About this file

This Invitation for Price Quote (IFPQ) from the California Department of Transportation (Caltrans) District 03 solicits bids for the removal and replacement of parking lot light fixtures at the Caltrans off-site parking lot located at 902 Yuba Street, Marysville, California 95901 in Yuba County. The scope of work includes removal and legal disposal of 13 existing light fixtures on light poles, furnishing and installation of 13 new LED light fixtures with a minimum output of 18,000 lumens at 135 watts or greater with a color index of 70, and provision of three additional light fixtures for future replacement needs. An optional site inspection is scheduled for January 7, 2026 at 10:00 a.m., with written questions due by January 8, 2026 at 5:00 p.m. Price quotations must be submitted by January 13, 2026 at 2:00 p.m., with an estimated award date of January 27, 2026. The contract is estimated to commence on February 1, 2026 and expire on January 31, 2027, with work to be completed within eight weeks of the Notice to Proceed during normal business hours Monday through Friday, 7:30 a.m. to 4:00 p.m., excluding state holidays.

This solicitation is set aside exclusively for certified Small Businesses (SB), Microbusinesses (MB), Small Businesses for public works (SB-PW), or Disabled Veteran Business Enterprises (DVBE) under Government Code Section 14838.7, with a maximum bid cap of $461,000.00. Bidders must possess a valid C-10 (Electrical Contractor) license from the California Contractors State License Board and current registration with the Department of Industrial Relations. Prevailing wage requirements apply if the total bid exceeds $15,000.00. All costs including labor, materials, equipment, travel, insurance premiums, and disposal of freon must be included in the bid price. A Payment Bond equal to 100 percent of the total contract amount is required if the bid exceeds $25,000.00. Insurance requirements include Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), and Workers' Compensation with Employer's Liability ($1,000,000). Caltrans requires a minimum of two price quotes from certified SB/MB or DVBE contractors before award authorization. No subcontracting is permitted under this agreement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30TH STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

12/19/2025

Invitation for Price Quote (IFPQ)

IFPQ # 03A4093

Notice to Prospective Contractors

You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 03A4093 entitled Removal and Replacement of Parking Lot Light Fixtures in Yuba County.

“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00, to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”

This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.

In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:

Shawn Fitzpatrick California Department of Transportation (Caltrans) Email address: shawn.fitzpatrick@dot.ca.gov Phone: (279) 234-2489

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing and at an Optional Site Inspection. See Section C1, Time Schedule, for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT

LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.

Sincerely, Shawn Fitzpatrick Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/

Invitation for Price Quote IFPQ Number 03A4093

A) Purpose and Description of Services

1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, parts, tools, equipment, materials, supplies, travel, and incidentals necessary to remove and legally dispose of 13 existing light fixtures on light poles and furnish and install 13 new light fixtures with specified light heads, or equivalent. Three (3) additional light fixtures will be included for future replacement needs with Caltrans.

2. The services shall be performed at Caltrans District 03 off-site parking lot, located at 902 Yuba Street, Marysville, CA 95901, in Yuba County.

3. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. Bidder shall possess at the time of bid submittal and for the duration of the Agreement, a valid and current C-10- (Electrical Contractor) license issued from the California Contractor State License Board (CSLB).

2. Bidder must possess at the time of bid submittal and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.

3. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.

4. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Price Quotation Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFPQ available to prospective bidders 12/19/25 Optional Site Inspection 01/07/26 10:00a.m.

Written Question Submittal 01/08/26 5:00 p.m.

Final Date for Quote Submission 01/13/26 2:00 p.m.

Proposed Award Date (estimate) 01/27/26

2. Optional Site Inspection A. An optional site inspection is scheduled at 10:00 a.m., 01/07/26, at 902 Yuba Street, Marysville, CA 95901 for the purpose of discussing concerns regarding this IFPQ.

B. In the event a potential prime contractor is unable to attend the optional site inspection an authorized representative may attend on its behalf. The representative may only sign in for one

(1) company.

C. All prospective contractors are to be assembled at Caltrans, 902 Yuba Street, Marysville, CA 95901 at 10:00 a.m.. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.

3. Reasonable Accommodation For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the site inspection to arrange for a reasonable accommodation.

4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by 01/08/26.

B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 03A4093. Questions must be sent to the following email:

Email: shawn.fitzpatrick@dot.ca.gov

C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.

5. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.

6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.

7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Yuba as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification https://caleprocure.com/pages/index,aspx https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

9. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.

10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and

34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).

B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).

B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.

C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

12. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current C-10 (Electrical Contractor) license issued by the CSLB, for the type of work to be performed.

Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).

13. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A)

Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

14. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.

15. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

16. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying a Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

17. Darfur Contracting Act

A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).

18. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.

B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:

IFPQ Number: 03A4093

PRICE QUOTATION SUBMITTAL–DO NOT OPEN

C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.

D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

E. Email to: shawn.fitzpatrick@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.

G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.

H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.

Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.

J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.

Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at shawn.fitzpatrick@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.

L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.

M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.

N. Caltrans reserves the right to reject all price quotes for reasonable cause.

O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.

P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.

19. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.

B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.

C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:

https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.

20. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.

B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.

C. Antitrust Provisions

1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.

3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).

D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.

E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

21. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

22. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder / Offeror must notify the State in writing if it:

1) Intends to provide GenAI as a deliverable to the State; or

2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:

a) Functionality of a State system,

b) Risk to the State, or

c) Contract performance.

Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 03A4093 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1

ADM-1412 (REV. 9/2025)

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit Of Measure Item

Unit Price (Price Per

Unit of Measure)

Total (Estimated Quantity X Unit Price)

1 1 Each

All l labor, parts, tools, equipment, materials, supplies, travel, and incidentals necessary to remove and legally dispose of 13 existing light fixtures on light poles at the District 03 off-site parking lot per STD 213, Exhibit A, Scope of Work.

2 1 Each All labor, parts, tools, equipment, materials, supplies, travel, and incidentals necessary to furnish and install 13 new light fixtures on light poles at the District 03 off-site parking lot per STD 213, Exhibit A, Scope of Work.

3 3 Each All labor, parts, tools, equipment, materials, supplies, travel, and incidentals necessary to furnish new light fixtures and provide to Caltrans Contract Manager, per STD 213, Exhibit A, Scope of Work.

1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.

3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.

4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.

Total This Proposal $

Attachment 2

Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

☐ Attachment 1 – Price Quote Proposal (ADM-1412)

☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet

☐ Non-Collusion Declaration Non-Collusion Declaration

☐ Darfur Contracting Act Certification

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record

☐ Payment Bond https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 3

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.

2. The term of this Agreement is:

Contractor’s Name TBD Agreement Number 03A4093

Exhibit A

Public Works (State)

Scope of Work

1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, parts, tools, equipment, materials, supplies, travel, and incidentals necessary to remove and legally dispose of 13 existing light fixtures on light poles and furnish and install 13 new light fixtures with specified light heads, or equivalent, as described herein. Three (3) additional light fixtures will be furnished for future replacement needs.

2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.

3. The services shall be performed at Caltrans District 3 off-site parking lot, 902 Yuba Street, Marysville, CA 95901 in Yuba County.

4. Any reference to Caltrans Contract Manager shall also include his/her designee.

5. This Agreement will commence on February 01, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on January 31, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday, 7:30 a.m. to 4:00 p.m., excluding State holidays.

The parties may amend this Agreement as permitted by law.

6. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans):

Contractor: TBD

Section/Unit: District3/Administration Project Manager:

Caltrans Contract Manager: TBD

Address Address

Business Phone Number: Business Phone Number:

Email: Email:

7. Notice to Proceed A. Contractor shall begin work within five (5) business days of receiving a written approval notification or “Notice to Proceed” (NTP) from Caltrans Contract Manager. Contractor shall contact Caltrans Contract Manager within five (5) business days to establish the schedule and dates for work to be completed within the timeframe provided in this Agreement. All work scheduling shall be approved in writing and coordinated with Caltrans Contract Manager.

B. Once initiated, Contractor shall complete all work within eight (8) weeks, unless otherwise approved in advance, in writing, by Caltrans Contract Manager.

Exhibit A

Public Works (State)

8. Description of Work A. Contractor shall remove and legally dispose of 13 existing light fixtures on parking lot light poles.

There are five (5) poles with two (2) light fixtures each and three (3) poles with one (1) light fixture each.

B. Contractor shall furnish and install 13 new light fixtures on existing poles.

C. Contractor shall furnish three (3) additional light fixtures for future light fixture replacement. The additional light fixtures shall be turned over to Caltrans Contract Manager for future use.

D. New light fixtures shall have a light output of 18000 lumens or greater, 135 watts or greater, light emitting diode (LED), and have a color index of 70. See Attachment A - Photographs.

E. If necessary, Contractor shall provide a lift truck for the removal and installation of light fixtures.

F. Caltrans Contract Manager must approve storage of equipment and disposal bins used by

Contractor.

G. All employees must wear clean clothing and Cal/OSHA required personal protective equipment.

8. Heavy Equipment and Work Trucks

Contractor’s heavy equipment and work trucks shall be leak free and in good working order.

9. General Contractor Responsibilities

A. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards. Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s) and/or the general public.

B. Contractor shall conduct its operation in such a manner as to avoid injury or damage to the property of Caltrans or any adjacent property.

C. Contractor shall avoid causing unreasonable inconvenience to Caltrans facility operations and any person(s) doing business on Caltrans property. In the event Contractor’s operation creates a condition hazardous to Caltrans property, its occupants, or the general public, Contractor shall provide warning signs alerting to any dangerous conditions at Contractor’s own expense and without cost to Caltrans.

D. Contractor shall protect all access areas, including concrete and sidewalks, from Contractor’s materials and equipment.

10. Contract Project Manager Responsibilities A. Contract Project Manager shall coordinate work-related matters and Contractor’s operations under this Agreement.

B. In addition to other responsibilities described in this Agreement, Contractor Project Manager shall be responsible for all matters related to Contractor’s personnel including, but not limited to, the following:

1) Perform all work in accordance with the provisions of this Agreement.

2) Ensure deliverables meet the criteria established by the Agreement.

3) Supervise, review, monitor, train, and direct Contractor’s personnel.

Exhibit A

Public Works (State)

4) Include Caltrans Contract Manager in written communications to other Caltrans personnel for any clarification on Exhibit A, Scope of Work.

5) Assign qualified personnel to complete the required work, as specified, in coordination with Caltrans Contract Manager.

6) Administer personnel actions for Contractor personnel.

7) Implement and maintain quality control procedures to ensure product and service accuracy.

8) Ensure all applicable safety measures are in place.

9) Provide invoices in a timely manner.

10) Review invoices for accuracy and completion before billing to Caltrans.

11) Ensure the schedules, deliverables and the deliverables’ requirements set forth in the

Agreement are satisfied.

12) Ensure compliance with the provisions in this Agreement and all specific work requirements.

11. Damages to State Property A. In the event that any Caltrans property is damaged as a result of the actions of Contractor, or its employees, Contractor shall repair, at its sole expense, the damage which has occurred as a direct result of Contractor, or its employees.

B. Repair efforts must be performed in a manner in which ensures all warranties are maintained for any products that are damaged.

C. Repair efforts shall include the full costs for all required labor and materials. If the repair must be completed by an outside entity, Caltrans Contract Manager will approve of who shall be hired to complete the work.

12. Code of Conduct A. Contractor and its employees shall be aware that they are working on Caltrans property and be courteous and respectful at all times. Contractor and its employees shall refrain from using loud voices, inappropriate language, and shall conduct themselves in a professional manner at all times.

B. Public safety and convenience are to be considered at all times. If any person employed by Contractor appears to Caltrans Contract Manager to be incompetent or to act in a disorderly, unsafe, or improper manner, that person will be removed from the premises immediately and will no longer be employed on this Caltrans Agreement, unless agreed in advance by Caltrans Contract Manager.

C. If Contractor’s employees display any behavior that Caltrans Contract Manager deems inappropriate or offensive, Caltrans Contract Manager will have the right to remove that employee from doing further work on this Agreement.

13. Final Clean Up A. Contractor shall leave the work site in a neat and clean condition. Contractor shall clean and keep the area in an orderly, safe, and clean condition including, but not limited to, spills and smudges. If work site is not left in a clean and orderly condition, Contractor shall be called back to correct the condition at no extra charge to Caltrans.

Exhibit A

Public Works (State)

B. Contractor shall own and assume all responsibility for litter, waste, debris, and similar materials arising from or produced by the work performed under this Agreement. Contractor shall haul away and legally discard any materials or debris caused by its work actions from the job site.

C. Contractor’s bid shall include the cost to dispose of and/or recycle freon, to include any discarded materials resulted from installs, repairs. Contractor shall be responsible for such disposal, recycling costs and shall be included in Attachment 1.

14. Inspection and Acceptance for Payment A. It is the responsibility of Contractor to notify Caltrans Contract Manager that the work is complete and ready for inspection. Work is subject to inspection and acceptance by Caltrans Contract Manager.

B. Caltrans Contract Manager will have ultimate responsibility and authority to determine whether Contractor’s satisfied Contractor’s duties and obligations under the Agreement, including specifically whether Contractor delivered all work product and deliverables and whether Contractor’s work product and deliverables satisfied all of the applicable contract requirements.

C. Approval of work constitutes approval for payment and not transference or termination of Contractor’s responsibility to perform work in accordance with the terms of the Agreement, and any work that needs corrections shall be at Contractor's sole cost and expense in a timely manner.

D. Regardless of any prior inspections and acceptances of work during the term of this Agreement, all work is subject to final inspection and approval by Caltrans Contract Manager.

E. Failure to complete work, as required by this Agreement, shall be considered grounds for termination of this Agreement for default, per Exhibit D, Termination.

15. Waste Disposal Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. Seq.

16. Warranty Upon completion and acceptance of work by Caltrans Contract Manager, Contractor shall provide a warranty for one (1) year against defects and deficient workmanship. Contractor shall guarantee all parts, components, and services that were provided under this Agreement.

Exhibit B

Public Works–State

Budget Detail and Payment Provisions

1. Invoicing and Payment

A. For services satisfactorily rendered and approved by Caltrans Contract Manager, and upon receipt and approval of the invoices, Caltrans agrees to compensate Contractor in accordance with the Price Quote Proposal, Attachment 1, and this Exhibit B.

Incomplete or disputed invoice(s) shall be returned to Contractor, unpaid, for correction.

B. Invoice(s) shall be itemized in accordance with Price Quote Proposal, Attachment 1, and shall be signed and submitted in triplicate not more frequently than monthly, in arrears of the service.

C. Each invoice shall include:

1) Agreement Number 03A4093

2) Dates of Service

3) Location of Service

4) Description of Work Performed

D. Each invoice shall be submitted in triplicate to:

California Department of Transportation (Caltrans) District 03 / Administration Attention: TBD 902 Yuba Street Marysville, CA 95901.

E. Contractor shall submit a certified copy of all payroll records for verification by Caltrans Contract Manager and/or designee with each invoice. Delinquent or inadequate certified payrolls or other required documents will result in the withholding of payment until such documents are submitted by Contractor.

2. Budget Contingency Clause A. It is mutually understood between the parties that this Agreement may have been written before ascertaining the availability of congressional or legislative appropriation of funds, for the mutual benefit of both parties in order to avoid program and fiscal delays that would occur if the Agreement were executed after that determination was made.

B. This Agreement is valid and enforceable only if sufficient funds are made available to Caltrans by United States Government or California State Legislature for the purpose of this program. In addition, this Agreement is subject to any additional restrictions, limitations, conditions, or any statute enacted by the Congress or the State Legislature that may affect the provisions, terms, or funding of this Agreement in any manner.

C. It is mutually agreed that if Congress or State Legislature does not appropriate sufficient funds for the program, Agreement shall be amended to reflect any reduction in funds.

D. Pursuant to Government Code Section 927.13, no late payment penalty shall accrue during any time period for which there is no Budget Act in effect, nor on any payment or refund that is the result of a federally mandated program or that is directly dependent upon the receipt of federal funds by a state agency.

Exhibit B

Public Works–State

E. Caltrans has the option to terminate the Agreement under the 30-day termination clause or to amend the Agreement to reflect any reduction of funds.

3. Prompt Payment Clause A. Payment will be made in accordance with, and within the time specified in, Government

Code, Chapter 4.5, commencing with Section 927 and all agreements must comply with Public Contract Code Sections 10262 and 10262.5.

B. Pursuant to Public Contract Code Section 10262, Contractor shall pay its Subcontractor(s) within seven (7) calendar days from receipt of each payment made to Contractor by Caltrans.

C. Failure of Contractor adhering to Public Contract Code Section 10262 may result in termination of this Agreement per Public Contract Code Section 10253 and disciplinary action by the Contractors State License Board may be implemented.

D. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.

4. Cost Limitation A. Total amount of this Agreement shall not exceed $TBD.

B. It is understood and agreed that this total is an estimate and that Caltrans will pay only for those services actually rendered as authorized by Caltrans Contract Manager up to the total amount set forth in Section 4A, above.

5. Excise Tax State of California is exempt from Federal excise taxes, and no payment will be made for any taxes levied on employees’ wages. Caltrans will pay for any applicable State or local sales or use taxes on the services rendered or equipment or parts supplied pursuant to this Agreement. Caltrans may pay any applicable sales and use tax imposed by another state.

6. Costs Included in Bid Rates A. The cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, Agreement bond premiums, and any other taxes or assessments including sales and use taxes required by law or otherwise shall be included in the Agreement rates and no additional allowance will be made thereof, unless separate payment provision should specifically so provide.

B. Contractor shall make travel and subsistence payments to each worker in compliance with Labor Code Sections 1773.1 and 1773.9. Travel and subsistence requirements are available on the of Department of Industrial Relations (DIR) website at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm.

7. Cost Principles A. Contractor agrees that the Contract Cost Principles and Procedures, 48 CFR, Part 31, and the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, in 2 CFR, Part 200, shall be used to determine the allowable individual items of cost.

Exhibit B

Public Works–State

B. Any costs for which payment has been made to Contractor that are determined by subsequent audit to be unallowable under 48 CFR Part 31 or 2 CFR Part 200 are subject to repayment by Contractor to Caltrans.

C. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.

8. Payroll Records A. Contractor and each Subcontractor shall comply with the following provisions. Contractor shall be responsible for compliance by its Subcontractors.

1) Each Contractor and Subcontractor shall keep accurate payroll records and supporting documents as mandated by California Labor Code Section 1776 and as defined in Section 16000 of Title 8 of the California Code of Regulations, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or Subcontractor in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:

a) The information contained in the payroll record is true and correct.

b) Employer has complied with requirements…

This is the start of the file's text. The full file is on GovTribe.