IFB23000649_Dec_30_24_solicitation_doc.pdf
PDF 20 KB Posted
- Solicitation number
- IFB23000649
- Issued by
- Jefferson County, Missouri
About this file
This is an Invitation for Bid (IFB23000649) issued by the Missouri Department of Natural Resources Division of State Parks for an ADA-compliant ramp, deck, and stairs system at the North Regional Park District. The solicitation requests quotes for a commercial grade, prefabricated modular aluminum stair, ramp, and platform system designed for outdoor accessibility to buildings. The system must be a free-standing rigid structure compliant with ADA, IBC, OSHA, and local codes. Bids are due September 30, 2022, at 2:00 PM CDT, with the solicitation opening on September 16, 2022, at 8:00 AM CDT. No pre-proposal conference will be held, though detailed project information is available through Ann Nickell.
The delivery terms are FOB Destination to the Missouri State Parks North Regional Office in Brookfield, MO. Payment terms are Net 30 days from invoicing. The system must include foot plates designed for secure connections to concrete footings or slabs (minimum 12 inches in diameter), with platforms allowing for optional fastening to adjacent buildings. Vendors may submit multiple proposals and alternatives for this item. The solicitation requires vendors to complete and attach Exhibit A and any other applicable exhibits to their bid submission through the MissouriBUYS system.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: IFB23000649
North Regional Park District - ADA Ramp, Deck, and Stairs
Invitation for Bid (IFB)
DNR Division of State Parks
September 16, 2022 - September 30, 2022
Page:2
General Header Information
IFB23000649
No. IFB23000649 Title: North Regional Park District - ADA Ramp, Deck, and Stairs Start Date: September 16, 2022 at 8:00:00 AM CDT End Date: September 30, 2022 at 2:00:00 PM CDT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: Please quote a commercial grade, prefabricated modular aluminum stair, ramp and platform system for outdoor accessibility to buildings. The system shall be designed as a free-standing rigid structure that will be code compliant with ADA, IBC, OSHA and most local codes to provide full public access to government buildings.
The modular system will allow reconfiguration of the components in the event the system needs to be moved to another building or altered due to changes in the building access or landscape.
Delivery Terms: Free On Board Destination Delivery Notes: Deliver to:
Missouri State Parks North Regional Office 600 W. Locking PO Box 314 Brookfield, MO. 64628-0314
(660) 258-5030 *Must contact office prior to delivery to ensure proper equipment and staffing are available for receiving product.
Payment Terms: Net 30 Days Payment Notes: Payment to occur 30 days from invoicing.
Contact Information: DNR Division of State Parks
Vincent Guelbert 1659 East Elm Jefferson City MO, 65101 United States Tel: 573-751-8363 Fax:
vincent.guelbert@dnr.mo.gov
Contact Details: If you have any questions, please contact:
Vincent Guelbert 1659 East Elm Jefferson City MO, 65101 United States Tel: 573-751-8363 Fax:
vincent.guelbert@dnr.mo.gov
Selected Categories:
Page:3
Header Custom Fields:
IFB23000649
NOTICE
Vendor Responsibility
The vendor is solely responsible for ensuring timely submission of their solicitation response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
The State of Missouri's Privacy Policy can be accessed here.
PRE-PROPOSAL CONFERENCE
Pre-Proposal Conference A pre-proposal conference regarding this Request for Proposal will not be held.
For detailed information relating to the project please contact:
Ann Nickell (660) 258-4951 or ann.nickell@dnr.mo.gov
VENDOR'S INSTRUCTIONS
Submission of Bids Vendors should be aware there are exhibits attached to the documentation of the attached
IFB. Vendors should fill out and sign exhibit A and any others that apply. Vendors should attach the exhibits to their bid.
http://www.mo.gov/privacy-policy/
Page:4
Solicitation Requirements:
This quote has no questions defined.
IFB23000649
REQUIREMENTS
Requirements:
To access the official solicitation document, which includes all applicable requirements, detailed specifications, and terms and conditions, the vendor must click on the Overview tab to view the solicitation. Under the Overview tab, the vendor must either: 1) print the solicitation document in order to submit a hard copy, if allowed by the solicitation, or 2) review and accept the solicitation documents under the Overview tab, and submit an electronic response to the solicitation through the MissouriBUYS system.
ATTACHMENT INSTRUCTIONS
Uploading Attachments Uploading Attachments To A Bid Response: The vendor is solely responsible for downloading and reviewing the complete solicitation document and, if any, all solicitation attachments. The vendor shall further understand and agree that in order for the state to be able to conduct a complete evaluation of the vendor's response, the vendor is strongly advised to attach and upload completed
RFP/IFB exhibits (e.g., Exhibit A through Exhibit ? ) including Pricing Pages.
Page:5
Documents:
Brookfield off mod spec.docx
Modular Al Ramp Plan197.pdf
Page:6
Item Specifications
No. Item Alternative Supplier Part No Mfr.
Name
Mfr. No Del
Date
Unit Unit Bid Qty. Total
1 ADA Ramp, Deck, & Stair
System each 1.00
Item Specification for ADA Ramp, Deck, & Stair System
Description: Please quote a commercial grade, prefabricated modular aluminum stair, ramp and platform system for outdoor accessibility to buildings. The system shall be designed as a free-standing rigid structure that will be code compliant with ADA, IBC, OSHA and most local codes to provide full public access to government buildings. The modular system will allow reconfiguration of the components in the event the system needs to be moved to another building or altered due to changes in the building access or landscape. The ramp, step and platform system is to be designed as a free-standing structure. All foot plates shall be designed to allow secure connections to concrete footings or slabs, a minimum of 12 inches in diameter. Platforms or landings shall allow fastening to adjacent buildings as desired by building owners. Ramps and stairs shall connect to platforms or other sections as needed and depicted in the attached drawing.
Buyer allows multiple proposals to be submitted for this item.
Buyer allows alternatives to be submitted for this item
Allow Vendor to Enter Negative Value : No
Exclude Line Item from Bid Total : No
Page:7
File details come from the government source that posted it. Updated .