This is an Invitation for Bid (IFB) specifications document issued by the Montana Department of Transportation (MDT) for the demolition and removal of state-owned property located at 1207 Johnson Lane, Billings, Montana. The project requires the successful contractor to demolish two structures—a 2-story, 3-bedroom, 2-bathroom house built in 1953 (Structure 1, approximately 2,100 square feet including basement) and a 1,344 square foot pole frame garage built in 1960 (Structure 2)—along with removal of all concrete foundations, slabs, parking lot, debris, and site improvements. Additional scope includes permanent disconnection and abandonment of three water wells (except one well on the southwest corner which should be disconnected from Structure 1 but not capped unless in the demolition path), removal and proper disposal of the septic system associated with Structure 1, and final backfilling, grading, and hydroseeding of the site. All work must be completed by April 30, 2027, with backfill and topsoil placement completed by May 31, 2027, or the contractor forfeits their bid and performance bond. A pre-bid conference and site inspection is scheduled for October 20, 2026, from 11:00 a.m. to 1:00 p.m. on-site, and all contractors are strongly encouraged to attend.
The contractor must obtain a NESHAP Notification Permit from the Montana Department of Environmental Quality at least ten working days prior to demolition start, and all work must comply with applicable city, county, state, and federal codes. A pre-demolition hazardous materials inspection completed on December 11, 2025, identified asbestos-containing materials in Structure 1, which were abated as of July 1, 2026; the contractor must have a copy of the asbestos report on-site and immediately notify MDT's Environmental Services Bureau (Joe Radonich, 406-444-9204) if any suspicious materials are discovered. Contractor responsibilities include obtaining all required permits and licenses, verifying utility disconnections (electricity has been pre-disconnected by Yellowstone Valley Electric Co-op), ensuring tree and shrub removal occurs between August 15 and April 15 to comply with the Migratory Bird Treaty Act, and properly disposing of all solid waste in accordance with federal, state, and local regulations with no burning or incineration allowed on-site. Foundation backfill must consist of well-graded sand and gravel meeting ASSHTO M 145 A-2-4 standards, and the contractor must provide compaction equipment meeting minimum specifications (single drum vibratory roller, 16,000-pound operating weight, 90 horsepower) with documentation of compaction testing submitted to Paul Lewis, the Billings District Materials Lab Supervisor. Final payment requires inspection by MDT and receipt of a Final Labor Certificate from Kathleen Terrio (406-475-2258); no payments will be made prior to site inspection and verification that all contract requirements have been met.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1456721-event.pdf | ||
| Prevailing Wage Rates_Highway Construction_2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Montana Department of Transportation
Demolition/Removal of State-Owned Property
Right-of-Way Bureau MDT-ROW-167 Rev. 10/2025
CODE AND PERMIT REQUIREMENTS
Successful Contractor agrees that all work performed because of award of the project detailed herein shall meet or exceed all applicable city, county, state, and federal codes. Failure to research said codes will not relieve the successful Contractor of his/her responsibility regarding code compliance. The Contractor shall be responsible for all required permits, licenses, fees, and inspections associated with the project.
A NESHAP Notification Permit (Permit) must be filed with the Montana Department of Environmental Quality (DEQ) at least ten (10) working days prior to the start of demolition. Working days are Monday through Friday (includes holidays) but do not include the day the Permit is received by the DEQ.
• The Permit form is provided in this packet. The successful contractor must submit the Permit to the DEQ to start the clock on the 10-working day requirement.
• The Contractor must advise the Department upon receipt and send a copy of the NESHAP acknowledgement certificate from DEQ.
• A purchase order and notice to proceed authorizing the Contractor to begin work cannot be issued until this requirement has been fulfilled.
SPECIFICATIONS FOR WORK
Provide all labor, materials, equipment, and incidentals necessary for the demolition/removal of the structures, plants, parking lot, and debris which were acquired on the following highway project:
NCPD-MT 56(55), 4199-055-000, Billings Bypass, Parcel 1
The above-mentioned property is located approximately 0.3 miles NE of I-90 and Johnson Lane in Billings, MT.
The property address is as follows 1207 Johnson Ln, Billings, MT 59101. There are 3 possible ways to access the driveway: access off N Frontage Rd and turn left on Sannon Blvd (driveway to the left), Coulson Rd and Sannon Blvd (driveway will be to the right) or access off Coulson Rd between Johnson Ln and Sannon Blvd (see aerial-street view attachment for directions).
1207 Johnson Ln has 2 structures that need to be demolished. Those structures are as follows:
Structure 1 is a 2-story, 3 bed, 2 bath house built in 1953. First floor is 888 sq. ft. with 162 sq. ft. enclosed porch, and the basement is 1,050 sq. ft. with a concrete foundation.
Structure 2 is a 1,344 sq. ft. pole frame garage built in 1960 with metal exterior walls, no insulation and gravel floor.
To comply with the Migratory Bird Treaty Act, any tree or shrub removal shall occur from August 15 to April 15 (outside of the nesting season). If contractor has any questions regarding this Act or tree removal, please contact Bill Semmens, (406) 444-7227, with MDT Environmental Services Bureau.
The Contractor is required to permanently disconnect, cap and abandon the water wells that are located behind Structure 2 and the well that is located near the northeast corner of the property in the field. If possible, leave the well in front of Structure 2 on the southwest corner of the structure, the contractor will need to disconnect this well from Structure 1 but do not cap or abandon, unless the well is in the way of the demolition.
The Contractor must pump, remove, and properly dispose of the septic system associated with structure 1. The septic system (no permit) appears to be located northwest of Structure 1 as shown on the attachment and the drainfield is north-northeast of the domicile.
MDT has contacted Yellowstone Valley Electric Co-op about the disconnecting of electricity from both Structures and has removed the meter. The Contractor may contact Yellowstone Valley Electric Co-op at (406) 348-3411 with any additional questions regarding the utilities.
The Contractor is ultimately responsible for verifying all the necessary utilities connected to the structures have been disconnected before work begins.
Hazardous Materials and Asbestos Inspection
Testing for asbestos was conducted on December 11, 2025, for asbestos containing materials. The results found asbestos-containing building materials present in structure. Abatement work was completed on July 1, 2026.
Attached are a copy of the Asbestos Inspection (Report) and the Post-Abatement Final Visual Inspection and Clearance Air Sample Report.
MDT has done its due diligence to ensure that the structures have been inspected for the presence of asbestos however, the Contractor is required to stop work immediately and notify the Remediation and Assessment Supervisor, Joe Radonich, with MDT’s Environmental Services Bureau at (406) 444-9204 if any suspicious materials not previously identified in the report are found or if the Contractor has any question(s) regarding Environmental issues related to this contract.
DEQ requires that the Contractor always have a copy of the asbestos report with them on the work site.
WORK SHALL CONSIST OF, BUT NOT LIMITED TO THE FOLLOWING:
The successful Contractor must demolish/remove the structures and improvements, all concrete (foundation and slabs), and/or obstruction (and everything contained within them) from the state-owned land identified as 1207 Johnson Ln, Billings, MT 59101 on or before 4/30/2027. Upon removal of the structures and clearing of debris, the successful contractor is responsible for obtaining material to back fill and level the ground surface, add topsoil and hydroseed by May 31, 2027.
If the above deadline is not met the successful Contractor will forfeit their bid and/or Contract Performance Security Bond(s).
All combustible material must be removed from the site. There will be no burning or incineration of waste materials on the project site. There will be no burying of salvage material on the project site. All solid waste, trash and rubbish must be hauled off the site, leaving the site in a neat condition.
The disposal of all solid waste will be done by the Contractor, and all disposals must be done in accordance with Federal, State and Local laws and policies. The Contractor is responsible for determining how much material is present, that needs to be disposed of and may drill holes or dig around the edge of the areas when making their determination. All crawlspace or open holes must be filled in, graded, and contoured to ground level.
The Department is not responsible for any vandalism, theft, or damage to the properties (as listed in the bid) after the date of the site inspection. These are abandoned properties and are not monitored or secured in any way. There is no guarantee, stated or implied, that the property as viewed at the site inspection will be the same as when the Contractor starts demolition.
All asphalt, concrete flatwork, and foundations must be removed from the site and disposed of in accordance with Federal, State, and local laws. All basements or open holes must be filled in, graded, and contoured to ground level.
This work is the supply, placement, and compaction for backfilling the removed foundation as described in the contract or shown on the plans. Contractor must provide material for foundation backfill consisting of a well-grade sand gravel, free of organic and other deleterious materials, meeting the ASSHTO M 145 requirements for A-2-4 group classifications of better with 100% passing the 8-inch sieve. Contractor must provide compaction equipment meeting the following minimum requirements:
• Single Drum vibratory roller
• Operating weight of 16,000 lbs.
• 90 horsepower measured at the flywheel
During placement and compaction of subgrade apply water as necessary to aid in compaction. Scarify and re-compact the subgrade after foundation removal to a depth of 4 inches. Roll the subgrade a minimum of two passes before placing fill. Place foundation backfills in no greater than 8-inch loose lifts. Roll each lift with the specified compaction equipment a minimum of three passes before placing the next lift. Continue placing fill until the foundation backfill is even with the existing grade after the specified compaction.
If rutting occurs from construction equipment on the compacted foundation backfill, increase compaction equipment passes to four. Ruts are defined as gaps greater than 2 inches as measured from a rod placed across the wheel or track path.
Alternate construction: Place foundations backfill in no greater than 8-inch loose lifts, and pact to 95% of the standard proctor plus or minus 2% of the optimum moisture content. Provide compaction testing documentation to Paul Lewis, the Billings District Materials Lab Supervisor, 424 Morey St, Billings, MT 59104. His office phone number is (406) 255-0129 and email palewis@mt.gov. Foundation backfill will be measured by the neat line cubic yard with no allowance for shrink or swell. Compaction is not measured for payment: include compaction and foundation backfill in the project cost. The Contractor must contact Paul Lewis, at least 5 business days prior to beginning the foundation backfill. Contractor must place a minimum of 4” of soil capable of supporting plant growth over the compacted foundation backfill.
Hydroseeding requirements are as follows:
Hydroseeding needs to be done for the entire demolition area and the grass seed needs to be suitable for the Lockwood area and drought tolerance.
Hydroseeding must be completed by May 31, 2027. If the contractor cannot complete the hydroseeding by the deadline, they must contact MDT to extend hydroseeding to no later than October 31, 2027.
No interest in the land upon which the structures are situated will pass to the Contractor.
All Contractors should attend a pre-bid conference and site inspection. The time and date of the pre-bid conference and site inspection will be held on 10/20/2026 from 11:00am to 1:00pm on-site. The purpose of these conferences is to answer questions related to the bid and to provide a site inspection of the properties. The improvements on 1207 Johnson Ln, Billings will be open during this time with Department representatives on site, please bring flashlights because the power is off and the windows are boarded up so it may be dark.
Contractor(s) are asked to sign in at the pre-bid conference and site inspection with the Department Representative.
The Contractor MUST leave the Site as neat and safe as is feasibly possible at the end of each workday. Any open holes MUST be fenced to prevent people or animals from falling into the holes at the end of each workday.
The Contractor is responsible for installing and maintaining appropriate traffic control devices when removing and transporting material from the site.
When the improvements have been removed and the Site cleaned up, Contractor must submit claim for payment to Montana Department of Transportation, Real Estate Services Section, PO Box 201001, Helena, MT 59620- 1001.
The Department will inspect site and disburse payment upon a satisfactory inspection and receipt of the Final Labor Certificate (Certificate) from Kathleen Terrio at MDT (406) 475-2258. No payments will be made prior to inspection of site and verification that all requirements of the contract have been met and Terrio provides RESS with the Certificate.
NCPD-MT 56(55), 4199-055-000, Billings Bypass, Parcel 1; Demo
Location Map – Not to Scale
- Subject Property
NE¼ of Section 19, Township 1 North, Range 27 East, Yellowstone County, MT.
1207 Johnson Ln, Billings, MT 59101.
N 1
NCPD-MT 56(55), 4199-055-000, Billings Bypass, Parcel 1, Demo
Aerial – Street View
1207 Johnson Ln, Billings, MT 59101
Directions
Melissa Amman Pencil
Street view for 1207 Johnson Ln from Coulson Rd, Billings.
Plans – Not To Scale
Plans – Not To Scale
TETRA TECH
7100 Commercial Avenue, Suite 4, Billings, MT 59101
Tel +1 (406) 248-9161 | Fax +1 (406) 248-9282 | tetratech.com
January 9, 2026
Mr. John Collins Environmental Scientist Environmental Services Bureau Montana Department of Transportation 2701 Prospect Avenue Helena, Montana 59620
Delivered via email jcollins@mt.gov
SUBJECT: Pre-Demolition Hazardous Materials Inspection Report Former Residence and Outbuilding 1207 Johnson Lane Billings, Montana Tetra Tech Project No. 117-023947-26003
Dear Mr. Collins:
On December 11, 2025, Tetra Tech performed a pre-demolition hazardous materials inspection at the referenced site. In accordance with prior directives, the inspection focused on identifying suspect asbestos-containing materials (ACMs), lead-based paint (LBP), mercury-containing components, polychlorinated biphenyl (PCB) containing components, chlorofluorocarbon (CFC) containing components, and other hazardous materials in preparation for planned demolition activities. The following sections summarize the findings and observations from this inspection.
ASBESTOS INSPECTION
The asbestos inspection was performed in accordance with the Administrative Rules of Montana (ARM) 17.74.354, following the standard protocol established under the National Emission Standards for Hazardous Air Pollutants (NESHAP) and the Asbestos Hazard Emergency Response Act (AHERA), as administered by the State of Montana Department of Environmental Quality (MDEQ).
Messrs. Rylee Prinz and Chanc Lawrence, MDEQ Accredited Asbestos Inspectors with Tetra Tech, collected samples of the suspect ACMs. Their accreditation documentation is provided in Attachment A. Approximate sample collection locations are shown in Figures F-01 and F-02.
The bulk samples, along with the completed chain of custody (COC) documentation, were shipped to Crisp Analytical in Carrollton, Texas, for asbestos fiber analysis using polarized light microscopy (PLM) in accordance with U.S.
Environmental Protection Agency (EPA) methods outlined in 40 CFR Part 763, Appendix E, Subpart E (Interim) and EPA 600/R-93/116 (Improved). Copies of the laboratory analytical report and COC are provided in Attachment B.
Table 1 summarizes the ACMs identified with concentrations greater than 1% asbestos. Approximate ACMs are shown in Figures F-03 through F-06. A duplicate summary of the ACMs, as required by ARM 17.74.354(7)(i), is provided in Attachment C.
mailto:jcollins@mt.gov
Pre-Demolition Hazardous Materials Inspection Report Former Residence and Outbuilding 1207 Johnson Lane
Billings, Montana
2 January 9, 2026
Table 1. Summary of ACMs
HA Number Material Description and Location Percent Asbestos Material Type
NESHAP
Category
FORMER RESIDENCE
B1-F2.1 9-inch by 9-inch tan mottle pattern vinyl floor tiles and associated black mastic located in Rooms 004-006
Tile: 2% Chrysotile Mastic: 2% Chrysotile
Miscellaneous Category I
Non-Friable
B1-M4.1 Transite panel siding located on the exterior 20% Chrysotile Miscellaneous
Category II Non-Friable
B1-M10.1 Sink undercoating located in Room 103 2% Chrysotile Miscellaneous Category II Non-Friable
B1-M29.1 Window glazing located on exterior windows 2% Chrysotile Miscellaneous
Category II Non-Friable
B1-S3.1
White painted orange peel textured wallboard system located on walls and ceilings in Rooms 102, portion of 103, 104, and 106
Surfacing: 2% Chrysotile Joint Compound: 2% Chrysotile
Gypsum drywall: ND Surfacing RACM
B1-S3.2
Light blue painted light orange peel textured wallboard system located on walls and beneath wood paneling on the ceiling in portion of 103
Surfacing: 2% Chrysotile Joint Compound: 2% Chrysotile
Gypsum drywall: ND Surfacing RACM
B1-S3.22 White painted smooth wallboard system located on walls and ceiling in Room 004
Joint Compound: 2% Chrysotile Gypsum drywall: ND
Miscellaneous Category II Non-Friable
HA = Homogeneous Area Number, NESHAP = National Emission Standard for Hazardous Air Pollutants, RACM = Regulated Asbestos Containing Material, and ND = Non-Detect
According to state and federal regulations, the ACMs identified in Table 1 must be removed before disturbance. The ACMs must be removed by a licensed asbestos abatement contractor using appropriate asbestos abatement methods and procedures following applicable state and federal regulations. Following the completion of asbestos removal, a visual inspection and asbestos air clearance need to be conducted as required by ARM 17.74.357. Any contractor preparing to bid or perform work on the site should be informed of the potential presence of the ACMs. Contractors should also be informed of compliance requirements under current state and federal regulations.
The following suspect ACMs sampled from the site were determined by laboratory analysis not to contain asbestos:
FORMER RESIDENCE
• 12-inch by 12-inch gray vinyl sheet tiles and associated gray mastic located in Room 007 (B1-F1.1A, B, C)
• Brown brick design vinyl sheet flooring and associated white mastic located in Room 102 (B1-F7.1A, B, C)
• Tan with floral design vinyl sheet flooring located in Room 105 (B1-F7.2A, B, C)
• Green carpet with foam pad and associated brown faced paper and associated tan mastic located in Rooms 102 and 104 (B1-F8.1A, B, C)
• Tan carpet and associated tan mastic located in Room 103 (B1-F8.2A, B, C)
3 January 9, 2026
• Tan multicolored carpet and associated foam pad and tan mastic located in Room 106 (B1-F8.3A, B, C)
• Black asphalt roof shingles with white granules and associated black felt paper located on the roof (B1-M1.1A, B, C)
• Smooth wallboard system located in Room 105(B1-M3.1A, B, C)
• Smooth wallboard system located in Room 004 (B1-M3.2A, B, C)
• 12-inch by 12-inch white ceiling tiles located in Rooms 005 and 006 (B1-M6.1A, B, C)
• Silver electrical wire insulation located throughout (B1-F11.1A, B, C)
• White electrical wire insulation located throughout (B1-11.2A, B, C)
• Green electric wire insulation located in Room 103 (B1-F11.3A, B, C)
• 4-inch by 4-inch white ceramic tile and associated white grout located in Room 105 (B1-M16.1A, B, C)
• Gray concrete founding (B1-M18.1A, B, C)
• Gray concrete sidewalk (B1-M18.2A, B, C)
• Black tar vapor barrier located beneath exterior siding and B1-M20.2 (B1-M20.1A, B, C)
• Black felt paper moisture barrier located beneath exterior siding (B1-M20.2A, B, C)
• Red CMU block and gray mortar located in Rooms 002 and 003 (B1-M22.1A, B, C)
• Floral pattern wallpaper and associated tan mastic located in Room 105 (B1-M28.1A, B, C)
• Floral pattern wallpaper located in Room 004 (B1-M28.1A, B, C)
• Window glazing located on Room 101 (B1-M29.2A, B, C)
• Black faced felt paper and associated wool bat insulation located throughout the basement (B1-M32.1A, B, C)
• Pink fiberglass bat insulation located throughout the basement (B1-M32.2A, B, C)
• Pink painted skim coat stucco located on the exterior (B1-S2.1A, B, C)
OUTBUILDING
No suspect ACMs were identified during our inspection. Therefore, no samples were collected.
LBP INSPECTION
No painted components were tested for LBP as part of this inspection.
EPA has stated that whole building demolition debris is considered a non-hazardous waste regarding lead. Further analysis for lead in the waste stream by TCLP analysis is not needed. Tetra Tech recommends that the waste created from whole building demolition be considered non-hazardous regarding lead, and the building components can be disposed of at an authorized C&D landfill.
MERCURY-CONTAINING COMPONENT INSPECTION
The visual inspection of mercury-containing equipment, including compact fluorescent lamps, fluorescent U-tubes, fluorescent lamps, linear fluorescent lamps, mercury vapor lamps, metal halide lamps, sodium vapor lamps, thermostats, as well as miscellaneous components (if present), was conducted during the inspection. The final portion of the inspection consisted of Tetra Tech personnel opening and disassembling the component to observe whether the
4 January 9, 2026 component had labels indicating mercury content. Where applicable, the components’ manufacturing information was compared against a listing of mercury-containing components provided by the EPA.
During the visual inspection, no mercury-containing components were identified in the former residence and outbuilding. Consequently, there are no recommendations or required actions, or remediation needed at this time.
PCB-CONTAINING COMPONENT INSPECTION
The visual inspection of PCB-containing equipment, including air conditioners, capacitors, equipment with electrical motors, freezers, furnace blower motors, hydraulic equipment, light ballasts, switches, and transformers, as well as miscellaneous components (if present), was conducted during the inspection. The final portion of the inspection consisted of Tetra Tech personnel opening and disassembling the component to observe whether the component had labels indicating PCB content. Where applicable, the components’ manufacturing information was compared against a listing of PCB-containing components provided by the EPA.
During the visual inspection, no PCB-containing components were identified in the former residence and outbuilding.
Consequently, there are no recommendations or required actions, or remediation needed at this time.
CFC-CONTAINING COMPONENT INSPECTION
The visual inspection of CFC-containing equipment, including air conditioners, capacitors, equipment with electrical motors, freezers, as well as miscellaneous components (if present), was conducted during the inspection. The final portion of the inspection consisted of Tetra Tech personnel opening and disassembling the component to observe whether the component had labels indicating CFC content. Where applicable, the components’ manufacturing information was compared against a listing of CFC-containing components provided by the EPA.
A summary of the CFC-containing component, component location, and description is provided in Table 2. The CFC-containing component locations are presented in Figure F-7.
Table 2. Summary of Material CFC Components
Component ID Number
Location Component Description
FORMER RESIDENCE
CFC-1 Room 103 Refrigerator
Tetra Tech recommends that the CFC-containing component identified in Table 2 of this report be removed from the building before the commencement of demolition activities. The CFC-containing component should be managed to prevent leakage, spillage, or damage. Storage of the materials must comply with 40 CFR 82, and containers must be labeled, transported, and manifested for disposal in accordance with 40 CFR 82, and must comply with applicable DOT requirements.
During the visual inspection, no CFC-containing components were identified in the outbuilding. Consequently, there are no recommendations or required actions, or remediation needed at this time.
5 January 9, 2026
LIMITATIONS
The purpose of this pre-demolition hazardous materials inspection is to identify suspect ACMs, mercury-containing components, PCB-containing components, CFC-containing components, and other hazardous materials through reasonable testing and visual observations. However, no inspection can guarantee that all hazardous materials present at the site will be detected. This assessment was limited to visible and accessible materials and components. Hidden materials and components may exist within walls, above ceilings, or in other concealed spaces. Completion of this inspection does not constitute a warranty or guarantee that hazardous materials are absent from the site.
Our findings and recommendations are intended solely for the Montana Department of Transportation and may not be suitable for other parties. Any use or reliance on this document by others is at their own risk. This report may not be altered or reproduced without written approval from Tetra Tech. The opinions provided are based on the scope of services requested and the site conditions observed during the inspection. They may not apply to future conditions that were not evaluated as part of this assessment.
Thank you for the opportunity to assist with this project. If you have any questions or need additional information, please contact me at Tetra Tech’s Billings, Montana office at +1 (406) 248-9161.
Respectfully submitted, TETRA TECH
Roger Herman Jr.
Roger Herman Jr.
Asbestos, Lead & IH Services Manager
Figures Attachment A – MDEQ Asbestos Inspector Accreditations Attachment B – Bulk Asbestos Laboratory Analytical Report and COC Attachment C – Duplicate Summary of ACMs
I:\H-M\Montana Dept of Transportation\117-023947-26003 - 1207 Johnson Ln HAZMAT\05-Deliverables\Final\MDT_1207 Johnson Lane Billings MT_Hazardous Materials Inspection Report.docx
FIGURES
001002
003 004
005 006
006A
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
BASEMENT
PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
ASBESTOS SAMPLE COLLECTION LOCATIONS
MONTANA DEPARTMENT OF TRANSPORTATION
FORMER RESIDENCE
1207 JOHNSON LANE
BILLINGS, MONTANA
F-01
117-765468884
RP
RP
RWH
000 - Room Numbers
000 - Sample Collection Locations
B1-F1.1A
B1-F1.1B B1-F1.1C
B1-F2.1A B1-F2.1B
B1-F2.1C
B1-M22.1A
B1-M22.1B
B1-M22.1C
B1-M32.1A, B, C
B1M32.2A, B, C
B1-M6.1A
B1-M6.1B
B1-M6.1C
B1-M28.2A, B, C B1-M3.2A, B, C
REF
101 102
103 104
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
1ST FLOOR
F-02
117-765468884
RP
RP
RWH
000 - Room Numbers
000 - Sample Collection Locations
B1-F8.2B
B1-S3.1B B1-F8.1A
B1-S3.1C
B1-F7.2A
B1-M29.1B B1-M29.1C
B1-M20.1B B1-M20.2B
B1-M4.1B
B1-M28.1A B1-M3.1A
B1-F7.2B B1-F7.2C B1-M28.1C B1-M3.1C B1-M16.1B B1-M28.1B
B1-F8.3A
B1-F8.3B B1-F8.3C
B1-M1.1A B1-F7.1A, B, C B1-F8.2C B1-F8.2A B1-S3.2B, C B1-M20.1A B1-M4.1A B1-M20.2A B1-M29.1A B1-M1.1B, C B1-S3.2A B1-M4.1C B1-M20.1C B1-M20.2C
B1-M29.2A
B1-M29.2B
B1-M29.2C B1-M18.1A, B, C B1-M18.2A, B, C
B1-S2.1A B1-S3.1A
B1-M3.1B B1-M16.1C B1-F8.1C B1-M16.1A B1-F8.1B B1-S2.1C B1-S2.1B
B1-M10.1A, B, C
PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
ASBESTOS SAMPLE COLLECTION LOCATIONS MONTANA
DEPARTMENT OF TRANSPORTATION
FOMER RESIDENCE
1207 JOHNSON LANE
BILLINGS, MONTANA
005 006
006A
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
BASEMENT
F-03
117-765468884
RP
RP
RWH
000 - Room Numbers
- Smooth wall board system (B1-S3.22)
PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
ASBESTOS LOCATIONS
MONTANA DEPARTMENT OF TRANSPORTATION
FORMER RESIDENCE
1207 JOHNSON LANE
https://www.tetratech.com
005 006
006A
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
BASEMENT
F-04
117-765468884
RP
RP
RWH
000 - Room Numbers
- 9-inch by 9-inch tan mottle vinyl tiles and assocaited black mastic
(B1-F2.1) PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
ASBESTOS LOCATIONS
MONTANA DEPARTMENT OF TRANSPORTATION
FORMER RESIDENCE
1207 JOHNSON LANE
https://www.tetratech.com
103 104
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
1ST FLOOR
F-05
117-023947-26
RP
RP
RWH
000 - Room Numbers
- Light blue painted light orange peel textured wallboard system beneath wood paneling (B1-S3.2)
- White painted orange peel texture wallboard system (B1-S3.2)
PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
ASBESTOS LOCATIONS
MONTANA DEPARTMENT OF TRANSPORTATION
FORMER RESIDENCE
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
1ST FLOOR
F-06
117-023947-26
RP
RP
RWH
000 - Room Numbers
- Gray window glazing (B1-M29.1)
- Red Transite siding (B1-M4.1)
PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
ASBESTOS LOCATIONS
MONTANA DEPARTMENT OF TRANSPORTATION
FOMER RESIDENCE
Project No.:
Designed By:
Drawn By:
Checked By:
Not To Scale
C op yr ig ht T et ra
T ec h www.tetratech.com
7100 Commercial Ave, Suite 4 Billings, Montana 59101
PHONE: 406-248-9161 FAX: 406-248-9282
LEGEND
1ST FLOOR
F-07
117-023947-26
RP
RP
RWH
000 - Room Numbers
- Refrigerator
PRE-DEMOLITION HAZARDOUS MATERIALS INSPECTION
CFC-COMPONENT LOCATION
MONTANA DEPARTMENT OF TRANSPORTATION
FOMER RESIDENCE
ATTACHMENT A
MDEQ Asbestos Inspector Accreditations has met the requirements of Montana Administrative Rule
17.74.362 and/or 17.74.363 for accreditation in the following asbestos occupation(s) through the specified expiration date(s).
RYLEE S PRINZ
R Y
L E
E S
P R
IN
Z
M
IN
N
IE
P L
A C
E B
IL
L
IN
G
S M
T
MTA-6513
Asbestos Inspector Project Contractor/Supervisor
08/21/2026 06/19/2026
MT DEQ Asbestos Control Program has met the requirements of Montana Administrative Rule
17.74.362 and/or 17.74.363 for accreditation in the following asbestos occupation(s) through the specified expiration date(s).
CHANC LAWRENCE
C H
A N
C L
A W
R E
N C
E
G
O L
D E
N A
C R
E S
D R
B
IL
L
IN
G S
M T
MTA-6668
Asbestos Inspector Project Contractor/Supervisor
07/30/2026 07/25/2026
MT DEQ Asbestos Control Program
ATTACHMENT B
Bulk Asbestos Laboratory Analytical Report and COC
Customer Project:
Reference #: Date: 12/19/25
Analysis and Method
Discussion
Qualifications
AIHA LAP, LLC Laboratory #102929
A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances.
Since allowable variation in quantification of samples close to 1% is high, <1% may be reported. Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1% percent asbestos or "trace asbestos".
In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <1% asbestos results (except floor tiles) will be point counted at no additional charge.
CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). CA Labs is also accredited by AIHA LAP, LLC. in the PLM asbestos field of testing for Industrial Hygiene. All analysts have completed college courses or hold a degree in a natural science (geology, biology, or environmental science). Recognition by a state professional board in one these disciplines is preferred, but not required. Extensive in-house training programs are used to augment the educational background of the analyst. The Laboratory Director and Quality Manager have received supplemental McCrone Research training for asbestos identification. Analysis performed at Crisp Analytical Labs, LLC 1929 Old Denton Road Carrollton, TX 75006
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
Summary of polarized light microscopy (PLM / Stereomicroscopy bulk asbestos analysis) using the methods described in 40CFR Part 763
Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of a stereomicroscope. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001% asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace).
Vermiculite containing samples may contain trace amounts of actinolite/tremolite. When not detected by PLM, these samples should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report.
Fibrous talc containing samples may contain a regulated asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended.
Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be detectable by PLM analysis and should be analyzed by TEM bulk protocols.
Laboratory Analysis Report - Polarized Light
Tetra Tech, Inc.
7100 Commercial Ave Suite 4
Billings, Montana 59101 117- 1207 Johnson Ln.
CAL25129150AG
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
Materials Characterization - Bulk Asbestos Analysis
Labs
A
C
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 1 of 26
Customer Project: 117- 1207 Johnson Ln. CA Labs Project #: CAL25129150AG brown floor tile black mastic red surfaced gray transite black sealant gray caulking white surfaced off-white compound off-white compound (beneath tape) green surfaced tan compound tan compound (beneath tape) off-white surfaced off-white compound
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
This report relates to the items tested as received. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted.
Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
AIHA LAP, LLC Laboratory #102929 ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
2% Chrysotile
109645 B1 S3.2A S3.2A-1 green surfaced tan compound 2% Chrysotile
109642 S3.1A-2 off-white compound (beneath tape)
2% Chrysotile
109642 B1 S3.1A S3.1A-1 white surfaced off-white compound 2% Chrysotile
109627 B1 M29.1A M29.1A-1 gray caulking
20% Chrysotile
109600 B1 M10.1A M10.1A-1 black sealant 2% Chrysotile
109594 B1 M4.1A M4.1A-1 red surfaced gray transite
2% Chrysotile
109570 F2.1A-2 black mastic 2% Chrysotile
109570 B1 F2.1A F2.1A-1 brown floor tile
Overview of Project Sample Material Containing Asbestos
Laboratory
Sample ID
Sample # Layer # Analysts Physical Description of
Subsample
Asbestos type / calibrated visual estimate percent
List of Affected
Building Material
Types
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 2 of 26
Customer Project: 117- 1207 Johnson Ln. CA Labs Project #: CAL25129150AG
*Two sample groups were labeled as S3.2A, B and C. We reported the second set as S3.2A-2, S3.2B-2, and S3.2C-2 at the end of the job.
Sample group M3.2A, B and C was missing as well.
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
This report relates to the items tested as received. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted.
Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.
2% Chrysotile
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
AIHA LAP, LLC Laboratory #102929 ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
109648 S3.2A-2-2 off-white compound (beneath tape)
2% Chrysotile
109648 B1 S3.2A-2 S3.2A-2-1 off-white surfaced off-white compound 2% Chrysotile
109645 S3.2A-2 tan compound (beneath tape)
Overview of Project Sample Material Containing Asbestos
Laboratory
Sample ID
Sample # Layer # Analysts Physical Description of
Subsample
Asbestos type / calibrated visual estimate percent
List of Affected
Building Material
Types
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 3 of 26
Customer Info: Attn: Customer Project:
Date:
Phone #
Fax #
Josh Strange Senior Analyst
Analyst Analyst Julio Robles Analyst Tanner Rasmussen
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
Approved Signatories:
Robert Olivarez Justin Cox Technical Manager ca - carbonate gy - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastonite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
98% qu,ca
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
AIHA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116). All samples received in good condition unless noted.
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
brown floor tile y 2% Chrysotile 109570 B1 F2.1A F2.1A-
100% qu,ma
109569 F1.1C-
2 off-white mastic y None Detected 100% gy,bi gray self-adhesive floor tile y None Detected 109569 B1 F1.1C F1.1C-
100% qu,ma
109568 F1.1B-
2 off-white mastic y None Detected 100% gy,bi gray self-adhesive floor tile y None Detected 109568 B1 F1.1B F1.1B-
100% qu,ma
109567 F1.1A-
2 off-white mastic y None Detected 100% gy,bi
Non-asbestos fiber type / percent
Non-fibrous type / percent
109567 B1 F1.1A F1.1A-
1 gray self-adhesive floor tile y None Detected
406-248-9282 Purchase Order #:
Laboratory
Sample ID
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
Asbestos type / calibrated visual estimate percent
Samples Rec'd: 12/15/25 10:30AM
406-248-9161 Date Of Sampling: 12/11/2025
Polarized Light Asbestiform Materials Characterization
CA Labs Project #:
Tetra Tech, Inc.
117- 1207 Johnson Ln.
CAL25129150AG
7100 Commercial Ave Suite 4
Billings, Montana 59101 Turnaround Time: 12/19/2025
5 days
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 4 of 26
Phone #
Fax #
Josh Strange Senior Analyst
Analyst Analyst Julio Robles Analyst Tanner Rasmussen
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
Approved Signatories:
Robert Olivarez Justin Cox Technical Manager ca - carbonate gy - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastonite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
100% gy,bi
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
AIHA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116). All samples received in good condition unless noted.
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
off-white mastic y None Detected 109573 F7.1A-
109573 B1 F7.1A F7.1A-
1 brown linoleum y None Detected 15% ce
10% fg 75% gy,ma black mastic Positive Stop 109572 F2.1C-
109572 B1 F2.1C F2.1C-
1 brown floor tile Positive Stop black mastic Positive Stop 109571 F2.1B-
98% gy,bi
109571 B1 F2.1B F2.1B-
1 brown floor tile Positive Stop
Non-asbestos fiber type / percent
Non-fibrous type / percent
109570 F2.1A-
2 black mastic y 2% Chrysotile
406-248-9282 Purchase Order #:
Laboratory
Sample ID
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
Asbestos type / calibrated visual estimate percent
12/15/25 10:30AM
406-248-9161 Date Of Sampling: 12/11/2025
CA Labs Project #:
Tetra Tech, Inc.
117- 1207 Johnson Ln.
CAL25129150AG
7100 Commercial Ave Suite 4
Billings, Montana 59101 Turnaround Time: 12/19/2025
5 days Samples Rec'd:
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
Polarized Light Asbestiform Materials Characterization
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 5 of 26
Phone #
Fax #
Josh Strange Senior Analyst
Analyst Analyst Julio Robles Analyst Tanner Rasmussen
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
Approved Signatories:
Robert Olivarez Justin Cox Technical Manager ca - carbonate gy - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastonite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
75% gy,ma
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
AIHA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116). All samples received in good condition unless noted.
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
off-white linoleum y None Detected 15% ce
10% fg 109577 B1 F7.2B F7.2B-
75% gy,ma
109576 F7.2A-
2 tan mastic y None Detected 100% gy,bi off-white linoleum y None Detected 15% ce
10% fg 109576 B1 F7.2A F7.2A-
75% gy,ma
109575 F7.1C-
2 off-white mastic y None Detected 100% gy,bi brown linoleum y None Detected 15% ce
10% fg 109575 B1 F7.1C F7.1C-
75% gy,ma
109574 F7.1B-
2 off-white mastic y None Detected 100% gy,bi
Non-asbestos fiber type / percent
Non-fibrous type / percent
109574 B1 F7.1B F7.1B-
1 brown linoleum y None Detected 15% ce
10% fg
406-248-9282 Purchase Order #:
Laboratory
Sample ID
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
Asbestos type / calibrated visual estimate percent
12/15/25 10:30AM
406-248-9161 Date Of Sampling: 12/11/2025
CA Labs Project #:
Tetra Tech, Inc.
117- 1207 Johnson Ln.
CAL25129150AG
7100 Commercial Ave Suite 4
Billings, Montana 59101 Turnaround Time: 12/19/2025
5 days Samples Rec'd:
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 6 of 26
Phone #
Fax #
Josh Strange Senior Analyst
Analyst Analyst Julio Robles Analyst Tanner Rasmussen
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
Approved Signatories:
Robert Olivarez Justin Cox Technical Manager ca - carbonate gy - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastonite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
Dallas NVLAP Lab Code 200349-0 TEM/PLM TDSHS 30-0235
AIHA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116). All samples received in good condition unless noted.
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
multi-colored carpeting y None Detected 100% sy 109580 B1 F8.1B F8.1B-
100% qu,ot
109579 F8.1A-
3 tan mastic y None Detected 100% gy,bi multi-colored foam backing y None Detected 109579 F8.1A-
100% gy,bi
109579 B1 F8.1A F8.1A-
1 multi-colored carpeting y None Detected 100% sy tan mastic y None Detected 109578 F7.2C-
100% gy,bi
109578 B1 F7.2C F7.2C-
1 off-white linoleum y None Detected 15% ce
10% fg 75% gy,ma
Non-asbestos fiber type / percent
Non-fibrous type / percent
109577 F7.2B-
2 tan mastic y None Detected
406-248-9282 Purchase Order #:
Laboratory
Sample ID
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
Asbestos type / calibrated visual estimate percent
12/15/25 10:30AM
406-248-9161 Date Of Sampling: 12/11/2025
CA Labs Project #:
Tetra Tech, Inc.
117- 1207 Johnson Ln.
CAL25129150AG
7100 Commercial Ave Suite 4
Billings, Montana 59101 Turnaround Time: 12/19/2025
5 days Samples Rec'd:
CA Labs
Dedicated to QualityDedicated to QualityDedicated to QualityDedicated to Quality
Crisp Analytical, L.L.C.
1929 Old Denton Road
Carrollton, TX 75006
Phone 972-242-2754
Fax 972-242-2798
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
/data/wordandspreadsheets/templates/asbestos/PLMReport.xls (Revision 6 10/30/2023) Page 7 of 26
Phone #
Fax #
Josh Strange Senior Analyst
Analyst Analyst Julio Robles Analyst Tanner Rasmussen
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis…