IFPC HEL RFWP_(20Jan22)(Final).pdf
PDF 282 KB Posted
- Solicitation number
- W50RAJ-22-IFPC-RFWP
- Issued by
-
Department of the Army
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for White Papers (RFWP)
Indirect Fire Protection Capability-High Energy Laser (IFPC-HEL) Prototypes Prime Contractor
Issued by:
Rapid Capabilities and Critical Technologies Office (RCCTO) 3307 Wells Road
Redstone Arsenal, AL 35898
Request Issue Date: January 20, 2022 Submission Deadline: March 4, 2022 - 4:00 PM Eastern Time
RCCTO RFWP IFPC-HEL Weapon System
Table of Contents
1.0 General
1.1 Introduction
1.2 Project Description
1.3 Procedures
1.4 Non-Government Personnel
1.5 Points of Contact
1.6 Response Dates
2.0 Award Information
2.1 Funding
2.2 Instrument Type
2.3 Project Award Value
2.4 Period of Performance
3.0 White Paper Preparation & Submission Instructions
3.1 White Papers
3.2 Format of White Papers
3.3 Content of WPs
3.4 WP Approach
3.5 Submission of WPs
3.6 Solution Presentation
4.0 Proposal Preparation and Submission Instructions
4.1 PWS Content
4.2 Cost Proposal Content
4.3 Submission of Cost proposal
5.0 Evaluation Information
5.1 White Paper Evaluation Criteria
5.2 Proposal Evaluation Criteria
5.3 Offeror Exchanges
6.0 Award Information
7.0 Other Information
7.1 Follow-On Production Work
7.2 Security & Anti-Terrorism Operations Security (AT-OPSEC)
1.0 General
1.1 Introduction
The U.S. Army’s Rapid Capabilities and Critical Technologies Office (RCCTO) is issuing a Request for White Papers (RFWPs) with the intent of awarding one (1) or more Other Transaction Agreement for Prototype (pOTA) in accordance with (IAW) 10 U.S.C. § 2371b. Only U.S.
companies with the ability to process and store SECRET information and hardware are eligible to submit a white paper.
1.2 Project Description
High-energy laser (HEL) weapons significantly contribute to the Army’s execution of Multi-Domain Operations and offer a strategic tool in the fight against low-cost threats, such as drones, found on the modern battlefield. IFPC-HEL is intended to protect fixed and semi-fixed sites from rockets, artillery and mortars; unmanned aerial systems; and rotary and fixed-wing threats. Additionally, the IFPC-HEL can be used to defeat more stressing threats.
White papers are sought to satisfy the U.S. Army RCCTO’s requirements to prototype 300kW class [>250kW] HEL weapon systems. This effort will provide up to four (4) complete HEL weapon systems (e.g., beam control, beam director, battle management, and power and thermal management), integrated onto a Government furnished property (GFP) platform that incorporates a Government-directed HEL that will be identified not later than October 2022. The HEL weapon systems must be delivered no later than 4QFY24. The HEL weapon systems will participate in live range testing against operationally relevant targets.
1.3 Procedures
This RFWP consists of the submission of a White Paper (WP), and if selected, a cost proposal.
This RFWP is considered a competitive process. Key milestones are listed in Table 1, and described in more detail below.
Table 1 RFWP Release Date 20 January 2022 Offeror Submission of CAGE Code 28 January 2022 Release of SOO to Cleared Offerors 2 February 2022 RFWP Questions Cut-off Date 11 February 2022 WP Due Date 4 March 2022
As stated above, only U.S. companies with the ability to process and store SECRET information and hardware are eligible to submit a WP. Interested Offerors shall submit a Commercial and Government Entity (CAGE) code to the following Government Security POC:
- Jeffery Miles, jeffery.j.miles.ctr@army.mil mailto:jeffery.j.miles.ctr@army.mil
Upon validation of facility clearances, Offerors shall be provided with the draft Statement of Objectives (SOO) on the date indicated in Table 1. The draft SOO will support the creation of the WP technical content and the Rough Order of Magnitude (ROM) costing. Offerors shall submit a WP in accordance with the Format of WPs and Content of WPs contained in Section 3.2 and 3.3, respectively. Failure to timely submit CAGE Code information, or related Vendor errors, will not be a basis for extensions of time for questions or WP submissions.
Upon receipt of WPs, the Government will evaluate submitted WPs IAW the specified WP Evaluation Criteria, Section 5.1, to determine which submitted WPs represent the most advantageous solution to the Government. At that time, the Government may elect to request additional information or a solution presentation from any Offeror that submitted WPs or from only the Offeror(s) that submitted the most advantageous WP solution. Offerors that submitted WPs that are not selected for award may not be notified until after award.
The Government will notify the selected Offeror that submitted a WP deemed to represent the most advantageous solution to provide a cost proposal and Performance Work Statement (PWS) to the Government. Upon receipt of the proposed PWS, the Government will collaborate with the Offeror to finalize the PWS. Upon receipt of the cost proposal, the Government will evaluate the cost proposal IAW the specified Proposal Evaluation Criteria, Section 5.2. If the cost proposal is deemed advantageous to the Government and a consensus on the terms of the agreement are agreed to, the Offeror will be awarded the pOTA.
If the evaluated cost proposal is not found to be acceptable or the parties cannot successfully reach a consensus on the terms of the agreement, as determined at the sole discretion of the Government, the Government reserves the right to engage the Offeror with the next best WP solution based on the original WP evaluation. Once the Government has engaged the Offeror with the next best WP solution, no further engagements with the previous Offeror will be entertained until after the agreement has been awarded. The process will continue until an agreement is successfully reached and a pOTA is awarded.
All documents necessary for the review and evaluation of WPs, cost proposal submissions and updated PWS shall be provided as described in this RFWP.
1.4 Non-Government Personnel
Offerors are advised that employees of the firms identified below may serve as non-Government advisors in the review and evaluation of WPs. Such firms are expressly prohibited from competing on the subject acquisition. The non-Government advisors will be required to submit to the Government a Non-Disclosure Agreement reflecting the effort(s) that they will be supporting. The Offeror’s submission of a WP under this RFWP indicates concurrence with the aforementioned use of non-Government advisors.
1. KODA Technologies; 620 Discovery Drive Building 2, Suite 100 Huntsville, AL 35806- 2816; (256) 900-1002
2. Radiance Technologies; 310 Bob Heath Drive, Huntsville, AL. 35806; (256) 704-3400
3. Scientic; 6700 Odyssey Drive, Suite 105; Huntsville, AL. 35806; (256) 319-0800
In accomplishing their duties related to the WP evaluation, the aforementioned firm may require access to proprietary information contained in the Offerors' WP. Therefore these firms may execute an agreement with each Offeror that states that they will: (1) protect the Offerors’ information from unauthorized use or disclosure for as long as it remains proprietary; and, (2) refrain from using the information for any purpose other than that for which it was furnished. To expedite the evaluation process, each Offeror must contact the above company to effect execution of such an agreement prior to the submission of proposals. Each Offeror shall submit copies of the agreement with their WP, if applicable.
1.5 Points of Contact
All questions regarding WPs and full cost proposal submissions must be emailed to ALL of the following personnel:
1. Joshua Flinn, joshua.e.flinn.civ@army.mil
2. James Bedsole, james.e.bedsole.civ@army.mil
3. Barbara Cantrell, barbara.a.cantrell2.civ@army.mil
1.6 Response Dates
Offerors must submit CAGE Code to Security POCs listed in Section 1.3 no later than 1600 EST on 28 January 2022. Failure to timely submit CAGE Code information, or related Vendor errors will not be a basis for extensions of time for questions or WP submissions. All questions regarding this RFWP shall be submitted via email no later than 1600 EST on 11 February 2022 to the points of contact listed in Section 1.5. All contacts listed in Section 1.5 must be included in the email. It is preferred that only one set of questions be submitted by each Offeror instead of submitting multiple sets of questions. Questions received by the Government after 1600 EST on 11 February 2022 may not be answered prior to the closing date/time for receipt of white paper submissions. Questions submitted by any method other than email will not be accepted or answered. The Government will post responses to all questions received and any amendments issued as a result of submitted questions.
All WPs must be received no later than 1600 EST on 4 March 2022 by the POCs listed in Section 1.5. All contacts listed in Section 1.5 must be included in the email. It is the responsibility of the submitting party to confirm receipt of submissions.
Information and dates regarding questions about, and submission of, cost proposal will be included in the notifications sent to selected Offeror(s).
2.0 Award Information
2.1 Funding
The Government reserves the right to consider all, some, or none of the WPs or cost proposals received in response to this RFWP for selection of award. The Government reserves the right to cancel this RFWP at any time for any reason or for no reason. Issuance of this RFWP does not commit the Government to pay for any preparation costs incurred by the contractor in compiling a response to any aspect of this RFWP.
mailto:joshua.e.flinn.civ@army.mil mailto:james.e.bedsole.civ@army.mil mailto:barbara.a.cantrell2.civ@army.mil
All potential Offerors should be aware that due to unanticipated budget fluctuations, funding in any or all areas may change with little or no notice.
2.2 Instrument Type
The instrument type shall be expenditure based. An expenditure-based instrument will contain a payable Milestone Payment Schedule with amounts to be adjusted based on generated information from financial or cost records. Funding arrangements are at the discretion of the Government.
2.3 Project Award Value
Proposals are expected to be bid at a cost commensurate with the level of effort.
2.4 Period of Performance
The period of performance of the anticipated pOTA shall not exceed 36 months.
3.0 White Paper Preparation & Submission Instructions
3.1 White Papers
Only UNCLASSIFIED WPs will be accepted. The Government’s decision to invite an Offeror to submit a cost proposal will be based upon the evaluation results of the WP submission.
In the event of a possible or actual compromise of classified information in the submission of your WP, immediately and within no more than 24 hours, bring this to the attention of the POCs in Section 1.5.
3.2 Format of White Papers
Offerors shall submit the WP IAW the following:
1. Number of Pages: The WP is limited to 20 pages. The WP cover sheet is not included in the page limit, nor is the requested ROM. Pages submitted in excess of the WP page limit will not be read or evaluated.
2. Number of Copies & Format: One electronic copy of the WP and cover sheet.
3. Text & Font Format: Text shall be at least single-spaced, on 8½ x 11 inch paper, with a minimum of one-inch margin all around. Pages shall be numbered consecutively. Font size shall be of minimum 12-point font. Bolding, underlining, and italics may be used to identify topic demarcations or points of emphasis. Graphic presentations, including tables, while not subject to the same font size and spacing requirements, shall have spacing and text no less than 9 point font that is easily readable.
4. Security: Do not lock or encrypt any files uploaded as part of your white paper submission.
5. Use of a diagram(s) or figure(s) to depict the essence of the proposed solution is encouraged.
6. All WPs shall be UNCLASSIFIED. WPs containing data that is not to be disclosed to the public for any purpose or used by the Government except for evaluation purposes shall include the following sentences on the cover page:
“This WHITE PAPER includes data that shall not be disclosed outside the Government, except to non-Government personnel for evaluation purposes, and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this submission. If, however, an agreement is awarded to this Offeror as a result of -- or in connection with – the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent agreed upon by both parties in the resulting agreement. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]”
Each restricted data sheet should be marked as follows:
“Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.”
7. Questions regarding the objectives or preparation of the WP should be addressed to the POC’s listed in Section 1.5.
3.3 Content of WPs
The Offeror’s WP must include the following:
1. Cover Sheet
Offerors shall provide the following information on the cover sheet:
a. Organization Information: name, mailing address, technical POC, phone number, e-mail address, CAGE code, and Tax Identification Number (TIN)
b. Business POC, phone number, and e-mail address
c. Self-Certification of Offeror: (select all that apply)
(1) Small business
(2) Large business
(3) Academic institution
(4) Non-traditional defense contractor (see definition below)
(5) Other
Non-traditional defense contractor is defined in 10 U.S.C. § 2302(9) as an entity that is not currently performing and has not performed, for at least the one-year period preceding the solicitation of sources by the Department of Defense for the procurement or transaction, any contract or subcontract for the Department of Defense that is subject to full coverage under the cost accounting standards prescribed pursuant to section 1502 of title 41 and the regulations implementing such section.
3.4 WP Approach
Ensure your WP adequately describes the proposed approach, capabilities and resulting contributions. The WP shall include the following sections in the order given below, as applicable:
1. Technical Approach: Describe how the proposed technical approach is innovative, feasible, achievable, and complete and is supported by a technical team that has the expertise and capabilities to accomplish the proposed tasks. Address:
a. Project objectives and scope.
b. Proposed capabilities of the Offeror’s weapon system.
c. Process and procedures to inspect and accept subsystems.
d. Ability to integrate the Government directed HEL system, determined the best technical solution for the overall weapon system.
e. Facilities/equipment available to carry out the proposed effort and how they meet or exceed required tolerances and precisions.
f. Overview of tasks and methods planned to achieve each objective and the final product to be delivered no later than 4QFY24.
g. Particular approaches the Offeror will take to ensure successful completion within the clear schedule constraints.
h. Identify and assert any restrictions on the Government's use, release, or disclosure of technical data or computer software pertaining to its proposal submission IAW the instructions provided in Exhibit A below. If the offeror has no restrictions for a particular section then it shall state “none.” All assertions (including entries of “none”) shall be signed by an authorized representative of the offeror. If all assertions are contained on one page, one signature is sufficient. If the assertions are separated, each assertion shall be signed (separately) as required. The offeror's assertions, including the assertions of its subcontractors or suppliers or potential subcontractors or suppliers, shall be submitted in the required format, dated, and signed by an official authorized to contractually obligate the offeror. The offeror shall provide a detailed discussion of the degree to which asserted data rights restrictions, as well as any proposed option(s) for additional data rights, affect the proposed technical solutions and the Government’s ability to use, modify, reproduce, release, perform, display, or disclose the resulting technical data and computer software for Government purposes as defined in
DFARS 252.227-7013(a)(12) and DFARS 252.227-7014(a)(11). Note: The data rights assertions are not subject to the page limit specified for this part of the proposal.
2. Qualifications and Experience
a. Related prior or current work, including Small Business Innovation Research
(SBIR)/Small Business Technology Transfer (STTR) contracts and Independent Research & Development (IR&D) projects related to the development and integration of 300kW class [>250kW] high energy laser weapon systems. Provide contract numbers and POCs for Government sponsored efforts.
b. Identify team member role assignments and each team member's qualifications and experiences in comparison to the respective SOO performance requirement(s) the team members are proposed to perform.
c. Identify key technical and management personnel proposed to execute the program.
3. ROM Costs: Describe the estimated costs for the proposed technical approach. Provide a rough order of magnitude (ROM) and any assumptions pertaining to price for how this concept could be achieved. For ROM development, the Offeror should provide a breakout of the estimated costs associated with the tasks and methods planned to achieve the proposed technical approach. The Offeror should describe general methods (e.g. expert judgment, analogous estimating, and parametric estimating) used to define estimated costs for the technical approach. Identify long lead items in terms of ROM costs and required dates to purchase or begin fabrication in order to deliver no later than 4QFY24. If applicable, include any suggested cost share distribution or creative costing approaches to maximize successful completion within the constrained schedule.
4. Data Rights: Identify any intellectual property involved in the effort and associated restrictions on the Government’s use of that intellectual property. Processes, procedures and special test equipment developed under this pOTA will be delivered with unlimited data rights. Government approval is required for any delivery resulting in less than unlimited rights.
3.5 Submission of WPs
Information and dates regarding questions about, and submission of, WPs are stated above in Section 1.6.
Late submissions may not be accepted, and any other failure to comply with WP submission instructions (content, approach, etc.) may not be evaluated by the Government.
3.6 Solution Presentation
Prior to invitation to submit cost proposals, the Government may elect to request additional information or a solution presentation, either in person or virtually, from all Offerors or from only the Offeror(s) that submitted the most advantageous WP solution.
4.0 Proposal Preparation and Submission Instructions
When invited to do so by the Government, an Offeror may develop and submit a proposal. A proposal is defined as a cost proposal and accompanying PWS. A notification will be sent to the Offeror(s) that submitted a WP that represents the most advantageous solution, requesting the Offeror(s) to submit a cost proposal. The request for cost proposal will occur after the Government identifies the HEL technology is final. Only UNCLASSIFIED proposals will be accepted.
4.1 PWS Content
1. Shall utilize Government SOO to develop PWS performance requirements.
2. Shall identify the primary performer and the performer’s certification status (non-traditional/traditional defense contractor) for each task.
3. Shall address and include all applicable deliverables.
4.2 Cost Proposal Content
1. Proposed detailed schedule;
2. Proposed Milestone Payment Schedule;
3. Data Rights, to include subcontractors and suppliers.
4. Price (broken out by cost (detailed cost elements)) and profit;
5. Subcontractor and supplier team roles, responsibilities and deliverables.
Additional proposal and proposal formatting instructions may be provided in the notification to the selected Offeror.
There is no maximum page count for the cost proposal. All pages shall be formatted for printing on 8-1/2- by 11-inch paper with a font size not smaller than 12 point. Font sizes no smaller than 9 point may be used for figures, tables and charts. Document files must be in .rtf, .txt, Portable Document Format (.pdf, ISO 32000-1), OpenDocument (.odx, ISO/IEC 26300:2006), .doc, .docx,.
xls,. or .xlsx formats. Submissions must be written in English.
The proposal must include a detailed timeline, including technical milestones and a schedule of deliverables. Payments will be made in accordance with the proposed Milestone Payment Schedule.
The milestones on the Milestone Payment Schedule SHALL be based on meaningful and identifiable events and associated deliverables (monthly reports are not acceptable milestones).
Payment will be made when those deliverables are accepted by the Government, and at no other time. As such, if a proposer is expecting to be paid monthly, then the proposal must include a Milestone Payment Schedule detailing monthly meaningful deliverables (e.g., incremental code drops, test results, etc.). The proposer should take this into account when planning their schedule.
For the prime and subcontractors, the proposal must include a detailed breakout of how the money will be spent and how prices and rates were determined. Direct and Indirect rates must be justified based on past commercial or Government rates, or by providing examples of equivalent rates for equivalent talent. If rates are based on Defense Contract Management Agency (DCMA) or Defense Contract Audit Agency (DCAA) negotiated rates, the rate agreements shall be provided.
4.3 Submission of Cost proposal
Cost proposal(s) shall be submitted IAW the response dates provided in the notification to the selected Offeror(s). Failure to timely provide a complete cost proposal, to timely negotiate, or to satisfactorily agree to Government terms and cost/price goals may result in the prompt de-selection of your WP, allowing the Government to seek another proposal.
5.0 Evaluation Information
5.1 White Paper Evaluation Criteria
WPs will be evaluated using three (3) criteria. These criteria are listed below, in descending order of importance.
1. WP Evaluation Criteria #1: Technical Approach
a. The Government will evaluate acceptability of the Offeror's capability and approach to accomplish the technical objectives of the SOO. To be assessed as acceptable, the response must:
(1) Present a sound understanding of the overall objectives and technologies involved as demonstrated by a feasible, executable, and comprehensive approach to satisfying the objectives of the SOO and effective approaches for identifying, eliminating and mitigating risks.
(2) Proposed approach to develop and provide the prototype 300kW class [>250kW] HEL weapon system(s) to include integrating the Government directed HEL.
(3) Propose facilities/equipment available to carry out the proposed effort and meet or exceed required tolerances and precisions, as well as meeting security requirements and identification of available licenses, certifications, and/or permits that are required to meet the objectives of the SOO.
(4) Present task schedule, key milestones, projected timelines and proposed critical path(s) consistent with the proposed technical approach to ensure delivery no later than 4QFY24.
(5) The evaluation of this criteria will also consider the degree to which asserted data rights restrictions, as well as any proposed option(s) for additional data rights, affect the proposed technical solutions and the Government's ability to use, modify, reproduce, release, perform, display or disclose the resulting technical data and computer software for Government purposes as defined in DFARS 252.227- 7013(a)(12) and 252.227-7014(a)(11) in terms of demonstrating its ability to execute the proposed approach.
2. WP Evaluation Criteria #2: Qualifications and Experience
The Government will assess the acceptability of the Offeror's qualifications and experience for accomplishing all requirements. To be assessed as acceptable, the response must:
a. Relevance of related prior or current work experience for the development and integration of 300kW class [>250kW] high energy laser weapon systems.
b. Present effective team member role assignments in terms of each team member's qualifications and experiences in comparison to the respective SOO performance requirement(s) the team members are proposed to perform, AND reflect team member qualifications and experiences that ensures comprehensive coverage of all SOO performance requirements.
c. Identify sufficiently qualified key technical and management personnel to successfully execute the proposed technical approach and support SOO performance requirements.
The assessment of key personnel will consider the extent to which proposed key technical and management personnel qualifications relate to the SOO performance requirements.
3. WP Evaluation Criteria #3 – ROM Cost –
a. Whether the proposed cost or price is realistic and affordable for the proposed technical approach to the extent appropriate and whether the proposed cost/price generally reflects an understanding of the Government’s objectives.
5.2 Proposal Evaluation Criteria
The Government will evaluate the reasonableness and realism of the cost/price, and will evaluate whether the proposed cost/price reflect an understanding of the Government’s objectives. Offerors shall describe the labor mix and labor hours necessary in sufficient detail to give evaluators a clear understanding of the Offeror’s approach and to allow evaluations to determine the realism of the offered figures to accomplish the effort. The Offeror shall map hours to the appropriate PWS paragraph. Concurrent to this evaluation, the Government will ensure that the proposed PWS accurately reflects the full breadth of the project, including properly addressing the Government SOO and specific tasks, deliverables and milestones required to successfully complete the prototype project. As needed, the Government may negotiate with the Vendor to adjust the PWS, cost/price and other terms before award.
If agreement cannot be reached with the Offeror whose proposal is initially assessed to present the most advantageous technical approach, the Government will evaluate Cost/Price and PWS for the proposal of the Offeror with the next best technical solution. If additional funding subsequently becomes available, and funding of additional awards becomes possible, the Government will evaluate Cost/Price for the proposal of the Offeror(s) with the next best technical solution(s).
5.3 Offeror Exchanges
Once the Government determines that a cost proposal represents the most advantageous solution based on all evaluation criteria identified in Section 5.2, the Government reserves the right to engage with only that Offeror to address remaining issues, either orally or in writing if necessary, and finalize an agreement with that Offeror. If the parties cannot successfully address any remaining issues, as determined pertinent at the sole discretion of the Government, the Government reserves the right to engage the Offeror with the next best solution based on the original evaluation and to address any remaining issues with that Offeror. Once the Government has engaged the Offeror with the next best solution, no further engagements with the previous Offeror will be entertained until after the agreement has been awarded. The process will continue until an agreement is successfully reached and a prototype agreement is awarded. If additional funding subsequently becomes available, and funding of additional awards becomes possible, the Government reserves the right to engage the Offeror(s) with the next best cost proposal solution(s) based on the original cost proposal evaluation and to address any remaining issues with such Offeror(s). Alternatively, the Government reserves the right to consider pOTA awards for partial solutions to Offerors who submitted WPs with particularly meritorious and unique aspects or approaches to subsets of the overall problem set, if additional funding becomes available.
6.0 Award Information
Awards of prototype projects as a result of this announcement will be in the form of a pOTA. To receive an award, the Offeror(s) must be in compliance with the statutory requirements at 10 U.S.C. § 2371b.
To receive an award, an Offeror must have a Dunn and Bradstreet (DUNS) number and must register in the System for Award Management (SAM). This system verifies identity and ensures that payment is sent to the right party. The Offeror must be considered a responsible party by the Agreements Officer, must not be suspended or debarred from such agreement by the Federal Government, and must not be prohibited by Presidential Executive Order or law from receiving such award.
7.0 Other Information
7.1 Follow-On Production Work
The authority at 10 U.S.C. § 2371b, paragraph (f) provides the authority to enter into awards for follow-on production to successful participants of an agreement under the authority of a pOTA utilizing competitive procedures. This effort anticipates the need for possible follow-on production.
The requirement for competition has been met through the RFWP process, and upon successful completion of the prototype project and subject to the availability of funds, the Government reserves the right to proceed into a production Federal Acquisition Regulation (FAR) based contract or production OTA on a non-competitive basis. This prototype project will be deemed completed and successful upon the result of the system characterization, as the Government determines.
7.2 Security & Anti-Terrorism Operations Security (AT-OPSEC)
1. Certain aspects of work performed under this prototype project will be done at the SECRET level.
2. CONTROLLED UNCLASSIFIED INFORMATION (CUI) generated and/or provided under this prototype project shall be safeguarded and marked as specified in DoDM 5200.01, Vols 1-4.
3. AT Level I Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the AOR or to the contracting officer, if a AOR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil
4. Access and General Protection Policy and Procedures. Contractor and all associated sub-contractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
5. For Contractor not eligible for CAC, but requires access to DoD facility or installation.
Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
6. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally- developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the AOR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the AOR NLT 30 calendar days after contract award.
7. Army Training Certification Tracking System (ATCTS) Registration for Contractor
Employees who Require Access to Government Information Systems. All contractor employees with access to a Government info system must be registered in the ATCTS at http://jko.jten.mil/ commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.
8. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
9. Information Assurance/Information Technology Training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.
10. Information Assurance/Information Technology Training Certification. Per DoD
8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
11. Threat Awareness Reporting Program. For all contractors with security clearances. Per
AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a counterintelligence agent or other trainer as specified in 2-4b.
12. Technical data and reports produced as a result of this prototype project will be marked
DISTRIBUTION D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Administrative Use) (20 May 2016). Request to disseminate this document shall be referred to Army Rapid Capabilities and Critical Technologies Office, ATTN: SAAL-RCC, Building 3307 Wells Road, Redstone Arsenal, AL 35898.
13. Controlled Unclassified Information (CUI) is information the Government creates or possesses, or that an entity creates or possesses for or on behalf of the Government, that a law, regulation, or Government-wide policy requires or permits an agency to handle using safeguarding or dissemination controls. However, CUI does not include classified information (see definition above) or information a non-executive branch entity possesses and maintains in its own systems that did not come from, or was not created or possessed by or for, an executive branch agency or an entity acting for an agency. Law, regulation, or Government-wide policy may require or permit safeguarding or dissemination controls in three ways: Requiring or permitting agencies to control or protect the information but providing no specific controls, which makes the information CUI Basic; requiring or permitting agencies to control or protect the information and providing specific controls for doing so, which makes the information CUI Specified; or requiring or permitting agencies to control the information and specifying only some of those controls, which makes the information CUI Specified, but with CUI Basic controls where the authority does not specify.
14. Mark submitted documents appropriately, including pages which contain sensitive, proprietary, or CUI. No SECRET information can be submitted.
| 1.0 General |
| 1.1 Introduction |
| 1.2 Project Description |
| 1.3 Procedures |
| 1.4 Non-Government Personnel |
| 1.5 Points of Contact |
| 1.6 Response Dates |
| 2.0 Award Information |
| 2.1 Funding |
| 2.2 Instrument Type |
| 2.3 Project Award Value |
| 2.4 Period of Performance |
| 3.0 White Paper Preparation & Submission Instructions |
| 3.1 White Papers |
| 3.2 Format of White Papers |
| 3.3 Content of WPs |
| 3.4 WP Approach |
| 3.5 Submission of WPs |
| 3.6 Solution Presentation |
| 4.0 Proposal Preparation and Submission Instructions |
| 4.1 PWS Content |
| 4.2 Cost Proposal Content |
| 4.3 Submission of Cost proposal |
| 5.0 Evaluation Information |
| 5.1 White Paper Evaluation Criteria |
| 5.2 Proposal Evaluation Criteria |
| 5.3 Offeror Exchanges |
| 6.0 Award Information |
| 7.0 Other Information |
| 7.1 Follow-On Production Work |
| 7.2 Security & Anti-Terrorism Operations Security (AT-OPSEC) |
File details come from the government source that posted it. Updated .