U.S. Department of Justice
Federal Bureau of Prisons Administrative Division
Field Acquisition Office Grand Prairie, Texas 75051
June 15, 2017
ATTN: ALL BIDDERS
RE: Minutes of Pre-bid Conference
Solicitation IFBP05141700001 FCI Seagoville, Texas
Expand Front Entry
Dear Bidders, In reference to the above solicitation, attached are the pre-bid minutes and sign in sheet as a result of the pre-bid conference which was held on Wednesday, June 14, 2017. These pre-bid minutes are for informational purposes only; are not intended to change any specifications/statement of work/drawings, terms or conditions of the solicitation; and any changes to the solicitation shall be issued in subsequent amendments.
If you have any questions regarding these minutes, feel free to contact me at (972) 352- 4641 or e-mail at dpatton@bop.gov
Sincerely, Douglas V. Patton Contracting Officer Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, Texas 75051
Attachment cc: Pre-Award File
SCS, FCI Seagoville COR, FCI Seagoville Facility Manager, FCI Seagoville Regional Facilities Administrator, SCRO mailto:dpatton@bop.gov
PRE-BID CONFERENCE/SITE VISIT MEETING MINUTES
IFBP05141700001
EXPAND FRONT ENTRY
FCI SEAGOVILLE, TEXAS
A PRE-BID CONFERENCE FOR IFBP05141700001 WAS CALLED TO ORDER ON
JUNE 14, 2017 AT 9:00 AM AT THE FEDERAL CORRECTIONAL INSTITUTION,
SEAGOVILLE, TEXAS. TAMMIE JOHNSON , SUPERVISORY CONTRACT
SPECIALIST, PRESIDED OVER THE MEETING.
MRS. JOHNSON ENSURED EVERYONE SIGNED SIGN IN SHEET AND RECEIVED
AN AGENDA.
MRS.JOHNSON INTRODUCED HERSELF AND WELCOMED EVERYONE ON
BEHALF OF WARDEN D. J. HARMON , TO THE PRE-BID CONFERENCE FOR
EXPANSION OF THE FRONT LOBBY AT FCI SEAGOVILLE.
INTRODUCTIONS WERE MADE FROM THE BOP STAFF AND INTERESTED
CONTRACTORS IN ATTENDANCE.
MRS. JOHNSONN STATED THIS IS THE PRE-BID CONFERENCE FOR THE
EXPANSION OF THE FRONT ENTRY AT FCI SEAGOVILLE, TEXAS. SOLICITATION
NUMBER IFBP05141700001 .
SHE STATED THE PURPOSE OF THE MEETING WAS TO FAMILIARIZE BIDDERS
WITH THE REQUIREMENTS AND UNIQUE CIRCUMSTANCES SURROUNDING A
CORRECTIONAL ENVIRONMENT AND TO EXPLAIN THE SOLICITATION , AS
ISSUED AND THAT THIS CONFERENCE WAS NOT TO FURNISH ADDITIONAL
INFORMATION AND IS NOT TO BE USED AS A SUBSTITUTE FOR, OR AMEND
DEFECTIVE OR AMBIGUOUS SPECIFICATIONS.
SHE EXPLAINED THAT NOTHING SAID HERE WILL BE INTERPRETED AS A
CHANGE TO THE SOLICITATION WITHOUT THE ISSUANCE OF A FORMAL
AMENDMENT THROUGH THE AWARDING CONTRACTING OFFICER (DOUGLAS
PATTON AT THE FIELD ACQUISITION OFFICE).
SHE INFORMED CONTRACTORS THAT MINUTES OF THIS MEETING WILL BE
RECORDED AND DISTRIBUTED VIA FEDERAL BUSINESS OPPORTUNITY
(FEDBIZOPPS) AT WWW.FBO.GOV
MRS. JOHNSON INFORMED THE CONTRACTORS THAT THERE WILL BE A SITE
VISIT IMMEDIATELY FOLLOWING THE MEETING AND TO HOLD THEIR TECHNICAL
QUESTIONS UNTIL THEN . SHE ALSO INFORMED THEM THAT IF QUESTIONS
COULDN'T BE ANSWERED FROM THE SITE VISIT AND/OR CLARIFIED, THEY
SHOULD EMAIL THEIR QUESTIONS TO: DOUGLAS V. PATTON, CONTRACT
SPECIALIST AT THE FIELD ACQUISITION OFFICE AT dpatton@bop.gov. THE
CUTOFF FOR ALL QUESTIONS IS JUNE 20, 2017 AT 3:00 PM.
MRS. JOHNSON INTRODUCED SPECIALTY STAFF:
MARK CHRISTIAN, SAFETY SPECIALIST, DISCUSSED OSHA REQUIREMENTS AND
STATE AND FEDERAL REGULATIONS PERTAINING TO A SAFE CONSTRUCTION
SITE.
ROBERT HONSTED, GENERAL FOREMAN DISCUSSED SECURITY
PROCEDURES, WORKING IN AN ENVIRONEMTN WITH INMATES, STAFF
ESCORTS PROCEDURES, CONTRABAND, ALCOHOL AND DRUG USE
ON THE GOVERNMETN PROPERTY, CAMERAS AND TAKING PICTURES, CELL
PHONES, TOOL ACCOUNTABILITY, WORK DELAYS, PARKING, MOBILIZATION,
GANG BOXES, RESTROOMS, LUNCH BREAKS,
MONICA LIMBRICK, HUMAN RESOURCE MANAGER DISCUSSED BACKGROUND
INVESTIGATIONS, CLEARANCE PROCEDURES, AND DOJ RESIDENCY
REQUIREMENTS.
MRS. JOHNSON BEGAN TO HIGHLIGHT IMPORTANT INFORMATION ON THE
COVER PAGE AND IN THE SOLICATION.
SHE DISCUSSED THE BID OPENING DATE , TIME, AND PROCESS: THE DEADLINE
FOR RECEIPT OF BIDS IS JUNE 29, 2017, 1 :00 PM CST AT WHICH TIME BIDS WILL
BE OPENED. SHE INFORMED CONTRACTORS THAT HAND CARRIED BIDS AND
BIDS MAILED THROUGH THE USPS/OR A CARRIER SHALL BE DELIVERED TO
DOUGLAS V. PATTON , CONTRACT SPECIALIST AT THE FIELD ACQUISITION
OFFICE. (FAQ ADDRESS: FRONT COVER PAGE AND BLOCKS 7 AND 8 OF THE
SF-1442). BIDS WILL BE TIME STAMPED UPON RECIEPT. LATE BIDS WILL NOT
BE CONSIDERED AND WILL BE REJECTED. BIDDERS WERE TO LEG/ALBY
COMPLETE AND SUBMIT PAGES 1, 2, 4, AND PAGES 30 THROUGH 32 OF THE SF
1442 WITH YOUR BID.
MRS. JOHNSON DISCUSSED THE BONDS REQUIRED FOR THIS SOLICATION. SHE
INFORMED THE CONTRACTORS THAT BID BOND MUST BE SUBMITIED WITH
YOUR BID. THE BID BOND MUST BE 20% OF YOUR BID PRICE AND NOT TO
EXCEED $3,000,000.00. THE BID BOND FORM IS LOCATED AT SECTION 5 OF THE
SOLICATION (ATTACHMENTS - STANDARD FORM 24. A PERFORMANCE AND
PAYMENT BOND MUST BE SUBMITTED WITHIN 10 DAYS AFTER NOTIFICATION OF
AWARD.
THE REPRESENTATIONS AND CERTIFICATIONS ARE LOCATED AT SECTION 7,
PAGES 30-32.
THIS ACQUISITION IS A 100% SMALL BUSINESS SET ASIDE
THE NAICS CODE= 236220 - COMMERCIAL AND INDUSTIRAL BUILDING
CONSTRUCTION
THE SIZE STANDARD= $36.5 MILLION
MRS. JOHNSON EXPLAINED HOW TO DETERMIN IF YOUR COMPANY IS A SMALL
BUSINESS UNDER THIS NAICS CODE.
MRS. JOHNSON DISCUSSED PROVISION 52.204-8, ANNUAL REPRESENTATIONS
AND CERTIFICATIONS AND STATED THIS SHALL BE SUBMITTED WITH YOUR BID
(PAGES 30-32)
MRS. JOHNSON DISCUSSED THE ON LINE REPRESENTATIONS AND
CERTIFICATIONS- SYSTEM FOR AWARD MANAGEMENT SYSTEM - (SAMS)
WWW.SAMS.GOV - CONTRACTORS MUST BE REGISTERED IN SYSTEM FOR
AWARD MANAGEMENT SYSTEM (SAMS) - WWW.SAM.GOV AND YOUR SOCIO
ECONOMIC REPS AND CERTS MUST BE UPDATED . ENSURE YOUR SAMS
REGISTRATION IS UPDATED WITH NAICS 236220. THE GOVERNMENT CAN NOT
MAKE AN AWARD TO CONTRACTORS ON THE GOVERNMENTS EXCLUDED
PARTIES LIST (EPLS).
MRS. JOHNSON STATED THERE ARE NO AMENDMENTS TO THE SOLICIATION
AS OF TODAY: 06/14/2017 AND THAT IF THERE ARE AMMENDMENTS -
AMENDMENTS MUST BE ACKNOWLEDGED IN ACCORDANCE WITH THE
INSTRUCTIONS IN BLOCK ELEVEN ON THE STANDARD FORM 30, AMENDMENT
OF SOLICITATION/MODIFICATION OF CONTRACT FORM.
MRS. JOHNSON DISCUSSED THAT CONTRACTORS MUST BE REGISTERED IN
SYSTEM FOR AWARD MANAGEMENT (SAMS) . INSTRUCTIONS FOR
REGISTRATION IN THE SAMS CAN BE FOUND AT WWW.SAM.GOV. IN ORDER TO
REGISTER YOU MUST HAVE A DUNS NUMBER - YOU CAN OBTAIN A DUNS FROM
DUN AND BRADSTREET AT WWW.DNB.COM OR BY CALLING 800-333-0505. YOUR
LOCAL (PTAC) PROCUREMENT TECHNICAL ASSISTANCE CENTER MAY BE ABLE
TO ASSIST IF YOU HAVE PROBLEMS. PLACE YOUR DUNS NUMBER AND TAX ID#
ON THE SF-1442 AT BLOCK 10. THE GOVERNMENT CAN NOT MAKE AWARDS TO
CONTRACTORS ON THE GOVERNMENTS EXCLUDED PARTIES LIST (EPLS).
MRS. JOHNSON DISCUSSED THE MILLER ACT, PERFORMANCE AND PAYEMNT
BONDS AND STATED THIS CONTRACT IS SUBJECT TO THE MILLER ACT. THE
CONTRACTOR SHALL EXECUTE AND SUBMIT PERFORMANCE AND PAYMENT
BONDS TO THE ADMINISTRATIVE CONTRACTING OFFICER WITHIN 10 DAYS
AFTER AWARD (PAGE 8, SECTION FA0-001 BONDS)
MRS. JOHNSON DISCUSSED THE DAVIS BACON INFORMATION AND STATED
THIS CONTRACT IS SUBJECT TO THE DAVIS BACON ACT. THIS CONTRACT IS
SUBJECT TO THE DAVIS BACON ACT. ALL APPLICABLE WORKERS MUST BE
PAID ACCORDING TO THE TERMS OF THE DEPARTMENT OF LABOR WAGE
GRADE DECISION : TX170291 DATED 04/14/2017 TX291 OR AS UPATED VIA
AMENDMENT{S) , IF ANY. THE CONTRACTING OFFICER WILL BE CONDUCTING
RANDOM WAGE GRADE INTERVIEWS WITH WORKERS AND VERIFYING WAGE
RATES AGAINST CERTIFIED PAYROLL THROUGHOUT THE DURATION OF THE
PROJECT.
MRS. JOHNSON DISCUSSED THE HIRING GOALS FOR THIS PROJECT WHICH
ARE 18.2% FOR MINORITIES AND 6.9% FOR FEMALES --A "GOOD FAITH" EFFORT
SHOULD BE PUT FORTH BY THE CONTRACTOR TO ACHIEVE THESE GOALS.
MRS. JOHNSON STATED THE CONTRACTOR IS RESPONSIBLE FOR ANY
LICENSING OR PERMITS THAT ARE REQUIRED.
MRS. JOHNSON STATED THE MAGNITUDE OF THIS PROJECT IS BETWEEN
$250,000 AND $500,000K. THIS PROJECT IS NOT TAX EXEMPT. THE
GOVERNMENT WILL NOT ISSUE TAX EXEMPTION CERTIFICATES. IT IS THE
CONTRACTORS RESPONSIBILITY TO DETERMINE IF THEY ARE TAX EXEMPT.
CONTRACTORS SHOULD INCLUDE ANY/ALL APPLICABLE TAXES IN THEIR BID.
THE CONTRACTOR MAY CONTACT THE STATE COMPTROLLERS OFFICE TO
DETERMINE/OBTAIN ANY TAX EXEMPTIONS, IF APPLICABLE.
MRS. JOHNSON STATED THE PROJECT WILL CONSIST OF EIGHT HOUR WORK
DAYS, MONDAY THROUGH FRIDAY EXCLUDING FEDERAL HOLIDAYS. THE
WORK DAY MAY NOT CONSTITUTE A FULL EIGHT HOUR DAY DUE TO SECURITY
PROCEDURES.
MRS. JOHNSON STATED THE COMPLETION PERIOD IS 365 CALENDAR DAYS
AFTER RECIEVING THE NOTICE TO PROCEED. THE NOTICE TO PROCEED WILL
BE ISSUED AT THE PRE-CONSTURCTION MEETING, WHICH IS TYPICALY 10 DAYS
AFTER AWARD. THIS IS WHEN THE CLOCK STARTS FOR THE CONTRACT
PERFORMANCE PERIOD. THE CONTRACTOR NEEDS TO BE ON-SITE WITH-IN 10
DAYS AFTER GIVEN THE N-T-P. IF YOU ARE NOT ON SITE WITHIN 10 DAYS AFTER
BEING GIVEN THE NTP, YOU WILL BE IN DEFAULT AND WILL BE ISSUED A CURE
NOTICE; IF THE DEFAULT IS NOT RECTIFIED YOU WILL BE ISSUED A SHOW
CAUSE NOTICE; IF THE SHOW CAUSE IS NOT VALID, THE CONTRACT WILL BE
TERMINATED FOR DEFAULT AND WILL BE REPORTED IN CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS). EVENTHOUGH
THE SECURITY CLEARANCE PROCESS IS BUil TINTO THE PERFORMANCE
PERIOD, THIS PROCESS CAN START !MEDIATELY AFTER NOTIFICATION OF
AWARD. ALSO THE CONTRACTOR CAN BE MOBILIZING, ORDERING
EQUIPMENT, ETC. DURING THIS 10 DAY PERIOD, MUST SHOW PROGRESS
DURING THIS PERIOD.
MRS. JOHNSON STATED THAT TIME EXTENSIONS FOR INCLEMENT WEATHER
WILL NOT BE GRANTED UNLESS THE WEATHER IS UNUSUALLY SEVERE AND
ABNORMAL IN COMPARISON TO PRIOR YEARS AND SHE WILL BE MONITORING
THE WEATHER DAYS.
MRS. JOHNSON STATED THAT LIQUIDATED DAMAGES FOR THIS PROJECT ARE
IN THE AMOUNT OF $1 ,121.17 PER CALENDAR DAY OF DELAY AFTER
SCHEDULED COMPLETION
SHE STATED THAT A PRE-CONSTRUCTION CONFERENCE IS REQUIRED AFTER
THE CONTRACT IS AWARDED AND WILL BE SCHEDULED ACCORDINGLY.
TYPICALLY THIS IS SCHEDULED AS CLOSE TO THE 10 DAYS AFTER THE DATE OF
AWARD BECAUSE THIS IS WHEN THE CONTRACTOR'S BONDS ANO INSURANCE
ARE DUE ANO THE NOTICE TO PROCEED IS ISSUED, WHICH STARTS THE
PERFORMANCE PERIOD. IT IS BEST TO START THE SECUIRTY CLEARACE
PROCESS SOON AFTER NOTIFICATION OF AWARD.
SHE STATED PROGRESS MEETINGS WILL BE SCHEDULED MONTHLY
THORUGHOUT THE DURATION OF THE PROJECT. APPLICATION FOR
PAYMENTS ARE TO BE SUBMITTED ON AIA G702 AND G702A (CONTINUATION)
OR THE CONTRACTOR'S OWN FORM AS LONG AS THE INFORMATION IS SIMILAR
TO THE G702. CONTRACTORS CAN GET THE G702 FORM FROM AMERICAN
INSTITUTE OF ARCHITECTS .
THE MEETING WAS ADJOURNED AT APPROXIMATELY 9:45 A.M. AND EVERYONE
WENT ON A TOUR TO VISIT THE SITE.
Digitally signed by TAMMIE
JOHNSON
TAM M I E DN: c= US, o=U.S. Government, ou= Dept of Justice, ou= BOP, en= TAMMIE JOHNSON, J 0 H N So N 0.9.2342.19200300.100.1 .1= 15 001002975512 Date: 2017.06.15 13:01 :57 -05'00'
NAME
gir
TITLE
Cr-c,o i2A1
(AAA; 1 7041‘E 4, et-fr Cit.; CA.
U
/,-3P/P
SIGN IN REGISTER
PREBID CONFERENCE
SITE VISIT
June 14, 2017 9:00 AM CST
PROJECT: EXPAND FRONT LOBBY
FCI SEAGOVILLE, TEXAS
SOLICITATION: IFBP05141700001 (Project 5B9B)
| PRE BID CONF MEET MINUTES COVER LETTER |
| IFBP05141700001 PRE BID CONF MINUTES |
| SIGN IN SHEET |
| Page 1 |
| Page 2 |