RFI1LEWboiler.pdf
PDF 37 KB Posted
- Solicitation number
- IFBP02071100001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsBOILERlewisburg.pdf | ||
| WageRatesAUG5.PDF | ||
| Amendment3.PDF | ||
| Amendment2.PDF | ||
| WageRatesJuly292011.PDF | ||
| MeetingMinutes.pdf | ||
| Amendment0001.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) 1
IFBP02071100001
Replace Boiler
USP Lewisburg
1. Under section 2 part 2-products number 7 the micro modulation controller it does not say what controller to use as long as it meets the specifications, however under subsection k ii, it calls out for a AutoFlame
MK7 controller. Just want to clarify if you are specifying the AutoFlame system or not.
ANSWER: Please omit the following paragraph:
PART 2 ~ Products, Section C, part 7, sub section k, number ii "The control panel will include a AutoFlame MK7 controller with servo motors mounted on the fuel valves and the FGR system."
All controls must be suitable and compatible with all current controls being used in the power plant.
2. Section c#7kii makes reference to an AutoFlame MK7 controller. Do we have any latitude in choice of other systems?
ANSWER: Please omit the following paragraph:
PART 2 ~ Products, Section C, part 7, sub section k, number ii "The control panel will include a AutoFlame MK7 controller with servo motors mounted on the fuel valves and the FGR system."
All controls must be suitable and compatible with all current controls being used in the power plant.
3. Section C1 specifies a four pass boiler. Would it be considered to do a like for like change of the existing three pass boiler?
ANSWER: Please follow the statement of work. Please prepare a bid for a four pass boiler.