This document is an Invitation for Bid (IFB) issued by the Missouri Department of Transportation (MoDOT) for a conduit installation project in Howell County, Missouri. The solicitation (IFB605SE18001220) seeks qualified vendors to install 2-inch HDPE conduit for future fiber optic cable along US 63, spanning from the BUS 63 Intersection to the MoDOT Maintenance Building in West Plains. The project involves installing 5,095 linear feet of trenched conduit, 1,315 linear feet of pushed conduit, and 9 Class 2 pull boxes, with an orange-colored conduit installed at a minimum depth of 18 inches and including pull tape. The bid was posted on December 14, 2017, with a submission deadline of January 5, 2018, at 10:00 AM CST, and the contract period runs from the Notice to Proceed through May 1, 2018.

The contract will be awarded on a lump sum basis, with bidders encouraged to achieve 10% Minority Business Enterprise (MBE) and 5% Women Business Enterprise (WBE) participation through subcontractors, suppliers, or joint ventures. Contractors must comply with prevailing wage requirements per Missouri Annual Wage Order #24, maintain specific insurance coverage (including $500,000 per person/$3,000,000 per occurrence general liability), and provide workers' compensation insurance. Additional requirements include completing OSHA construction safety training, submitting an affidavit confirming enrollment in a federal work authorization program, and providing traffic control. Liquidated damages of $100 per day may be assessed for late completion. The project emphasizes infrastructure preparation for future fiber optic cable deployment, with the contractor responsible for ground restoration and adherence to stormwater management requirements.

View the file

Other files

File Type Posted
IFB605SE18001220_Oct_14_24_solicitation_doc.pdf PDF
IFB605SE18001220_Nov_11_24_solicitation_doc.pdf PDF
IFB605SE18001220_Jan_13_25_solicitation_doc.pdf PDF
IFB605SE18001220_Feb_3_25_solicitation_doc.pdf PDF
IFB605SE18001220_Feb_24_25_solicitation_doc.pdf PDF
IFB605SE18001220_Mar_31_25_solicitation_doc.pdf PDF
IFB605SE18001220_Apr_21_25_solicitation_doc.pdf PDF
IFB605SE18001220_Aug_30_24_solicitation_doc.pdf PDF
IFB605SE18001220_Nov_18_24_solicitation_doc.pdf PDF
IFB605SE18001220_Mar_17_25_solicitation_doc.pdf PDF
IFB605SE18001220_Apr_14_25_solicitation_doc.pdf PDF
IFB605SE18001220_May_19_25_solicitation_doc.pdf PDF
IFB605SE18001220_Sep_23_24_solicitation_doc.pdf PDF
IFB605SE18001220_Jan_20_25_solicitation_doc.pdf PDF
solicitation_summary.pdf PDF
IFB605SE18001220_Sep_30_24_solicitation_doc.pdf PDF
IFB605SE18001220_Nov_25_24_solicitation_doc.pdf PDF
IFB605SE18001220_Dec_30_24_solicitation_doc.pdf PDF
IFB605SE18001220_Jan_6_25_solicitation_doc.pdf PDF
IFB605SE18001220_Jan_27_25_solicitation_doc.pdf PDF
IFB605SE18001220_May_12_25_solicitation_doc.pdf PDF
IFB605SE18001220_Sep_2_24_solicitation_doc.pdf PDF
IFB605SE18001220_Sep_16_24_solicitation_doc.pdf PDF
IFB605SE18001220_Nov_4_24_solicitation_doc.pdf PDF
IFB605SE18001220_Jun_2_25_solicitation_doc.pdf PDF
IFB605SE18001220_Jun_23_25_solicitation_doc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: IFB605SE18001220

Conduit Installation Howell County, MO

MoDOT Invitation to Bid (IFBR)

MoDOT - SE

December 14, 2017 - January 05, 2018

Page:2

General Header Information

IFB605SE18001220

No. IFB605SE18001220 Title: Conduit Installation Howell County, MO Start Date: December 14, 2017 at 8:00:00 AM CST End Date: January 05, 2018 at 10:00:00 AM CST Vendor Q&A Start Date:

Vendor Q&A End Date:

Estimated Total Value:

Who can respond to this bid? : All Vendors Description: This solicitation seeks qualified vendors to install conduit for future fiber optic cable along US 63 from the BUS 63 Intersection to the MoDOT Maintenance Building in West Plains, Howell County, MO. The contract period shall be from Notice to Proceed through May 1, 2018.

Delivery Terms: N/A: Not Applicable Delivery Notes: Completion Date: May 1, 2018 Payment Terms: Net 30 Days Contact Information: MoDOT - SE

Tammy Baker 2675 N Main Sikeston MO, 63801 United States Tel: 573-472-5369 Fax: 573-472-5890 tammy.baker@modot.mo.gov

Contact Details: If you have any questions, please contact:

Tammy Baker 2675 N Main Sikeston MO, 63801 United States Tel: 573-472-5369 Fax: 573-472-5890 tammy.baker@modot.mo.gov

Selected Categories:

Page:3

Header Custom Fields:

IFB605SE18001220

NOTICE

Vendor Responsibility

The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.

The State of Missouri's Privacy Policy can be accessed here.

MODOT Section Numbering

Section Numbering All section numbering contained in this solicitation is for the convenience of reference only and is not intended to define or limit the scope of any provision of this solicitation and may not be sequential.

http://www.mo.gov/privacy-policy/

Page:4

Solicitation Requirements:

IFB605SE18001220

MoDOT Instructions for Submitting a Response

Instructions for Submitting a Response

Page:5

The Missouri Department of Transportation is now posting all of its bid solicitation documents on the new

MissouriBUYS Bid Board (https://www.missouribuys.mo.gov). MissouriBUYS is the State of Missouri’s web-based statewide eProcurement system which is powered by WebProcure, through our partner, Perfect

Commerce.

For all bid solicitations, vendors now have the option of submitting their solicitation response either as an electronic response or as a hard copy response. As a means to save vendors the expense of submitting a hard copy response and to provide vendors both the ease and the timeliness of responding from a computer, vendors are encouraged to submit an electronic response. Both methods of submission are explained briefly below and in more detail in the step-by-step instructions provided at https://missouribuys.mo.gov/pdfs/how_to_respond_to_a_solicitation.pdf.

Notice: The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.

• ELECTRONIC RESPONSES: To respond electronically to a solicitation, the vendor must first register with MissouriBUYS by going to the MissouriBUYS Home Page (https://missouribuys.mo.gov), clicking the

“Register” button at the top of the page, and completing the Vendor Registration. Once registered the vendor should log back into MissouriBUYS and edit their profile by selecting the organizational contact(s) that should receive an automated confirmation of the vendor’s electronic bid responses successfully submitted to the state.

To respond electronically to a solicitation, the vendor must login to MissouriBUYS, locate the desired solicitation on the Bid Board, and, at a minimum, the vendor must read and accept the Original Solicitation

Documents and complete pricing and any other identified requirements. In addition, the vendor should download and save all of the Original Solicitation Documents on their computer so that they can prepare their response to these documents. Vendors should upload their completed response to these downloaded documents (including exhibits, forms, and other information concerning the solicitation) as an attachment to the electronic solicitation response. Step-by-step instructions for how a registered vendor responds to a solicitation electronically are available on the MissouriBUYS system at:

https://missouribuys.mo.gov/pdfs/how_to_respond_to_a_solicitation.pdf.

Vendors are encouraged to submit their entire proposal electronically; however in lieu of attaching exhibits, forms, pricing, etc. to the electronic solicitation response, a vendor may submit the exhibits, forms, pricing, etc. through mail or courier service. However, any such submission must be received prior to the solicitation’s specified end date and time. Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents submitted through mail or courier service.

In the event a registered vendor electronically submits a solicitation response and also mails hard copy documents that are not identical, the vendor should explain which response is valid for the state's consideration. In the absence of such explanation, the state reserves the right to evaluate and award the response which serves its best interest.

https://www.missouribuys.mo.gov https://missouribuys.mo.gov/pdfs/how_to_respond_to_a_solicitation.pdf https://missouribuys.mo.gov https://missouribuys.mo.gov/pdfs/how_to_respond_to_a_solicitation.pdf

Page:6

Addendum Document: If an addendum document is subsequently issued, please follow these steps to accept the addendum document(s).

1. If you have not accepted the original solicitation document go to the Overview page, find the section titled, Original Solicitation Documents, review the solicitation document(s) then click on the box under

Select, and then click on the Accept button.

2. To accept the addendum document, on the Overview page find the section titled Addendum Document, review the addendum document(s) then click on the box under Select, and then click on the Accept button.

Note: If you submitted an electronic response prior to the addendum date and time, you should review your solicitation response to ensure that it is still valid by taking into consideration the revisions addressed in the addendum document. If a revision is needed to your solicitation response and/or to indicate your acceptance of the addendum document, you will need to retract your response and re-submit your response by following these steps:

1. Log into MissouriBUYS.

2. Select the Solicitations tab.

3. Select View Current Solicitations.

4. Select My List.

5. Select the correct Opportunity Number (Opportunity No); the Overview page will display.

6. Click on Review Response from the navigation bar.

7. Click on Retract if your response needs to be revised.

8. A message will come up asking, “Are you sure you want to retract the Bid”. Click on Continue to confirm.

9. Click on Respond and revise as applicable.

10. Click on Review Response from the navigation bar and then click on Submit to submit your response.

• HARD COPY RESPONSES: Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents.

MoDOT STANDARD SOLICITATION PROVISIONS

1.1. Standard Provisions

The solicitation for the procurement of the supplies referenced therein, to which these Standard Bid

Provisions, General Terms and Conditions and Special Terms and Conditions, is being issued under, and governed by, the provisions of Title 7 - Missouri Department of Transportation, Division 10, Missouri

Highways and Transportation Commission, Chapter 11- Procurement of Supplies, of the Code of State

Regulations. The Missouri Highways and Transportation Commission (MHTC), acting by and through its operating arm, the Missouri Department of Transportation (MoDOT), draws the Bidders attention to said 7

CSR 10-11 for all the provisions governing solicitation and receipt of bids/quotes and the award of the contract pursuant to this solicitation.

1.2 Standard Provisions

Page:7

All bids/quotes must be submitted by a responsible officer or employee of the firm. Obligations assumed by such submission must be fulfilled.

1.3 Standard Provisions

Work is to be performed under the general supervision and direction of MoDOT and, if awarded any portion of the work, the Contractor agrees to furnish at his/her own expense all labor and equipment required to complete the work, it being expressly understood that this solicitation is for completed work based upon the price(s) specified according to the requirements and specifications detailed within the solicitation documents.

MoDOT IFB GENERAL TERMS AND CONDITIONS

2.1 Definitions

Capitalized terms as well as other terms used but not defined herein shall have the meaning assigned to them in section 7 CSR 10-11.010 Definition of Terms. Whenever the following words and expressions appear in an Invitation for Bid (IFB) document or any addendum thereto, the definition or meaning described below shall apply.

2.1.1. Addendum means a written official modification to an IFB.

2.1.2. Amendment means a written official modification to a contract.

2.1.3. Attachment applies to all forms or documents which are included with an IFB to incorporate any informational data or requirements related to the performance requirements and/or specifications.

2.1.4. Bid end date and time and similar expressions mean the exact deadline required by the IFB for the receipt of bids.

2.1.5. Exhibit applies to forms which are included with an IFB for the vendor to complete and submit with the bid prior to the specified end date and time.

2.1.6. Invitation for Bid (IFB) means the solicitation document issued to potential vendors for the purchase of equipment, supplies, and/or services as described in the document. The definition includes these Terms and Conditions as well as all Pricing Pages, Exhibits, Attachments, and Addendums thereto.

2.1.7. May means a certain feature, component, or action is permissible, but not required.

2.1.8. Must means a certain feature, component, or action is a mandatory condition. Failure to provide or comply will result in a bid being considered non-responsive.

2.1.9. Pricing page(s) applies to the form(s) which the vendor must state the price(s) applicable for the equipment, supplies, and/or services required in the IFB. Pricing page(s) must be completed and submitted by the vendor with the bid response prior to the specified bid end date and time.

2.1.10. Revised Statutes of Missouri (RSMo) refers to the body of laws enacted by the Legislature which govern the operations of all agencies of the State of Missouri.

2.1.11. Shall has the same meaning as the word must.

2.1.12. Should means that a certain feature, component and/or action is desirable but not mandatory.

2.2 Nondiscrimination

Page:8

The Contractor shall comply with all state and federal statutes applicable to the Contractor relating to nondiscrimination, including, but not limited to, Chapter 213, RSMo; Title VI and Title VII of Civil

Rights Act of 1964 as amended (42 U.S.C. Sections 2000d and 2000e, et seq.); and with any provision of the Americans with Disabilities Act (42 U.S.C. Section 12101, et seq)..

2.2.1 Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the nondiscrimination provisions of this contract, MHTC shall impose such contract sanctions as it or the Federal

Highway Administration may determine to be appropriate, including, but not limited to:

2.2.1.1 withholding of payments to the Contractor under the contract until the Contractor complies, and/or,

2.2.1.2 cancellation, termination or suspension of the contract, in whole or in part.

2.3 Contract/Purchase Order

By submitting a response, the Bidder agrees to furnish any and all equipment, supplies and/or services specified in the solicitation documents, at the prices quoted, pursuant to all requirements and specifications contained therein.

2.3.1. A binding contract shall consist of: (1) the solicitation documents, amendments thereto, and/or Best and Final Offer (BAFO) request(s) with any changes/additions, (2) the Contractor's bid response, and (3) the

MHTCs acceptance of the bid by post-award contract or purchase order.

2.3.2. A notice of award does not constitute an authorization for shipment of equipment or supplies or a directive to proceed with services. Before providing equipment, supplies and/or services, the Contractor must receive a properly authorized notice to proceed and/or purchase order

2.4 Applicable Laws and Regulations

The contract shall be construed according to the laws of the State of Missouri. The Contractor shall comply with all applicable local, state, and federal laws and regulations related to the performance of the contract. The exclusive venue for any legal proceeding relating to or arising, out of the contract shall be in the Circuit Court of Cole County, Missouri.

2.4.1. The Contractor must be registered and maintain good standing with the Secretary of State of the

State of Missouri, Missouri Department of Revenue, and other regulatory agencies, as may be required by law or regulations. Prior to the issuance of a purchase order and/or notice to proceed, the Contractor may be required to submit to MHTC a copy of their current Authority Certificate from the Secretary of State of the

State of Missouri and/or a copy of their Certificate of No Tax Due from the Missouri Department of Revenue.

2.4.2. Prior to the issuance of a purchase order and/or notice to proceed, all out-of-state Contractors providing services in the state of Missouri must submit to MHTC a copy of their current Transient Employer

Certificate from the Missouri Department of Revenue, and a current Certificate of Registration from the

Secretary of State of the state of Missouri.

2.5 Open Competition and IFB Document

Page:9

It shall be the vendor's responsibility to ask questions, request changes or clarification, or otherwise advise MoDOT if any language, specifications or requirements of an IFB appear to be ambiguous, contradictory, and/or arbitrary, or appear to inadvertently restrict or limit the requirements stated in the IFB to a single source. Any and all communication from vendors regarding specifications, requirements, competitive bid process, etc., must be directed to the IFB Contact, unless the IFB specifically refers the vendor to another contact. Such e-mail, fax, or phone communication should be received at least ten calendar days prior to the official bid end date.

2.5.1. Every attempt shall be made to ensure that the vendor receives an adequate and prompt response.

However, in order to maintain a fair and equitable bid process, all vendors will be advised, via the issuance of an addendum to the IFB, of any relevant or pertinent information related to the procurement. Therefore, vendors are advised that unless specified elsewhere in the IFB, any questions received less than ten calendar days prior to the IFB end date may not be answered.

2.5.2. Vendors are cautioned that the only official position of the MHTC is that which is issued in the IFB or an addendum thereto. No other means of communication, whether oral or written, shall be construed as a formal or official response or statement.

2.5.3. The IFB is available for viewing and downloading on the MissouriBUYS Statewide eProcurement

System. Registered vendors are electronically notified of those bid opportunities that match the commodity codes for which the vendor registered in MissouriBUYS. If a registered vendors e-mail address is incorrect, the vendor must update the e-mail address themselves on the state's MissouriBUYS Statewide eProcurement System at https://missouribuys.mo.gov/.

2.5.4. MoDOT reserves the right to officially amend or cancel an IFB after issuance. It shall be the sole responsibility of the vendor to monitor the MissouriBUYS Statewide eProcurement System to obtain a copy of the addendum(s). Registered vendors who received e-mail notification of the bid opportunity when the

IFB was established and registered vendors who have responded to the IFB on-line prior to an addendum being issued, should receive e-mail notification of the addendum(s). Registered vendors who received e-mail notification of the bid opportunity when the IFB was established and registered vendors who have responded to the bid on-line prior to a cancellation being issued, should receive e-mail notification of a cancellation issued prior to the exact end date and time specified in the IFB.

2.6 Preparation of Bids

https://missouribuys.mo.gov/

Page:10

Vendors must examine the entire IFB carefully. Failure to do so shall be at the vendor's risk.

2.6.1. Unless otherwise specifically stated in the IFB, all specifications and requirements constitute minimum requirements. All bids must meet or exceed the stated specifications and requirements.

2.6.2. Unless otherwise specifically stated in the IFB, any manufacturer names, trade names, brand names, information and/or catalog numbers listed in a specification and/or requirement are for informational purposes only and are not intended to limit competition. The vendor may offer any brand which meets or exceeds the specification for any item, but must state the manufacturer's name and model number for any such brands in the bid. In addition, the vendor shall explain, in detail, (1) the reasons why the proposed equivalent meets or exceeds the specifications and/or requirements and (2) why the proposed equivalent should not be considered an exception thereto. Bids which do not comply with the requirements and specifications are subject to rejection without clarification.

2.6.3. Bids lacking any indication of intent to bid an alternate brand or to take an exception shall be received and considered in complete compliance with the specifications and requirements as listed in the IFB.

2.6.4. In the event that the vendor is an agency of state government or other such political subdivision which is prohibited by law or court decision from complying with certain provisions of an IFB, such vendor may submit a bid which contains a list of statutory limitations and identification of those prohibitive clauses.

The vendor should include a complete list of statutory references and citations for each provision of the IFB, which is affected by this paragraph. The statutory limitations and prohibitive clauses may (1) be requested to be clarified in writing or (2) be accepted without further clarification if the statutory limitations and prohibitive clauses are deemed acceptable. If MHTC determines clarification of the statutory limitations and prohibitive clauses is necessary, the clarification will be conducted in order to agree to language that reflects the intent and compliance of such law and/or court order and the IFB.

2.6.5. All equipment and supplies offered in a bid must be new, of current production, and available for marketing by the manufacturer unless the IFB clearly specifies that used, reconditioned, or remanufactured equipment and supplies may be offered.

2.6.6. Prices shall include all packing, handling and shipping charges FOB destination, freight prepaid and allowed unless otherwise specified in the IFB.

2.6.7. Bids, including all pricing therein, shall remain valid for 90 days from bid opening unless otherwise indicated. If the bid is accepted, the entire bid, including all prices, shall be firm for the specified contract period.

2.6.8. Any foreign vendor not having an Employer Identification Number assigned by the United States

Internal Revenue Service (IRS) must submit a completed IRS Form W-8 prior to or with the submission of their bid in order to be considered for award.

2.7 Submission of Bids

Page:11

Registered vendors may submit bids electronically through the MissouriBUYS Statewide eProcurement System at https://missouribuys.mo.gov/ or by delivery of a hard copy to the Contact address shown on the Solicitation General Header Information. Vendors that have not registered on the MissouriBUYS Statewide eProcurement System may submit bids hard copy to the Contact address shown on the Solicitation General Header Information. Delivered bids must be sealed in an envelope or container, and received in the required location no later than the exact end date and time specified in the IFB. All bids must (1) be submitted by a duly authorized representative of the vendors organization, (2) contain all information required by the IFB, and (3) be priced as required. It shall be the responsibility of the vendor to ensure their bid is in the required location no later than the exact end date and time specified in the IFB.

2.7.1. The sealed envelope or container containing a bid should be clearly marked on the outside with (1) the official IFB number and (2) the official end date and time. Different bids should not be placed in the same envelope, although copies of the same bid may be placed in the same envelope.

2.7.2. A bid submitted electronically by a registered vendor may be modified on-line prior to the official end date and time. A bid which has been delivered to the Purchasing office may be modified by signed, written notice which has been received in the required location prior to the official end date and time specified. A bid may also be modified in person by the vendor or its authorized representative, provided proper identification is presented before the official end date and time. Telephone or telegraphic requests to modify a bid shall not be honored.

2.7.3. A bid submitted electronically by a registered vendor may be retracted on-line prior to the official end date and time. A bid which has been delivered to the required location may only be withdrawn by a signed, written document on company letterhead transmitted via mail, e-mail, or facsimile which has been received at the required location prior to the official end date and time specified. A bid may also be withdrawn in person by the vendor or its authorized representative, provided proper identification is presented before the official end date and time. Telephone or telegraphic requests to withdraw a bid shall not be honored.

2.7.4. A bid may also be withdrawn after the bid opening through submission of a written request by an authorized representative of the vendor. Justification of withdrawal decision may include a significant error or exposure of bid information that may cause irreparable harm to the vendor.

2.7.5. When submitting a bid electronically, the registered vendor indicates acceptance of all IFB requirements, terms and conditions by clicking on the Review and Submit button on the Response Review tab.

2.7.6. Faxed bids shall not be accepted. However, faxed and e-mail no-bid notifications shall be accepted.

2.8 Bid Opening

Bid openings are public on the end date and at the opening time specified on the IFB document.

Names and prices of the respondents shall be read at the bid opening. All vendors may view the same bid response information on the MissouriBUYS Statewide eProcurement System. Purchasing will not provide prices or other bid information via the telephone.

2.8.1. Bids which are not received in the Purchasing office prior to the official end date and time shall be considered late, regardless of the degree of lateness, and normally will not be opened.

https://missouribuys.mo.gov/

Page:12

2.9 Evaluation and Award

Page:13

Any clerical error, apparent on its face, may be corrected by the buyer before contract award. Upon discovering an apparent clerical error, the buyer shall contact the vendor and request clarification of the intended bid. The correction shall be incorporated in the notice of award. Examples of apparent clerical errors are: 1) misplacement of a decimal point; and 2) obvious mistake in designation of unit.

2.9.1. Any pricing information submitted shall be subject to evaluation if deemed to be in the best interest of the MHTC.

2.9.2. The vendor is encouraged to propose price discounts for prompt payment or propose other price discounts that would benefit the MHTC. However, unless otherwise specified in the IFB, pricing shall be evaluated at the maximum potential financial liability to the MHTC.

2.9.3. Awards shall be made to the vendor whose bid (1) complies with all mandatory specifications and requirements of the IFB and (2) is the lowest and best bid, considering price, responsibility of the vendor, and all other evaluation criteria specified in the IFB and (3) complies with all applicable Missouri statutes and Executive Orders.

2.9.4. In the event all vendors fail to meet the same mandatory requirement in an IFB, MHTC reserves the right, at its sole discretion, to waive that requirement for all vendors and to proceed with the evaluation. In addition, MHTC reserves the right to waive any minor irregularity or technicality found in any individual bid.

2.9.5. MHTC reserves the right to reject any and all bids. When all bids are non-responsive or otherwise unacceptable and circumstances do not permit a rebid, MHTC may negotiate for the required supplies.

2.9.6. When evaluating a bid, the MHTC reserves the right to consider relevant information and fact, whether gained from a bid, from a vendor, from vendor references, or from any other source.

2.9.7. Any information submitted with the bid, regardless of the format or placement of such information, may be considered in making decisions related to the responsiveness and merit of a bid and the award of a contract.

2.9.8. Any award of a contract shall be made by notification to the successful vendor. MHTC reserves the right to make awards by item, group of items, or an all or none basis unless otherwise identified in the solicitation. The grouping of items awarded shall be determined based upon factors such as item similarity, location, administrative efficiency, or other considerations in the best interest of the MHTC.

2.9.9. All bids and associated documentation which were submitted on or before the official end date and time will be considered open records pursuant to section 610.021, RSMo, following the official opening of bids.

2.9.10. The MHTC posts all bid results on the MissouriBUYS Statewide eProcurement System website for all vendors to view for a reasonable period of time after bid award.

2.9.11. The MHTC reserves the right to request clarification of any portion of the vendor response in order to verify the intent of the vendor. The vendor is cautioned, however, that its response may be subject to acceptance or rejection without further clarification.

2.9.12. Any bid award protest must be received within ten (10) business days after the date of award in accordance with the requirements of 7 CSR 10-11.020 (9).

Page:14

2.9.13. The final determination of contract award(s) shall be made by the MHTC.

2.10 Executive Order

The Contractor shall comply with all the provisions of Executive Order 07-13, issued by the

Honorable Matt Blunt, Governor of Missouri, on the sixth (6th) day of March, 2007. This Executive

Order, which promulgates the State of Missouri's position to not tolerate persons who contract with the state engaging in or supporting illegal activities of employing individuals who are not eligible to work in the United States, is incorporated herein by reference and made a part of this Agreement.

2.10.1. The Contractor hereby certifies that any employee of the Contractor assigned to perform services under the contract is eligible and authorized to work in the United States in compliance with federal law.

2.10.2. In the event the Contractor fails to comply with the provisions of the Executive Order 07-13, or in the event the Commission has reasonable cause to believe that the contractor has knowingly employed individuals who are not eligible to work in the United States in violation of federal law, the Commission reserves the right to impose such contract sanctions as it may determine to be appropriate, including but not limited to contract cancellation, termination or suspension in whole or in part or both.

2.10.3. The Contractor shall include the provisions of this paragraph in every subcontract. The Contractor shall take such action with respect to any subcontract as the Commission may direct as a means of enforcing such provisions, including sanctions for noncompliance.

2.11 Preferences

In the evaluation of bids/quotes, preferences shall be applied in accordance with 7 CSR 10-

11.020(7). Contractors should apply the same preferences in selecting subcontractors.

2.11.1. Bidders are encouraged to obtain minority business enterprise (MBE) and women business enterprise (WBE) participation in this work through the use of subcontractors, suppliers, joint ventures, or other arrangements that afford meaningful participation for M/WBEs. Bidders are encouraged to obtain 10%

MBE and 5% WBE participation.

2.12 Cancellation of Contract

The MHTC may cancel the Contract at any time for a material breach of contractual obligations or for convenience by providing Contractor with written notice of cancellation. Should the MHTC exercise its right to cancel the contract for such reasons, cancellation will become effective upon the date specified in the notice of cancellation sent to the Contractor.

2.13 Bankruptcy or Insolvency

Upon filing for any bankruptcy or insolvency proceeding by or against the Contractor, whether voluntarily, or upon the appointment of a receiver, trustee, or assignee, for the benefit of creditors, the Commission reserves the right and sole discretion to either cancel the Agreement or affirm the Agreement and hold the

Contractor responsible for damages.

2.14 Warranty

Page:15

The Contractor expressly warrants that all equipment, supplies, and/or services provided shall: (1) conform to each and every specification, drawing, sample or other description which was furnished to or adopted by the MHTC, (2) be fit and sufficient for the purpose expressed in the solicitation documents, (3) be merchantable, (4) be of good materials and workmanship, and (5) be free from defect. Such warranty shall survive delivery and shall not be deemed waived either by reason of the MHTC's acceptance of or payment for said equipment, supplies, and/or services.

2.15 Status of Independent Contractor

The Contractor represents itself to be an independent Contractor offering such services to the general public and shall not represent itself or its employees to be an employee of the MHTC. Therefore, the Contractor shall assume all legal and financial responsibility for taxes, FICA, employee fringe benefits, workers compensation, employee insurance, minimum wage requirements, overtime, etc., and agrees to indemnify, save and hold the MHTC, its officers, agents and employees harmless from and against any and all losses

(including attorney fees) and damage of any kind related to such matters.

2.16 Non-Waiver

If one of the parties agrees to waive its right to enforce any term of this Contract, that party does not waive its right to enforce such term at any other time or to enforce any or all other terms of this Contract.

2.17 Indemnification

The Contractor shall defend, indemnify and hold harmless MHTC, including its members and department employees, from any claim or liability whether based on a claim for damages to real or personal property or to a person for any matter relating to or arising out of the Contractor's performance of its obligations under the contract awarded pursuant to this solicitation.

2.18 Right of Acceptance and/or Rejection

MoDOT reserves the right to reject any responses, and to accept or reject any items thereon, and to waive technicalities. In case of error in the extension of prices in the response, unit prices will govern.

2.19 Inspection and Acceptance

No equipment, supplies, and/or services received by MoDOT pursuant to a contract shall be deemed accepted until MoDOT has had reasonable opportunity to inspect said equipment, supplies, and/or services.

2.19.1. All equipment, supplies, and/or services which do not comply with the specifications and/or requirements or which are otherwise unacceptable or defective may be rejected. In addition, all equipment, supplies, and/or services which are discovered to be defective or which do not conform to any warranty of the contractor upon inspection (or at any later time if the defects contained were not reasonably ascertainable upon the initial inspection) may be rejected.

2.19.2. The MHTC reserves the right to return any such rejected shipment at the contractor's expense for full credit or replacement and to specify a reasonable date by which replacements must be received.

2.19.3. The MHTCs right to reject any unacceptable equipment, supplies, and/or services shall not exclude any other legal, equitable or contractual remedies the MHTC may have.

2.20 Invoicing and Payment

Page:16

The statewide financial management system has been designed to capture certain receipt and payment information. For each purchase order received, an invoice must be submitted that references the purchase order number and must be itemized in accordance with items listed on the purchase order. Failure to comply with this requirement may delay processing of invoices for payment.

2.20.1. The contractor shall not transfer any interest in the contract, whether by assignment or otherwise, without the prior written consent of the MHTC.

2.20.2. Payment for all equipment, supplies, and/or services required herein shall be made in arrears unless otherwise indicated in the IFB.

2.20.3 The MHTC assumes no obligation for equipment, supplies, and/or services shipped or provided in excess of the quantity ordered. Any unauthorized quantity is subject to the state's rejection and shall be returned at the contractor's expense.

2.20.4. The State of Missouri reserves the right to purchase goods and services using the state purchasing card.

2.21 Conflict of Interest

Elected or appointed officials or employees of the State of Missouri or any political subdivision thereof, serving in an executive or administrative capacity, must comply with sections 105.452 and

105.454, RSMo, regarding conflict of interest.

2.21.1. The contractor hereby covenants that at the time of the submission of the bid the contractor has no other contractual relationships which would create any actual or perceived conflict of interest. The contractor further agrees that during the term of the contract neither the contractor nor any of its employees shall acquire any other contractual relationships which create such a conflict.

2.22 Tax Exempt Status

MHTC is exempt from paying Missouri Sales Tax, Missouri Use Tax and Federal Excise Tax. However, the

Contractor may themselves be responsible for the payment of taxes on materials they purchase to fulfill the contract.

Scope of Work

Page:17

Project Special Provisions

1.Purpose:

The intent of this project is to install conduit for future fiber optic cable along US 63 from the BUS 63 Intersection to the MoDOT Maintenance Building in West Plains, Howell County, MO.

2.2-inch Conduit – General: This work includes the installation of 2” HDPE conduit at a minimum depth of 18 inches below the surface grade. The conduit shall be orange in Color. The contractor shall be required to install a Pull Tape inside the conduit. The quantities shown in the plans are estimated quantities; the contract will be paid as a lump sum one. No adjustments will be made to the contract quantities or final bid prices.

3.Install 2-inch Conduit, in Trench: The contractor shall install conduit by trenching between entrances or pullboxes as directed by Engineer and as indicated on the attached figures. The quantity shown for trenching is an estimated quantity and shall be used for informational purposes.

These quantities were established based on field conditions. The contractor shall be allowed to use a coupler to connect sections of trenched and pushed conduit as shown on the attached figures.

4.Install 2-inch Conduit, Pushed: The contractor shall install conduit by boring under entrances as directed by Engineer and as indicated on the attached figures. The quantity shown for pushing is an estimated quantity and shall be used for informational purposes. These quantities were established based on field conditions. The pushes included in this work are under entrances, roadway pavement, or sidewalks as noted in Figure 1, Estimated Quantities. The contractor shall be allowed to use a coupler to connect sections of trenched and pushed conduit as shown on the attached figures.

5.Install Pull Boxes: This work includes the installation of Class 2 Pull Boxes at the locations marked in the field, and shown on the attached figures.

6.Other Requirements: On completion of project all associated debris and rubbish shall be removed from the premises. The contractor shall be responsible for restoring any ground disturbed during the operations of the contract to its original condition. This includes seeding and mulching disturbed soil as needed.

7.Traffic Control: Contractor shall provide any necessary traffic control for the completion of this project. At minimum for work occurring on two-way roadways, this shall consist of two “SHOULDER WORK AHEAD” signs, one placed on each approach prior to the work area. At minimum for divided highways, this shall consist of four “SHOULDER WORK AHEAD” signs, one placed on each side of the both approaches prior to the work area.

See Figure 02.

1.Existing Utilities:

Existing Utilities are not shown on the attached figures. It is the contractors’ responsibility to have utilities located within the corridor and notify the Engineer or designated representative of any conflicts.

Stormwater Compliance Requirements NJSP-15-38

Page:18

1.0 The land disturbance necessary to complete this project is not anticipated to exceed one (1) acre. Should the contractor disturb more than one (1) acre to complete the work, or for any other reason, all terms of this Job Special Provision will apply.

1.1 Description. The Contractor shall comply with the terms of the United States of America v.

Missouri Highways and Transportation Commission Consent Decree (Consent Decree) that are identified as the responsibility of the Contractor or subcontractor, and with the terms of this provision. Viewing of the Consent Decree is available on the MoDOT Land Disturbance webpage under Contractor Resources, or by going to the web address www.modot.org/LD.

1.2 Applicability. The Consent Decree and this provision apply to any project that includes land disturbance of areas totaling greater than one (1) acre on the project site. The project site consists of all areas designated on the plans, including temporary and permanent easements. The Consent

Decree and this provision do not apply to Contractor staging, plant, or borrow areas that are not located on MoDOT right of way (Off-site). The Contractor is responsible for obtaining its own separate land disturbance permit for Off-site areas. This provision is in addition to any other stormwater, environmental, and land disturbance requirements specified elsewhere in the contract.

2.0 Stormwater Training for Contractor Employees. The Contractor’s on-site project manager, designated Water Pollution Control Manager (WPCM), as defined in Section 3.0, and WPCM delegate, shall complete MoDOT Stormwater Training prior to serving in those roles. If someone other than the Contractor’s project manager is given the authority to manage the grading or erosion control operations, the project manager(s) for those operations shall also complete MoDOT

Stormwater Training. MoDOT Stormwater Training is also required for any other person who the

Contractor gives authority to take measures to prevent or minimize the consequences of non-compliance with the Stormwater requirements, as defined in Section 3.1(a) of this provision.

2.1 The Commission will provide MoDOT Stormwater Training to the Contractor employees specified in Section 2.0 at a location and time determined by MoDOT. There will be no fee for attending the training; however, the Contractor shall be responsible for all other cost related to the training, such as travel expenses, if necessary, and wages for its employees. The time to complete the training is anticipated to be no more than 6 hours. As long as the Consent Decree is in effect, MoDOT will provide periodic trainings at various locations around the state, as needed, to ensure contractors and bidders have the opportunity to maintain the number of WPCMs they need to comply with this provision.

2.2 Those who require MoDOT Stormwater Training per Section 2.0 shall complete the training prior to beginning any land disturbance work. Thereafter, training shall occur at least once every two (2) years. The training is not project-specific. Any Contractor employee who receives the training will be qualified to perform the WPCM duties on any MoDOT project for a period of two (2) years.

http://www.modot.org/LD

Page:19

2.3 MoDOT will document the names and dates that contractor employees attend MoDOT

Stormwater Training and will retain those records for the period of time specified in the Consent

Decree. Duplicate record keeping by the contractor is not required.

3.0 Water Pollution Control Manager (WPCM). Prior to the Pre-Activity meeting for Grading/

Land Disturbance, the Contractor shall designate a Water Pollution Control Manager (WPCM) to fulfill the duties and responsibilities listed in Section 3.1 until final stabilization occurs. The

Contractor’s on-site project manager may also serve as the WPCM or that role may be assigned to another manager employed by the contractor or a subcontractor. The Contractor shall also maintain a WPCM delegate to temporarily fulfill the WPCM duties in the absence of the primary

WPCM (e.g. illness, vacation, other leave).

3.1 Duties of the WPCM:

1.Be familiar with Stormwater Requirements including the National Pollutant Discharge Elimination System (NPDES), the current MoDOT State Operating Permit for construction stormwater discharges/ land disturbance activities, the Project-specific Stormwater Pollution Prevention Plan (Project SWPPP), the Corps of Engineers Section 404 Permit, when applicable, the Consent Decree, and this provision. The Project SWPPP includes: a title page with project-specific information, the general SWPPP posted on the MoDOT land disturbance website, the Project Erosion & Sediment Control Plan, all applicable special provisions, and all applicable specifications and standard drawings;

2.Complete the stormwater training set forth in Section 2.0;

3.Attend the Pre-Activity for Grading/ Land Disturbance Meeting or, if hired after the meeting has occurred, be familiar with the conference decisions;

4.Review and sign the Project-specific SWPPP and all updates thereto within time periods set out in the Consent Decree;

5.Visit and review the project site for compliance with Stormwater Requirements at least once per week from the start of any grading operations until final stabilization is achieved and permit is closed;

6.Be authorized by the Contractor to supervise all work performed by the Contractor and subcontractors that involves compliance with Stormwater Requirements, including the authority to order work be stopped on a Project, implement MoDOT-directed changes in work related to Stormwater Requirements, and order the taking of, measures to cease, correct, prevent, or minimize the consequences of non-compliance with Stormwater Requirements;

Page:20

7.Review and certify electronically each MoDOT inspection report for the Project within three (3) days of receiving each report to ensure it conforms with report requirements in the National Pollution Discharge Elimination System Stormwater (NPDES SW) Permit, Project SWPPP and the Consent Decree and ensure that all Stormwater Deficiencies noted on the report are corrected within the time required;

8.Recommend in writing within three (3) days of discovering any changes in site conditions and Best Management Practices (BMPs) that require an update to the Project-specific SWPPP; and

9.Be the point of contact relating to Stormwater Requirements and the Consent Decree between the Contractor, Subcontractors and MoDOT.

4.0 Pre-Activity Meeting for Grading/Land Disturbance and Required Hold Point. At each

Project, a Pre-Activity Meeting for Grading/Land Disturbance shall be held prior to the start of any land disturbance and shall include a physical visit and review of the project site. Discussion items at the pre-activity meeting shall include a review of the project SWPPP, the planned order of grading operations, proposed areas of initial disturbance, identification of all necessary BMPs that shall be installed prior to commencement of grading operations, and any issues relating to compliance with the Stormwater requirements that could arise in the course of construction activity at the project.

4.1 Contractor employees who shall attend the Pre-Activity Meeting for Grading/Land Disturbance include the WPCM for the Project and the person(s) designated the authority to manage the grading and erosion control operations.

4.2 Following the pre-activity meeting for Grading/land disturbance, and subsequent installation of the initial BMPs identified at the pre-activity meeting, a Hold Point shall occur prior to the start of any land disturbance operations to allow the engineer and WPCM the time needed to perform an on-site review of the installation of the BMPs to ensure compliance with the SWPPP is met. Land disturbance operations shall not begin until authorization is given by the engineer.

5.0 Compliance with the NPDES SW Permit and Project SWPPP. On all projects, the

Contractor shall comply with all applicable Stormwater Requirements which are defined as, but are not limited to:

Page:21

1.Consulting with the engineer on recommended design revisions to the Project SWPPP to accommodate the Contractor’s staging plan, implementation, managing, and maintaining BMPs or other control measures to prevent or minimize sediment and other pollutants in stormwater runoff in accordance with contract specifications or any relevant manufacturer specifications and good engineering practices, including but not limited to the manuals (Note: two manuals cited in the MoDOT permit are “Developing your stormwater pollution prevention plan: A guide for construction activities” and “Protecting Water Quality: A Field Guide to erosion, sediment and stormwater best management practices for development sites in Missouri”) and any other applicable standards for sedimentation basins, stabilization, rock dams, brush checks, construction entrances, and other BMPs;

2.Installing all BMPs at the locations and relative times specified in the Project SWPPP; and

3.Complying with the Missouri Water Quality Standards and with effluent limitations in Section E.1 of the NPDES SW Permit. Measurement of effluent is not required except as specified in E.2.

5.1 Stormwater Deficiency Corrections. Per terms of the Consent Decree, Stormwater

Deficiencies identified on the MoDOT Land Disturbance Inspection Report shall be corrected within

7 days of the inspection date to avoid stipulated penalties, except that more time might be granted by the engineer when weather or field conditions prohibit the corrective work. If the Contractor does not initiate corrective measures within 5 calendar days of the inspection date or any extended period granted by the engineer, all work shall cease on the project except for work to correct these deficiencies, unless otherwise allowed by the engineer. All impact costs related to this halting of work, including, but not limited to stand-by time for equipment, shall be borne by the Contractor.

Work shall not resume until the engineer approves the corrective work.

6.0 Inspection Protocol. The Contractor and all subcontractors shall review and adhere to

MoDOT’s written Stormwater Inspection Protocol, found on the MoDOT Land Disturbance webpage

(www.modot.org/LD). The Inspection Protocol is applicable to all Projects under the consent decree. The MoDOT Resident Engineer will serve the role of Stormwater Resident Engineer, or a delegate will be named in their absence.

http://www.modot.org/LD

Page:22

6.1 Inspection Reports. MoDOT will provide one or more Environmental Construction Inspectors

(ECI) to perform the weekly and post run-off inspections and other duties described in paragraph

17 of the Consent Decree. The ECI will enter the inspection reports into a web-based Stormwater

Compliance database. The WPCM will have access to this database to view all report information, including any noted deficiencies, and to certify the report as required in Section 3.1 (g.).

Automated email reminders of pending reports that need to be certified and for deficiencies that need to be corrected will be sent to the WPCM. The Contractor may designate other employees or subcontractor employees to have viewing access to this database and to receive the email reminders. Completion of MoDOT Stormwater Training is necessary in order to receive the email reminders. The WPCM and other users shall be equipped with an electronic device (desktop computer, laptop, tablet, smartphone, etc.) with a browser and internet access to connect to the database. The contractor shall be responsible for providing the electronic devices.

7.0 Stipulated Penalties. If the Contractor fails to comply fully and timely with the requirements of the Consent Decree, stipulated penalties will be assessed to the Commission.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .