by 5:00 p.m. on February 17, 2026.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 07A6316. Questions must be sent to the following email:
Email: Matthew.Stephens@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website https://caleprocure.com. It is the responsibility of the bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the IFPQ’s schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
https://caleprocure.com/
3. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.
4. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
5. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
6. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Los Angeles as described in the Proposed Form of Agreement, Exhibit B. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
7. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
8. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and
34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Proposed Form of Agreement, Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
B. The MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
9. Contractor Registration Program A. No Contractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
D. If Contractor lists Subcontractor who is believed to be performing work that is not subject to the registration requirements, written confirmation from DIR must be obtained and submitted with the proposal to validate the bid.
10. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current Class A General Engineering Contractor or C 36 Plumbing Contractor license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).
11. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
12. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.
13. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
14. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
15. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.
16. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the Darfur Contracting Act Certification form.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
17. Price Quote Submittal A. The Price Quote should be emailed as described below. All price quotes must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:
IFPQ Number: 07A6316
PRICE QUOTATION SUBMITTAL
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: Matthew.Stephens@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at Matthew.Stephens@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) and Contractor Certification Clauses (CCC 04/2017) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.
18. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
19. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
20. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf execution, or, if determined after contract execution, shall be grounds for termination by the State.
21. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and
Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system,
b) Risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 07A6316 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1
ADM-1412 (REV. 9/2025)
Contractor’s Name (Please Print):
Item Number
Estimated Quantity
Unit Of Measure Item
Unit Price (Price Per Unit of
Measure)
Total (Estimated Quantity X
Unit Price)
1 17 Lump Sum
All labor, tools, incidentals, complete plans, equipment, disposal, travel, inspector fees, and other fees necessary to remove eyewash stations at various Caltrans maintenance facilities as described in Exhibit A, Scope of Work.
2 18 Lump Sum
All labor, tools, incidentals, complete plans, equipment, disposal, travel, inspector fees, and other fees necessary to install new eyewash stations at various Caltrans maintenance facilities as described in Exhibit A, Scope of Work.
Subtotal: $
Maximum allowable expenditure for all parts, materials, supplies, fees, and permits per Exhibit A, Item 8. Actual cost will be reimbursed based on submitted original receipts. This Amount Shall be 10 percent (10%) of the Actual Subtotal Amount (0.10 x Subtotal). Enter 10% in Total column.
1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.
3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.
Total This Proposal (Subtotal + Line 3)
Attachment 2
Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Non-Collusion Declaration Non-Collusion Declaration
☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification
☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification
☐ Copy of a valid and current certification as a Small Business (SB) or a Disabled Veteran Business Enterprise (DVBE) with the Department of General Services (DGS).
☐ Copy of valid and current registration with the Department of Industrial Relations (DIR).
☐ Copy of valid and current Class A general Engineering or C 36 Plumbing Contractor license issued by the Contractor State License Board (CSLB)
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
☐ Payment BondPayment Bond
☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3
Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 07A6316
Exhibit A
Public Works - State
Scope of Work
1. Contractor agrees to provide the California Department of Transportation (Caltrans) Eyewash
Station Services as described herein.
Contractor agrees to provide all labor, tools, incidentals, complete plans, equipment, disposal, travel, inspector fees, and other fees necessary to remove and replace eyewash stations at various Caltrans maintenance facilities to comply with the latest California Building Code and ANSI/ISEA Z358.1-2014 Performance requirements.
2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.
3. The services shall be performed at the following locations in Los Angeles County:
A. Cerritos Maintenance Station (MS) – 16949 Studebaker Road, Cerritos, CA 90701 B. Florence MS – 10903 Florence Avenue, Downy CA 90240 C. Bellflower MS – 10147 Flora Vista Street, Bellflower, CA 90701 D. Rosemead MS – 9153 East Lower Azusa Road, Rosemead, CA 91770 E. East Los Angeles MS – 102 South Humphrey Street, Los Angeles, CA 90022 F. Pomona MS – 1698 West Mission, Pomona, CA 91766 G. Diamond Bar MS – 21420 east Golden Spring Road, Walnut, CA 91789 H. Monrovia MS – 850 East Huntington Drive, Monrovia, CA 91016 I. Whittier MS – 194 South Workman Mill Road, Whitter, CA 90601
4. Any reference to Caltrans Contract Manager shall also include their designee.
5. This Agreement will commence on April 1, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on March 31, 2027 (estimate). The routine services shall be provided during normal business hours Monday through Friday 6:30 a.m. to 3:30 p.m., excluding State holidays.
The parties may amend this Agreement as permitted by law.
6. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
Exhibit A
Public Works - State
California Department of Transportation (Caltrans):
Contractor: TBD
Section/Unit: District 07/Maintenance Project Manager:
Caltrans Contract Manager: TBD
Address Address
Business Phone Number: Business Phone Number:
Email: Email:
7. Detailed Description of Work:
A. Contractor shall install one (1) new eyewash station, and remove, legally dispose of, and replace 17 existing eyewash stations as described by Caltrans Contract Manager and as follows:
1) Cerritos MS – Remove and legally dispose of one (1) eyewash station and replace with similar to existing.
2) Florence MS - Remove and legally dispose of one (1) eyewash station and replace with similar to existing.
3) Bellflower MS - Remove and legally dispose of two (2) eyewash stations and replace with similar to existing.
4) Rosemead MS - Remove and legally dispose of two (2) eyewash stations and replace with similar to existing.
5) East Los Angeles MS – Remove and legally dispose of two (2) eyewash stations and replace with similar to existing.
6) Pomona MS – Remove and legally dispose of two (2) eyewash stations and replace with similar to existing.
7) Diamond Bar MS – Remove and legally dispose of one (1) eye wash station and replace with similar to existing.
8) Monrovia MS – Remove and legally dispose of three (3) eyewash stations and replace with similar to existing.
9) Whittier MS - Remove and legally dispose of three (3) eyewash stations and replace with similar to existing. Install one (1) new additional eyewash station at this site.
B. Before starting work, Contractor shall designate, in writing, an authorized representative who shall have the authority to represent and act on Contractor’s behalf. Contractor’s authorized representative or designee shall be present at the work site while work is in progress.
Contractor’s representative shall provide a working telephone number to Caltrans Contract Manager prior to the start of work.
C. Contractor shall remove old eyewash stations where necessary, install new eyewash stations with signage at locations listed above. Install new water heaters to supply hot water required at each eyewash location, and new water line (underground and above ground) wherever it is required. Install new mixing valve to temper water and maintain required temperature at each
Exhibit A
Public Works - State eyewash location. All the work must comply with the latest version of California Building Code and ANSI/ISEA Z358.1-2014 Performance requirements.
D. Contractor shall provide trenching and backfill for any underground water, sewer and electrical lines if required, as well as concrete or asphalt repair at trench locations and where the existing eyewash stations have been removed.
E. Caltrans Contract Manager must approve all the equipment and material prior to installation.
Contractor to provide a submittal presenting the specs for plumbing and electrical material or equipment they wish to install.
F. Contractor crew shall wear Personal Protective Equipment (PPE) complying with OSHA and Caltrans requirements.
8. Parts/Materials/Supplies/Fees/Permits A. Contractor shall notify Caltrans Contract Manager in writing of any parts/materials/ supplies/fees/permits not specifically identified in Attachment 1, Price Quote Proposal that are necessary to complete the work. Written approval from the Caltrans Contract Manager must be obtained prior to the purchase or installation of such items for the costs to be eligible for reimbursement.
B. Contractor will be reimbursed for the actual cost of pre-approved parts/materials/ supplies/fees/permits purchased to be consumed or installed at the work site in performance of the Agreement (including applicable sales tax), without additional allowance for markup. No additional compensation will be made for the cost to acquire, store, deliver, or use/install any purchased items. Cost of parts/materials/supplies/fees/ permits are to be verified and substantiated by submitting a copy of appropriately signed receipts. Total expenditure for parts/materials/supplies/fees/permits shall not exceed the amount set forth in Attachment 1, Price Quote Proposal.
C. Contractor shall not be reimbursed for any parts/materials/supplies/fees/permits that were not pre-approved in writing by Caltrans Contract Manager.
9. Materials and Requirements A. Contractor shall furnish all new materials required to complete the repairs. Only materials conforming to the latest version of California Building Code shall be incorporated in the work.
B. Materials shall be manufactured, handled, and used in a workmanlike manner to ensure completed work. Materials will be subject to inspection and test by Caltrans Contract Manger.
Contractor shall furnish samples without charge to Caltrans upon request.
C. Caltrans Contract Manager may inspect, sample, or test materials at the source of supply or other locations. Such inspection, sampling, or testing will not be undertaken until Caltrans Contract Manager is assured by Contractor of the cooperation and the assistance of Contractor and the supplier.
D. Contractor shall allow Caltrans Contract Manager access, at all times, to materials being inspected, sampled, or tested. Such inspections and tests made shall in no way guarantee acceptance of materials.
E. Reports, records of inspections and tests shall only be made available to Caltrans Contract Manager upon request.
https://www.dgs.ca.gov/BSC/Codes
Exhibit A
Public Works - State
F. Any Manufacture’s warranties, guarantees, instruction sheets, and parts lists shall be turned over to Caltrans Contract Manager prior to Contractor starting work.
G. Waste materials shall be disposed of in a legal manner at no cost to Caltrans. Costs involved with disposing of material shall be included in Attachment 1, Price Quote Proposal.
Exhibit A
Public Works - State
10. Defective Materials All materials, supplied by Contractor, which Caltrans Contract Manager has determined do not conform to the requirements of this Agreement will be rejected whether in place or not. Defective materials shall be removed immediately from the site of the work, unless otherwise directed by Caltrans Contract Manager. No rejected material, the defects of which have been subsequently corrected, shall be used in the work, unless advance approval in writing has been given by Caltrans Contract Manager. Upon failure of Contractor to comply promptly with any order of Caltrans Contract Manager regarding defective materials, Caltrans Contract Manager shall have authority to cause the removal and replacement of rejected material and to deduct the cost thereof from any money due or to become due to Contractor.
11. General Contractor Responsibilities A. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards. Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s) and/or the general public.
B. Contractor shall conduct its operation in such a manner as to avoid injury or damage to the property of Caltrans or any adjacent property.
C. Contractor shall avoid causing unreasonable inconvenience to any person(s) doing business on Caltrans property. In the event Contractor’s operation creates a condition hazardous to Caltrans property, its occupants, or the general public, Contractor shall provide warning signs alerting to any dangerous conditions at Contractor’s own expense and without cost to Caltrans.
12. Contractor Project Manager Responsibilities A. Contractor Project Manager shall coordinate work-related matters and Contractor’s operations under this Agreement.
B. In addition to other responsibilities described in this Agreement, Contractor Project Manager shall be responsible for all matters related to Contractor’s personnel including, but not limited to, the following:
1) Ensure deliverables meet the criteria established by the Agreement.
2) Supervise, review, monitor, train, and direct Contractor’s personnel.
3) Include Caltrans Contract Manager in written communications to other Caltrans personnel for any clarification on the scope of work.
4) Assign qualified personnel to complete the required work, as specified, in coordination with
Caltrans Contract Manager.
5) Administer personnel actions for Contractor personnel.
6) Implement and maintain quality control procedures to ensure product and service accuracy.
7) Ensure all applicable safety measures are in place.
8) Provide invoices in a timely manner.
9) Review invoices for accuracy and completion before billing to Caltrans.
10) Ensure the schedules, deliverables and the deliverables’ requirements set forth in the
Exhibit A
Public Works - State
Agreement are satisfied.
11) Ensure compliance with the provisions in this Agreement and all specific Service Request requirements.
13. Workmanship
A. Any work or material that may be found to be substandard or out of compliance under Sections 7058 and 7059 (Business and Professions Code), Caltrans Contract Manager, will subject Contractor to a call back to redo the job and bring the job up to standard code. Any call back and any materials required will be provided at Contractor’s sole expense.
B. If poor work persists by Contractor and necessitates a third call back to complete/correct jobs, Contractor is hereby advised that this poor work record will constitute grounds for termination of the Agreement for default per Exhibit D, Termination. If Contractor does not correct the work, Caltrans shall hire another Contractor to complete the work, and the cost of the work will be paid for by the original Contractor.
14. Damages to State Property In the event that any Caltrans property is damaged as a result of the actions of Contractor, or its employees, Contractor shall repair, at its sole expense, the damage which has occurred as a direct result of Contractor, or its employees. Repair efforts must be performed in a manner in which ensures all warranties are maintained for any products that are damaged. Repair efforts shall include the full costs for all required labor and materials. If the repair must be completed by an outside entity, Caltrans Contract Manager will approve of who shall be hired to complete the work.
15. Code of Conduct Contractor and its employees shall be aware that they are working on Caltrans property and be courteous and respectful at all times. Contractor and its employees shall refrain from using loud voices, inappropriate language, and shall conduct themselves in a professional manner at all times.
If Contractor’s employees display any behavior that Caltrans Contract Manager deems inappropriate or offensive, Caltrans Contract Manager will have the right to remove that employee from doing further work on this Agreement.
16. Discovery of Asbestos, Lead-based Paint, or Other Hazardous Substances/Material A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor shall STOP WORK IMMEDIATELY. Contractor shall verbally notify Caltrans Contract Manager of these findings immediately and confirm verbal notification in writing within 24 hours. Contractor is not responsible for any work related to clean up or disposal of these substances.
B. Continuation of work shall not commence until Contractor has been authorized to do so in writing, by Caltrans Contract Manager.
C. Should it become necessary to terminate a service request, Contractor shall be compensated only for work in progress or actually completed to Caltrans Contract Manager’s satisfaction. No payment shall be made for delay or lost profits anticipated for uncompleted work.
D. Failure to notify Caltrans Contract Manager of the discovery of asbestos, lead-based paint or other hazardous substances/materials may result in immediate termination of the Agreement for default. Contractor shall be responsible for all damages arising from failure to disclose the discovery of any hazardous substances.
https://california.public.law/codes/ca_bus_and_prof_code_div_3_chap_9_art_4
Exhibit A
Public Works - State
E. No hazardous materials or waste shall be handled by Contractor. Contractor shall notify Caltrans Contract Manager of any hazardous materials immediately upon discovery.
17. Final Clean Up A. Contractor shall leave the work site in a neat and clean condition. Contractor shall clean and keep the area in an orderly, safe, and clean condition including, but not limited to, spills and smudges. If work site is not left in a clean and orderly condition, Contractor shall be called back to correct the condition at no extra charge to Caltrans.
B. Contractor shall own and assume all responsibility for litter, waste, debris, and similar materials arising from or produced by the work performed under this Agreement. Contractor shall haul away and legally discard any materials or debris caused by its work actions from the job site.
C. Contractor’s bid shall include the cost to dispose of any discarded materials resulted from installs, repairs. Contractor shall be responsible for such disposal, recycling costs and shall be included in Attachment 1, Price Quote Proposal.
18. Inspection and Acceptance for Payment A. It is the responsibility of Contractor to notify Caltrans Contract Manager that the work is complete and ready for inspection. Work will be accepted only after Contractor has adjusted equipment, demonstrated that it fulfills the requirements of any drawings and service request, and has furnished all required certificates. Work is subject to inspection and acceptance by Caltrans Contract Manager.
B. Caltrans Contract Manager will have the ultimate responsibility and authority to determine whether Contractor’s satisfied Contractor’s duties and obligations under the Agreement, including specifically whether Contractor delivered all work product and deliverables and whether Contractor’s work product and deliverables satisfied all of the applicable contract requirements.
C. Approval of work constitutes approval for payment and not transference or termination of Contractor’s responsibility to perform work in accordance with the terms of the Agreement, and any work that needs corrections shall be at Contractor's sole cost and expense in a timely manner.
D. Regardless of any prior inspections and acceptances of work during the term of this Agreement, all work is subject to final…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .