Flap_B_Tab_1_-_Solicitation_03302015.pdf
PDF 370 KB Posted
- Attached to
- FPC ALDERSON - REPLACE SWITCHGEAR - PHASE I Federal contract opportunity
- Solicitation number
- IFBP01011500002
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Flap_C_Tab_1_-_Abstract_of_Alderson.pdf | ||
| Flap_B_Tab_3A_-_Meeting_Minutes_-_Alderson.pdf | ||
| Coverletter_03302015.pdf | ||
| Flap_A_Tab_6_-_Wage_Rate.pdf | ||
| Flap_A_Tab_4A_-_Drawings.pdf | ||
| Tab_13_-_SF-24_Bid_Bond_Form.pdf | ||
| Flap_A_Tab_4_-_SOW.pdf | ||
| NCIC_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFBP01011500002 Page 1 of 29
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
0182-15
6. PROJECT NO.
1B2L YREG: P2L10001
7. ISSUED BY CODE BFAO 8. ADDRESS OFFER TO
Federal Bureau of Prisons Mid Atlantic Regional Office 302 Sentinel Drive, Suite 200 Annapolis Junction, MD 20701
Federal Bureau of Prisons Mid Atlantic Regional Office 302 Sentinel Drive, Suite 200 Annapolis Junction, MD 20701
9. FOR INFORMATION CALL: a. NA ME
Jennifer Brouillard
b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS)
(301) 317-3255
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IFBP01011500002
2. TYPE OF SOLICITATION
X SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
04/14/2015
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE W ORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
PROJECT TITLE: REPLACE SWITCHGEAR – PHASE I
TAS 151003 - The selected contractor shall provide all materials, labor, and equipment to complete the Replace Switchgear – Phase I at the Federal Prison Camp (FPC Alderson), located in Alderson, West Virginia, in accordance with the attached Statement of Work.
*INCLUDE THE FOLLOWING INFORMATION*
Tax ID#:______________________
DUNS#:______________________
EMAIL ADDRESS:
CAGE CODE:
11. The Contractor shall begin performance 10 calendar days and complete it within ___280 calendar days after receiving award, X notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
X YES NO *See FAO-0001, paragraph (b), on page 5*
12b. CALENDAR DA YS
13. ADDITIONAL SOLICITATION REQUIRE MENTS
A. Sealed offers in original and 01 copy to perform the work required are due at the place specified in item 8 by May 29, 2015, no later than 11:00 a.m. local time. If this is a sealed bid solicitation, offers will be publicly opened at that time.
Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than __90__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
X
IFBP01011500002 Page 2 of 29
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS OFFER AMOUNT FOR IFBP01011500002: $___________________________
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOW LEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
A MENDMENT NO.
DATE.
20a. NA ME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED
AW ARD (To be completed by Government)
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
X3-FP010101PZ-1B2L-25CC SMALL BUSINESS YREG: P2L10001
24. SUBMIT INVOICES TO ADDRESS
SHOWN IN (4 copies unless otherwise specified)
ITEM 27 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) (5)
26. ADMINISTERED BY CODE BALD 27. PAYMENT WILL BE MADE BY
Federal Bureau Of Prisons FPC Alderson Attn: Accounting Section One Glen Ray Road Alderson, West Virginia 24910
Federal Bureau Of Prisons FPC Alderson Attn: Wendy Holliday One Glen Ray Road Alderson, West Virginia 24910
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 4-85)BACK
IFBP01011500002 Page 3 of 29
Table of Contents Section Description Page Number
1 Solicitation, Offer and Award 1 2 Schedule of Supplies/Services 4 3 Special Contract Requirements 5 4 Contract Clauses 10-20 5 Attachments 21 6 Solicitation Provisions 22 7 Representations and Certifications 26
IFBP01011500002 Page 4 of 29
Section 2 - Commodity or Services Schedule
This project will be constructed in accordance with the specifications, drawings, and contractors must furnish the appropriate bid, and performance and payment bonds. The specifications, drawings, and bond forms can be located in Section 5 - Attachments
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM
NO.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
The selected contractor shall provide all materials, labor, and equipment to complete the Replace Switchgear – Phase I at the Federal Prison Camp (FPC Alderson), located in Alderson, West Virginia, in accordance with the attached Statement of Work.
1.0
JB
The successful contractor shall be responsible for all applicable federal, state, and local taxes. No tax exemption certification will be issued by the Federal Bureau of Prisons. THE TOTAL PRICE SHALL BE WRITTEN ON LINE ITEM 17 OF THE STANDARD FORM 1442.
IFBP01011500002 Page 5 of 29
Section 3 - Special Contract Requirements
Clauses by Full Text
FAO-0001 Bonds
(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be ex pressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)
(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows; a Performance Bond (Standard Form
25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)
(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(c) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):
(1) A Payment Bond;
(2) An irrevocable letter of credit (ILC);
(3) A tripartite escrow agreement;
(4) A Certificate of Deposit; or
(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(d) Individual Sureties.
(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.
(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.
FAO-0002 Magnitude The magnitude of this project is between $1,000,000.00 and $5,000,000.00.
FAO-0003 Required Insurance See FAR 52.228-5, Insurance - Work on a Government Installation.
(a) The contractor shall, at his own expense, provide and maintain during the entire performance of this contract at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract:
TYPE AMOUNT
(1) WORKERS COMPENSATION & EMPLOYER'S LIABILITY $100,000.00
The required Workmen's Compensation Insurance shall extend to cover employee's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.00.
(2) COMPREHENSIVE GENERAL LIABILITY with a minimum limit of: Per accident or occurrence for bodily injury $500,000.00 This insurance shall include contractor's protective and contractual liability.
(3) COMPREHENSIVE AUTOMOBILE LIABILITY with the following minimum limits:
Per person $200,000.00 Per Occurrence for Bodily Injury $500,000.00 Per Occurrence for Property Damage $ 20,000.00
FAO-0004 Pre-Construction Conference
(a) Prior to the start of construction, Contracting Officers shall call a conference with the contractor, subcontractor(s), Warden, Controller/Business Administrator, Safety Manager, Facilities Administrator, Project Representative, A&E firm, Captain and other
IFBP01011500002 Page 6 of 29 interested personnel to discuss the statutory labor standards, prevailing wage requirements, submission of the contractor's payrolls, subcontractor's responsibilities, institution work schedules, local policies, contraband, parking, storage of vehicles and equipment, etc.
(b) The Contractor shall familiarize himself/herself with all procedures involved in normal institution routines. Any requirements which may constitute a problem or result in conflict will be brought to the attention of the Contracting Officer or his/her representative for determination.
FAO-0005 Submittals Within 10 calendar days after commencement of work or as otherwise established by the Contracting Officer, all materials and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the contractor.
The submittal process is in place to allow the Government the opportunity to determine whether materials or procedures used by the contractor are in accordance with contract requirements. It is ultimately the Contractor's responsibility via the quality control process to ensure submittal items installed under the contract and work performed on site are in accordance with industry standards and general practices.
(a)The types of submittal requirements specified in this contract may include, but is not limited to; shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, equipment, materials, and miscellaneous work related submittals for construction. Individual submittal requirements are generally specified in applicable sections for each unit of work in the specifications and/or as a whole in one section in the statement of work.
(b)The Bureau of Prisons (BOP) Contracting Officer’s Representative (COR) shall act for the Contracting Officer in the review and acceptance of all submittals. The Contractor shall submit submittals as required by the contract/specifications to the COR for transmittal to the Contracting Officer. Fabrication of any work or purchase or use of any submittals (such as materials for which samples are required or equipment, etc.) shall not take place until acceptance is given by the COR, except at the Contractor's own risk.
(c) The Contractor shall submit all shop drawings and submittals sufficiently in advance (unless otherwise specified in the specifications) of the construction requirements to allow ample time for checking, re-submitting, and re-checking.
(d) Failure of any materials to pass their specified tests shall be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which has previously proven unsatisfactory in service.
(e) The Contracting Officer’s or designee’s approval or acceptance of submittals is not to be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for the satisfactory construction of all work. The Contractor is responsible for delivering a final product/system that is operational as intended by the contract requirements, regardless of any Government approvals or acceptance of submittals. The Government assumes no liability during the submittal approval/acceptance process. It is the sole responsibility of the Contractor to deliver a properly functioning product or system.
FAO-0006 Contractor Use of Premises
Work Hours The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.
NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.
Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site.
Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.
Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.
IFBP01011500002 Page 7 of 29
Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.
Safety and Accident Prevention In performing work under this contract the contractor shall:
(a) Conform to the specific safety requirements established by this contract;
(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;
(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(d) Take such additional immediate precautions as the Contracting Officer may reasonably require for safety and accident prevention purposes.
FAO-0007 Payment Services (a)Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form; however, it shall contain similar information as the AIA Form G-702. The Contracting Officer will approve the amount of payment by signing and forwarding the application and certificate as follows: Original to Accounting; Copy for Contract Award File.
(b) All small business contractors are required to self-certify on all invoices their small business status.
FAO-0008 Request for Final Inspection The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.
FAO-0009 Contract Security (3000-03 Human Resources Management Manual) The following security measures will be applied to all contract employees who will be working under the terms of the contract:
National Crime Information Center (NCIC) Check Name Check Fingerprint Check (FD-258) Completed OF-306, Declaration for Federal Employment, and Appropriate Resume or Optional Application Completion of the Contract Pre-employment Form Release of Information
**A form package will be issued by the Administrative Contracting Officer or Contracting Officer’s Representative (COR) at the institution upon contract award. A package shall be submitted to the institution to obtain clearance for each contract employee (to include sub-contractors). Upon clearance being obtained the contractor will be notified. Should a contract employee NOT be cleared to enter the facility for this project, the contractor will be notified immediately. The contractor will be responsible to submit another contract employee as soon as possible for clearance. Be advised, the Federal Bureau of Prisons cannot disclose why an individual does not pass the security clearance process, as it is a violation of law.**
FAO-0010 Assignment of Contract Administration Office and Functions Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back.
This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.
FAO-0011 Schedule of Values The Contractor shall prepare a Schedule of Values (SOV) for the project and submit to the Contracting Officer for approval prior to submitting the first application for payment. The SOV shall be correlated with the construction schedule. The SOV shall be formatted per the Construction Specification Institute Master Format structure. The Contractor may propose an alternate organizational format to the Contracting Officer for approval.
A) The Schedule of Values shall include:
1. Project name, location, and contract number;
2. Contractor’s name and address;
3. Date of submittal.
IFBP01011500002 Page 8 of 29 B) The SOV shall be arranged in a tabular form with separate columns to indicate the following for each item listed:
1. Description of Work or Material;
2. Related specification section, if applicable;
3. Name of subcontractor, if applicable;
4. Name of manufacturer or fabricator, if applicable;
5. Name of supplier, if applicable;
6. Change orders (modifications) that have affected value, if Applicable;
7. Dollar value;
8. Percentage of Contract sum rounded to the nearest percent, adjusted to total 100 percent.
C) The SOV breakdown shall breakdown the contract sum in sufficient detail to facilitate continued evaluation of applications for payment and progress reports. The contractor should break principal subcontract amounts down into several line items.
D) SOV amounts shall be rounded to the nearest whole dollar. The total of all SOV amounts shall equal the total contract amount.
E) The contractor shall progress the percentage of completion, with the concurrence of the Contracting Officer’s Representative, for each value on a monthly basis in conjunction with the preparation of each monthly application for payment. The progressed value percentages shall directly correlate to the calculated total amount due for each monthly progress payment.
F) The SOV shall remain fixed for the duration of contract performance. Any revisions to the SOV must be requested in writing, with justification, for approval by the Contracting Officer.
FAO-0012 Progress Meetings The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.
(a) At a minimum, the attendees shall include but is not limited to:
(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administrator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).
(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).
(b)The meeting should include, but is not limited to issues such as:
Administrative Contracting Officer:
(1) Old business from previous progress meeting(s);
(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);
(3) Review of payments made to date and review/approve current payment request;
(4) Status of modification proposal requests;
(5) Discuss new business.
COR:
(1) Status of escort coverage;
(2) Review gate or Sallyport entrance/exit issues;
(3) Discuss other delays contractor may be experiencing;
(4) Discuss performance/quality issues.
Contractor:
(1) Review/discuss updated progress schedule;
(2) Provide 30 day outlook;
(3) Discuss other issues affecting performance.
IFBP01011500002 Page 9 of 29
FAO-0013 Contract Closeout Procedures (for construction contracts exceeding $150,000) Contract Closeout must be completed within six (6) months of physical completion of the work.
Prior to payment of final invoice the contractor shall submit the following documents:
(1) Contractor’s Affidavit of Release of Liens (AIA Document G706A);
(2) Contractor’s Affidavit of Payment of Debts and Claims (AIA Document G706);
(3) All as-built drawings/shop drawings, if applicable;
(4) Contractor’s final invoice;
(5) Release of Claims (GSA Form 1142);
(6) Consent of Surety to Final Payment (AIA Document G707);
(7) Letter establishing warranty dates;
(8) Complete list of subcontractors with telephone numbers and points of contact;
(9) Guarantees and warranties;
(10) All balance and test reports;
(11) All operation/maintenance manuals;
(12) All permits and certifications.
AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com. GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).
http://www.aiabookstore.com/ http://www.gsa.gov/
IFBP01011500002 Page 10 of 29 Section 4 - Contract Clauses
Clauses by Reference
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far/ Clause Title
52.253-1 Computer Generated Forms (Jan 1991)
52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I (Sept 1996)
52.249-10 Default (Fixed-Price Construction) (Apr 1984)
52.248-3 Value Engineering - Construction (Oct 2010)
52.246-21 Alt I Warranty of Construction (Mar 1994) Alternate I (Apr 1984)
52.246-12 Inspection of Construction (Aug 1996)
52.244-6 Subcontracts for Commercial Items (Apr 2015)
52.243-4 Changes (June 2007)
52.242-14 Suspension of Work (Apr 1984)
52.242-13 Bankruptcy (July 1995)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
52.236-8 Other Contracts (Apr 1984)
52.236-7 Permits and Responsibilities (Nov 1991)
52.236-6 Superintendence by the Contractor (Apr 1984)
52.236-5 Material and Workmanship (Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
52.236-26 Preconstruction Conference (Feb 1995)
52.236-21 Alt II Specifications and Drawings for Construction (Feb 1997) - Alternate II (Apr 1984) [Insert "4" for clause fill-in.]
52.236-2 Differing Site Conditions (Apr 1984)
52.236-17 Layout of Work (Apr 1984)
52.236-15 Schedules for Construction Contracts (Apr 1984)
52.236-14 Availability and Use of Utility Services (Apr 1984) [Available utilities are: water, restrooms and electricity.]
52.236-13 Accident Prevention (Nov 1991), Alt I (Nov 1991)
52.236-12 Cleaning Up (Apr 1984)
52.236-11 Use and Possession Prior to Completion (Apr 1984)
52.236-10 Operations and Storage Areas (Apr 1984)
52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
52.233-3 Protest after Award (Aug 1996) http://www.arnet.gov/far http://www.arnet.gov/far
IFBP01011500002 Page 11 of 29 Clause Title
52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991)
52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013)
52.232-27 Prompt Payment for Construction Contracts (May 2014)
52.232-23 Assignment Of Claims (May 2014)
52.232-17 Interest (May 2014)
52.229-3 Federal, State and Local Taxes (Feb 2013)
52.228-5 Insurance - Work on a Government Installation (Jan 1997)
52.228-2 Additional Bond Security (Oct 1997)
52.228-15 Performance and Payment Bonds - Construction (Oct 2010)
52.228-14 Irrevocable Letter of Credit (Nov 2014)
52.228-12 Prospective Subcontractor Requests for Bonds (May 2014)
52.228-11 Pledges of Assets (Jan 2012)
52.227-4 Patent Indemnity - Construction Contracts (Dec 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Dec 2007)
52.227-1 Authorization and Consent (Dec 2007)
52.225-13 Restrictions on Certain Foreign Purchases (June 2008)
52.223-6 Drug Free Workplace (May 2001)
52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013)
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (Aug 2011)
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (May 2008)
52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007)
52.222-9 Apprentices and Trainees (July 2005)
52.222-8 Payrolls and Basic Records (May 2014)
52.222-7 Withholding of Funds (May 2014)
52.222-6 Construction Wage Rate Requirements (May 2014)
52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2014)
52.222-54 Employment Eligibility Verification (Aug 2013)
52.222-50 Combating Trafficking in Persons ( Mar 2015)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation (May 2014)
IFBP01011500002 Page 12 of 29
52.222-37 Employment Reports on Veterans (Jul 2014)
52.222-3 Convict Labor (June 2003)
52.222-27 Affirmative Action Compliance Requirements for Construction Apr 2015)
52.222-26 Equal Opportunity (Apr 2015)
52.222-21 Prohibition of Segregated Facilities (Apr 2015)
52.222-15 Certification of Eligibility (May 2014)
52.222-14 Disputes Concerning Labor Standards (Feb 1988)
52.222-13 Compliance with Construction Wage Requirements (May 2014)
52.222-12 Contract Termination - Debarment (May 2014)
52.222-11 Subcontracts (Labor Standards) (May 2014)
52.222-10 Compliance with Copeland Act Requirements (Feb 1988)
52.222-1 Notice to the Government of Labor Disputes (Feb 1997)
52.219-8 Utilization of Small Business Concerns (Oct 2014)
52.219-6 Notice of Total Small Business Set-Aside (Nov 2011)
52.219-28 Post Award Small Business Program Rerepresentation (Jul 2013)
52.219-14 Limitations on Subcontracting (Nov 2011)
52.214-28 Subcontractor Certified Cost or Pricing Data - Modifications - Sealed Bidding (Oct 2010)
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications - Sealed Bidding (Aug 2011)
52.214-26 Audit and Records - Sealed Bidding (Oct 2010)
52.209-9 Updates of Publically Available Information Regarding Responsibility Matters (Jul 2013)
52.209-6 Protecting The Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)
52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)
52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II (Apr 1984)
52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)
52.204-18 Commercial and Government Entity Code Maintenance (Nov 2014)
52.204-14 Service Contract Reporting Requirements (Jan 2014)
52.204-13 System for Award Management Maintenance (Jul 2013)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014)
52.203-7 Anti-Kickback Procedures (May 2014)
IFBP01011500002 Page 13 of 29
52.203-6 Restrictions On Subcontractor Sales To The Government (Sept 2006)
52.203-5 Covenant Against Contingent Fees (May 2014)
52.203-3 Gratuities (Apr 1984)
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014)
52.203-12 Limitation On Payments To Influence Certain Federal Transactions (Oct 2010)
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity (May 2014)
52.202-1 Definitions (Nov 2013)
Clauses By Full Text
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 280 calendar days after receipt of the notice to proceed.* The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages—Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $585.65 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.215-21 Alt IV Requirements for Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data - Modifications (Oct 2010) - Alternate IV (Oct 2010)
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below:
Modification proposal breakdown formatted as a listing of individual costs for labor, materials, equipment, overhead, profit, bond increase, and any additional information requested by the Contracting Officer.
(End of clause)
52.222-35 Equal Opportunity for Veterans (Jul 2014)
(a) Definitions. As used in this clause— “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
IFBP01011500002 Page 14 of 29 52.225-9 Buy American - Construction Materials (May 2014) “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products. “Component” means an article, material, or supply incorporated directly into a construction material. “Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material. “United States” means the 50 States, the District of Columbia, and outlying areas. (b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item.
(See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
IFBP01011500002 Page 15 of 29
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISION
Construction Materials Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material
Domestic construction material
Item 2:
Foreign construction material Domestic construction material
(List name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.) (Include other applicable supporting information.)
(*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued.)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business sub- contractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including sub-contracts with small business concerns for the acquisition of commercial items.
IFBP01011500002 Page 16 of 29
52.21-603-70 Contracting Officer Representative (COR) (JUN 2012)
(a) Mr. James Ridgeway, Engineering Technician, FPC Alderson, is hereby designated as the Contracting Officer’s Representative (COR) under this contract. He can be contacted at 304-445-3345 upon contract award.
(b) The COR is responsible, as applicable, for: receiving all deliverables, inspecting and accepting the supplies or services provide hereunder in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the contractor effort, fills in details or otherwise serves to accomplish the contractual Scope of Work; evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payment.
(c) The COR does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If as a result of technical discussions it is desirable to alter/change contractual obligations or the Scope of Work, the Contracting Officer shall issue such changes.
(End of clause)
52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005) Compliance with Homeland Security Presidential Directive-12 (HSPD-12) and Federal Information Processing Standard Publication
201 (FIPS 201) 1 entitled "Personal Identification Verification (PIV) for Federal Employees and Contractors," Phase I.
1. Long-Term Contractor Personnel:
In order to be compliant with HSPD-12/PIV I, the following investigative requirements must be met for each new long-term 2 con-tractor employee whose background investigation (BI) process begins on or after October 27, 2005:
a. Contractor Personnel must present two forms of identification in original form prior to badge issuance (acceptable documents are listed in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification," and at least one document must be a valid State or Federal government-issued picture ID);
b. Contractor Personnel must appear in person at least once before a DOJ official who is responsible for checking the identification documents. This identity proofing must be completed sometime during the clearance process but prior to badge issuance and must be documented by the DOJ official;
c. Contractor Personnel must undergo a BI commensurate with the designated risk level associated with the duties of each position.
Outlined below are the minimum BI requirements for each risk level:
• High Risk - Background Investigation (5 year scope)
• Moderate Risk - Limited Background Investigation (LBI) or Minimum Background Investigation (MBI)
• Low Risk - National Agency Check with Inquiries (NACI) investigation
d. The pre-appointment BI waiver requirements for all position sensitivity levels are a:
1) Favorable review of the security questionnaire form;
2) Favorable fingerprint results;
3) Favorable credit report, if required;3
4) Waiver request memorandum, including both the Office of Personnel Management schedule date and position sensitivity/risk level;
and
5) Favorable review of the National Agency Check (NAC) 4 portion of the applicable BI that is determined by position sensitivity/ risk level.
A badge may be issued following approval of the above waiver requirements. If the NAC is not received within five days of OPM's scheduling date, the badge can be issued based on a favorable review of the Security Questionnaire and the Federal Bureau of Investigation Criminal History Check (i.e., fingerprint check results). e. Badge re-validation will occur once the investigation is completed and favorably adjudicated. If the BI results so justify, badges issued under these procedures will be suspended or revoked.
2. Short- Term Contractor Personnel:
It is the policy of the DOJ that short-term contractors having access to DOJ information systems and/or DOJ facilities or space for six months or fewer are subject to the identity proofing requirements listed in items 1a. and 1b. above. The pre-appointment waiver requirements for short-term contractors are:
a. Favorable review of the security questionnaire form; b. Favorable fingerprint results; c. Favorable credit report, if required;5 and d.
Waiver request memorandum indicating both the position sensitivity/risk level and the duration of the appointment. The commensurate BI does not need to be initiated.
IFBP01011500002 Page 17 of 29 A badge may be issued following approval of the above waiver requirements and the badge will expire six months from the date of issuance. This process can only be used once for a short-term contractor in a twelve month period. This will ensure that any consecutive short-term appointments are subject to the full PIV-I identity proofing process.
For example, if a contractor employee requires daily access for a three or four-week period, this contractor would be cleared according to the above short-term requirements. However, if a second request is submitted for the same contractor employee within a twelve-month period for the purpose of extending the initial contract or for employment under a totally different contract for another three or four-week period, this contractor would now be considered "long-term" and must be cleared according to the long-term requirements as stated in this interim policy.
3. Intermittent Contractors:
An exception to the above-mentioned short-term requirements would be intermittent contractors.
a. For purposes of this policy, "intermittent" is defined as those contractor employees needing access to DOJ information systems and/ or DOJ facilities or space for a maximum of one day per week, regardless of the duration of the required intermittent access. For ex-ample, the water delivery contractor that delivers water one time each week and is working on a one-year contract.
b. Contractors requiring intermittent access should follow the Department's escort policy. Please reference the August 11, 2004, and January 29, 2001, Department Security Officer policy memoranda that conveys the requirements for contractor facility escorted access.
c. Due to extenuating circumstances, if a component requests unescorted access or DOJ IT system access for an intermittent contract or, the same pre-employment background investigation waiver requirements that apply to short-term contractors are required.
d. If an intermittent contractor is approved for unescorted access, the contractor will only be issued a daily badge. The daily badge will be issued upon entrance into a DOJ facility or space and must be returned upon exiting the same facility or space.
e. If an intermittent contractor is approved for unescorted access, the approval will not exceed one year. If the intermittent contractor requires unescorted access beyond one year, the contractor will need to be re-approved each year.