IFB605CO19000029_Jun_2_25_solicitation_doc.pdf

PDF 89 KB Posted

Attached to
Fall Aggregate
Solicitation number
IFB605CO19000029
Issued by
Phelps County, Missouri

About this file

This document is an Invitation for Bid (IFB) No. IFB605CO19000029 issued by the Missouri Department of Transportation (MoDOT) for Fall Aggregate procurement across multiple districts, including Kansas City, Northeast, and Northwest. The solicitation seeks various aggregate materials such as Spec 3 Aggregate for Surfacing, Cinders (Coal Slag), Spec 8 Aggregate for Base, Spec 5 Snow and Ice Control Chips, Spec 6A Natural Sand, and Spec BR2 Blanket Rock. The bid submission period runs from July 10, 2018, to August 1, 2018, at 3:00 PM CDT, with contract completion dates ranging between September 15, 2018, and October 31, 2018, depending on the specific district and item. Quantities vary by location, ranging from 100 to 3,000 tons, with delivery requirements including a minimum of 500 tons per day during normal working hours and specific restrictions on delivery times and methods.

The solicitation requires vendors to be registered on the MissouriBUYS procurement system and submit pricing on a per-ton basis, FOB destination. A bid bond or certified check for 5% of the bid amount is required, with the successful bidder needing to provide a 100% performance and payment bond. The bid encourages Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) participation, with goals of 10% MBE and 5% WBE involvement. Service-disabled veteran-owned businesses are also encouraged to participate. Payment terms are set at Net 30 days, and all materials must conform to the Missouri Standard Specifications for Highway Construction (2018 Edition). The contract includes provisions for potential fuel price adjustments and liquidated damages of $250 per day per item for late deliveries. The solicitation allows for cooperative purchasing, enabling Missouri counties, cities, and other political entities to potentially utilize the resulting contract, with MoDOT reserving the right to adjust quantities by up to 40% prior to award.

View the file

Other files

File Type Posted
IFB605CO19000029_Sep_2_24_solicitation_doc.pdf PDF
IFB605CO19000029_Sep_16_24_solicitation_doc.pdf PDF
IFB605CO19000029_Sep_30_24_solicitation_doc.pdf PDF
IFB605CO19000029_Nov_4_24_solicitation_doc.pdf PDF
IFB605CO19000029_Nov_18_24_solicitation_doc.pdf PDF
IFB605CO19000029_Nov_25_24_solicitation_doc.pdf PDF
IFB605CO19000029_Jan_27_25_solicitation_doc.pdf PDF
IFB605CO19000029_Feb_24_25_solicitation_doc.pdf PDF
IFB605CO19000029_Apr_7_25_solicitation_doc.pdf PDF
IFB605CO19000029_Apr_21_25_solicitation_doc.pdf PDF
IFB605CO19000029_May_12_25_solicitation_doc.pdf PDF
IFB605CO19000029_Aug_30_24_solicitation_doc.pdf PDF
IFB605CO19000029_Oct_7_24_solicitation_doc.pdf PDF
IFB605CO19000029_Oct_14_24_solicitation_doc.pdf PDF
IFB605CO19000029_Nov_11_24_solicitation_doc.pdf PDF
IFB605CO19000029_Dec_30_24_solicitation_doc.pdf PDF
IFB605CO19000029_Jan_13_25_solicitation_doc.pdf PDF
IFB605CO19000029_Mar_31_25_solicitation_doc.pdf PDF
IFB605CO19000029_Jun_23_25_solicitation_doc.pdf PDF
IFB605CO19000029_Sep_23_24_solicitation_doc.pdf PDF
IFB605CO19000029_Jan_6_25_solicitation_doc.pdf PDF
solicitation_summary.pdf PDF
IFB605CO19000029_Jan_20_25_solicitation_doc.pdf PDF
IFB605CO19000029_Feb_3_25_solicitation_doc.pdf PDF
IFB605CO19000029_Mar_17_25_solicitation_doc.pdf PDF
IFB605CO19000029_Apr_14_25_solicitation_doc.pdf PDF
IFB605CO19000029_May_19_25_solicitation_doc.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: IFB605CO19000029

Fall Aggregate

MoDOT Invitation to Bid (IFBR)

MoDOT - Dept of Transportation

July 10, 2018 - August 01, 2018

Page:2

General Header Information

IFB605CO19000029

No. IFB605CO19000029 Title: Fall Aggregate Start Date: July 10, 2018 at 9:00:00 AM CDT End Date: August 01, 2018 at 3:00:00 PM CDT Vendor Q&A Start Date:

Vendor Q&A End Date:

Estimated Total Value:

Who can respond to this bid? : All Vendors Description: Bid for delivered Fall Aggregate for various district locations, with a contract period from Notice to Proceed to completion date as indicated on pricing pages. ATTENTION VENDORS: You must be a registered MissouriBUYS vendor to review all terms and conditions of this solicitation. Visit https://missouribuys.mo.gov/registration.html to obtain full access.

Delivery Terms: Free On Board Destination Delivery Notes: Bid price must include delivery to various locations in Kansas City, Northeast and Northwest Districts Payment Terms: Net 30 Days Contact Information: MoDOT - Dept of Transportation

Tammy Young 830 MoDOT DR Jefferson City MO, 65109 United States Tel: 573-526-7929 Fax: 573-526-6948 Tammy.Young@modot.mo.gov

Contact Details: If you have any questions, please contact:

Tammy Young 830 MoDOT DR Jefferson City MO, 65109 United States Tel: 573-526-7929 Fax: 573-526-6948 Tammy.Young@modot.mo.gov

Selected Categories:

Page:3

Header Custom Fields:

IFB605CO19000029

NOTICE

Vendor Responsibility

The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.

The State of Missouri's Privacy Policy can be accessed here.

MODOT Section Numbering

Section Numbering All section numbering contained in this solicitation is for the convenience of reference only and is not intended to define or limit the scope of any provision of this solicitation and may not be sequential.

http://www.mo.gov/privacy-policy/

Page:4

Solicitation Requirements:

IFB605CO19000029

MoDOT Instructions for Submitting a Response

Instructions for Submitting a Response

Page:5

The Missouri Department of Transportation is now posting all of its bid solicitation documents on the new

MissouriBUYS Bid Board (https://www.missouribuys.mo.gov). MissouriBUYS is the State of Missouri’s web-based statewide eProcurement system which is powered by WebProcure, through our partner, Perfect

Commerce.

For all bid solicitations, vendors now have the option of submitting their solicitation response either as an electronic response or as a hard copy response. As a means to save vendors the expense of submitting a hard copy response and to provide vendors both the ease and the timeliness of responding from a computer, vendors are encouraged to submit an electronic response. Both methods of submission are explained briefly below and in more detail in the step-by-step instructions provided at https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf

Notice: The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.

• ELECTRONIC RESPONSES: To respond electronically to a solicitation, the vendor must first register with MissouriBUYS by going to the MissouriBUYS Home Page (https://missouribuys.mo.gov), clicking the

“Register” button at the top of the page, and completing the Vendor Registration. Once registered the vendor should log back into MissouriBUYS and edit their profile by selecting the organizational contact(s) that should receive an automated confirmation of the vendor’s electronic bid responses successfully submitted to the state.

To respond electronically to a solicitation, the vendor must login to MissouriBUYS, locate the desired solicitation on the Bid Board, and, at a minimum, the vendor must read and accept the Original Solicitation

Documents and complete pricing and any other identified requirements. In addition, the vendor should download and save all of the Original Solicitation Documents on their computer so that they can prepare their response to these documents. Vendors should upload their completed response to these downloaded documents (including exhibits, forms, and other information concerning the solicitation) as an attachment to the electronic solicitation response. Step-by-step instructions for how a registered vendor responds to a solicitation electronically are available on the MissouriBUYS system at:

https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf

Vendors are encouraged to submit their entire proposal electronically; however in lieu of attaching exhibits, forms, pricing, etc. to the electronic solicitation response, a vendor may submit the exhibits, forms, pricing, etc. through mail or courier service. However, any such submission must be received prior to the solicitation’s specified end date and time. Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents submitted through mail or courier service.

In the event a registered vendor electronically submits a solicitation response and also mails hard copy documents that are not identical, the vendor should explain which response is valid for the state's consideration. In the absence of such explanation, the state reserves the right to evaluate and award the response which serves its best interest.

https://www.missouribuys.mo.gov https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf https://missouribuys.mo.gov https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf

Page:6

Addendum Document: If an addendum document is subsequently issued, please follow these steps to accept the addendum document(s).

1. If you have not accepted the original solicitation document go to the Overview page, find the section titled, Original Solicitation Documents, review the solicitation document(s) then click on the box under

Select, and then click on the Accept button.

2. To accept the addendum document, on the Overview page find the section titled Addendum Document, review the addendum document(s) then click on the box under Select, and then click on the Accept button.

Note: If you submitted an electronic response prior to the addendum date and time, you should review your solicitation response to ensure that it is still valid by taking into consideration the revisions addressed in the addendum document. If a revision is needed to your solicitation response and/or to indicate your acceptance of the addendum document, you will need to retract your response and re-submit your response by following these steps:

1. Log into MissouriBUYS.

2. Select the Solicitations tab.

3. Select View Current Solicitations.

4. Select My List.

5. Select the correct Opportunity Number (Opportunity No); the Overview page will display.

6. Click on Review Response from the navigation bar.

7. Click on Retract if your response needs to be revised.

8. A message will come up asking, “Are you sure you want to retract the Bid”. Click on Continue to confirm.

9. Click on Respond and revise as applicable.

10. Click on Review Response from the navigation bar and then click on Submit to submit your response.

• HARD COPY RESPONSES: Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents.

MoDOT STANDARD SOLICITATION PROVISIONS

1.1. Standard Provisions

The solicitation for the procurement of the supplies referenced therein, to which these Standard Bid

Provisions, General Terms and Conditions and Special Terms and Conditions, is being issued under, and governed by, the provisions of Title 7 - Missouri Department of Transportation, Division 10, Missouri

Highways and Transportation Commission, Chapter 11- Procurement of Supplies, of the Code of State

Regulations. The Missouri Highways and Transportation Commission (MHTC), acting by and through its operating arm, the Missouri Department of Transportation (MoDOT), draws the Bidders attention to said 7

CSR 10-11 for all the provisions governing solicitation and receipt of bids/quotes and the award of the contract pursuant to this solicitation.

1.2 Standard Provisions

Page:7

All bids/quotes must be submitted by a responsible officer or employee of the firm. Obligations assumed by such submission must be fulfilled.

1.3 Standard Provisions

Work is to be performed under the general supervision and direction of MoDOT and, if awarded any portion of the work, the Contractor agrees to furnish at his/her own expense all labor and equipment required to complete the work, it being expressly understood that this solicitation is for completed work based upon the price(s) specified according to the requirements and specifications detailed within the solicitation documents.

MoDOT IFB GENERAL TERMS AND CONDITIONS

2.1 Definitions

Capitalized terms as well as other terms used but not defined herein shall have the meaning assigned to them in section 7 CSR 10-11.010 Definition of Terms. Whenever the following words and expressions appear in an Invitation for Bid (IFB) document or any addendum thereto, the definition or meaning described below shall apply.

2.1.1. Addendum means a written official modification to an IFB.

2.1.2. Amendment means a written official modification to a contract.

2.1.3. Attachment applies to all forms or documents which are included with an IFB to incorporate any informational data or requirements related to the performance requirements and/or specifications.

2.1.4. Bid end date and time and similar expressions mean the exact deadline required by the IFB for the receipt of bids.

2.1.5. Exhibit applies to forms which are included with an IFB for the vendor to complete and submit with the bid prior to the specified end date and time.

2.1.6. Invitation for Bid (IFB) means the solicitation document issued to potential vendors for the purchase of equipment, supplies, and/or services as described in the document. The definition includes these Terms and Conditions as well as all Pricing Pages, Exhibits, Attachments, and Addendums thereto.

2.1.7. May means a certain feature, component, or action is permissible, but not required.

2.1.8. Must means a certain feature, component, or action is a mandatory condition. Failure to provide or comply will result in a bid being considered non-responsive.

2.1.9. Pricing page(s) applies to the form(s) which the vendor must state the price(s) applicable for the equipment, supplies, and/or services required in the IFB. Pricing page(s) must be completed and submitted by the vendor with the bid response prior to the specified bid end date and time.

2.1.10. Revised Statutes of Missouri (RSMo) refers to the body of laws enacted by the Legislature which govern the operations of all agencies of the State of Missouri.

2.1.11. Shall has the same meaning as the word must.

2.1.12. Should means that a certain feature, component and/or action is desirable but not mandatory.

2.2 Nondiscrimination

Page:8

The Contractor shall comply with all state and federal statutes applicable to the Contractor relating to nondiscrimination, including, but not limited to, Chapter 213, RSMo; Title VI and Title VII of Civil

Rights Act of 1964 as amended (42 U.S.C. Sections 2000d and 2000e, et seq.); and with any provision of the Americans with Disabilities Act (42 U.S.C. Section 12101, et seq)..

2.2.1 Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the nondiscrimination provisions of this contract, MHTC shall impose such contract sanctions as it or the Federal

Highway Administration may determine to be appropriate, including, but not limited to:

2.2.1.1 withholding of payments to the Contractor under the contract until the Contractor complies, and/or,

2.2.1.2 cancellation, termination or suspension of the contract, in whole or in part.

2.3 Contract/Purchase Order

By submitting a response, the Bidder agrees to furnish any and all equipment, supplies and/or services specified in the solicitation documents, at the prices quoted, pursuant to all requirements and specifications contained therein.

2.3.1. A binding contract shall consist of: (1) the solicitation documents, amendments thereto, and/or Best and Final Offer (BAFO) request(s) with any changes/additions, (2) the Contractor's bid response, and (3) the

MHTCs acceptance of the bid by post-award contract or purchase order.

2.3.2. A notice of award does not constitute an authorization for shipment of equipment or supplies or a directive to proceed with services. Before providing equipment, supplies and/or services, the Contractor must receive a properly authorized notice to proceed and/or purchase order

2.4 Applicable Laws and Regulations

The contract shall be construed according to the laws of the State of Missouri. The Contractor shall comply with all applicable local, state, and federal laws and regulations related to the performance of the contract. The exclusive venue for any legal proceeding relating to or arising, out of the contract shall be in the Circuit Court of Cole County, Missouri.

2.4.1. The Contractor must be registered and maintain good standing with the Secretary of State of the

State of Missouri, Missouri Department of Revenue, and other regulatory agencies, as may be required by law or regulations. Prior to the issuance of a purchase order and/or notice to proceed, the Contractor may be required to submit to MHTC a copy of their current Authority Certificate from the Secretary of State of the

State of Missouri and/or a copy of their Certificate of No Tax Due from the Missouri Department of Revenue.

2.4.2. Prior to the issuance of a purchase order and/or notice to proceed, all out-of-state Contractors providing services in the state of Missouri must submit to MHTC a copy of their current Transient Employer

Certificate from the Missouri Department of Revenue, and a current Certificate of Registration from the

Secretary of State of the state of Missouri.

2.5 Open Competition and IFB Document

Page:9

It shall be the vendor's responsibility to ask questions, request changes or clarification, or otherwise advise MoDOT if any language, specifications or requirements of an IFB appear to be ambiguous, contradictory, and/or arbitrary, or appear to inadvertently restrict or limit the requirements stated in the IFB to a single source. Any and all communication from vendors regarding specifications, requirements, competitive bid process, etc., must be directed to the IFB Contact, unless the IFB specifically refers the vendor to another contact. Such e-mail, fax, or phone communication should be received at least ten calendar days prior to the official bid end date.

2.5.1. Every attempt shall be made to ensure that the vendor receives an adequate and prompt response.

However, in order to maintain a fair and equitable bid process, all vendors will be advised, via the issuance of an addendum to the IFB, of any relevant or pertinent information related to the procurement. Therefore, vendors are advised that unless specified elsewhere in the IFB, any questions received less than ten calendar days prior to the IFB end date may not be answered.

2.5.2. Vendors are cautioned that the only official position of the MHTC is that which is issued in the IFB or an addendum thereto. No other means of communication, whether oral or written, shall be construed as a formal or official response or statement.

2.5.3. The IFB is available for viewing and downloading on the MissouriBUYS Statewide eProcurement

System. Registered vendors are electronically notified of those bid opportunities that match the commodity codes for which the vendor registered in MissouriBUYS. If a registered vendors e-mail address is incorrect, the vendor must update the e-mail address themselves on the state's MissouriBUYS Statewide eProcurement System at https://missouribuys.mo.gov/.

2.5.4. MoDOT reserves the right to officially amend or cancel an IFB after issuance. It shall be the sole responsibility of the vendor to monitor the MissouriBUYS Statewide eProcurement System to obtain a copy of the addendum(s). Registered vendors who received e-mail notification of the bid opportunity when the

IFB was established and registered vendors who have responded to the IFB on-line prior to an addendum being issued, should receive e-mail notification of the addendum(s). Registered vendors who received e-mail notification of the bid opportunity when the IFB was established and registered vendors who have responded to the bid on-line prior to a cancellation being issued, should receive e-mail notification of a cancellation issued prior to the exact end date and time specified in the IFB.

2.6 Preparation of Bids

https://missouribuys.mo.gov/

Page:10

Vendors must examine the entire IFB carefully. Failure to do so shall be at the vendor's risk.

2.6.1. Unless otherwise specifically stated in the IFB, all specifications and requirements constitute minimum requirements. All bids must meet or exceed the stated specifications and requirements.

2.6.2. Unless otherwise specifically stated in the IFB, any manufacturer names, trade names, brand names, information and/or catalog numbers listed in a specification and/or requirement are for informational purposes only and are not intended to limit competition. The vendor may offer any brand which meets or exceeds the specification for any item, but must state the manufacturer's name and model number for any such brands in the bid. In addition, the vendor shall explain, in detail, (1) the reasons why the proposed equivalent meets or exceeds the specifications and/or requirements and (2) why the proposed equivalent should not be considered an exception thereto. Bids which do not comply with the requirements and specifications are subject to rejection without clarification.

2.6.3. Bids lacking any indication of intent to bid an alternate brand or to take an exception shall be received and considered in complete compliance with the specifications and requirements as listed in the IFB.

2.6.4. In the event that the vendor is an agency of state government or other such political subdivision which is prohibited by law or court decision from complying with certain provisions of an IFB, such vendor may submit a bid which contains a list of statutory limitations and identification of those prohibitive clauses.

The vendor should include a complete list of statutory references and citations for each provision of the IFB, which is affected by this paragraph. The statutory limitations and prohibitive clauses may (1) be requested to be clarified in writing or (2) be accepted without further clarification if the statutory limitations and prohibitive clauses are deemed acceptable. If MHTC determines clarification of the statutory limitations and prohibitive clauses is necessary, the clarification will be conducted in order to agree to language that reflects the intent and compliance of such law and/or court order and the IFB.

2.6.5. All equipment and supplies offered in a bid must be new, of current production, and available for marketing by the manufacturer unless the IFB clearly specifies that used, reconditioned, or remanufactured equipment and supplies may be offered.

2.6.6. Prices shall include all packing, handling and shipping charges FOB destination, freight prepaid and allowed unless otherwise specified in the IFB.

2.6.7. Bids, including all pricing therein, shall remain valid for 90 days from bid opening unless otherwise indicated. If the bid is accepted, the entire bid, including all prices, shall be firm for the specified contract period.

2.6.8. Any foreign vendor not having an Employer Identification Number assigned by the United States

Internal Revenue Service (IRS) must submit a completed IRS Form W-8 prior to or with the submission of their bid in order to be considered for award.

2.7 Submission of Bids

Page:11

Registered vendors may submit bids electronically through the MissouriBUYS Statewide eProcurement System at https://missouribuys.mo.gov/ or by delivery of a hard copy to the Contact address shown on the Solicitation General Header Information. Vendors that have not registered on the MissouriBUYS Statewide eProcurement System may submit bids hard copy to the Contact address shown on the Solicitation General Header Information. Delivered bids must be sealed in an envelope or container, and received in the required location no later than the exact end date and time specified in the IFB. All bids must (1) be submitted by a duly authorized representative of the vendors organization, (2) contain all information required by the IFB, and (3) be priced as required. It shall be the responsibility of the vendor to ensure their bid is in the required location no later than the exact end date and time specified in the IFB.

2.7.1. The sealed envelope or container containing a bid should be clearly marked on the outside with (1) the official IFB number and (2) the official end date and time. Different bids should not be placed in the same envelope, although copies of the same bid may be placed in the same envelope.

2.7.2. A bid submitted electronically by a registered vendor may be modified on-line prior to the official end date and time. A bid which has been delivered to the Purchasing office may be modified by signed, written notice which has been received in the required location prior to the official end date and time specified. A bid may also be modified in person by the vendor or its authorized representative, provided proper identification is presented before the official end date and time. Telephone or telegraphic requests to modify a bid shall not be honored.

2.7.3. A bid submitted electronically by a registered vendor may be retracted on-line prior to the official end date and time. A bid which has been delivered to the required location may only be withdrawn by a signed, written document on company letterhead transmitted via mail, e-mail, or facsimile which has been received at the required location prior to the official end date and time specified. A bid may also be withdrawn in person by the vendor or its authorized representative, provided proper identification is presented before the official end date and time. Telephone or telegraphic requests to withdraw a bid shall not be honored.

2.7.4. A bid may also be withdrawn after the bid opening through submission of a written request by an authorized representative of the vendor. Justification of withdrawal decision may include a significant error or exposure of bid information that may cause irreparable harm to the vendor.

2.7.5. When submitting a bid electronically, the registered vendor indicates acceptance of all IFB requirements, terms and conditions by clicking on the Review and Submit button on the Response Review tab.

2.7.6. Faxed bids shall not be accepted. However, faxed and e-mail no-bid notifications shall be accepted.

2.8 Bid Opening

Bid openings are public on the end date and at the opening time specified on the IFB document.

Names and prices of the respondents shall be read at the bid opening. All vendors may view the same bid response information on the MissouriBUYS Statewide eProcurement System. Purchasing will not provide prices or other bid information via the telephone.

2.8.1. Bids which are not received in the Purchasing office prior to the official end date and time shall be considered late, regardless of the degree of lateness, and normally will not be opened.

https://missouribuys.mo.gov/

Page:12

2.9 Evaluation and Award

Page:13

Any clerical error, apparent on its face, may be corrected by the buyer before contract award. Upon discovering an apparent clerical error, the buyer shall contact the vendor and request clarification of the intended bid. The correction shall be incorporated in the notice of award. Examples of apparent clerical errors are: 1) misplacement of a decimal point; and 2) obvious mistake in designation of unit.

2.9.1. Any pricing information submitted shall be subject to evaluation if deemed to be in the best interest of the MHTC.

2.9.2. The vendor is encouraged to propose price discounts for prompt payment or propose other price discounts that would benefit the MHTC. However, unless otherwise specified in the IFB, pricing shall be evaluated at the maximum potential financial liability to the MHTC.

2.9.3. Awards shall be made to the vendor whose bid (1) complies with all mandatory specifications and requirements of the IFB and (2) is the lowest and best bid, considering price, responsibility of the vendor, and all other evaluation criteria specified in the IFB and (3) complies with all applicable Missouri statutes and Executive Orders.

2.9.4. In the event all vendors fail to meet the same mandatory requirement in an IFB, MHTC reserves the right, at its sole discretion, to waive that requirement for all vendors and to proceed with the evaluation. In addition, MHTC reserves the right to waive any minor irregularity or technicality found in any individual bid.

2.9.5. MHTC reserves the right to reject any and all bids. When all bids are non-responsive or otherwise unacceptable and circumstances do not permit a rebid, MHTC may negotiate for the required supplies.

2.9.6. When evaluating a bid, the MHTC reserves the right to consider relevant information and fact, whether gained from a bid, from a vendor, from vendor references, or from any other source.

2.9.7. Any information submitted with the bid, regardless of the format or placement of such information, may be considered in making decisions related to the responsiveness and merit of a bid and the award of a contract.

2.9.8. Any award of a contract shall be made by notification to the successful vendor. MHTC reserves the right to make awards by item, group of items, or an all or none basis unless otherwise identified in the solicitation. The grouping of items awarded shall be determined based upon factors such as item similarity, location, administrative efficiency, or other considerations in the best interest of the MHTC.

2.9.9. All bids and associated documentation which were submitted on or before the official end date and time will be considered open records pursuant to section 610.021, RSMo, following the official opening of bids.

2.9.10. The MHTC posts all bid results on the MissouriBUYS Statewide eProcurement System website for all vendors to view for a reasonable period of time after bid award.

2.9.11. The MHTC reserves the right to request clarification of any portion of the vendor response in order to verify the intent of the vendor. The vendor is cautioned, however, that its response may be subject to acceptance or rejection without further clarification.

2.9.12. Any bid award protest must be received within ten (10) business days after the date of award in accordance with the requirements of 7 CSR 10-11.020 (9).

Page:14

2.9.13. The final determination of contract award(s) shall be made by the MHTC.

2.10 Executive Order

The Contractor shall comply with all the provisions of Executive Order 07-13, issued by the

Honorable Matt Blunt, Governor of Missouri, on the sixth (6th) day of March, 2007. This Executive

Order, which promulgates the State of Missouri's position to not tolerate persons who contract with the state engaging in or supporting illegal activities of employing individuals who are not eligible to work in the United States, is incorporated herein by reference and made a part of this Agreement.

2.10.1. The Contractor hereby certifies that any employee of the Contractor assigned to perform services under the contract is eligible and authorized to work in the United States in compliance with federal law.

2.10.2. In the event the Contractor fails to comply with the provisions of the Executive Order 07-13, or in the event the Commission has reasonable cause to believe that the contractor has knowingly employed individuals who are not eligible to work in the United States in violation of federal law, the Commission reserves the right to impose such contract sanctions as it may determine to be appropriate, including but not limited to contract cancellation, termination or suspension in whole or in part or both.

2.10.3. The Contractor shall include the provisions of this paragraph in every subcontract. The Contractor shall take such action with respect to any subcontract as the Commission may direct as a means of enforcing such provisions, including sanctions for noncompliance.

2.11 Preferences

In the evaluation of bids/quotes, preferences shall be applied in accordance with 7 CSR 10-

11.020(7). Contractors should apply the same preferences in selecting subcontractors.

2.11.1. Bidders are encouraged to obtain minority business enterprise (MBE) and women business enterprise (WBE) participation in this work through the use of subcontractors, suppliers, joint ventures, or other arrangements that afford meaningful participation for M/WBEs. Bidders are encouraged to obtain 10%

MBE and 5% WBE participation.

2.12 Cancellation of Contract

The MHTC may cancel the Contract at any time for a material breach of contractual obligations or for convenience by providing Contractor with written notice of cancellation. Should the MHTC exercise its right to cancel the contract for such reasons, cancellation will become effective upon the date specified in the notice of cancellation sent to the Contractor.

2.13 Bankruptcy or Insolvency

Upon filing for any bankruptcy or insolvency proceeding by or against the Contractor, whether voluntarily, or upon the appointment of a receiver, trustee, or assignee, for the benefit of creditors, the Commission reserves the right and sole discretion to either cancel the Agreement or affirm the Agreement and hold the

Contractor responsible for damages.

2.14 Warranty

Page:15

The Contractor expressly warrants that all equipment, supplies, and/or services provided shall: (1) conform to each and every specification, drawing, sample or other description which was furnished to or adopted by the MHTC, (2) be fit and sufficient for the purpose expressed in the solicitation documents, (3) be merchantable, (4) be of good materials and workmanship, and (5) be free from defect. Such warranty shall survive delivery and shall not be deemed waived either by reason of the MHTC's acceptance of or payment for said equipment, supplies, and/or services.

2.15 Status of Independent Contractor

The Contractor represents itself to be an independent Contractor offering such services to the general public and shall not represent itself or its employees to be an employee of the MHTC. Therefore, the Contractor shall assume all legal and financial responsibility for taxes, FICA, employee fringe benefits, workers compensation, employee insurance, minimum wage requirements, overtime, etc., and agrees to indemnify, save and hold the MHTC, its officers, agents and employees harmless from and against any and all losses

(including attorney fees) and damage of any kind related to such matters.

2.16 Non-Waiver

If one of the parties agrees to waive its right to enforce any term of this Contract, that party does not waive its right to enforce such term at any other time or to enforce any or all other terms of this Contract.

2.17 Indemnification

The Contractor shall defend, indemnify and hold harmless MHTC, including its members and department employees, from any claim or liability whether based on a claim for damages to real or personal property or to a person for any matter relating to or arising out of the Contractor's performance of its obligations under the contract awarded pursuant to this solicitation.

2.18 Right of Acceptance and/or Rejection

MoDOT reserves the right to reject any responses, and to accept or reject any items thereon, and to waive technicalities. In case of error in the extension of prices in the response, unit prices will govern.

2.19 Inspection and Acceptance

No equipment, supplies, and/or services received by MoDOT pursuant to a contract shall be deemed accepted until MoDOT has had reasonable opportunity to inspect said equipment, supplies, and/or services.

2.19.1. All equipment, supplies, and/or services which do not comply with the specifications and/or requirements or which are otherwise unacceptable or defective may be rejected. In addition, all equipment, supplies, and/or services which are discovered to be defective or which do not conform to any warranty of the contractor upon inspection (or at any later time if the defects contained were not reasonably ascertainable upon the initial inspection) may be rejected.

2.19.2. The MHTC reserves the right to return any such rejected shipment at the contractor's expense for full credit or replacement and to specify a reasonable date by which replacements must be received.

2.19.3. The MHTCs right to reject any unacceptable equipment, supplies, and/or services shall not exclude any other legal, equitable or contractual remedies the MHTC may have.

2.20 Invoicing and Payment

Page:16

The statewide financial management system has been designed to capture certain receipt and payment information. For each purchase order received, an invoice must be submitted that references the purchase order number and must be itemized in accordance with items listed on the purchase order. Failure to comply with this requirement may delay processing of invoices for payment.

2.20.1. The contractor shall not transfer any interest in the contract, whether by assignment or otherwise, without the prior written consent of the MHTC.

2.20.2. Payment for all equipment, supplies, and/or services required herein shall be made in arrears unless otherwise indicated in the IFB.

2.20.3 The MHTC assumes no obligation for equipment, supplies, and/or services shipped or provided in excess of the quantity ordered. Any unauthorized quantity is subject to the state's rejection and shall be returned at the contractor's expense.

2.20.4. The State of Missouri reserves the right to purchase goods and services using the state purchasing card.

2.21 Conflict of Interest

Elected or appointed officials or employees of the State of Missouri or any political subdivision thereof, serving in an executive or administrative capacity, must comply with sections 105.452 and

105.454, RSMo, regarding conflict of interest.

2.21.1. The contractor hereby covenants that at the time of the submission of the bid the contractor has no other contractual relationships which would create any actual or perceived conflict of interest. The contractor further agrees that during the term of the contract neither the contractor nor any of its employees shall acquire any other contractual relationships which create such a conflict.

2.22 Tax Exempt Status

MHTC is exempt from paying Missouri Sales Tax, Missouri Use Tax and Federal Excise Tax. However, the

Contractor may themselves be responsible for the payment of taxes on materials they purchase to fulfill the contract.

MoDOT IFB SPECIAL TERMS AND CONDITIONS

3.1 Insurance

Page:17

The Contractor shall maintain or cause to be maintained at Contractor's own expense commercial general liability, automobile liability, workers compensation insurance against negligent acts, errors or omissions of the Contractor, or its subcontractors and anyone directly or indirectly employed by any of them. Upon request from the Commission, the Contractor shall provide the Commission with certificates of insurance evidencing the required coverage and that such insurance is in effect. Any insurance policy required as specified in this Section shall be written by a company that is licensed and authorized to issue such insurance in the state of Missouri and shall provide insurance coverage for not less than the following limits of liability:

3.1.1. General Liability: Not less than $500,000 for any one person in a single accident or occurrence, and not less than $3,000,000 for all claims arising out of a single occurrence;

3.1.2. Automobile Liability: Not less than $500,000 for any one person in a single accident or occurrence, and not less than $3,000,000 for all claims arising out of a single occurrence;

3.1.3. Missouri State Workmen's Compensation policy or equivalent in accordance with state law.

3.2 Bid Guaranty/Contract Bond

Each bid shall be accompanied by one of the following: a Bid Bond, Certified Check, Cashier's Check, or

Bank Money Order payable to Director of Revenue - Credit State Road Fund for an amount equal to Five

Percent (5%) of the amount of the bid submitted. This is to act as a guarantee that the bidder, if awarded the contract, will furnish an acceptable performance and payment bond (Contract Bond) or a cashier's check, a bank money order or a certified check made payable to "Director of Revenue - Credit State Road

Fund" in an amount equal to One Hundred Percent (100%) of the contract price. Vendors submitting an electronic response must attach a COPY of the Bid Bond, Certified Check, Cashier's Check or Bank Money

Order to the electronic bid response along with proof the bond instrument has been mailed to the bid contact prior to the bid deadline date and time. Failure to receive the ORIGINAL hardcopy bond instrument within

FIVE (5) calendar days of bid opening, may render the bid as non-responsive.

3.2.1. If a BID BOND is used (in lieu of a certified check, cashier's check, or bank money order), it must be in the form provided and executed by the bidder as principal and by a surety company authorized to do business in the State of Missouri as surety. The agent executing the same on behalf of the surety company must attach a current Power of Attorney setting forth his authority to execute the bond involved.

3.2.2. Certified Checks, Cashier's Checks or Bank Money Orders of unsuccessful bidders will be returned upon execution of the awarded contract. The checks or bank money orders of the successful bidder(s) will be retained until the contract is executed and a satisfactory Performance and Payment (Contract Bond) is furnished. Bid Bonds will not be returned except on specific request of the bidder.

3.2.3. Failure to execute the contract and file acceptable performance payment (Contract Bond) or cashier's check, bank money order or certified check within 15 days after the contract has been transmitted to the bidder shall be just cause for the cancellation of the award and the forfeiture of the proposal guaranty.

Award may then be made to the next lowest responsible bidder, or the work may be re-advertised and performed under contract or otherwise, as the Commission may decide. No contract shall be considered effective until it has been executed by all parties thereto.

3.4 Prohibition Of Employment Of Unauthorized Aliens

Page:18

Non-employment of Unauthorized Aliens: Pursuant to Section 285.530, RSMo., no business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the State of Missouri. As a condition for the award of any contract or grant in excess of five thousand dollars by the State or by any political subdivision of the State to a business entity, or for any business entity receiving a state-administered or subsidized tax credit, tax abatement, or loan from the state, the business entity shall:

3.4.1. By sworn affidavit and provision of documentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection with the contracted services. E-Verify is an example of a federal work authorization program. The business entity must affirm its enrollment and participation in the E-Verify federal work authorization program with respect to the employees proposed to work in connection with the services requested herein by providing acceptable enrollment and participation documentation consisting of completed copy of the E-Verify Memorandum of

Understanding (MOU). For business entities that are not already enrolled and participating in a federal work authorization program, E-Verify is available at http://www.dhs.gov/files/programs/gc_1185221678150.shtm

3.4.2. By sworn affidavit, affirm that it does not knowingly employ any person who is an unauthorized alien in connection with the contracted services. A copy of the affidavit referenced herein is provided within this document, attached as Exhibit ____.

3.4.3. Proof of Lawful Presence For Sole Proprietorships and Partnerships: If the business entity is a sole proprietorship or partnership, pursuant to Section 208.009, RSMo., each sole proprietor and each general partner shall provide affirmative proof of lawful presence in the United States. Such sole proprietorship or partnership is eligible for temporary public benefits upon submission by each sole proprietor and general partner of a sworn affidavit of his/her lawful presence on the United States until such lawful presence is affirmatively determined, or as otherwise provided by Section 208.009, RSMo. A copy of the affidavit reference herein is provided within this document, attached as Exhibit____.

3.7 Permits, Licenses and Safety Issues

The contract price shall include any necessary permits and licenses required by law incidental to the work.

Local ordinances requiring building permits are not applicable to state agencies.

3.8 Delivery-Additional Requirements

http://www.dhs.gov/files/programs/gc_1185221678150.shtm

Page:19

The Contractor shall furnish the Missouri Department of Transportation with a planned delivery schedule at least 2 Business Days before starting delivery.

3.8.1. Notification should be during the normal workday preceding the day on which the Contractor desires to initiate delivery.

3.8.2. A representative of the Missouri Department of Transportation must be present when items are delivered.

3.8.3. No material will be accepted that has been dumped in the absence of the department representative.

3.8.4. Unless otherwise specified, deliveries will be a minimum of 500 Tons Per Day. No deliveries will be made during the period from 30 minutes before sundown to sunrise. No deliveries will be made on

Saturdays, Sundays and holidays unless specifically authorized by the department representative.

3.8.5. The following days shall be construed as official holidays under the terms of the contract:

3.8.5.1. January 1 - New Year's Day

3.8.5.2. Third Monday in January - Martin Luther King, Jr.s Birthday

3.8.5.3. February 12-Lincoln's Birthday

3.8.5.4. Third Monday in February - Washington's Birthday

3.8.5.5. May 8 - Truman's Birthday

3.8.5.6. Last Monday in May-Memorial Day

3.8.5.7. July 4 - Independence Day

3.8.5.8. First Monday in September - Labor Day

3.8.5.9. Second Monday in October-Columbus Day

3.8.5.10. November 11 - Veteran's Day

3.8.5.11. Fourth Thursday in November - Thanksgiving Day

3.8.5.12. December 25 - Christmas Day

3.8.6. When any of the above holidays falls on a Sunday, the holiday will be observed on the following

Monday; when any of the above holidays falls on a Saturday, the holiday will be observed on the immediately preceding Friday.

3.8.7. Contractor will not be required to provide dozers, loaders, motor graders, or other equipment for shaping of stockpiles, constructing ramps or runways, or leveling of the top of a completed lift, unless otherwise noted herein.

3.8.8. During construction/maintenance seasons, many maintenance buildings work four day, ten hour shifts and deliveries may not be made on the off days for those buildings.

3.9 Temporary Suspension of Work

Page:20

Any authorized department representative shall have authority to suspend work wholly or in part for such period or periods as may be deemed necessary when weather or other conditions are such that in the opinion of the department representative, the work may be done at a later time with advantage to MoDOT or for failure on the part of the Contractor to comply with any of the provisions of the Contract.

3.9.1. If MoDOT suspends the work for its own advantages and not because of the Contractor's failure to comply with the Contract, the Contractor will be allowed an equal number of calendar days after the completion date for the completion of the work. MoDOT may at its discretion give the Contractor an extension of time for completing the work where the Contractor incurs delays for causes beyond his control.

3.9.2. Normal rainfall is not considered a cause qualifying for an extension of time. Claim for extension of time for all causes must be submitted by the Contractor in writing within 30 Days after the claimed cause for the delay has ceased to exist.

3.11 Liquidated Damages

In the event the successful Contractor fails to deliver the material within the time specified, the Department and the public will sustain damages because of such delay in delivery, the exact extent of which would be difficult to ascertain, and in order to liquidate such damage in advance it is agreed that the sum of $250 per day, per item, for each assessable calendar day on which the delivery has not been completed, is reasonable and the best estimate which the parties can arrive at as liquidated damages, and it is therefore agreed that said amount will be withheld from payments due the Contractor or otherwise collected from the

Contractor as liquidated damages.

3.11.1 Saturdays, Sundays, holidays and days whereas the Department has suspended work shall not be assessable days.

3.12 General Services Specifications (MGS)

All materials, equipment, and/or services bid must comply with the attached General Services Specifications for each district and any other provisions outlined in the solicitation documents. The material to be supplied shall comply with the quality requirements of the current edition of the Missouri Standard Specifications for

Highway Construction and any revisions thereto, unless modified by these specifications.

3.13 Personal Protective Equipment

Page:21

All contractor and subcontractor employees utilized in the performance of work resulting from this request must adhere to OSHA standards and at a minimum shall utilize appropriate head, eye and foot protection in the performance of work.

3.13.1 All workers within highway right of way shall wear approved ANSI/ISEA 107 Performance Class 2 or

3 safety apparel and more specifically as follows:

3.13.1.1 Daytime Flagger. During daytime activities, flaggers shall wear a high visibility hard hat, safety glasses, a Performance Class 3 top OR a Performance Class 2 top, and safety footwear. Hard hats other than high visibility orange or green shall be covered with a high visibility covering.

3.13.1.2 Daytime Worker. During daytime activities, workers shall wear a hard hat, safety glasses, a

Performance Class 3 top OR a Performance Class 2 top, and safety footwear.

3.13.1.3 Nighttime Flagger. During nighttime activities, flaggers shall wear a high visibility/reflective hard hat, safety glasses, a Performance Class 3 top AND Class E bottoms, OR Performance Class 2 top AND Class

E bottoms, and safety footwear. Hard hats shall be reflective or covered with a high visibility covering.

3.13.1.4 Nighttime Worker. During nighttime activities, workers shall wear a hard hat, safety glasses, a

Performance Class 3 top OR Performance Class 2 top AND Class E bottoms, and safety footwear.

3.14 Increase or Decrease Quantities

The quantities listed are MoDOT's best estimate of needs at the time of the solicitation posting. MoDOT reserves the right to increase or decrease quantities. The final quantity ordered by MoDOT shall be furnished at the unit price bid.

3.14.1 Prior to contract award, MoDOT may increase or decrease quantities by forty percent (40%), or cancel an item(s).

3.14.2 MoDOT reserves the right to obtain "like or similar products as specified herein from other manufacturers, exclusive of the contract, when use of such products is deemed in the best interest of

MoDOT.

Detailed Requirements

4.1 Material and Material Delivery

Page:22

4.1 All material shall conform to Missouri Standard Specifications for Highway Construction, 2018 Edition, and any revisions thereto, except as revised herin:

4.1.1 Section 1001.14 Aggregate Quality Control/Quality Assurance. Aggregate produced under an approved MoDOT QC/QA program will be accepted on that basis. All other aggregates are subject to the department's conventional inspection and acceptance procedure. All mine tailing shall meet the requirements of Section 1001.12 Mining By-Product Aggregates.

4.1.2 MoDOT reserves the right to inspect the material at the point of manufacture, intermediate storage point, or at a destination which shall be at the discretion of MoDOT.

4.1.3 Delivery shall be to the applicable MoDOT locations(s) as specified in accordance with pricing pages.

4.1.4 The starting date is upon receipt of Notice to Proceed and the completion date for the shall be as noted on the pricing pages.

a. If the date the purchase order is issued is less than 15 days from the completion date, the Contractor shall be given an extension for delivery. The Contractor shall be given a minimum of 15 days to deliver upon receipt of purchase order.

4.1.5 Belly dumps are prohibited from use for delivery with this contract, unless authorized by the District.

4.1.6 All deliveries are to be made during maintenance facilities normal working hours unless prior arrangements have been made with the appropriate MoDOT district office or other designated contact person(s).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .