RFI1.pdf
PDF 119 KB Posted
- Attached to
- Upgrade Boiler Controls at the Federal Correctional Institution (FCI) Danbury, Connecticut
- Solicitation number
- IFBP02031100001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsBoilerControlDAN.pdf | ||
| Amendment0002.PDF | ||
| AttachToAmend2.PDF | ||
| MeetingMinutesApril13DANfinal.pdf | ||
| Amendment0001.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) 1
IFBP02031100001
Upgrade Boiler Controls
FCI Danbury
1. Can the FBOP provide an as-built drawing(s) showing the existing Cleaver Brooks D-26 Water tube Boiler furnace dimensions, front wall/plate construction, tube locations and refractory construction with modifications implemented over the years?
ANSWER: No, Blake equipment installed the boilers in 1973, The drawings might be in their archives.
2. Please provide existing boiler furnace pressure (inches
WC)
ANSWER: Wind Box: 0 to 10 inches of water
Furnace: -5 to +3 inches of water
3. Boiler site Elevation/Altitude?
ANSWER: 378’ to 397’
4. Required/specified and permitted BTU input for the new burner.
ANSWER: Approximately 11,971,429 BTU/ HR, MRC of 15.91 MMBtu/hr.
5. Maximum and minimum ambient (room) and/or combustion air temperature.
ANSWER: Since there is no Combustion Air Fan unit in the plant, boilers operates in room temp of 60 F to 100 F. (60 in winter, 100 in peak summer)
6. What is the RFI cutoff date?
ANSWER: April 15, 2011
7. Is there a clearer drawing of the existing boilers? It is drawing #3 on the FBO website.
ANSWER: No, the available drawings are submitted.