Replace Roofs Phase-1 - FCI Oxford, Wisconsin
Solicitation number
IFBP04101400001
Issued by

About this file

Attachment 1 Specification

View the file

Other files

File Type Posted
Bid_Abstract_OXF_Roofs.pdf PDF
Asbestos_Report_OXF_Roof.PDF PDF
Amendment_0005_OXF_Roof.pdf PDF
Amendment_0004_OXF_Roof.pdf PDF
Amendment_0003_OXF_Roof.pdf PDF
Prebid_Meeting_Minutes_OXF_Roof.pdf PDF
Amendment_0002_OXF_Roof.pdf PDF
Amendment_0001_OXF_Roof.pdf PDF
3_Davis-Bacon_05022014.pdf PDF
IFBP04101400001.pdf PDF
4_SF24_Bid_Bond.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUREAU OF PRISONS

NORTH CENTRAL REGION Federal Bureau of Prisons

FCI Oxford, Project 4A6V Janual}' 29, 2014

FACILITIES DIVISION

CONTRACTOR RESPONSI!!LE FOR

THE DIMENSIONS, QUANTffiES, AND CONFORMITY WITH THE

CONTRACT DOCUMENTS

;zf APPROVED Specification

D MAKE NOTED

J> CORRECTIONS

C] NOT APPROVED

roject 4A6V - Replace Roofs PH 1 United States Department of Justice

Federal Bureau of Prisons RESUBMIT

IIATE

rA/~,;,., ~

FCI Oxford l'llOIB:J O~oF 1.1/f/,v, ~"¥' &-g 'llj

TAhiA nfC

Division 01 - General Requirements 01 11 00 Summary of Work and Bureau Procedures

1.1 Summary of Work

1.2 Contractor Use of Premises

1.3 Contractor Personnel and Equipment Security

1.4 Execution of Work and Clarification of Information

1.5 Definitions

1.6 Project Meetings

1. 7 Construction Submittals

1.8 Construction Contract Management Requirements

1.9 Temporary Construction Facilities and Controls

1. 10 Health and Safety

1.11 Construction Cleaning

1.12 Submittals for Substitution

1.13 Quality Assurance

1.14 Product Delivery/Storage/Handling

1.15 Warranties (Guarantees)

1.16 Project Closeout

PROPERTY OF TilE UNITED STATES GOVERNMENT COPYING, DISSEMINATION. OR DISTRIBUTION OF Tl lESE

ORA WINGS, PLANS, SPECIFICATIONS OR INFORMATION TO

UNAUTHORIZED USI~RS IS PROIIIUITIED.

Do not remove this notice.

l,roperly destroy documents when no longer needed.

Federal Bureau of Prisons FCI Oxford, Project 4A6V

January 29, 2014

SECTION 01 11 00 - Summary of Work & Bureau Procedures

PART 1 GENERAL

1.1 SUMMARY OF WORK

A. All work described in these documents and all work necessary to complete the work as described or shown is to be executed in a thoroughly substantial and workmanlike manner. All work shall be done by persons who are thoroughly experienced in their particular trade or craft. The work includes, but is not necessarily limited to the following description:

FCI Oxford proposes to have an outside roofing contractor remove and dispose of the existing two (2) rock ballasted EPDM flat roof svstems and underlying insulation, down to the concrete decking to the Administration Building (approximately 9,500 sq. ft.), Education Roof (approximately 37,000

sq. ft.). and approximately 40,000 sq. fl. of the Warehouse. Food Service. and Recreation Roof

The contractor will haul the existing rock to an on-site location identified by FCI Oxford. The contractor will remove the membrane and roof insulation. The concrete decking will be swept. f1igiJ pressure water cleaned. and high pressure air blast.

The contractor will apply an insulated spray polyurethane foam roof system.

The polyurethane foam thickness will average 6.5" to 7" and receive 25mils of elastomeric coating with ceramic granules. The new roof system shall have a minimum R-Value of 40.

Tile contractor will install a new metal fascia system over the existing to receive the added roof /Jeigllt. due to insulation thickness.

The new roof system will inc/ucla a 15 year. full system warranty (R-40). At the conclusion of the project, an on-site training session will provide for proper repair ancl maintenance procedures of the polyuretiJBne foam roof A roof repair kit will be provided which will include one case of sealant. one gallon of silicone coating, and one bag of ceramic roof granules.

Project Name: Project 4A6V- Replace Roofs PH 1

Location: FCI Oxford

Address: 350 Elk Ave Oxford, WI 53952

Owner: U.S. Department of Justice, Federal Bureau of Prisons

(FBOP)

SUMMARY OF WORK & BUREAU PROCEDURES

SenlltiYe But Unclassified - SBU

01 11 00-1

BOP00447

Cross-Out

BOP00447

Typewritten Text County Road G & Elk Ave., Grand Marsh

' r ,,

1.2 CONTRACTOR USE OF PREMISES

Federal Bureau of Prisons FCI Oxford, Ptoject 4A8V

Januaty 29, 2014

A. The Contractor shall limit its use of the premise to the work indicated, so as to allow for Government occupancy and use. During the entire construction period, the Contractor shall coordinate use of the premises for construction operations with the FBOP Project Representative.

1. All visitors to the construction site shall register with the FBOP site officials. The Contractor shall not allow employees to have personal visitors on site.

2. The project site will be open to the Contractor from Monday through Friday, with exception of federal holdays, tor the duration of the project.

The project schedule Is to be based on a normal40 hour work week. The Contractor shaH establish a normal work week schedule for the duration of the project.

a. Work outside the secure perimeter of the institution will be allowed between the hours of 6:30 AM to 4:00 PM. This wiH allow the Contractor's work force to arrive on-site in the morning and prepare for entering the secure perimeter of the institution. It wUI also ai9W the Contractor's work force to button-up their lay-down/staging area after exiting the secure perimeter at the end of the work day.

b. Work inside the secure perimeter of the institution will be allowed between the hours of 8:00AM to 3:00 PM. Work inside the secure perimeter is restricted to the operation of the institution's rear gate.

The Contractor's work force wiD be allowed to enter the rear gate at approximately 8:00AM each workday. At this time, the FBOP staff will begin personnel and tool security check-In procedures. Once the check-in procedures are completed, the Contractor will be escorted by an FBOP escort to the work area. The rear gate closes at 3:00 PM;

therefore, the Contractor's work force will be escorted back to the rear gate by FBOP staff no later than approximately 2:30 PM, in order to allow enough time for the completion of security check-out procedures prior to exiting the secure perimeter.

3. Contraband: The Contractor shall inform hislher employees that intoxicating beverages, drugs, weapons, etc .. , will not be allowed on the site. Introduction of contraband shan be subject to the penalties prescribed by Tide 18 USC 1791.

4. Explosives: The use of explosives is absolutely forbidden without written authorization from the FBOP Contracting Officer upon no less than thirty

(30) days advance written request.

5. Cell phones. pagers. and radios are not aHowed within the secure perimeter.

8. Parking: Parking areas, either on or off-site wiR be furnished for workmen by the Contractor at a location approved by the FBOP Project Representative.

SUMMARY OF WORK & BUREAU PROCEDURES

......,. But Unalaulftld • 88U

0111 00-2

January 29, 2014

7. Temporary Office: Any temporary field offiCe used by the Contractor shall be located in an area approved by the FBOP Project Representative.

8. The Contractor shall review his or her site layout plan for staging, stockpHes, etc... with the FBOP Project Representative. The Contractor shaH maintain all staging and construction areas in a neat and orderly fashion.

9. The Contractor shaD provide protection of the work against weather, rain, wind, storms, frost, cold, or heat so as to maintain all work, materials, apparatus and fiXtures free from injury or damage.

1.3 CONTRACTOR PERSONNEL AND EQUIPMENT SECURITY

A. Contractor employees working at a FBOP facUlty will be subject to a background investigation after award of the contract. Contractor employees must complete the applicable fonns provided by the FBOP Project Representative. Following the investigation, the FBOP will provide the Contractor with a list of employees approved to work at the institution. If a Contractor's employee is not approved, only that fact will be communicated to the Contractor. No additional justification will be released. in compliance with Privacy Act requirements.

B. Contractor employees working within the secure perimeter shaH wear a clearance badge issued by the institution at all times, and shall be escorted by an institution staff member.

C. Tools brought into the institution's secure perimeter will be inventoried at the beginning and end of each work day by FBOP staff.

1. All tools used by the Contractor working within the secure perimeter shall be under constant supeNision. Loss of a tool shal be reported immediately to the escorting FBOP staff. ·

2. No explosive action tools shall be used on the property at anytime.

3. Materials brought Inside the secure perimeter of the institution shall be limited to a one-day supply. Surplus materials that are not instaUed in on work day must be moved outside the secure perimeter at the end of the day.

D. Contractor employees working on the FBOP site shall be required to undergo a general institution orientation on responsibilities. proceduras and laws governing conduct When working at an FBOP institution. These rules Include, but are not limited to the foUowlng:

1. Weapons and ammunition of any kind are not allowed on Federal property, ilcludlng the parking lot.

2. Do not give, or offer to give, anything to an inmate.

3. Do not bring any correspondence into or out of the institution.

4. Do not accept gifts or favors from inmates.

SUMMARY OF WORK a BUREAU PROCEDURES 8enelllve ButU..._..ed ·IBU

0111 00 ·3

Federal Bureau of Prisons FCI Oxlotd, Project 4A8V

January 29, 2014

5. Leave personal items locked in your vehicle or secure them at the Contractor's lay-down area.

6. A form of photo ID is required to enter the facility.

7. Revealing clothing is not acceptable attire and work attire is required at all times.

8. Conduct yourself In a responsible. mature manner.

9. Report an unusual action(s) or behavior to FBOP staff.

1.4 EXECUTION OF WORK AND CLARIFICATION OF INFORMATION

A. The Contractor's execution of the Contract represents that the Contractor has visited the site and become familiar with the local conditions under which the Work is to be performed; and correlated personal observations with the Contract requirements.

B. It is the intention of the Construction Documents to provide a complete project.

The Contractor shall be responsible for this result. The Contractor shall verify all measurements and be responsible for the correctness of same. The Contractor shall layout their work and be responsible for all lnes, elevations.

and measurements of buildings, utilities, and other work executed by them.

This includes verifccation of existing conditions, If any, that affect their work or to which their work is to be fitted.

C. The Contractor shall carefully study and compare Contract Documents before proceeding with fabrication and Installation of work. Coordinate schedulng, submittals and work to ensure efficient and orderly sequence of installation.

D. Should it appear that the work intended to be described is not sufficiently detailed or explained by the Construction Documents. the Contractor shall issue a Request for Information (RFI) to the FBOP Contracting Officer. RFI's shall be used by the Contractor to clarify Information in the Construction Documents only. Each RFI shall be numbered sequentially, dated and indicate a reasonable date for the Contracting Officer's written reply. All RFI questions shall be thoroughly researched by the Contractor. prior to presenting them as RFI's. In no case shall any work proceed in uncertainty.

1.5 DEFINITIONS

A. Contracting Officer. The officer who executes the contract on behalf of the United States; this shall include a duly appointed successor. The Contracting Officer Ia the onlv official authgrized to administer. modifV. and/or tanniQall the contract. The Contracting Officer makes related approvals, determinations, and findings pertaining to the contract and is the only individual on the project staff who can obligate funds on behalf of the Government and Ia reglateled with the Department of Justice.

SUMMARY OF WORK a BUREAU PROCEDURES ......_But Uncta•lfled -aau

0111 oo-,4 i I l ' i

Federal Bureau of Prisons FCI Oxfottl, Ptojed 4A6V

January 29, 2014

B. FBOP Project Representative: The FBOP representative, located at the construction project site, or authorized representative(&) who has overaU responsibility (except for contractual matters) for the administration of the operations and activities at the construction project site. References to ''Government Representative• or "Contracting Officer's Representative (COR)" shall mean the FBOP Project Representative. The FBOP Project Representative represents the Contracting Officer for all technical matters that arise under the contract. The FBOP Project Representative shall be specifically responsible for the following areas as they relate to the administration of the construction contract. This delegation of duties and responsibilities does not preclude the Contracting Officer from also performing these duties.

1. Monitor and review the progress of the work. This will include the conduct of onslte observations of the work as it is in progress. The FBOP Project Representative shall issue reports concerning deficiencies and/or omissions observed in the work.

2. Receive submittals to verify conformance with the Contract Documents.

3. Review requests for information from the Contractor. This does not

Include the authority for any change that may result from the approval of the request for infonnation. Authorization for any change can come only from the Contracting Officer.

4. Monitor that all tests required by the Contract Documents are performed.

This may Include the documentation of the test procedures and results.

5. Review sample construction and job site rnockups for conformance with the Contract Documents.

6. Review and sign the application and certificates for payment as submitted by the Contractor. Approval of the certification must be made by the Contracting Officer.

7. Evaluate the Contractor's performance and prepare a performance report at the completion of the Contract.

8. Review and recommend final approval of the Contractor's schedule for the Contracting Officer as required by the Contract Documents. This process would Include the Schedule of Values.

9. The FBOP Project Representative shall approve the placement of the Contractor's trailers and general administration of the construction site as It relates to the construction work.

10. The FBOP Project Representative shal not, and has no authority to:

a. Re-delegate any authority to any other person.

b. Change any of the terms of the Contract or sign any modification to the Contract.

c. Oblgate the payment of any money by the Government.

d. Cause the Contractor to incur cost not otherwise covered by the

Contract.

SUMMARY OF WORK a BUREAU PROCEDURES 8e11811ve But Unc .... llled • 88U

0111 00·5

Januaty 29, 2014

C. Contractor: The sole proprietorship, partnership, joint venture, corporation, or other legal entity that agrees to provide all labor, material, and services required In the contract. In order to administer and supervise the Contract Work, the Contractor shall provide the following minimum supervisors:

1. Contractors Project Manager: The Contractors Representative experienced in administration, supervision and quality control of all construction work required by the Contract This includes, but is not limited to enforcing all applicable federal, state and local standards.

2. Project Field Superintendent: The Contractors Representative experienced in general field supervision of all construction work required by the Contract. Supervise, direct, inspect and coordinate the constrUction work of the Contractor, subcontractors, suppliers, and installers, and to assure compliance with the Construction Schedule.

D. Subcontractor. _The term, as employed herein, includes a business having a direct contract with the Contractor, and it Includes one who furnishes material according to the Drawings and Specifications of this work. This definition also includes businesses having contracts with subcontractors. Subcontractors are considered to be Contractor employees.

E. Approve: Only the Contracting Officer can approve or disapprove Contract actions. Even if the Specifacations indicate that an Individual other than the Contracting Officer (such as the "FBOP Project Representative'1 will approve or disapprove an action, it Is understood that only the Contracting Officer has this authority. In no case will "approval" by the Contracting Officer be interpreted as a release of the Contractor from responsibility to fulfill the requirements of Contract Documents.

F. Industry Standards and General Applicability of Standards: Except where more explicit or more stringent requirements are written directly into the Contract Documents, applicable standards of the construction industry have the same force and effect (and are made a part of Contract Documents by reference) as if copied directly into Contract Documents, or as if published copies were bound herein. Any materials, equipment, or workmanship specified by references to published manufacturers specifications. industry standards, building codes, or other referenced published standard shall comply with the requirements of the latest editions or revisions thereof and any amendment or supplements in effect on the date of the Invitation for Bid, except as limited to type, class, grade, or modification In the Specification.

The Contractor. if requested, shaH furnish an affidavit from the manufacturer certifying that material or product delivered to the project site meets requirements specified.

1. •federal Specification", :"Commercial Standards", and "Simplified Practice

Recommendations" can be purchased from the Superintendent of Documents, u.s. Government Printing Olftce, Washington, DC 20402.

SUMMARY OF WORK & BUREAU PROCEDURES

,.....,. aut unct ... lftld-aau

011100-8

January 29, 2014

2. Standards of associations, institutes, or similar organizations referred to in the Specifications may be obtained directly from the organization.

G. Substantial Completion: The stage in the progress of the work or designated portion thereof is suffiCiently complete in accordance with the contract documents so the Govemment can occupy or utilize the work for its intended use.

1.6 PROJECT MEETINGS

A. Pre-Construction Meeting: The Contracting Officer shall sched1,1le and conduct a pre-construction conference and organizational meeting at the project site or other convenient location prior to or at the time of receipt of the Notice to Proceed for the Construction Contract. Contracting Officer shaH arrange for a record of the meeting to be taken and distributed to all concemed. Instructions given that are supported in the Contract Documents are considered binding on all contracting parties. The attendees shall be:

1. The attendees shall include: the Contracting Officer, the FBOP Project

Representative, the Contractor's Project Manager, the Project Field Superintendent, and major subcontractors and other technical support disciplnes as appropriate. Attendees will also include representatives from the correctional institution, as deemed necessary by the Contracting Offtcer.

2. The meeting itinerary shall include, but not be limited to issues such as:

a. Introductions and coordination of the various parties in attendance.

b. Use of premises and security procedures.

c. Construction scheduling and work sequencing.

d. Processing of shop drawings, product data, samples, request for information, contract modifications, and applications for paymenl

e. Contract closeout requirements.

B. Construction Progress Meetings: The Contracting Oftlcer and the FBOP Project Representative shaH co-conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the Contracting Officer.

The attendees shaH be:

1. The attendees shall Include:

a. FBOP: Contracting Oftlcer. FBOP Project Representative, Institution Representatives, and technical support discipUnes as appropriate.

b. Contractor: Project Manager, Project Field Superintendent. and technical support disciplines as appropriate (Subcontractors, Manufacturers, SuppHers, etc ... ).

2. The meeting itinerary shall include, but not be limited to issues such as:

a. Progress since previous meeting, and completion date conftnnatlon.

SUMMARY OF WORK & BUREAU PROCEDURES

8enllllvtl But Unalllnlfled • 88U

011100-7

January 29, 2014

b. Field observations and the construction schedule.

c. Corrective measures necessary to maintain the project standards.

resolve current problems, or head-off anticipated conflicts.

d. The status of: project submittals, request for Information, and contract modifacations.

1.7 CONSTRUCTION SUBMITTALS

A. The types of submittal requirements specified in these requirements include shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, and miscellaneous work related submittals for construction. Individual submittal requirements are specified In applicable Sections for each unit of work. Provide a standard transmittal form with each submittal.

B. The Contractor shall ensure submittals (product data. shop drawings, etc.} produced by subcontractors, vendors, or other entitles are reviewed for adequacy of coordination and meeting the design intent of the construction documents prior to the submlllion to the Govemmenl The Contractor shall stamp and certify that each submittal was reviewed, approved, and coordinated with the requirements of Work and the Contract documents.

FaHure on the part of the Contractor to indicate review and approval on submittals, prior to submission to the FBOP Project Representative. will result in the submittals not being accepted and returned to the Contractor. The FBOP Project Representative shall return the submittals to the General Contractor within approximately fifteen (15) calendar days.

c. Preparation of Submittals: Provide permanent marking on each submittal to identify project, date. Contractor, Subcontractor, submittal name, Speciftcation section number, and similar information to distinguish It from other submittals.

Number resubmittals with original number and an alphabetic suffix.

0. Coordination and Sequencing: Coordinate preparation and proce88ing of submittals with performance of the work so that work will not be delayed by submittals. Coordinate and sequence different categories of submittals for the same Work, and for interfacing units of Work, so that one wil not be delayed for coordination of review with another. The Contractor shall promptly notify the Contracting Officer and the FBOP Project Representative when submittal action is delayed for any reason, citing the cause for delay.

1.8 CONSTRUCTION CONTRACT MANAGEMENT REQUIREMENTS

(Construction Scheduling, Schedule of Values, Pay ApplcaUona. Contract Modiftcallons)

A. Construction Scheduling: The Contractor shall provide a detailed Construction Schedule with activity entries for each portion of the conatruction work, in chronological order, cumulatively Indicating the entire Contract Performance

SUMMARY OF WORK a BUREAU PROCEDURES 8eMIMt But Unclaelllllcl• 88U

011100-8

FCI Oxfotd, Project 4A6V

January 29. 2014

Period. The Construction Schedule shall include the initial detaHed construction schedule, and all subsequent construction schedule updates and revisions, as required over the life of the contract.

1. The entire contract performance period as established by the Contract shaH establish a Final Contract Completion Date and shall be utilized in the planning and presentation of 1he Contractor's Construction Schedule.

As the Construction Schedule is being developed, the Contractor may project an earlier completion date. The government may elect to accept a schedule that projects an earlier completion date; however, this acceptance shall not modify the Final Contract Completion Date. The time difference between the Contractor's projected completion date and the Final Contract Completion Date shaH be owned and for the mutual use of both the Contractor and the Government The Govemment reserves the right not to accept any schedule It determines to be unrealistic In length.

2. The purpose of the Construction Schedule shaH be to;

a. Assure adequate planning, staffing, scheduling and reporting during execution of the work by the Contractor.

b. Assure coordination of the work among the Contractor, subcontractors, manufacturers and suppliers.

c. Assist the Contractor and Contracting Officer in monitoring the progress of the work and evaluating proposed changes to the Contract and the Construction Schedule.

d. Assist the Contracting Officer and the Contractor in the preparation.

and evaluation of the Contractor's monthly progress payments.

3. The Construction SchedUle shall be updated on a monthly basis throughout the entire Contract time and until Project Completion. The Contractor and the Contracting Officer shall review the actual progress made during each Construction Progress Meeting. The Contractor shall inform the Contracting Officer of any current or anticipated conditions which may delay the work, and provide any additional written information necessary to support these conditions. The Contractor shall update the Construction Schedule to reflect the actual progress of the project. as of the date directed by the Contracting Officer. If it appears the Construction Schedule no longer represents the actual prosecution and progress of the work, the Contracting Officer wHI direct the Contractor to revise the Construction Schedule.

4. The Construction Schedule shall:

a. Show the sequence of construction by activity, with dates for beginning and completion of each element of construction.

b. Identify each Item by specification section number.

c. Show accumulated percentage of completion for each item.

d. Coordinate with the Schedule of Values (See Item 8, below).

e. Provide sub-schedules to define critical portions of the entire

Construction Schedule. ·

SUMMARY OF WORK a BUREAU PROCEDURES lenlllllve ButUnclaetllflecl ·8BU

0111 oo .. a

FCI Oxford, Ptoject 4A8V

Januaty 29, 2014

f. Include a narrative report to discuss issues of importance, such as, bUt not limited to: anticipated delays, contract modifications, revisions, etc.

B. Schedule of Value: The Contractor shall prepare a Schedule of Value (SOV) for the total project. The SOV shall be correlated to the Construction Schedule. The SOV shall be formatted per the CSI Master Format structure.

The Contractor may propose an alternate organizational fonnat to the Contracting Officer for approval.

1. The Schedule of Values shall include:

a. Project name, location, and contract number.

b. Contractor's name and address.

c. Date of submittal.

2. The SOV shall be arranged in a tabular form with separate columna to indicate the following for each item lated:

a. Generic name.

b. Related specification section, if applicable.

c. Name of subcontractor, if applicable.

d. Name of manufacturer or fabricator, if applicable

e. Name of supplier, if applicable.

f. Change orders (modifications) that have affected value, if applicable.

g. Dollar value.

h. Percentage of Contract sum rounded to the nearest percent, adjusted to total 100 percent.

3. The SOV breakdown ahaU breakdown the Contract sum in sufficient detail to facilitate continued evaluation of applications of payment and progress reports. Break principal subcontract amounts down into several line items.

4. SOV amounts shall be rounded to the nearest whole dollar. The total of all sov amounts shall equal the Contract sum.

C. Contractor Applications for Payments: The Contracting Officer shall provide the Contractor with hlslher requirements for submiUing applications for payment. The application for payment may include, but is not lmited to: lien waivers for work paid to date, receipts or vouchers for payment of labor, budget coat report, listing of stored materials, and any other supporting data requested by the ContracUng Offtcer.

1. Initial Application for Payment: Actions and submittals that must precede or coincide with submittal of the first applcatlon for payment include the following:

a. List of subcontractors.

b. List of principal suppliers and fabricators.

c. Schedule of Values.

d. Contractor's construction schedule.

e. SUbmittal schedule.

SUMMARY OF WORK & BUREAU PROCEDURES

8eMitlft But Unclaalfled • 88U

011100-10

FCI Oxford, Ptoject 4A6V

January 29, 2014

2. Final Payment Application: Actions and submittals that must precede or coincide with submittal of the final application for payment Include the following:

a. Completion of project closeout requirements.

b. Completion of items specified for completion after substantial completion.

c. Transmittal of Record Documents and other required project construction records to Government.

d. Proof that taxes, fees and sinilar obligations have been paid.

e. Removal of temporary facilities and services.

f. Removal of surplus materials, rubbish, and similar elements.

g. Release of claims.

D. Request for Information (RFI): If a question, information, or clarification regarding any part of the Contract or FBOP Requirements is needed, the Contractor will submit a Request for Information (RFI) to the Contracting Officer in accordance with the following RFI submission process:

1. The Contractor shall submit a written, signed and dated RFI to the

Contracting Officer.

2. Each RFI shall be numbered sequentially using a unique series of numbers for document control purposes.

3. The Contractor shall allow a reasonable amount of time from the date of receipt, for the Contracting Officer's review and written reply to the RFI.

E. Contract Modifications (Change Orders): When changes are made in the work that requires an equitable adjustment to the Contract, the Contractor shall submit to the Contracting Officer a written proposal for adjustment of the amount of increase or decrease. Each Contract Modification Proposal (Change Order) shall be numbered sequentially using a unique series of numbers for document control purposes. With the proposal, the Contractor shall submit an Itemized breakdown In at least the following detail:

1. Material quantities and Item cost.

2. Labor costs by material item.

3. Construction equipment cost.

4. Workmen's compensation and public lability insurance.

5. Overhead.

6. Profit or commission.

7. Employment taxes (FICA and FUTA); no overhead, profit or commission will be allowed on employment taxes.

8. Request for time extensions (calendar days} if applicable.

If the Contracllng Officer determines that an equitable adjustment In time and dollars is to be made, the contract shall be modified in writing using the prescribed Standard Form provided by the Contracting Officer.

SUMMARY OF WORK a BUREAU PROCEDURES 8enllln But Uncl .. llled • 8BU

0111 00-11

January 29, 2014

1.9 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

A. The Contractor shall provide the following temporary provisions for the duration of the contract

1. Temporary heating and ventilating as necessary to protect materials, products, and finishes from damage due to temperature or humidity, and to maintain specified conditions during construction.

2. Temporary barriers, barricades, and similar devices as necessary for safety and pro~ion of construction personnel and public.

3. Temporary utilities, as necessary to complete the contract~

a. Water Service: Water from the FBOP institution's existing water system is available for use without metering and without payment of use charges. The Contractor shall provide connections and extensions of services as required for construction operations, and protect the temporary service from freezing. The Contractor shall exercise measures to conserve water. and regulate the temporary system to prevent interference with the Institution's normal usage.

b. Electric Power Service: Electric power from the FBOP institution's existing system is available for use without metering and without payment of use charges. The Contractor shall provide connections and extensions of services as required for construction operations.

The Contractor shall exercise measures to conserve electricity. and regulate the temporary system to prevent interference with the Institution's normal usage.

4. Temporary dust and sediment controls. These include keeping drives and walks adjacent to the work site clean and free of dirt, debris and Utter caused by construction operations.

1.10 SAFETY AND HEALTH

A. The Contractor is responsible for safety and health on the project. In performing the work under this contract the Contractor shal:

1. Conform to the specifiC safety requirements established by1hi8 contract:

2. Comply with the safety rules of the FBOP Institution that concern related activities not directly addressed in this contract;

3. Take all reasonable steps and precautions to prevent accidents and preserve the rife and health of Contractor and Government personnel performing or in any way coming in contact with the performance of this contract:

4. Take such additional immediate precautions as the Contracting Officer may reasonably require for safety and accident prevention purposes.

1.11 CONSTRUCTION CLEANING

A. The Contractor shall execute continual cleaning to keep building. site and adjacent properties free from accumulations of waste materials, litter, debris, SUMMARY OF WORK & BUREAU PROCEDURES

&eMIIIveButUnc.....,... -sau

0111 00-12

FCI Oxfotfl, Project 4A6V

January 29, 2014 rubbish, windblown debris and foreign substances resulting from construction operations. The entire work area must be kept free from all debris. The soils must be free of nails, wires, re-bar and other construction materials. During and after the construction process there must be no burying of any construction debris.

B. Remove waste materials, debris, and rubbish from premises and dispose off site In a lawful manner. Do not dispose of volatile waste such as mineral spirits, ol, paint thinner in storm or sanitary drains. Do not dispose of wastes into streams or waterways.

C. If a dispute arises between the Contractor and the Government as to the responsibility under this Contract for maintaining the premises and surrounding area free from waste materials, litter and so on; the Government may clean up; and the Contracting Officer will allocate the cost to the Contractor via modification to the Contract.

1.12 SUBMITTALS FOR SUBSTITUTION

A. General Requirements: Unless otherwise specifically provided in this contract, reference to any equipment, material, article, or patented process, by trade name, make, or catalog number, shall be regarded as establishing a standard of quaHty and shall not be construed as limiting competition. SUbject to compliance with specified requirements, the Contractor may, at its option, use any equipment, material, article, or proceaa, which in the judgment of the Contracting Officer is equal to that named.

B. Request for Substitutions prior to execution of the Contract: Requests for substitutions during the solicitation period shall be made by submitting completed substitution request a minimum of twenty (20) calendar days prior to the proposal/bid due date.

1. Submit four (4) copies, fully identified for product or method being proposed for substitution, including related Specification Section and drawing number(s), and fully documented to show compliance with requirements for substitutions. Include project data/drawings, descriptions of methods, samples where appHcable, detailed comparison of significant qualities between apecifted Item and proposed substitution, statement of effect on construction tine and coordination with other affected cost information or proposal, and statement to the effect that proposed substitution win result In overall work equal to or better than work originally indicated.

2. Document each request with supporting data substantiating compliance of proposed substitution with contract documents, including:

SUMMARY OF WORK & BUREAU PROCEDURES

lenaltlve ButunciiiHifted • 8BU

0111 00-13

FCI Oxlotd, Project 4A6V

Januaty 29, 2014

a. Manufacturer's name and address, product, trade name, mode, or catalog number, performance and teat data, and reference standards.

b. Itemized point-by-point comparison of proposed substitution with specific product. listing variations in quality, performance, and olher pertinent characteristics.

c. Changes required in other Work.

d. Availability of maintenance service and source of replacement parts, as applicable.

e. Certified test data to show compHance with performance characteristics specified.

f. Samples, when applicable or requested.

g. other information as necessary to assist in Contracting Officer's evaluation.

3. Properly submitted substitutions that are acceptable to the. Contracting

Officer will be included in Contract Documents by amendment.

4. Substitutions will not be considered for acceptance when:

a. They are indicated or implied on shop drawings or product data submittals without a formal request for Contractor.

b. Acceptance will require substantial revision of contract documents.

c. Submittal for substitution request does not include point-by-point comparison of proposed substitution with specified product.

d. In judgment of Contracting Officer, submittal does not include adequate information necessary for a complete evaluation.

e. If requested directly by a subcontractor or supplier.

5. Substitute products shaH not be ordered or installed without written acceptance of Contracting Officer.

6. Contracting Officer will determine acceptability of proposed substitutions.

7. No substitutions are permitted after execution of the Contract. except as allowed by Change Order.

1.13 QUALITY ASSURANCE

A. Source Limitations: To the greatest extent possible for each unit of Work, and subject to the restrictions of the Buy American Act, provide products, materials, or equipment of a singular generic kind from a single source.

B. CompatlbHity of Options: Where more than one choice is available an options for Contractor's selection of a product or material, select an option that is compatible with other products and materials already selected. Total compatibility among options is not assured by limitations within contract documents, but must be provided by Contractor. Compatibility Ia a basic general requirement of product/material selections.

SUMMARY OF WORK & BUREAU PROCEDURES

lenlllllve But Unoa.alfted -sau

011100-14

1.14 PRODUCT DELIVERY/STORAGE/HANDLING

FCI Oxford, Project 4A6V

January 29, 2014

A. General: Deliver, handle, and store products in accordance with manufacturer's recommendations and by methods and means that will prevent damage, deterioration, and loss, including theft, and protect against damage from climatic conditions. Control delivery schedules to minimize long-term storage of products at site and overcrowding of construction spaces. In particular, provide delivery/installation coordination to ensure minimum holding or storage times for products recognized to be flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other sources of loss.

Damaged or defective items, in the opinion of the Project Representative, shall be replaced at no cost to the Government.

1.15 WARRANTIES (GUARANTEES)

A. General: The warranty and guarantee provisions of the Contract Clauses apply to all Work of the contract. In accordance with FAR 52.248.21 Warranty of Construction, and In addition to any other warranties In this contract, the Contractor warrants that work perfonned under this contract conforms to the contract requirements and Is free of any defect In equipment, material, or workmanship performed by the contractor or any subcontractor or supplier at any tier. The warranty shall continue for a period of one (1) year from the date of Project Substantial Completion.

B. Refer to individual specification sections for the determination of units of Work that are required to be specifically or individually warranted, and for the specific requirements and terms of those warranties (or guarantees) In excess of what is required by the Contract Clauses.

1. Submit Special Project Warranty (Guarantee): A warranty specifically written and signed by Contractor for a defined portion of the Work and, where required, countersigned by subcontractor, installer, manufacturer, or other entity engaged by Contractor.

2. Specified Project Warranty: A warranty that is required by contract documents to be provided for a manufactured product Incorporated Into the Work, regardless of whether manufacturer has published a similar warranty without regard for specific incorporation of product Into the Work, or has written and executed a special project warranty as a direct result of contract document requirements.

3. Coincidental Product Warranty: A warranty that is not specifically required by contract documents (other than as specified In these Requirements), but that Is available on a product incorporated Into the Work, by virtue of the fact that manufacturer of product has published warranty in connection with purchases and uses of product without regard for specific applications except as otherwise limited by terms of warranty.

SUMMARY OF WORK a BUREAU PROCEDURES S.MIIve But Unclaulfted- 8BU

0111 00-15

1.16 PROJECT CLOSEOUT

FCI Oxford, Ptoject 4A6V

January 29, 2014

A. Substantial Completion: When the Contractor considers the work substantially complete, submit the following to the Contracting Officer:

1. A written notice that work. or designated portion thereof, is substantially complete, and request an inspection by the FBOP Project Representative and the Contracting Officer.

2. A punch list of remaining incompletelnon-compHant items shall accompany this written notice. Prior to the Contractor requesting substantial completion, the Contractor shall develop a punch list of incomplete and non-compliant items.

3. Within a reasonable time after receipt of such notice, the Contracting Officer and FBOP Project Representative shall make an inspection to determine the status of substantial completion.

4. If the Contracting Offar determines that the work Is not substantially complete:

a. The Contracting Officer will promptly notify the Contractor In writing, giving reasons therefore.

b. The Contractor shall remedy deficiencies in the work and send a second written notice of substantial completion to the Contracting Officer.

c. The Contracting Officer and FBOP Project Representative will re inspect the work.

d. The Contractor shall be responsible for any additional inspections by the Government that are not faul of the Government.

5. When the Contracting Officer determines that the work is substantially complete, the Contracting Officer will:

a. Request the FBOP Project Representative verify the Contractor's punch list. The Contractor's punch list may be amended by the FBOP Project Representative with any open issues and any remaining items from the Incomplete/non-compliant list.

b. Request the Contractor to prepare a Certificate of Substantial Completion on a form approved by the Contracting Officer.

accompanied by the punch Uat. This form will be used to record the established start dates for warranties and guaranties. This document provides for· agreement as to the time allowed for completion or correction of work remaining, the date upon which the FBOP institution will assume possession of the work. If Issued after the contract completion date, the certificate establishes the date upon which liquidated danages cease.

B. Final Inspection and Acceptance: The Contractor shall diligently complete all punch list items before a Final Inspection is scheduled.

1. When the Contractor considers the work complete, he/she shall submit a written certllcation to the Contracting Oflicer stating the Work has been

SUMMARY OF WORK & BUREAU PROCEDURES

....... But Unc••lftld. 8BU

011100-18

FCI Oxfotrl, Project 4A6V

January 29, 2014 completed and inspected for compliance with the Contract Documents;

and the Work is ready for final Inspection. The Contractor shall give the Contracting Officer a minimum of ten (10) work days advanced wrilten notice of the date on which the work will be fully completed and ready for the Govemmenfs final inspection.

2. The Contracting Officer and the FBOP Project Representative shaH make an inspection to verify the status of completion with reasonable promptness after receipt of such certification.

3. Should the Contracting Officer consider that the work is incomplete or defective;

a. The Contracting Officer will promptly notify the Contractor in writing, listing the incomplete or defective work.

b. The Contractor shall take immediate steps to remedy the stated deficiencies and send a second written certification to the Contracting Officer when the work is complete.

c. The Contracting Officer and the FBOP Project Representative wll re inspect the work.

d. The Contractor shal be responsible for any additional inspections by the Government that are not fault of the Government:

e. The Contracting Officer wil assign monetary value to all punch list items not completed. and to all required submittals not received, as of the date of Final Acceptance. The total value of those items shall be retained and/or deducted from the Contractor's final payment until the Contractor demonstrates to the Contracting Officer's satisfaction that such items t'!ave been completed or corrected.

4. When the Contracting Officer finds that work is acceptable under the Contract Documents, the Contracting Officer will request the Contractor to complete all remaining closeout submittals and contract requirements, including but not limited to: GSA Form 1142 - Release of Claims, operating and maintenance manuals, record documents, warranties, guarantees, certificates, clearances, and bonds.

5. When aU work is acceptable, the Contracting Officer will issue a Certificate of Contract Completion, GSA Form 218, or other approved form to the Contractor for signature.

C. Final Application for Payment: After the work is fully accepted by the Contracting Officer, the Contractor shall submit the final application for payment in accordance with procedures and requirements stated In the Contract requirements. As required by the Contracting Officer, the final application for payment shall Include affidavita that an bills have been paid.

The Contractor's submission of the final application for payment shall signify that the work is complete, and that the Contractor haa vacated the Project work site.

SUMMARY OF WORK & BUREAU PROCEDURES

Seneltlve But Una._.lflecl. aau

011100-17

END OF SECTION

SUMMARY OF WORK a BUREAU PROCEDURES Senaltlve But Unclaeltlad • IBU

Federal Bureau of Prisons FCI Oxford, Project 4A6V

January 29, 2014

0111 00-18