IFBP0518150001 CLARIFICATION SET ONE REPLACE UNDERGROUND HIGH VOLTAGE CABLE FCC OAKDALE LOUISIANA
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice
Federal Bureau of Prisons Administrative Division
Field Acquisition Office Grand Prairie, Texas 75051
July 14, 2015
ATTN: ALL BIDDERS
RE: Clarification Set Number One
Solicitation IFBP05181500001 FCC Oakdale, Louisiana Replace Underground High Voltage Cable
Dear Bidders, In reference to the above solicitation, enclosed are clarifications to questions that have been submitted. These clarifications are for informational purposes only.
If you have any questions, feel free to contact me at (972) 352-4641 or e-mail at dpatton@bop.gov
Sincerely, Douglas V. Patton Contracting Officer Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, Texas 75051
Enclosure cc: File
SCS, FCC Oakdale COR, FCC Oakdale Facility Manager, FCC Oakdale Regional Facilities Administrator, SCRO
CLARIFICATION SET NUMBER ONE
IFBP05181500001
REPLACE UNDERGROUNG HIGH VOLTAGE CABLE
FCC OAKDALE, LOUISIANA
1. Will the two (2) Replacement High Voltage Splice Cabinets fit on the existing foundation for the old cabinets without alterations other that to place anchors to hold them down? NO...it is a possibility that the slab will have to be added on to in order to accommodate the new splice cabinets depending on the cabinets used. Please refer back to the Statement of Work.
2. Will the existing conduits match easily to the new Splice Cabinets without alterations? The NEW cabinets will fit over the existing conduits, but some alterations will be required. Please refer back to the Statement of Work.
3. Is there a Spec. for the New Splice Cabinets? (Or they Brand Specific or Contractors choice) The only specifications are in the Statement of Work.
4. Are the New Splice Cabinets to be Fused? No
5. How are cables presently terminated on the Switch Gear? High Voltage Load Break Elbows
6. What is the Spec. for the cable feeding from the Switch Gear to the transformers. (Is it URD? What is the Mill? 1/0, 2/0, .....) Refer back to the Statement of Work.
7. Is the cable size common throughout the job? Refer back to the Statement of Work
8. Are the incoming feeders 200 Amp. or 600 Amp. ? Same question for outgoing feeders. Refer back to the Statement of Work
9. Is there any Excavation or Duct Bank required. Possibly, if spare conduits are not useable.
10. Is all new conduit required with the new cable? NO, The only new conduit will be to tie the new splice cabinets together.
11. Are we to remove existing cables and install new cables in existing conduits? Yes
END OF CLARIFICATIONS