Solicitation.pdf

PDF 74 KB Posted

Attached to
Replace Transformers FCC Oakdale
Solicitation number
IFBP05181700004
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
IMG_1359.JPG JPG image
IMG_1353.JPG JPG image
IMG_1358.JPG JPG image
IMG_1357.JPG JPG image
IMG_0180.JPG JPG image
IMG_1356.JPG~RF79acc89.TMP —
Pre-Bid_Conference_Agenda.pdf PDF
IMG_0188.JPG JPG image
IMG_0189.JPG JPG image
IMG_1355.JPG JPG image
IMG_0182.JPG JPG image
IMG_0184.JPG JPG image
IMG_1354.JPG~RF79ab64b.TMP —
IMG_1360.JPG JPG image
IMG_0184.JPG~RF799d1f6.TMP —
IMG_0192.JPG JPG image
IMG_1356.JPG JPG image
IMG_0187.JPG JPG image
IMG_1354.JPG JPG image
IMG_0190.JPG JPG image
IMG_0185.JPG JPG image
IMG_1353.JPG~RF79aa922.TMP —
IMG_0181.JPG JPG image
IMG_0179.JPG JPG image
IMG_0191.JPG JPG image
IMG_0183.JPG JPG image
IMG_0193.JPG JPG image
IMG_0183.JPG~RF799c0b7.TMP —
IMG_0178.JPG JPG image
IMG_1355.JPG~RF79ac2ba.TMP —
Statement_of_Work.pdf PDF
NCIC_Form.pdf PDF
Drawings.pdf PDF
Wage_Determination.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IFBP05181700006

X SEALED BID (IFB)

NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

06/26/2017

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

5C1N

CODE

Federal Bureau of Prisons FCC Oakdale 1507 East Whatley Road Oakdale, LA 71463

7. ISSUED BY 8. ADDRESS OFFER TO

9. FOR INFORMATION CALL: a. NAME b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

IGF::OT::IGF

The selected contractor shall provide all materials, labor, and equipment to remove and replace two (2) existing pad-mounted, liquid-filled, high-voltage transformers at FCI I Oakdale and FCI II Oakdale.

Please complete the following:

TAX ID#:__________________________

DUNS #:__________________________

11. The Contractor shall begin performance calendar days and complete it within calendar days after receiving10 80 award, X notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

01 17:00a.

07/27/2017

b. An offer guarantee X is, is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

90d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

IFBP05181700006 Page 1 of 28

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified) 27

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY

Federal Bureau of Prisons FCC Oakdale 1507 East Whatley Road

OAKDALE, LA 71463

Federal Bureau of Prisons FCC Oakdale P.O. Box 5050 Oakdale, LA 71463

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

Brant McCullough

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

06/26/2017 31c. DATE

STANDARD FORM 1442 (REV. 4-85)BACK

IFBP05181700006 Page 2 of 28

Table of Contents

Section Description Page Number

1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements

FAO-0001 Bonds FAO-0005 Required Insurance FAO-0006 Inspection of Work FAO-0007 Pre-Construction Conference FAO-0008 Material Approval Submittal FAO-0009 Preparation of Progress Schedules and Reports FAO-0010 Work Hours FAO-0011 Contraband FAO-0012 Explosives FAO-0013 Parking and Temporary Office FAO-0014 Safety and Accident Prevention FAO-0015 Inspecting The Site FAO-0016 Payment Services FAO-0017 Request for Final Inspection FAO-0018 Drawings FAO-0019 Contract Security (3000-03 Human Resources Management Manual) FAO-0020 Assignment of Contract Administration Office and Functions FAO-0042 Evaluation of Contractors Performance Utilizing CPARS (Apr 2011) FAO-0002 Magnitude

4 Contract Clauses 52.21-603-70 Contract Monitor (CM) (AUG 2008) 52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005)

52.27-103-72 DOJ CONTRACTOR RESIDENCY REQUIREMENT BUREAU OF PRISONS (JUNE

2004) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-12 Liquidated Damages--Construction(Sept 2000) 52.225-9 Buy American Act - Construction Materials (Sep 2010) 52.232-18 Availability Of Funds (Apr 1984) 52.236-14 Availability and Use of Utility Services (Apr 1984) 2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (June 1996) FAO-0021 Changes FAO-0022 Changes - - Supplement

5 Attachments 6 Solicitation Provisions

52.27-103-71 FAITH-BASED AND COMMUNITY-BASED ORGANIZATIONS (AUG 2005)

52.216-1 Type of Contract (Apr 1984) 52.222-5 Davis-Bacon Act -- Secondary Site of the Work (July 2005) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.225-10 Notice of Buy American Act Requirement--Construction Materials (Feb 2009) 52.228-1 Bid Guarantee (Sept 1996) 52.233-2 Service of Protest (Sept 2006) 2852.233-70 Protests Filed Directly with the Department of Justice (Jan 1998) FAO-0025 Equitable Adjustments: Waiver and Release of Claims 52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995)

7 Representations and Certifications FAO-0024 Business Management Questionnaire 52.204-8 Annual Representations and Certifications (May 2011) 52.209-7 Information Regarding Responsibility Matters (Jan 2011) FAO-0023 Contractor's Certification

IFBP05181700006 Page 3 of 28

Section 2 - Commodity or Services Schedule

This project will be constructed in accordance with the specifications, drawings, and contractors must furnish the appropriate bid, and performance and payment bonds. The specifications, drawings, and bond forms can be located in Section 5 - Attachments

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 The selected contractor shall provide all materials, labor, and equipment to remove and replace two (2) existing pad-mounted, liquid-filled, high-voltage transformers at FCI I Oakdale and FCI II Oakdale.

Base Period

1.000000 JB $____________ $___________________

The successful contractor shall be responsible for all applicable federal, state, and local taxes. No tax exemption certification will be issued by the Federal Bureau of Prisons. THE TOTAL PRICE SHALL BE WRITTEN ON LINE ITEM 17 OF THE STANDARD FORM 1442.

IFBP05181700006 Page 4 of 28

Section 3 - Special Contract Requirements

Clauses By Full Text

FAO-0001 Bonds

(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in contract provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be ex-pressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)

(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows; a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000.00 or less)

(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

( c ) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1):

(1) A Payment Bond;

(2) An irrevocable letter of credit (ILC);

(3) A tripartite escrow agreement;

(4) A Certificate of Deposit; or

(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.

(d) Individual Sureties.

(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid bonds, payment or perform-ance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that con-tain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.

(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 con-cerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.

FAO-0005 Required Insurance

[EMPTY CLAUSE TEXT]

IFBP05181700006 Page 5 of 28

FAO-0006 Inspection of Work

This provision in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract. In the event it is determined necessary to designate a Contract Monitor (CM) for this contract, such designation shall be by a separate letter to the individual selected with a copy furnished to the contractor.

FAO-0007 Pre-Construction Conference

[EMPTY CLAUSE TEXT]

FAO-0008 Material Approval Submittal

[EMPTY CLAUSE TEXT]

FAO-0009 Preparation of Progress Schedules and Reports

[EMPTY CLAUSE TEXT]

FAO-0010 Work Hours

[EMPTY CLAUSE TEXT]

FAO-0011 Contraband

[EMPTY CLAUSE TEXT]

FAO-0012 Explosives

The use of explosives is absolutely forbidden without written authorization from the Contracting Officer. Requests for use of explosives should be made to the Contract Monitor and Contracting Officer in writing with an explaination why the con-tractor is requesting to use them.

FAO-0013 Parking and Temporary Office

[EMPTY CLAUSE TEXT]

FAO-0014 Safety and Accident Prevention

[EMPTY CLAUSE TEXT]

FAO-0015 Inspecting The Site

The site is located at:

FCC Oakdale 1507 East Whatley Road Oakdale, Louisiana 71463 As you are aware, this is federal prison property, patrolled by armed Correctional Officers 24 hours a day. You must have authoriza-tion to be on federal prison property from the Contracting Officer and Contract Montior.

FAO-0016 Payment Services

[EMPTY CLAUSE TEXT]

FAO-0017 Request for Final Inspection

[EMPTY CLAUSE TEXT]

FAO-0018 Drawings

IFBP05181700006 Page 6 of 28

FAO-0019 Contract Security (3000-03 Human Resources Management Manual)

The following security measures will be applied to all contract employees who will be working under the terms of the contract:

National Crime Information Center (NCIC) Check Name Check Fingerprint Check (FD-258) Completed OF-306, Declaration for Federal Employment, and Appropriate Resume or Optional Application Completion of the Contract Pre-employment Form Release of Information **A form package will be issued by the Administrative Contracting Officer or Contract Monitor at FCC Oakdale. A package shall be submitted to FCC Oakdale to obtain clearance for each contract employee (to include sub-contractors). Upon clearance being obtained the contractor will be notified. Should a contract employee NOT be cleared to enter the facility for this project the contractor will be notified immediately. The contractor will be responsible to submit another contract employee as soon as possible for clearance. Be ad-vised, the Federal Bureau of Prisons cannot disclose why an individual does not pass the security clearance process, as it is a violation of law.**

FAO-0020 Assignment of Contract Administration Office and Functions

Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back. This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.

FAO-0042 Evaluation of Contractors Performance Utilizing CPARS (Apr 2011)

Services shall be reviewed by Federal Bureau of Prisons (BOP) staff to ensure contract compliance. The contractor's performance will be evaluated in accordance with FAR 42.15. Contract monitoring reports will be prepared by the Contracting Officer's Representative (COR) or Contract Monitor (CM) and maintained in the contract file.

In accordance with FAR 42.1502 and 42.1503, agencies shall prepare an evaluation of contractor performance and submit it to the Past Performance Information Retrieval System (PPIRS). The BOP utilizes the Department of Defense (DOD) web-based Contractor Performance Assessment Reporting System (CPARS) to provide contractor performance evaluations. The contractor shall provide and maintain a current e-mail address throughout the life of the contract. The contractor will receive an e-mail from the Focal Point thru the following website address ebptsmh@navy.mil when the contractor is registered in CPARS. The e-mail will contain a "user ID" and temporary password to register in the CPARS system. The contractor must be registered to access and review its evaluation and/or provide a response. If assistance is required when registering, please contact the Contracting Staff/Focal Point.

FAO-0002 Magnitude

The magnitude of this project is between $25,000.00 and $100,000.00.

IFBP05181700006 Page 7 of 28

Section 4 - Contract Clauses

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.202-1 Definitions (July 2004)

52.203-3 Gratuities (Apr 1984)

52.203-5 Covenant Against Contingent Fees (Apr 1984)

52.203-6 Restrictions On Subcontractor Sales To The Government (Sept 2006)

52.203-7 Anti-Kickback Procedures (Oct 2010)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity (Jan 1997)

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity (Jan 1997)

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

(Oct 2010)

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II (Apr 1984)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content

Paper (May 2011)

52.204-7 Central Contractor Registration (Apr 2008)

52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(Jul 2010)

52.209-6 Protecting the Government's Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (Dec

2010)

52.209-9 Updates of Publicly Available Information Regarding Responsibility

Matters (Jan 2011)

52.214-26 Audit and Records--Sealed Bidding (Oct 2010)

IFBP05181700006 Page 8 of 28

Clause Title Fill-ins (if applicable)

52.214-27 Price Reduction for Defective Certified Cost or Pricing

Data--Modifications--Sealed Bidding (Aug 2011)

52.214-28 Subcontractor Certified Cost or Pricing Data--Modifications--Sealed

Bidding (Oct 2010)

52.219-6 Notice of Total Small Business Set-Aside (June 2003)

52.219-8 Utilization of Small Business Concerns (Jan 2011)

52.219-14 Limitations on Subcontracting (Dec 1996)

52.219-28 Post-Award Small Business Program Rerepresentation (Apr 2009)

52.222-1 Notice to the Government of Labor Disputes (Feb 1997)

52.222-3 Convict Labor (June 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation (July 2005)

52.222-6 Davis Bacon Act (July 2005)

52.222-7 Withholding of Funds (Feb 1988)

52.222-8 Payrolls and Basic Records (June 2010)

52.222-9 Apprentices and Trainees (July 2005)

52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

52.222-11 Subcontracts (Labor Standards) (July 2005)

52.222-12 Contract Termination-Debarment (Feb 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (Feb

1988)

52.222-14 Disputes Concerning Labor Standards (Feb 1988)

52.222-15 Certification of Eligibility (Feb 1988)

52.222-21 Prohibition of Segregated Facilities (Feb 1999)

52.222-26 Equal Opportunity (Mar 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (Feb

1999)

52.222-35 Equal Opportunity for Veterans (Sep 2010)

52.222-36 Affirmative Action for Workers with Disabilities (Oct 2010)

52.222-37 Employment Reports Veterans (Sep 2010)

52.222-40 Notification of Employee Rights Under the National Labor Relations

Act (Dec 2010)

IFBP05181700006 Page 9 of 28

52.222-50 Combating Trafficking in Persons (Feb 2009)

52.222-54 Employment Eligibility Verification ((Jan 2009)

52.223-2 Affirmative Procurement of Biobased Products Under Service and

Construction Contracts. (Dec 2007)

52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)

52.223-6 Drug Free Workplace (May 2001)

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

(Aug 2011)

52.225-13 Restrictions on Certain Foreign Purchases (June 2008)

52.227-1 Authorization and Consent (Dec 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement

(Dec 2007)

52.227-4 Patent Indemnity--Construction Contracts (Dec 2007)

52.228-2 Additional Bond Security (Oct 1997)

52.228-5 Insurance - Work on a Government Installation (Jan 1997)

52.228-11 Pledges of Assets (Sep 2009)

52.228-12 Prospective Subcontractor Requests for Bonds (Oct 1995)

52.228-14 Irrevocable Letter of Credit (Dec 1999) fillin7: "[U.S. Government agency]" fillin11: "[state of confirming financial institution, if any, otherwise state of issuing financial institution]" fillin12: "[Issuing financial institution] " fillin16: "[U.S. Government agency] " fillin19: "[name of issuing financial institution] " fillin22: " [the expiration date]" fillin25: " [state of confirming financial institution]" fillin26: "[Confirming financial

IFBP05181700006 Page 10 of 28 institution] " fillin27: "[City, State] " fillin28: "[Confirming financial institution] " fillin32: "[Beneficiary Agency] " fillin35: "[Beneficiary Agency]" fillin36: "[By]"

52.228-15 Performance and Payment Bonds--Construction (Oct 2010)

52.229-3 Federal, State and Local Taxes (Apr 2003)

52.232-5 Payments under Fixed-Price Construction Contracts (Sept 2002)

52.232-17 Interest (Oct 2010)

52.232-23 Assignment Of Claims (Jan 1986)

52.232-27 Prompt Payment for Construction Contracts (Oct 2008)

52.232-33 Payment by Electronic Funds Transfer--Central Contractor

Registration (Oct 2003)

52.233-1 Alt I Disputes (July 2002)- Alternate I (Dec 1991)

52.233-3 Protest after Award (Aug 1996)

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)

52.236-2 Differing Site Conditions (Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)

52.236-5 Material and Workmanship (Apr 1984)

52.236-6 Superintendence by the Contractor (Apr 1984)

52.236-7 Permits and Responsibilities (Nov 1991)

52.236-8 Other Contracts (Apr 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (Apr 1984)

52.236-10 Operations and Storage Areas (Apr 1984)

52.236-11 Use and Possession Prior to Completion (Apr 1984)

52.236-12 Cleaning Up (Apr 1984)

52.236-13 Alt I Accident Prevention (Nov 1991)- Alternate I (Nov 1991)

52.236-15 Schedules for Construction Contracts (Apr 1984)

52.236-17 Layout of Work (Apr 1984)

IFBP05181700006 Page 11 of 28

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997)- Alternate I

(Apr 1984)

52.236-26 Preconstruction Conference (Feb 1995)

52.242-13 Bankruptcy (July 1995)

52.242-14 Suspension of Work (Apr 1984)

52.243-4 Changes (June 2007)

52.244-6 Subcontracts for Commercial Items (Dec 2010)

52.246-12 Inspection of Construction (Aug 1996)

52.246-21 Alt I Warranty of Construction (Mar 1994)- Alternate I (Apr 1984)

52.248-3 Value Engineering--Construction (Oct 2010)

52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (May

2004)- Alternate I (Sept 1996)

52.249-10 Default (Fixed-Price Construction) (Apr 1984)

52.253-1 Computer Generated Forms (Jan 1991)

Clauses By Full Text

52.21-603-70 Contract Monitor (CM) (AUG 2008)

(a)Mr. Randall Weatherford ,Contracting Officer's Representative , FCI Oakdale, Louisiana,318-335-4070 ext. 4300, is hereby desig-nated as the Contract Monitor (CM) under this contract.

(b) The CM is responsible, as applicable, for: receiving all deliverables, inspecting and accepting the supplies or services provide here-under in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the contractor effort, fills in details or otherwise serves to accomplish the contractual Scope of Work; evaluating performance; and certifying all in-voices/vouchers for acceptance of the supplies or services furnished for payment.

(c) The CM does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If as a result of technical discussions it is desirable to alter/change contrac-tual obligations or the Scope of Work, the Contracting Officer shall issue such changes.

52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005)

Compliance with Homeland Security Presidential Directive-12 (HSPD-12) and Federal Information Processing Standard Publication 201 (FIPS 201) 1 entitled "Personal Identification Verification (PIV) for Federal Employees and Contractors," Phase I.

1. Long-Term Contractor Personnel:

In order to be compliant with HSPD-12/PIV I, the following investigative requirements must be met for each new long-term 2 con-tractor employee whose background investigation (BI) process begins on or after October 27, 2005:

a. Contractor Personnel must present two forms of identification in original form prior to badge issuance (acceptable documents are listed in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification," and at least one document must be a valid State or Federal government-issued picture ID);

b. Contractor Personnel must appear in person at least once before a DOJ official who is responsible for checking the identification documents. This identity proofing must be completed sometime during the clearance process but prior to badge issuance and must be documented by the DOJ official;

IFBP05181700006 Page 12 of 28

c. Contractor Personnel must undergo a BI commensurate with the designated risk level associated with the duties of each position.

Outlined below are the minimum BI requirements for each risk level:

• High Risk - Background Investigation (5 year scope)

• Moderate Risk - Limited Background Investigation (LBI) or Minimum Background Investigation (MBI)

• Low Risk - National Agency Check with Inquiries (NACI) investigation

d. The pre-appointment BI waiver requirements for all position sensitivity levels are a:

1) Favorable review of the security questionnaire form;

2) Favorable fingerprint results;

3) Favorable credit report, if required;3

4) Waiver request memorandum, including both the Office of Personnel Management schedule date and position sensitivity/risk level;

and

5) Favorable review of the National Agency Check (NAC) 4 portion of the applicable BI that is determined by position sensitivity/risk level.

A badge may be issued following approval of the above waiver requirements.

If the NAC is not received within five days of OPM's scheduling date, the badge can be issued based on a favorable review of the Se-curity Questionnaire and the Federal Bureau of Investigation Criminal History Check (i.e., fingerprint check results).

e. Badge re-validation will occur once the investigation is completed and favorably adjudicated. If the BI results so justify, badges is-sued under these procedures will be suspended or revoked.

2. Short-Term Contractor Personnel:

It is the policy of the DOJ that short-term contractors having access to DOJ information systems and/or DOJ facilities or space for six months or fewer are subject to the identity proofing requirements listed in items 1a. and 1b. above. The pre-appointment waiver re-quirements for short-term contractors are:

a. Favorable review of the security questionnaire form;

b. Favorable fingerprint results;

c. Favorable credit report, if required;5 and

d. Waiver request memorandum indicating both the position sensitivity/risk level and the duration of the appointment. The commen-surate BI does not need to be initiated.

A badge may be issued following approval of the above waiver requirements and the badge will expire six months from the date of is-suance. This process can only be used once for a short-term contractor in a twelve month period. This will ensure that any consecutive short-term appointments are subject to the full PIV-I identity proofing process.

For example, if a contractor employee requires daily access for a three or four-week period, this contractor would be cleared according to the above short-term requirements. However, if a second request is submitted for the same contractor employee within a twelve-month period for the purpose of extending the initial contract or for employment under a totally different contract for another three or four-week period, this contractor would now be considered "long-term" and must be cleared according to the long-term requirements as stated in this interim policy.

3. Intermittent Contractors:

An exception to the above-mentioned short-term requirements would be intermittent contractors.

a. For purposes of this policy, "intermittent" is defined as those contractor employees needing access to DOJ information systems and/ or DOJ facilities or space for a maximum of one day per week, regardless of the duration of the required intermittent access. For ex-ample, the water delivery contractor that delivers water one time each week and is working on a one-year contract.

b. Contractors requiring intermittent access should follow the Department's escort policy. Please reference the August 11, 2004, and January 29, 2001, Department Security Officer policy memoranda that conveys the requirements for contractor facility escorted ac-cess.

c. Due to extenuating circumstances, if a component requests unescorted access or DOJ IT system access for an intermittent contract-or, the same pre-employment background investigation waiver requirements that apply to short-term contractors are required.

d. If an intermittent contractor is approved for unescorted access, the contractor will only be issued a daily badge. The daily badge will be issued upon entrance into a DOJ facility or space and must be returned upon exiting the same facility or space.

e. If an intermittent contractor is approved for unescorted access, the approval will not exceed one year. If the intermittent contractor requires unescorted access beyond one year, the contractor will need to be re-approved each year.

4. An individual transferring from another department or agency shall not be re-adjudicated provided the individual has a current (within the last five years), favorably adjudicated BI meeting HSPD-12 and DOJ's BI requirements.

5. The DOJ's current escorted contractor policy remains unchanged by this acquisition notice.

Notes:

1. FIPS 201 is available at: www.csrc.nist.gov/publications/fips/fips201/FIPS-201-022505.pdf

2. Under HSPD-12, long-term contractors are contractors having access to DOJ information systems and/or DOJ facilities or space for six months or longer. The PIV-I identity proofing process, including initiation and adjudication of the required background investiga-tion, is required for all new long-term contractors regardless of whether it is the current practice to issue a badge. The second phase of HSPD-12 implementation (PIV-II) requires badge issuance to all affected long-term contractors.

3. For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.

4. In order to avoid a delay in the hiring process, components should request an Advance NAC Report when initiating investigations to OPM. Per OPM ' s instructions, to obtain an Advance NAC Report, a Code " 3" must be placed in block " B " of the " Agency Use Only " section of the investigative form. This report is available for all case types.

5.For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-

IFBP05181700006 Page 13 of 28 appointment waiver package.

[End of Clause]

52.27-103-72 DOJ CONTRACTOR RESIDENCY REQUIREMENT BUREAU OF PRISONS (JUNE 2004)

For three of the five years immediately prior to submission of an offer/bid/quote, or prior to performance under a contract or commit-ment, individuals or contractor employees providing services must have:

1. Legally resided in the United States (U.S.);

2. worked for the U.S. overseas in a Federal or military capacity; or

3. been a dependent of a Federal or military employee serving overseas.

If the individual is not a U.S. citizen, they must be from a country allied with the U.S. The following website provides current inform-ation regarding allied countries: http://www.opm.gov/employ/html/citizen.htm By signing this contract or commitment document, or by commencing performance, the contractor agrees to this restriction.

[End of Clause]

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 80 calen-dar days after receipt of the notice to proceed.* The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calen-dar date.

52.211-12 Liquidated Damages--Construction(Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $962.56 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is com-pleted. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.225-9 Buy American Act - Construction Materials (Sep 2010)

(a) Definitions. As used in this clause- "Commercially available off-the-shelf (COTS) item"-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

"Component" means an article, material, or supply incorporated directly into a construction material.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are dis-crete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and dis-tinct construction material regardless of when or how the individual parts or components of those systems are delivered to the con-struction site. Materials purchased directly by the Government are supplies, not construction material.

"Cost of components" means-

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transporta-tion costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

"Domestic construction material" means-

IFBP05181700006 Page 14 of 28

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its compon-ents. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

"Foreign construction material" means a construction material other than a domestic construction material.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material.

In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or compon-ents listed by the Government as follows:

NONE.

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or incon-sistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include ad-equate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign con-struction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is non-compliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISION

Construction Materials Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material ____________ _______ ___________ Domestic construction material ____________ _______ ___________ Item 2:

Foreign construction material ____________ _______ ___________ Domestic construction material ____________ _______ ___________ (List name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)

(Include other applicable supporting information.)

(*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued.)

IFBP05181700006 Page 15 of 28

52.232-18 Availability Of Funds (Apr 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

52.236-14 Availability and Use of Utility Services (Apr 1984)

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and sup-plies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Govern-ment, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the pur-pose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

(End of clause)

ADDENDUM:

The following utilities will be provided to the contractor:

1. The FBOP will provide minimal electricity service (120v), for battery chargers, radios, small hand tools, etc.

2. The FBOP will provide restroom services for contract employees.

3. All other utilities must provided by the contractor.

2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (June 1996)

(a) "Unsafe condition" as used in this clause means the actual or potential exposure of contractor or Government employees to a haz-ardous material as defined in Federal Standard No. 313, and any revisions thereto during the term of this contract, or any other materi-al or working condition designated by the Contracting Officer's Technical Representative (COTR) as potentially hazardous and requir-ing safety controls.

(b) The Occupational Safety and Health Administration (OSHA) is responsible for issuing and administering regulations that require contractors to apprise its employees of all hazards to which they may be exposed in the course of their employment; proper conditions and precautions for safe use and exposure; and related symptoms and emergency treatment in the event of exposure.

(c) Prior to commencement of work, contractors are required to inspect for and report to the contracting officer or designee the pres-ence of, or suspected presence of, any unsafe condition including asbestos or other hazardous materials or working conditions in areas in which they will be working.

(d) If during the performance of the work under this contract, the contractor or any of its employees, or subcontractor employees, dis-covers the existence of an unsafe condition, the contractor shall immediately notify the contracting officer, or designee, (with written notice provided not later than three (3) working days thereafter) of the existence of an unsafe condition. Such notice shall include the contractor's recommendations for the protection and the safety of Government, contractor and subcontractor personnel and property that may be exposed to the unsafe condition.

(e) When the Government receives notice of an unsafe condition from the contractor, the parties will agree on a course of action to mitigate the effects of that condition and, if necessary, the contract will be amended. Failure to agree on a course of action will consti-tute a dispute under the Disputes clause of this contract.

(f) Nothing contained in this clause shall relieve the contractor or subcontractors from complying with applicable Federal, State, and local laws, codes, ordinances and regulations (including the obtaining of licenses and permits) in connection with hazardous material including but not limited to the use, disturbance, or disposal of such material.

(End of Clause)

FAO-0021 Changes

IFBP05181700006 Page 16 of 28

FAO-0022 Changes - - Supplement

The clauses entitled "Changes" in FAR 52.243-4 and "Differing Site Conditions" in FAR 52.236-2 are supplemented as follows:

(a) When requested by the Contracting Officer, the contractor shall submit proposals for changes in work to the Contract Monitor.

Proposals, to be submitted within 30 calendar days after receipt of request, shall be in legible form, original and two copies, with an itemized breakdown that will include material, quantities, unit prices, labor costs (separated into trades), construction equipment, etc.

(Labor costs are to be identified with specific material placed or operation performed.) The contractor must obtain and furnish with a proposal an itemized breakdown as described above, signed by each subcontractor participating in the change regardless of tier. When certified cost or pricing data are required under FAR 15.403-4 for proposals over $700,000, the cost or pricing data shall be submitted in accordance with FAR 15.408, Table 15-2. No itemized breakdown will be required for proposals amounting to less than $1,000.

(b) When the necessity to proceed with a change does not allow sufficient time to negotiate a modification or because of failure to reach an agreement, the Contracting Officer may issue a change order instructing the contractor to proceed on the basis of a tentative price based on the best estimate available at the time, with the firm price to be determined later. Furthermore, when the change order is issued, the contractor shall submit a proposal for cost of changes in work within 30 calendar days.

( c ) The Contracting Officer will consider issuing a settlement by determination to the contract, if the contractor's proposal required by paragraphs (a) and (b) of this clause is not received within 30 calendar days, or if agreement has not been reached.

(d) Allowances not to exceed 10 percent each for overhead and profit for the party performing the work will be based on the value of labor, material, and use construction equipment required to accomplish the change. As the value of the change increases, a declining scale will be used in negotiating the percentage of overhead and profit. Allowable percentages on changes will not exceed the follow-ing: 10 percent overhead and 10 percent profit on the first $20,000; 7 1/2 percent overhead and 7 1/2 percent profit on the next $30,000; 5 percent overhead and 5 percent profit on balance over $50,000. Profit shall be computed by multiplying the profit percent-age by the sum of the direct costs and computed overhead costs.

(e) The prime contractor's or upper-tier subcontractor's fee on work performed by lower-tier subcontractors will be based on the net in-creased cost to the prime contractor or upper-tier subcontractor, as applicable. Allowable fee on changes will not exceed the follow-ing:

10 percent fee on the first $20,000; 7 1/2 percent fee on the next $30,000; and 5 percent fee on balance over $50,000.

(f) Not more than three percentages, none of which exceed the percentages shown above, will be allowed regardless of the number of tiers of subcontractors.

(g) Where the contractor's or subcontractor's portion of a change involves credit items, such items must be deducted prior to adding overhead and profit for the party performing the work. The contractor's fee is limited to the net increase to contractor of subcontract-or's portions cost computed in accordance herewith.

(h) Where a change involves credit items only, a proper measure of the amount of downward adjustment in the contract price is the reasonable cost to the contractor if he/she had performed the deleted work. A reasonable allowance for overhead and profit are prop-erly includable as part of the downward adjustment for a deductive change. The amount of such allowance is subject to negotiation.

(i) Cost of Federal Old Age Benefit (Social Security) tax and of Workmen's Compensation and Public Liability insurance appertaining to changes are allowable. While no percentage will be allowed thereon for overhead or profit, prime contractor's fee will be allowed on such items in subcontractor's proposals.

(j) Overhead and contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office su-pervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefor. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to con-tract changes are associated with field and office supervision and are considered to be included in the contractor's overhead and/or fee percentage.

IFBP05…