About this file

This document is an Invitation for Bid (IFB) issued by the Department of Industrial Relations (DIR) of the State of California for cabling services at their new office space in Fresno, CA. DIR is seeking a contractor to install VoIP and data lines with supported equipment in Suite 3015 at 2550 Mariposa Mall, Fresno, CA 93721-2219. The contract term is for six (6) months. Bids are due by September 5, 2024 at 11:00 am and will be opened on September 9, 2024. DIR's budget for the project is $40,000.00 and bids exceeding this amount may be deemed non-responsive.

The IFB outlines the detailed scope of work, including requirements for VoIP and data cabling, network rack installation, dedicated power, and cable management. The contractor must meet minimum qualifications such as possessing a valid C-7 contractor's license, having a minimum of 3 years' experience with specified cabling and installation practices, and employing technicians with at least 4 years' journeyperson-level experience. Bidders may be eligible for various preference programs, including the Disabled Veteran Business Enterprise (DVBE) incentive, Small Business (SB) or Microbusiness (MB) preference, and Target Area Contract Preference Act (TACPA).

View the file

Other files

File Type Posted
IFB_S24BS014_Addendum_1_final.pdf PDF
IFB_S24BS014_Addendum_2_final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA GAVIN NEWSOM, Governor

INVITATION FOR BID

Notice to Prospective Bidders IFB No. S24BS014

August 21, 2024

You are invited to review and respond to this Invitation for Bid (IFB) No. S24BS014, entitled, “Fresno Cabling Services” In submitting your bid, you must comply with the instructions found herein.

This IFB is published online in the California State Contracts Register (CSCR) at https://caleprocure.ca.gov/pages/index.aspx. To ensure receipt of any addenda that may be issued, interested parties are encouraged to register online at: https://caleprocure.ca.gov.

The Department of Industrial Relations (DIR) deadline for receipt of bids is September 5th , 2024, no later than 11:00 am. All bids must be submitted via electronic mail to Winson Luong.

Faxed, hand delivered and mailed bids will not be accepted. Bids must be submitted no later than the date and time indicated under Section II. A. Key Action Dates. File size cannot exceed 50 Mega Bytes (MB). The naming convention of the bid must be in the following format: “IFB S24BS014 [insert vendor name] Bid.” Bids must be received on or before the date and time specified herein and the email addresses provided below:

EMAIL IFB Bids to:

Procurement@dir.ca.gov wluong@dir.ca.gov CC: abarron@dir.ca.gov

You are advised that you are responsible for ensuring that your bid is received by the above listed contact person by the time and date required. Any bid reaching the contact person after the deadline date and time will be rejected.

In the opinion of the DIR, this IFB is complete and without need of explanation. However, if you have questions, notice any discrepancies or inconsistencies, or need any clarifying information, the contact person for this IFB is listed below. All questions must be submitted in accordance with the IFB instructions contained herein and sent via email directly to the below listed contact person and not through the Cal eProcure system.

Contact: Winson Luong Email: wluong@dir.ca.gov

We appreciate your interest in this solicitation and hope to receive a bid from you if this is within your area of expertise.

Department of Industrial Relations

TABLE OF CONTENTS

SECTION PAGE

I. SCOPE OF WORK

II. BID INSTRUCTIONS AND INFORMATION

A. IFB Key Action Dates B. Submission of Bid C. Bid Submission Withdrawal D. Bidder Responsibilities E. Minimum Bidder Qualifications F. General Requirements G. Bid Rejection H. Signature I. Bid Opening and Evaluation J. Disposition of Bids K. Selection and Award L. Standard Conditions of Service M. Socio-Economic and Preference Programs N. Darfur Contracting Act Certification O. GenAI Technology Use & Reporting

DRAFT STANDARD AGREEMENT

Standard Agreement (STD 213) Exhibit A – Scope of Work Exhibit A, Attachment 1 – DIR Floor Space Exhibit B – Budget Detail and Payment Provisions Exhibit B, Attachment 1 – Contractor Cost Sheet Exhibit D – Special Terms and Conditions Exhibit E – Additional Provisions

ATTACHMENTS

1. Required Attachment Checklist

2. Bid/Bidder Certification Sheet

3. Contractor Cost Sheet 4 Bidder References 5 Payee Data Record (STD 204)

6. Contractor Certification Clauses (CCC 04/2017)

7. Bidder Declaration (GSPD-05-105)

8. DVBE Bid Incentive Instructions

9. Darfur Contracting Act Certification

10. Detailed Response for Minimum Qualifications

11. GenAI Reporting & Factsheet

I. SCOPE OF WORK

The Department of Industrial Relations (DIR) is dedicated to improving the health, safety, and economic well-being of over 18 million wage earners and helping their employers comply with state labor laws. DIR works to maximize the effectiveness of its programs, activities, and services, increase public access and promote its services to the public, including workers and employers who have limited English proficiency. DIR is seeking a Contractor to install VoIP, data lines with supported equipment to DIR’s new space offices located in Suite 3015 at 2550 Mariposa Mall, Fresno, CA 93721-2219.

The contract term shall be for six (6) months.

More detailed information can be found in the Draft Standard Agreement.

DIRs budget for this project is $40,000.00. Bids exceeding this amount may be deemed non- responsive and ineligible for award.

II. BID INSTRUCTIONS AND INFORMATION

This section contains instructions for the organization and timely submission of your bid.

It also contains the bid requirements and other important information crucial for submittal of a responsive and responsible bid. It is the responsibility of the bidder to carefully read and follow all bid requirements within this Invitation for Bid (IFB). Compliance with the IFB instructions is mandatory for your bid to be considered for award. Failure to comply with the IFB instructions will cause your bid to be deemed non-compliant and non-responsive, thus, ineligible for award.

Please read and carefully follow the instructions listed in the following sections. The instructions are separated by category, each with its own requirements and necessary information for submission of a timely and responsive bid. All requirements and specifications in the IFB must be responded to, and all requested data must be supplied for a bid to be considered responsive.

A. IFB Key Action Dates

Below is the tentative time schedule for this IFB. The DIR reserves the right to modify the

IFB and/or change the date and time at its sole discretion, prior to the date fixed for submission of bids, by the issuance of an addendum to all parties who received a bid package.

i. DIR reserves the right to modify or cancel in whole or part, this solicitation.

ii. Clarifications to solicitation will be given only in the form of addenda to all bidders.

Time Schedule Date Time

IFB Posted on Cal eProcure 8/21/2024 2:00 PM

Deadline for Submission of Written Questions

8/26/2024 5:00 PM

Responses to Questions Posted 8/28/2024 1:00 PM

Bid Submission Due 9/5/2024 11:00 AM

Opening of Bids via Microsoft TEAMS

Link: Click Here to Join Meeting

Meeting ID: 267 143 879 892

Passcode: bctCVA

Dial in by phone

+1 619-407-9860

Phone conference ID: 616 049 853#

9/9/2024 3:00 PM

Posting of Intent to Award Notice

(Notice is posted for five [5] business days)

9/11/2024 1:00 PM

Estimated Contract Start Date 9/25/2024

Written questions must be submitted via electronic mail by the date and time indicated in Section II.A., IFB Key Action Dates. All written questions received prior to the date indicated for the Written Questions Deadline will be answered in the form of an addendum and posted online at https://caleprocure.ca.gov. Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum to all parties/participants.

All questions or concerns related to the IFB must be directed electronically to:

Contracts and Procurement Branch

Contact: Winson Luong Email: wluong@dir.ca.gov

B. Submission of Bid

1. All bids RECEIVED by DIR must be submitted electronically and sent to DIR by the date and time shown in the time schedule in Section II. A., “IFB Key Action Dates.”

2. Time of delivery is of the essence and must be adhered to. Any bid received after the due date and time as outlined in the time schedule in Section II.A., “IFB Key Action

Dates” will be rejected by DIR as not complying with a mandatory requirement of this

IFB.

3. Bids must be submitted no later than the date and time indicated under Section II. A.

Key Action Dates and file size cannot exceed 50 Mega Bytes (MB).

4. The naming convention of the bid must be in the following format: “IFB S24BS014 [insert vendor name] Bid.”

5. Bids must be submitted to the following addresses:

Procurement@dir.ca.gov CC: wluong@dir.ca.gov

6. Bids received after the date and time shown in Section II.A. “IFB Key Action Dates” will be rejected.

7. Bids are only accepted electronically. Bids received by fax, mail, or hand delivery will be rejected.

C. Bid Submission Withdrawal

A bidder may modify a bid after its submission by withdrawing its original bid and resubmitting a new bid prior to the bid submission deadline. Bidder modifications offered in any other manner, oral or written, will not be considered.

D. Bidder Responsibilities

1. Before submitting a response to this solicitation, bidders should review, correct all errors, and confirm compliance with the IFB requirements.

2. Costs incurred for developing bids and in anticipation of award of the agreement are entirely the responsibility of the bidder and shall not be charged to DIR. This includes, but is not limited to: delivery, drayage, express, parcel post, packing, cartage, insurance, license fees, permits, cost of bonds, any and all travel related expenses incurred in the performance of completing the bid for submittal; or for any other purpose unless expressly included and itemized in the bid solicitation.

3. Prior to submission of bid, bidder shall examine any specifications and instructions or other materials required and included in the bid package to ensure that they meet all the requirements stated in this IFB.

4. It is the bidder’s responsibility to promptly notify the DIR Contract Analyst identified in the solicitation by email, if the bidder believes that the solicitation is unfairly restrictive, contains errors or conflicting language, or needs clarification. Such notification must be submitted no later than 72 hours prior to bid opening date and time. All such correspondence received after the 72-hour deadline will not be considered and deemed ineligible for review and/or response from DIR.

5. Bidder must complete and submit Contractor Cost Sheet, Attachment 3. Submission of this attachment is mandatory. Failure to fully complete and return attachment with your bid will cause your bid to be rejected and deemed non- responsive.

6. References must be provided using Bidder References Form, Attachment 4.

Submission of this attachment is mandatory. Failure to fully complete and return this attachment with your bid may cause your bid to be rejected and deemed non-responsive.

7. Bidder must complete and submit to DIR, the Payee Data Record (STD 204), Attachment 5, to determine if the selected bidder is subject to State income tax withholding, pursuant to California Revenue and Taxation Code, Section 18662.

Contract payment cannot be made unless a completed STD 204 has been returned to

DIR.

8. Bidder is responsible for reviewing, reading, understanding, and complying in full with the State’s General Terms and Conditions along with the Contractor Certification Clauses (CCCs) at:

http://www.dgs.ca.gov/ols/Resources/StandardContractLanguage.aspx. The bidder must sign and return CCCs, Attachment 6.

9. The bidder must be an individual or firm licensed to do business in California and shall obtain at his/her expense all license(s) and permit(s) required by law for accomplishing any work required in connection with this Agreement.

10. The bidder must own and operate a legitimate business. If required by law, the bidder must be registered and in good standing with the California Secretary of State. All businesses that are required to be registered with the Secretary of State must be registered prior to date of Agreement award. Evidence of registration shall be submitted with bid.

11. In the event that any license(s) and/or permit(s) expire at any time during the term of this agreement, bidder agrees to provide agency a copy of the renewed license(s) and/or permit(s) within 30 days following the expiration date. In the event the bidder fails to keep in effect at all times all required license(s) and permit(s), the State may, in addition to any other remedies it may have, terminate this Agreement upon occurrence of such event.

E. Minimum Bidder Qualifications

The bidder must provide a detailed response, outlining information as to how the bidder meets each of the minimum qualifications listed below. The bidder must provide their detailed response on Attachment 10, Detailed Response for Minimum Qualifications.

Bids that do not meet the minimum qualifications may be determined non-responsive and ineligible for award.

1. Bidder must possess a valid C-7 contractor license issued by the California Department of Consumer Affairs, Contractors State License Board (CSLB).

2. Bidder must have a minimum of three (3) years of experience with knowledge of CAT 5e/6/6a/7a, USOC and AT&T wiring specifications and installation practices.

3. Bidder technicians must possess, at a minimum, four (4) years of experience at the journeyperson level in low-voltage cabling to supervise work.

4. Bidder must possess a minimum of three (3) years of experience with knowledge of single-mode, multi-mode, and hybrid base fiber, ANSI/TIA/EIA-568-b, ANSI/TIA/EIA- 526-7 and ANSI/TIA/EIA-526-14-A standards.

F. General Requirements

1. Insurance Requirements

It is the bidder’s responsibility to provide insurance and endorsements as described in the Draft Standard Agreement, Exhibit D, Special Terms and Conditions, if selected for award.

2. Subcontracts/Subcontractors

If subcontractors are to be used, the bidder must include the description of each person or firm and the work to be done by each subcontractor in Attachment 7, Bidder Declaration. Subcontractors, if any must be identified and their qualifications.

G. Bid Rejection

1. Bids must be submitted for the performance of all the services described herein. Any deviation from the work specifications will not be considered and will cause a bid to be rejected.

2. Bids must be completed in all respects as required by the IFB. Each bid will be checked in detail to determine its compliance to the IFB requirements. A bid will be rejected if it is conditional or incomplete, or if it contains any alterations of forms or other irregularities of any kind. If a bid fails to meet any IFB requirements, DIR will determine if the deviation is material; a material deviation will cause rejection of the bid. The State may waive any immaterial deviation in a bid. A non-material deviation (errors in mathematical computation, spelling, etc.) will be examined to determine when the deviation is acceptable. If accepted, the bid will be processed as if no deviation had occurred. The State's waiver of immaterial defect shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements, if awarded the agreement. A bid must be rejected if any such defect or irregularity constitutes a material deviation from the IFB requirements.

3. DIR reserves the right to reject any or all bids. The agency is not required to award an agreement. All bids may be rejected whenever the agency determines that the cost is not reasonable, the cost exceeds the amount estimated, or otherwise in the best interest of the State.

4. Bids that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, will be rejected. If, in the opinion of the State, such information was intended to mislead the State in its evaluation of the bid, and the attribute, condition, or capability is a requirement of this IFB, it will be the basis for rejection of the bid.

5. Bids received past the date and time specified in the table in Section II.A., “IFB Key Action Dates,” will be deemed non-responsive and rejected. Under no circumstances will any bids be accepted past the date and time stated in the table. All such bids received past the date and time will not be accepted.

H. Signature

1. An individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet, Attachment 2. The signature must indicate the title or position that the individual holds in the firm. An unsigned bid may be rejected.

2. All documents requiring a signature must bear an original or electronic signature of a person authorized to bind the bidding firm and must be duly authorized to sign the contract/agreement if awarded the bid.

I. Bid Opening and Evaluation

1. The bids will be publicly opened and read promptly at the time and place indicated in the IFB, as stated in the table in Section II.A., “IFB Key Action Dates.”

2. A vendor’s bid must constitute an irrevocable offer for a period of at least 90 days following the scheduled date for contract award and execution.

3. DIR will put each bid through an administrative evaluation process pursuant to the published requirements to determine the bidder’s responsiveness to the IFB.

J. Disposition of Bids

Upon bid opening, all original documents submitted in response to this IFB will become the property of the State of California and DIR, and will be regarded as public records under the California Public Records Act (Government Code Section 6250 et seq.).

K. Selection and Award

1. Award, if made, will be to the lowest responsive, responsible bidder.

2. Notice of the proposed award shall be posted on Cal eProcure at https://caleprocure.ca.gov/pages/index.aspx for five (5) business days prior to awarding the Agreement.

3. Whenever a contract is awarded under a procedure which provides for competitive bidding, but the contract is not to be awarded to the low bidder, the low bidder shall be notified by email five (5) working days prior to the award of the contract.

4. Prior to award of the contract, bidders may protest the proposed award(s) by filing a notice of protest with DIR and the Department of General Services (DGS), Office of Legal Services (OLS) on the basis that they are the lowest responsible bidder meeting the specifications for the contract.

5. Protest notices should contain full contact information, including an email address, and the IFB number, and must be filed with:

Department of Industrial Relations Contracts and Procurement Branch Attention: Manager 1515 Clay Street, Suite 301, Oakland, CA 94621 Procurement@dir.ca.gov

Department of General Services Office of Legal Services Attention: Bid Protest Coordinator 707 Third Street, 7th Floor, Suite 7-330 West Sacramento, CA 95605 email address:

OLSProtests@dgs.ca.gov

6. Within five (5) calendar days after filing the notice of protest, the protesting Bidder shall file with DGS, OLS and DIR a detailed written statement specifying the grounds for the protest.

7. The Agreement(s) shall not be awarded until either the protest has been withdrawn or the State has decided the matter.

8. Proposed contractor will receive a fully executed contract with all necessary terms and conditions and exhibits/attachments. Proposed contractor should carefully read the entire contract and be sure to sign contract and all required documents.

9. Such award, if made, will be made within sixty (60) days after opening of bids, if not sooner. Contract shall be signed by bidder and returned within ten (10) working days of receipt. If lowest responsive, responsible bidder refuses or fails to execute the contract, DIR may award the contract to the next lowest responsive, responsible bidder.

L. Standard Conditions of Service

1. Services shall be available on the express date set by the awarding agency and the Contractor, after all approvals have been obtained and the agreement is fully executed. Should the Contractor fail to commence work at the agreed upon time, the awarding agency, upon five (5) days written notice to the Contractor, reserves the right to terminate the agreement. In addition, the Contractor shall be liable to the State for the difference between contractor's bid price and the actual cost of performing work by the second lowest bidder or by another contractor.

2. All performance under the agreement shall be completed on or before the termination date of the agreement.

3. The State does not accept alternate contract language from a prospective contractor.

A bid with such language may be considered a counter proposal and may be rejected. The State’s General Terms and Conditions (GTC) and Contractor Certification Clauses (CCC) are not negotiable. The GTC and CCCs are included in the sample agreement attached to this package and may also be viewed at the Internet site: http://www.dgs.ca.gov/ols/Resources/StandardContractLanguage.aspx under Standard Contract Language.

4. The State does not negotiate rates and/or costs listed on any bid submitted.

5. No oral understanding or agreement shall be binding on either party. Any changes or alterations to the contract/agreement must be in writing and approved by both parties and/or Department of General Services’ Office of Legal Services, if required.

M. Socio-Economic and Preference Programs

1. Disabled Veteran Business Enterprise (DVBE) Incentive (Optional)

This solicitation does not require a minimum amount of DVBE participation. However, you are strongly encouraged to either become certified, if eligible, or to subcontract a portion of the work to a certified DVBE.

If a prime bidder is a certified DVBE or commits to subcontracting with DVBE(s), it may be eligible to receive an incentive provided that the DVBE provides a commercially useful function as defined in California Military Code Section 999(i) and California Code of Regulations, Title 2, Section 1896.71. For evaluation purposes only, the State shall apply an incentive to bids that propose California certified DVBE participation as identified on the Bidder Declaration (GSPD-05-105), Attachment 7, and confirmed by the State.

The incentive amount varies in conjunction with the percentage of DVBE participation in accordance with the “California Disabled Veteran Business Enterprise (DVBE) Bid Incentive Instructions,” Attachment 8.

Bidders claiming the DVBE incentive must complete and return the Disabled Veteran Business Enterprise Declarations form (STD 843) found at:

http://www.documents.dgs.ca.gov/pd/poliproc/STD-843FillPrintFields.pdf.

2. Small Business (SB) or Microbusiness (MB) Preference (Optional)

If bidder is claiming the 5 % certified SB or MB preference, or is committing to subcontract 25 % or more of their net bid price to one or more Certified SBs or MBs, complete Bidder Declaration (GSPD-05-105), Attachment 7, and attach a copy of the certification.

Additional References: http://www.pd.dgs.ca.gov

Questions regarding the certification approval process or the Small Business program should be directed to the Department of General Services, Procurement Division at

(800) 559-5529 or (916) 375-4940 email: OSDSHelp@dgs.ca.gov . For the 24-Hour Recording & Mail Request call (916) 322-5060.

SB or MB bidders or bidders using the non-SB preference shall be granted a preference consisting of 5 % of the bid price of the lowest responsive bidder that is not a SB.

3. Target Area Contract Preference Act (TACPA)

The TACPA preference will be granted for this solicitation. Bidders wishing to take advantage of this preference will need to review the following website and submit the appropriate response with their Proposal:

https://www.documents.dgs.ca.gov/pd/poliproc/tacpapage.pdf.

Bidders seeking to obtain a TACPA preference must complete and submit the TACPA Preference Request, STD. 830, and DGS/PD 526 with their Bid. The STD. 830 and DGS/PD 526 are available to download at the link provided above.

N. Darfur Contracting Act Certification (Mandatory Submittal)

Public Contract Code Sections 10475-10481 applies to any company that currently or within the previous three years has conducted business activities or other operations outside of the United States. For any contractor that submits a bid or proposal, the contractor must certify that it is either 1) not a scrutinized company; or 2) a scrutinized company that has been granted permission by the Department of General Services. This form must be completed and submitted with your bid. See Darfur Contracting Act Certification, Attachment 9.

O. GenAI (Mandatory Submittal)

The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

Bidder / Offeror / Contractor must notify the State in writing if their solution or service includes, or makes available, any GenAI, including GenAI from third parties or subcontractors.

The State has developed a GenAI Reporting and Factsheet (STD 1000) to be completed by the Bidder / Offeror / Contractor. Failure to submit the GenAI Reporting and Factsheet (STD 1000) will result in disqualification of the Bidder / Offeror / Contractor.

Failure to report GenAI to the State may void any resulting contract. The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure. Upon receipt of a Bidder / Offeror / Contractor GenAI Reporting and Factsheet (STD 1000), the state reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the state.

DRAFT STANDARD AGREEMENT

(TO BE INSERTED ONCE FINAL)

EXHIBIT A

SCOPE OF WORK

The Department of Industrial Relations (DIR) and Contractor agree to provide (furnish and install) the hardware, infrastructure, cabling and terminations and associated components, trim, sealant, firestopping and accessories for complete and operational network/telecommunications system at the Fresno DIR’s Office.

A. BACKGROUND AND PURPOSE

DIR has moved into a new space, Suite 3015 at 2550 Mariposa Mall, Fresno and currently does not have any cabling installed. Contractor shall install VoIP, data lines with supported equipment to this space. The cabling will need to be connected to the nearest server room that is located in Suite 4000 at 2550 Mariposa Mall, Fresno.

B. DETAILED SCOPE OF WORK

Contractor shall install cables from existing data network rack within Suite 4000 to 8 cubicle locations in Suite 3015. There are currently no Cat6 ports in Suite 3015 near these 8 cubicles.

These will need to be installed along with installing the cabling into the existing furniture onsite.

The Contractor shall provide the following services:

1. VoIP Cabling – 21 pulls from Independent Distribution Frame (IDF) located in Suite 4000 to cubicles/offices located in Suite 3015. Cables shall be tested and labeled at both ends by the Contractor. There will be two (2) Cat6 Cables for VOIP and two (2) Cat6 Cables for Data to be used for Connectivity of the cabinets.

2. Data Cabling – 22 pulls from IDF in Suite 4000 to cubicles/offices located in Suite 3015.

3. Network rack – Install 2 post standing rack to IDF in Suite 4000.

3.1 Floor-mounted Relay Racks

3.2 Contractor shall provide floor-mounted relay racks, 84 inches tall (7 feet) and 19” wide with Standard EIA 1-3/4” hole spacing. Racks shall be double-sided, firmly attached to the floor, and securely attached to horizontal cable tray (ladder rack) from above.

3.3 Contractor shall equip each rack with provisions for ground bonding.

3.4 Contractor shall provision each equipment rack with (2) 3-foot long 115 VAC 15A multi-outlet power strip (no switch) with a minimum of 6 three prong receptacles.

The power strips shall be mounted vertically on the side of the equipment racks, and shall be electrically attached to a dedicated 115 VAC 15A circuit box located at the top of these racks.

3.5 Contractor shall provision each rack with two cantilevered aluminum half shelves nominally, unless otherwise specified. Chatsworth part number 55053-

703 is one such rack meeting these requirements

3.6 Horizontal Ladder Rack

Contractor shall provide cable ladder rack, constructed of 1 ½” solid steel bar (ASTM 36). Full sections shall be 10 feet in length and 6 to 12 inches in width depending on location. Exact location of ladder rack placement should conform to the location of equipment racks, entry points for horizontal conduit pathways, and entry points for backbone conduit pathways. The system shall provide means for cabling to traverse the voice/data rooms, at 7 foot elevation, in the straightest and most well-organized manner.

Contractor shall provide all ladder rack hardware including but not limited to:

sidewall supports, endwall supports, junctions, extensions, endcaps, cascades and necessary hardware for wall and ceiling mounting and earthquake bracing.

3.7 B-Line Telecom is one such manufacturer of this product. (Reference PN#s SB-

15, SB-21, SB- 2129, SB-2105, SB-165, SB-166, SB-213, SB-2113)

3.8 Cable Management for Rack Mounted Data Terminations and Patching

Contractor shall provide a Cable management for this system that shall consist of both vertical and horizontal components. Horizontal cable management shall be provided in front and back utilizing rack-mounted units measuring one rack space in height in the front, and strain relief bars mounted to the rear of the racks.

Strain relief bars shall permit horizontal cabling to easily dress into patch panel connections. Vertical cable management shall be accomplished with rack mountable units, front only, measuring 6” x 6” and 7 feet in height. Use only where two racks join at the sides.

Panduit is one such manufacturer of the vertical and horizontal management products. (Reference PN#s WMPVHDF45/WMPVHDCB and WMPFS) Strain Relief bars/rear managers are available from various manufacturers. (Reference Seimons PN# WM3A, WM6A or WMBK as applicable.)

4. Dedicated power – Installed on the network rack in IDF in Suite 4000.

The dedicated power is intended for the MDF/IDF racks, in which the network devices (router, firewall and switch/es) will draw power from.

5. Power Distribution Units (PDUs) – Install vertical mounted style PDU’s in IDF in Suite

4000.

5.1 Contractor shall provision each equipment rack with (2) 3-foot long 115 VAC 15A multi-outlet power strip (no switch) with a minimum of 6 three prong receptacles.

The power strips shall be mounted vertically on the side of the equipment racks, and shall be electrically attached to a dedicated 115 VAC 15A circuit box located at the top of these racks.

6. Cable management – Horizontal mounted style.

a. Contractor shall provide two (2) Category 6, UTP (Unshielded Twisted Pair) cable for Voice and two (2) Category 6, UTP cable for Data shall consist of four unshielded twisted pairs, 24 AWG, solid copper conductors. Conductors shall be individually insulated and under a common sheath; sheath shall be color coded to differentiate each of the four (4) cables.

b. Minimum performance specifications: Contractor shall meet requirements of EIA/TIA

568 B-2.1 and NEMA WC 66 for Category 6 cabling.

c. The cable jacket marking must be legible and shall contain the following information at regular intervals: manufacturer’s name, pair count, UL Listing and Category.

7. Voice Cross-connects

Contractor shall provide Cross-connect wire, 24 AWG, solid, unshielded twisted pair.

Electrical Specifications must exceed UL Subject 444 specifications. Provide adequate quantity to cross-connect minimum 1 pair per voice jack initially.

8. Data Patch Cords and Interconnects

Contractor shall provide Category 6 data patch cords, 24 AWG, unshielded twisted pair.

Cords shall be pre-connectorized and certified by the manufacturer. Cords shall have molded boot for strain relief at point of connection to patch panels.

9. Systems Furniture Outlet:

a. Contractor shall use AT&T M104SMB or NT surface-mount box.

b. Four (4) jack assemblies shall be provided by the systems furniture installer unless otherwise specified. Coordinate with the systems furniture installer for substitutes regarding faceplates or modular jacks. Use faceplate extenders in locations where cable congestion does not allow adequate room in furniture raceway to neatly dress Category 6 cables. Panduit is one such manufacturer of these systems furniture products. (Reference PN# CFPL3IW, and MFFPEIW if extensions are required).

10. Wire mold and Flush-Floor Outlets:

Contractor shall use AT&T, M106FR4 Modular Mounting Frame, mounted behind wire mold or appropriate covers.

11. Wall Outlet:

a. Contractor shall use Flush-mounted AT&T, M14A faceplates.

b. Assemblies shall be single gang with capacity to seat 4 modular jacks. Faceplate shall have capacity for labeling clearly, both at the faceplate level and at the individual jacks. Coordinate exact color with the Architect prior to purchase. Siemon, Avaya, Leviton and Hubbell are manufacturers of this product.

C. CONTRACTOR’S RESPONSIBILITIES

1. Services performed by the Contractor shall conform to the latest requirements of federal, State, city, and county regulations. Contractor is responsible for compliance with all applicable laws, codes, rules, and regulations in connection with work performed under this Agreement.

2. Contractor shall complete the services listed in this Scope of Work within the term of this agreement.

D. SERVICE HOURS AND LOCATION

1. Location

Services shall be performed at DIR’s facility, located at 2550 Mariposa Mall, Suite 3015, Fresno CA unless otherwise specified.

2. Normal Business Hours

All services shall be performed during the normal business hours of 8:00 AM to 5:00 PM (PST), Monday to Friday, unless otherwise specified. Excluded are State of California holidays, as per the California Department of Human Resources.

All services shall be performed during the normal business hours of 8:00 AM to 5:00 PM (PST), Monday to Friday, unless otherwise specified. Excluded are State of California holidays, as per the California Department of Human Resources.

E. CONTRACT REPRESENTATIVES

The Contract Managers during the term of this Agreement shall be:

Agency: Department of Industrial Relations

Contractor:

Division: Section:

Attention: Attention:

Address: Address:

Phone: Phone:

Email: Email:

Direct all questions to the Contract Manager. Contract representative may be changed without amendment upon written notification to the other party.

EXHIBIT A, ATTACHMENT 1

DIR FLOOR SPACE

The pink area noted “2005” is the space that needs to be cabled for 4 cubicles.

EXHIBIT B

BUDGET DETAIL AND PAYMENT PROVISIONS

A. INVOICING AND PAYMENT

1. For services satisfactorily rendered and upon receipt and approval of the invoice the State agrees to compensate the Contractor for actual expenditures incurred in accordance with Exhibit B, Attachment 1 – Contractor Cost Sheet, which is attached hereto and made a part of this Agreement.

2. Contractor shall submit one (1) original and one (1) copy of each invoice. Invoices must include the Agreement Number and must be submitted in arrears to:

Department of Industrial Relations – Facilities Unit

Contact Information: TBD

B. BUDGET CONTINGENCY CLAUSE

1. It is mutually agreed that if the Budget Act of the current year and/or any subsequent years covered under this Agreement does not appropriate sufficient funds for the program, this Agreement shall be of no further force and effect. In this event, the State shall have no liability to pay any funds whatsoever to Contractor or to furnish any other considerations under this Agreement and Contractor shall not be obligated to perform any provisions of this Agreement.

2. If funding for any fiscal year is reduced or deleted by the Budget Act for purposes of this program, the State shall have the option to either cancel this Agreement with no liability occurring to the State, or offer an agreement amendment to Contractor to reflect the reduced amount.

C. PROMPT PAYMENT CLAUSE

Payment will be made in accordance with, and within the time specified in, Government Code Chapter 4.5, commencing with Section 927.

D. TRAVEL AND PER DIEM

There shall be no reimbursement for travel or per diem.

EXHIBIT B, ATTACHMENT 1

CONTRACTOR COST SHEET

(Contractor Cost Sheet submitted with bid will be included in the final contract)

EXHIBIT D

SPECIAL TERMS AND CONDITIONS

A. EXCISE TAX

The State of California is exempt from federal excise taxes, and no payment will be made for any taxes levied on employees’ wages. The State will pay for any applicable State of California, local sales, or use taxes on the services rendered or equipment or parts supplied pursuant to this Agreement. California may pay any applicable sales and use tax imposed by another state.

B. SETTLEMENT OF DISPUTES

1. In the event of a dispute, Contractor shall file a “Notice of Dispute” with DIR within ten (10) days of discovery of the problem. Within ten (10) days, the DIR shall meet with the Contractor and Project Manager for purposes of resolving the dispute.

2. Any dispute concerning a question of fact arising under the terms of this Agreement which is not disposed of within a reasonable period of time by Contractor and State employees normally responsible for the administration of this Agreement shall be brought to the attention of the DIR Director or designated representative for resolution. The decision of the DIR Director or designated representative shall be final.

3. In the event of a dispute, the language contained within this Agreement shall prevail over any other language.

4. The existence of a dispute not fully resolved shall not delay Contractor to continue with the responsibilities under this Agreement which is not affected by the dispute.

C. POTENTIAL SUBCONTRACTORS

Nothing contained in this Agreement or otherwise, shall create any contractual relation between the State and any subcontractors, and no subcontract shall relieve the Contractor of his responsibilities and obligations hereunder. The Contractor agrees to be responsible to the State for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by any of them as it is for the acts and omissions of persons directly employed by the Contractor. The Contractor’s obligation to pay its subcontractors is an independent obligation from the State’s obligation to make payments to the Contractor. As a result, the State shall have no obligation to pay or to enforce the payment of any moneys to any subcontractor.

D. STOP WORK ORDER

State reserves the right to issue an order to stop work in the event that a dispute should arise, or in the event that State gives Contractor a notice that the Agreement will be terminated. The stop work order will be in effect until the dispute has been resolved or the Agreement has been terminated.

E. TERMINATION

1. In addition to the rights under Exhibit C of the Standard Agreement, State reserves the right to terminate this Agreement in whole or in part at its sole discretion at any time upon thirty

(30) days prior written notice to Contractor.

2. After receipt of a Notice of Termination, and except as directed by the State, the Contractor shall immediately stop work, regardless of any delay in determining or adjusting any amounts due under this clause.

3. In the case of early termination, Contractor must submit one (1) original and one (1) copy of a final invoice within 30 calendar days upon date of written notice. The final invoice shall cover all unpaid services to termination date, following the invoice requirements of this Agreement. Final invoice shall be submitted to the address listed on Exhibit B, Budget Detail and Payment Provisions.

4. Upon receipt of the final invoice, a final payment will be made to Contractor. This payment shall be for all State-approved costs that in the opinion of State are justified, and shall include labor, and materials purchased or utilized (including all non-cancellable commitments) to termination date at the rates set forth in the contract.

F. AMENDMENTS

1. No amendment or variation of the terms of this Agreement shall be valid unless made in writing, signed by the parties, and approved as required. No oral understanding or agreement not incorporated in this Agreement is binding on any of the parties.

2. DIR reserves the right to amend this Agreement through a formal written amendment, signed by the parties, for additional time and/or funding.

G. INSURANCE REQUIREMENTS

1. Commercial General Liability

Contractor must furnish to the State a certificate of insurance to remain in effect at all times during the term of this Agreement. Contractor shall maintain general liability on an occurrence form with limits not less than $1,000,000 per occurrence for bodily injury and property damage liability combined with a $2,000,000 annual policy aggregate. The policy must include coverage for liabilities arising out of premises operations, independent contractors, products, completed operations, personal & advertising injury, and liability assumed under an insured contract. This insurance shall apply separately to each insured against whom claim is made or suit is brought subject to the Contractor’s limit of liability. The policy must include:

Department of Industrial Relations, State of California, its officers, agents, and employees are included as additional insured, but only with respect to work performed under this Agreement.

This endorsement must be supplied under a form acceptable to the Office of Risk and Insurance Management.

In the case of Contractor’s utilization of subcontractors to complete the contracted scope of work, Contractors shall include all subcontractors as insured under Contractor’s insurance or supply evidence of insurance to the State equal to policies, coverage and limits required of Contractor.

2. Automobile Liability during the term of this Agreement. Contractor shall maintain motor vehicle liability with limits not less than $1,000,000 combined single limit per accident. Such insurance shall cover liability arising out of a motor vehicle including owned, hired and non-owned motor vehicles.

The policy must include:

Department of Industrial Relations, State of California, its officers, agents, and employees are included as additional insured, but only with respect to work performed under this Agreement.

3. Workers’ Compensation and Employers’ Liability during the term of this Agreement. Contractor shall maintain statutory workers’ compensation and employers’ liability for all its employees who will be engaged in the performance of the Agreement. Employers’ liability limits of $1,000,000 are required. The policy must include:

When work is performed on State owned or controlled property the Workers’ Compensation policy shall contain a waiver of subrogation in favor of the State. The waiver of subrogation endorsement shall be provided.

4. General Provisions Applying to all Policies

a. Coverage Term: Coverage needs to be in force for the complete term of the Agreement.

If insurance expires during the term of the Agreement, a new certificate must be received by the State at least ten (10) days prior to the expiration of this insurance. Any new insurance must still comply with the original terms of the Agreement. The Contractor agrees to provide a new certificate of insurance via email to:

procurement@dir.ca.gov Subject Line: Contract No. S24BS014 – Insurance Certificate

b. Policy Cancellation or Termination and Notice of Non-Renewal: Contractor shall provide to the State within five (5) business days following receipt by Contractor a copy of any cancellation or non-renewal of insurance required by this Agreement. In the event Contractor fails to keep in effect at all times the specified insurance coverage, the State may, in addition to any other remedies it may have, terminate this Agreement upon the occurrence of such event, subject to the provisions of this Agreement.

c. Deductible: Contractor is responsible for any deductible or self-insured retention contained within their insurance program.

d. Primary Clause: Any required insurance contained in the Agreement shall be primary, and not excess or contributory to any other insurance carried by the State.

e. Insurance Carrier Required Rating: All insurance companies must carry a rating acceptable

f. to the Office of Risk and Insurance Management. If the Contractor is self-insured for a portion or all of its insurance, review of financial information including a letter of credit may be required.

g. Endorsements: Any required endorsement must be physically attached to all requested certificates of insurance and not substituted by referring to such coverage on the certificate of insurance.

h. Inadequate Insurance: Inadequate or lack of insurance does not negate the Contractor’s obligations under the Agreement.

H. FORCE MAJEURE

Except for defaults of subcontractors, neither DIR nor the Contractor must be liable for or deemed to be in default for any delay or failure in performance under this Contract or interruption of services resulting from acts beyond the control of the offending party. This includes acts of God, enemy or hostile governmental action, civil commotion, strikes, government orders, national or state declared pandemics, lockouts, labor disputes, nuclear accident, freight embargo, fire, flood, earthquakes or other physical natural disaster, or governmental statutes or regulations superimposed after the fact. If either party intends to invoke this clause to excuse or delay performance, the party invoking the clause must provide written notice to the other party immediately but no later than fifteen (15) calendar days of when the force majeure even occurs and reasons that the force majeure event is preventing that party from or delaying that party in performing its obligations under this contract. DIR may terminate this Agreement immediately in writing without penalty in the event the Contractor invokes this clause.

If the Agreement is not terminated by DIR pursuant to this clause, upon completion of the event of force majeure, the Contractor must as soon as reasonably practicable recommence the performance of its obligations under this Agreement. The Contractor must also provide a revised schedule to minimize the effects of the delay caused by the event of force majeure. An event of force majeure does not relieve a party from liability for an obligation which arose before the occurrence of that event.

If a delay or failure in performance by the Contractor arises out of a default of its subcontractor, and if such default of its subcontractor, arises out of causes beyond the control of both the

Contractor and subcontractor pursuant to this force majeure clause, and without the fault or negligence of either of them, the Contractor shall not be liable for damages of such delay or failure, unless the supplies or services to be furnished by the subcontractor were obtainable from other sources in sufficient time to permit the Contractor to meet the required performance schedule.

I. REGISTRATION WITH STATE AND LOCAL JURISDICTIONS

All business entities doing business within the State must be registered with the appropriate state and local jurisdictions and maintain applicable licenses as required by law. All businesses who do not possess active licenses required to perform the contract services in the scope of work, or who are not registered with the appropriate jurisdictions as required by law during the Agreement term may have their Agreement terminated at the discretion of DIR.

J. TAX DELINQUENCIES

Public Contract Code Section 10295.4 provides that a State agency shall not enter into any contract for goods or services with a contractor whose name appears on either list of the

500 largest tax delinquencies pursuant to Section 7063 or 19195 of the Revenue and Taxation Code. Franchise Tax Board (FTB) and Board of Equalization (BOE) will post and periodically update lists of the 500 largest tax delinquencies on their websites as required by law. If DIR determines that the Contractor or any of its subcontractors are on either the FTB or BOE list at any time before or during the contract term, this will be grounds for termination of the contract.

K. HEALTH AND SAFETY

Contractors are required to, at their own expense, comply with all applicable health and safety laws and regulations. Upon notice, Contractors are also required to comply with the state agency’s specific health and safety requirements and policies. Contractors agree to include in any subcontract related to performance of this Agreement, a requirement that the subcontractor comply with all applicable health and safety laws and regulations, and upon notice, the state agency’s specific health and safety requirements and policies.

L. EXECUTIVE ORDER N-6-22 – RUSSIA SANCTIONS

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

M. PREVAILING WAGE

Public works contracts involving construction, alteration, demolition, installation, repair, or maintenance.

Contracts for “installation” are considered “public works” contracts under California Labor Code section 1720(a)(1) and include “the assembly and disassembly of freestanding and affixed modular office systems.” Contracts for maintenance, as defined in California Code of Regulations, title 8, section 16000, are also considered “public works” contracts under Labor Code section 1771. If this is a “public works” contract under the Labor Code over a thousand dollars ($1,000), Contractor must comply with the applicable provisions of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code relating to public works contracts. The following is a non-exhaustive list of some of the requirements:

Pursuant to Labor Code sections 1771 and 1774, for “public works” contracts under the Labor Code, all contractors and subcontractors (as defined in Labor Code section 1722.1) must pay “not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter” to all workers on public works.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .