RFI1freezerLEWbobfinal.pdf
PDF 20 KB Posted
- Attached to
- Walk-in Freezer Construction Project at the United States Penitentiary (USP) Lewisburg, Pennsylvania
- Solicitation number
- IFBP02071000002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsFreezerLEW.pdf | ||
| pages 4 -6.pdf | ||
| pages 11 -13.pdf | ||
| pages 1 -3.pdf | ||
| MeetingMinutes.pdf | ||
| WageRates.PDF | ||
| CoverLetterWALKinFreezerMay2010.pdf | ||
| Bond Forms June 23.zip | ZIP file | |
| SOW.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information (RFI) 1
IFBP02071000002
Walk-in Freezer Project USP Lewisburg
1. Will contractors be allowed to work before or past the allotted work time if we inform the prison prior to working?
ANSWER: Please bid the job according to the solicitation, 8 hours per day, Monday through Friday, excluding Federal holidays.
2. There are no drawings uploaded to fbo.gov website.
ANSWER: AS-BUILT drawings of the warehouse, can be uploaded and provided for reference purposes only. These drawings will not change the scope of work. It is the contractors responsibility to confirm all current conditions.
3. If prison conditions go to “lock down” or emergency vehicles are entering or exiting requiring a “lock down” situation, work need to cease until lifted?
ANSWER: There will not be a lock down situation that would prevent work.
4. Can the existing panel boxes, breakers, conduit, wiring junction boxes, disconnect switches and conduit breakers be reused for the new installation of the walk in boxes?
ANSWER: Yes if they meet or exceed manufactures recommendations.
5. At the site visit meeting on 6/2/10, contractors were told that cell phones could be used on site but specifications of bid state that cell phone use is prohibited under Section
3.4 Contractors use of site and premises, Item #12.
ANSWER: Cell phones are not permitted.
6. Are existing walk in panels to be disposed of by the agency?
ANSWER: All aluminum panels can be disposed by the agency.
7. Can the existing concrete insulated floor as required by the manufacturer specifications be re-used and extended for the new, larger walk in footprint?
ANSWER: IF the existing concrete insulated floor meets or exceeds the manufactures written recommendations and can be proven to the agency, then the area may be extended to except larger footprint.
8. If any as-built drawings are issued with this solicitation and they are incorrect, can the situation be addressed through a change order.
ANSWER: No. Do not bid this project and expect any change orders. It is the responsibility of any contractor to point out any errors in the solicitation to the Government immediately.
Unforseen conditions shall be addressed accordingly.