IFB NR PR_24_1402 23703-culpeper-total combined project manual-013024-final.pdf
PDF 12 MB Posted
- Attached to
- Community Pool Project
- Solicitation number
- 57910
- Issued by
- Culpeper County, Difficult Run CDP, Virginia
About this file
This document is an Invitation for Bids (IFB) for the Community Pool Project in Culpeper County and the Difficult Run CDP, Virginia. The project requires the furnishing of all materials, labor, and equipment for the completed construction and installation of a community pool. The IFB provides a detailed project manual with specifications and supporting exhibits. Bids are due by January 30, 2024, and a mandatory pre-bid conference will be held on January 15, 2024. The contract is anticipated to be awarded on February 15, 2024, with a construction timeline of 12 months.
The IFB specifies pricing terms, including unit pricing for listed items and materials, as well as a total lump sum bid amount. The project is funded through state and local sources, but the specific amounts and funding requirements are not detailed in the provided documents. No information is given about set-asides, incumbent contractors, or the current competitive environment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL AND BIDDING DOCUMENTS FOR THE
COUNTY OF CULPEPER, VIRGINIA
CULPEPER COUNTY COMMUNITY POOL
PROJECT
16388 COMPETITION DRIVE
CULPEPER, VA 22701
RELEASE FOR BID
JANUARY 3, 2024
NORMAN SMITH ARCHITECTURE
3637 SLATE MILLS ROAD
SPERRYVILLE, VA 22740
WWW.NORMANSMITHARCHITECTURE.COM
nsmith@normansmitharchitecture.com rzubyk@normansmitharchitecture.com http://www.normansmitharchitecture.com/ mailto:nsmith@normansmitharchitecture.com mailto:rzubyk@normansmitharchitecture.com
CULPEPER COUNTY COMMUNITY POOL PROJECT
16388 COMPETITION DRIVE
CULPEPER, VIRGINA, 22701
IFB# PR-24-1402
RELEASE FOR BID 01/03/24
TABLE OF CONTENTS AND DRAWING LIST
BIDDING
INFORMATION
FORM#
NOTICE OF INVITATION FOR BID (IFB)
PREBID QUESTION FORM DGS-30-272
NOTICE TO PROCEED DGS-30-072
FORMS
SAMPLE CONTRACT AGREEMENT FOR CONSTRUCTION
SERVICES
STANDARD LABOR AND MATERIAL PAYMENT BOND DGS-30-088
STANDARD PERFORMANCE BOND DGS-30-084
STANDARD BID BOND DGS-30-090
CHANGE ORDER FORM- SAMPLE; TO BE PROVIDED BY
GC
AIA G701
APPLICATION FOR PAYMENT-SAMPLE; TO BE PROVIDED
BY GC
AIA G702
PAY APP CONTINUATION SHEET-SAMPLE; TO BE
PROVIDED BY GC
AIA G703
CERTIFICATE OF SUBSTANTIAL COMPLETION AIA G704-SAMPLE
AFFIDAVIT OF PAYMENT OF CLAIMS DGS-30-108
CERTIFICATE OF COMPLETION BY CONTRACTOR DGS-30-136
REPORTS 23029 UNDERHILL ENGINEERING GEOTECHNICAL
REPORT 080423-NSA COMMENTS NUMBERED-080723
EMAIL RESPONSE FROM UNDERHILL; 23703-GEOTECH
REPORT RESPONSES TO NSA COMMENTS-081023
SPECIFICATIONS 00 00 00 – PROCUREMENT AND CONTRACTING
01 10 00 - SUPPLEMENTARY CONDITIONS
04 20 00 - UNIT MASONRY, POINTING AND REPAIR OF
EXISTING MASONRY
05 50 00 - MISCELLANEOUS METAL FABRICATIONS AND
PRODUCTS
06 41 00 – CASEWORK AND SIMILAR FABRICATIONS
07 19 16 - PENETRATING SILANE/SILOXANE WATER
REPELLENT SEALER
07 21 00 - THERMAL INSULATION, 07 21 16 - BLANKET
INSULATION, 07 26 00 - VAPOR RETARDER, 09 81 00
SOUND INSULATION
07 31 13 – ASPHALT SHINGLES
07 41 13 - PREFORMED METAL STANDING SEAM
ROOFING
07 46 46 – FIBER-CEMENT SIDING AND PANELS
07 62 00 - SHEET METAL FLASHING
07 72 00 – ROOF MOUNTED ATTIC INTAKE AND EXHAUST
VENT
07 92 00 - JOINT SEALANTS
07 92 13 - ELASTOMERIC JOINT SEALANTS
08 11 00 - METAL DOORS AND FRAMES, 08 31 00 -
ACCESS DOORS, 08 50 00 - WINDOWS, 08 70 00 -
HARDWARE.
09 29 00 - GYPSUM DRYWALL AND 25 GA METAL
FRAMING
09 30 00 - TILE AND STONE
09 50 00 - ACOUSTICAL CEILINGS
09 67 23.1 – RESINOUS FLOORING – SHERWIN WILLIAMS
HIGH PERFORMANCE FLOORING, RESUFLOR DECO
QUARTZ BC23
09 67 23.2 – RESINOUS FLOORING, SHERWIN WILLIAMS
RESULFLOR DECO FLAKE BC
09 77 00 – FIBER REINFORCED WALL PANELS
09 90 00 - PAINT, 09 91 13 - EXTERIOR, 09 91 23 -
INTERIOR
10 14 00 - SIGNAGE
10 21 13 – TOILET COMPARTMENTS
10 26 00 – WALL AND DOOR PROTECTION
10 28 00 – WASHROOM ACCESSORIES
10 44 16 – PORTABLE FIRE EXTINGUISHERS
10 51 26 - PLASTIC LOCKERS AND BENCHES
12 93 43.13 - SITE SEATING BENCHES
13 11 00 - SUMMARY OF THE SWIMMING POOL WORK
13 11 13 - BELOW GRADE STAINLESS-STEEL POOL
SYSTEM
13 11 29 - CERAMIC TILE SWIMMING POOL FINISH
13 11 46 - SWIMMING POOL ACCESSORIES
13 15 10 - SWIMMING POOL CAULKING AND SEALANTS
13 15 90 - SWIMMING POOL HEATER
13 16 50 - AQUATIC PLAY STRUCTURES
22 42 16.04 - LAVATORY DECKS AND FAUCETS
22 51 13 - SWIMMING POOL PIPING
22 51 16 - SWIMMING POOL PUMPS
22 51 19 - SWIMMING POOL WATER TREATMENT
EQUIPMENT
32 31 19 - ORNAMENTAL FENCE
DRAWINGS A000-COVER SHEET
A001-TABLE OF CONTENTS
A103-BUILDING CODE ANALYSIS
A104-GRAPHIC PLAN DIAGRAMS
A200-ARCH EXISTING SITE PLAN
A201-ARCH NEW PLAN
A202-ARCH ENLARGED NEW SITE PLAN
A300-ARCH FLOOR PLAN - SLAB
A301-ARCH NEW FLR PLAN-GROUND LEVEL
A302-ARCH NEW FLR PLAN-MID AND UPPER WALL
LEVELS
A310-ARCH ROOF PLAN
A400-REFLECTED CEILING PLAN
A500-EXTERIOR ELEVATIONS
A501-EXTERIOR ELEVATIONS
A600-BUILDING SECTIONS
A601-BUILDING SECTIONS
A602-BUILDING SECTIONS
A603-PAVILION PLANS AND SECTION
A710-DETAILS
A711-DETAILS
A712-DETAILS
A713-DETAILS
A714-DETAILS
A715-DETAILS
A716-DETAILS
A741-ACOUSTICAL DETAILS
A742-AIR BARRIER NOTES
A752-TYPICAL DETAILS
A760-TYPICAL DETAILS
A770- ACCESSIBILITY DETAILS
A771- ACCESSIBILITY DETAILS
A772- ACCESSIBILITY DETAILS
A800-INTERIOR ELEVATIONS - FILTER ROOM
A801-INTERIOR ELEVATIONS - CONCESSION
A802-INTERIOR ELEVATION - CLASSROOM
A803-INTERIOR ELEVATION - LOCKER ROOM
A804-INTERIOR ELEVATION - FAMILY ROOM
A805-ENLARGED LOCKER AND FAMILY ROOM PLANS
A806-ENTRY GATE PLAN AND ELEVATION
A900-DOOR AND DOOR HARDWARE SCHEDULES
A910-WINDOW SCHEDULE
A930-FINISH SCHED
A931-PRODUCT SCHEDULE
A932-KITCHEN AND MISCELLANEOUS SCHEDULE
A933-MISCELLANEOUS ITEMS SCHEDULE
A934-MISCELLANEOUS ITEMS SCHEDULE
AP101-SITE PLAN
AP102-POOL FLOOR PLAN
AP103-POOL DECK PLAN
AP104-POOL PIPING PLAN
AP105-POOL BONDING PLAN
AP106-POOL REINFORCING PLAN
AP107-SPLASH PAD PLAN
AP108-SPLASH PAD BONDING AND REINFORCING PLAN
AP109-SPLASH PAD PIPING PLAN
AP301-POOL SECTIONS
AP302-SPLASH PAD SECTIONS & VIEWS
AP401-EQUIPMENT ROOM PLAN
AP501-POOL EQUIPMENT DETAILS
AP502-INSTALLATION DETAILS
AP503-INSTALLATION DETAILS
AP504-POOL EQUIPMENT DETAILS
AP600-VORTEX PLUMBING PLAN
C1-COVER SHEET
C2-GENERAL NOTES & DETAILS
C3-EXISTING CONDITIONS & DEMOLITION PLAN
C4-SITE PLAN - POOL COMPLEX
C5-SITE PLAN - ADDITIONAL PARKING AREA NOT IN CONTRACT
C6-LANDSCAPE & LIGHTING DETAILS - PARKING AREA NOT IN CONTRACT
C7-PROPOSED CONSERVED OPEN SPACE PLAT
C8-UTILITY PLAN
C9-SANITARY SEWER PROFILES & DETAILS
C10-WATER LINE PROFILES & DETAILS
C11-STORM SEWER DRAINAGE MAP AND PROFILES
C12-STORM SEWER CALCULATIONS AND DETAILS
C13-POST-DEVELOPMENT DRAINAGE MAP - QUALITY
C14-SWM COMPUTATIONS - VRRM SPREADSHEET
C15-PRE-DEVELOPMENT DRAINAGE MAP - QUANTITY
C16-POST-DEVELOPMENT DRAINAGE MAP - QUANTITY
C17-ANALYSIS OF DOWNSTREAM CHANNEL
C18-HYDROGRAPHS & SWM NARRATIVE
C19-STORM WATER MANAGEMENT DETAILS
C20-EROSION & SEDIMENT CONTROL PLAN - PHASE 1
C21-EROSION & SEDIMENT CONTROL PLAN - PHASE 2
C22-EROSION & SEDIMENT CONTROL NOTES &
NARRATIVE
S100-NOTES AND SPECIFICATIONS
S100.1-SCHEDULE OF SPECIAL INSPECTIONS
S101-FOUNDATION PLAN–SECTIONS-DETAILS
S102-FRAMING PLAN – SECTIONS
S103-BRACE WALL PLAN – CALCS – DETAILS
S104-PAVILION FOUNDATION & FRAMING PLAN
S104.1-OPTIONAL PAVILION ROOF FRAMING
S105-POOL & SPLASH PAD SLAB REINFORCEMENT
PLANS
S106-POOL SECTIONS
M000.1-MECHANICAL LEGENDS
M000.2-MECHANICAL ABBREVIATIONS AND NOTES
M000.3-MECHANICAL SPECIFICATIONS
M000.4-MECHANICAL SPECIFICATIONS
M000.5-MECHANICAL SPECIFICATIONS
M000.6-MECHANICAL SPECIFICATIONS
M000.7-MECHANICAL SPECIFICATIONS
M000.8-MECHANICAL SPECIFICATIONS
M000.9-MECHANICAL SCHEDULES
M000.10-MECHANICAL SCHEDULES
M000.11-MECHANICAL SCHEDULES
M100.0-MECHANICAL OVERALL PLAN
M100.1-MECHANICAL DUCTWORK PLAN - AREA 'A'
M100.2-MECHANICAL DUCTWORK PLAN - AREA 'B'
M100.3-MECHANICAL DUCTWORK PLAN - AREA 'C'
M200.1-MECHANICAL PIPING PLAN - AREA 'A'
M200.2-MECHANICAL PIPING PLAN - AREA 'B'
M200.3-MECHANICAL PIPING PLAN - AREA 'C'
M500.1-MECHANICAL DETAILS
M500.2-MECHANICAL DETAILS
M500.3-MECHANICAL DETAILS
M500.4-MECHANICAL DETAILS
E000.1-ELECTRICAL LEGENDS
E000.2-ELECTRICAL ABBREVIATIONS AND NOTES
E000.3-ELECTRICAL SPECIFICATIONS
E000.4-ELECTRICAL SCHEDULES
E100.0-ELECTRICAL OVERALL PLAN
E100.1-ELECTRICAL POWER PLAN - AREA 'A'
E100.2-ELECTRICAL POWER PLAN - AREA 'B'
E100.3-ELECTRICAL POWER PLAN - AREA 'C'
E200.1-ELECTRICAL LIGHTING PLAN - AREA 'A'
E200.2-ELECTRICAL LIGHTING PLAN - AREA 'B'
E200.3-ELECTRICAL LIGHTING PLAN - AREA 'C'
E400.1-ELECTRICAL ONE-LINE DIAGRAM
E500.1-ELECTRICAL DETAILS
E500.2-ELECTRICAL DETAILS
E600.1-ELECTRICAL SITE PLAN
P000.1-PLUMBING LEGENDS
P000.2-PLUMBING ABBREVIATIONS AND NOTES
P000.3-PLUMBING SPECIFICATIONS
P000.4-PLUMBING SPECIFICATIONS
P000.5-PLUMBING SPECIFICATIONS
P000.6-PLUMBING SPECIFICATIONS
P000.7-PLUMBING SCHEDULES
P000.8-PLUMBING SCHEDULES
P100.0-PLUMBING OVERALL PLAN
P100.1-PLUMBING BELOW GRADE PLAN - AREA 'A'
P100.2-PLUMBING BELOW GRADE PLAN - AREA 'B'
P100.3-PLUMBING BELOW GRADE PLAN - AREA 'C'
P200.1-PLUMBING PLAN - AREA 'A'
P200.2-PLUMBING PLAN - AREA 'B'
P200.3-PLUMBING PLAN - AREA 'C'
P500.1-PLUMBING DETAILS
P500.2-PLUMBING DETAILS
P500.3-PLUMBING DETAILS
P500.4-PLUMBING DETAILS
P500.5-PLUMBING DETAILS
P500.6-PLUMBING DETAILS
L100.1-LANDSCAPE PLAN
1 | P a g e
INVITATION FOR BIDS
(IFB)
Issue Date: February 1, 2024 IFB# PR-24-1402
Title: Culpeper County Community Pool Project
Issuing Department: Culpeper County
Purchasing Department
302 N. Main Street
Culpeper, Virginia 22701
Sealed Bids Will Be Received Until 2:00 P.M., February 27, 2024 For Furnishing The
Services Described Herein. Bid opening will be in the Culpeper County Board of Supervisors meeting room at 302 N. Main Street, Culpeper VA 22701.
All Inquiries For Bid Information Should Be Directed To: Alan Culpeper, Director of
Procurement, Telephone Number: (540) 727-3488 Fax: (540) 727-3486
BIDS CAN BE MAILED, OR HAND DELIVERED DIRECTLY TO ISSUING DEPARTMENT
SHOWN ABOVE. RETURN COMPLETED: IFB COVER PAGE; EXHIBIT A: BID FORM,
EXHIBIT B: CONTRACTOR DATA SHEET, EXHIBIT C: INSURANCE & AUTHORITY TO
TRANSACT BUSINESS IN VIRGINIA FORM. THE COUNTY DOES NOT ACCEPT BID
SUBMISSIONS THAT ARE FAXED OR SENT ELECTRONICALLY
Note: Culpeper County does not discriminate against faith-based organizations in accordance with the Code of Virginia, §§ 2.2-4343.1 or against a bidder or offeror because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by Federal, State, and
County law relating to discrimination in employment or contracting.
In Compliance With This Invitation For Bids And To All The Conditions Imposed Herein And
Hereby Incorporated By Reference, The Undersigned Offers And Agrees To Furnish The
Goods/Services At The Price(s) Indicated In Exhibit A, Bid Form.
Name And Address Of Firm:
Date:
By:
Signature
Print Name
Title
Telephone Number: e-mail:
E-Mail: FIN:
RETURN THIS PAGE
2 | P a g e
INVITATION FOR BID
SECTION PAGE
1. PURPOSE
2. COMPETITION INTENDED
3. WORKMANSHIP
4. SCOPE OF WORK
5. MANDATORY PRE-BID AND SITE INSPECTIONS
6. LIQUIDATED DAMAGES ........................ ……….………………………….…...………4
7. CONTRACT TERMS AND CONDITIONS
8. SPECIAL TERMS AND CONDITIONS….…….…………………………….…...……..5
9. BONDS……………………………………………………………………….……...………6
10. QUESTIONS……………………………………………………….…………….………….6
11 GENERAL CONDITIONS & INSTRUCTION TOBIDDER/OFFERORS…...……… 6
EXHIBIT A BID FORM
EXHIBIT B CONTRACTOR DATA SHEET
EXHIBIT C INSURANCE CHECKLIST
AUTHORITY TO TRANSACT BUSINESS IN VIRGINIA FORM
ATTACHMENT A – SPECIFICATION
ATTACHMENT B – DRAWINGS
3 | P a g e
1. PURPOSE
The purpose and intent of the Invitation for Bid (IFB) is to establish a firm fixed price contract to furnish all materials, labor, and equipment, for the completed construction and installation of the Culpeper County Community Pool Project, 16388 Competition Drive, Culpeper, Virginia 22701 in accordance with the terms, conditions and specifications contained herein. This solicitation is issued by the Culpeper County Procurement
Department on behalf of the Culpeper County Board of Supervisors, herein referred to as
“County”.
All contractors are responsible for any addendums issued for this project. All notifications of any Addendums will only be posted on the Culpeper County Purchasing Website at https://web.culpepercounty.gov/rfps
2. COMPETITION INTENDED
It is the County's intent that this Invitation for Bid (IFB) permit open competition. It shall be the bidder's responsibility to advise the Purchasing Agent in writing if any language, requirement, specification, etc., or any combination thereof, inadvertently restricts or limits the requirements stated in this IFB to a single source. Such notification must be received by the Purchasing Agent no later than five (5) business days prior to the date set for bids to be received.
3. WORKMANSHIP
Where not more specifically described in these specifications, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction or installation regularly furnished or required for completion of the services. All work shall be executed by personnel skilled in their respective lines of work.
4. SCOPE OF WORK
The Scope of Work includes furnish all materials, labor, and equipment, for the completed construction and installation of Culpeper County Community Pool Project, 16388 Competition Drive, Culpeper, Virginia 22701 All construction shall conform to existing State and County building codes. It is the contractors’ responsibility to be aware of all applicable standards and specifications as well as required methods of construction.
See Specification 01 10 00, §1.4 for description of the Scope of Work.
Attachment A: Project Manual containing a Table of Contents of Specifications and
Drawings, Specifications, Project forms and reports, dated 01/03/24 and titled
RELEASE FOR BID
Attachment B: Drawings dated 01/03/24 and titled RELEASE FOR BID https://web.culpepercounty.gov/rfps
4 | P a g e
5. Mandatory Pre-Bid and Site Inspections
Mandatory Pre-Bid meeting, and site visit is scheduled for Thursday, February 8, 2024 at
10:00 A.M. local time at the Culpeper County Sports Complex Fieldhouse, 16388
Competition Drive, Virginia 22701.
If the County closes its offices due to inclement weather on Thursday, February 8, 2024, the scheduled Mandatory Pre-Bid and Site Inspections will be held on Friday, February 9, 2024 at the same time and location as noted above.
The primary purpose of the site visit is to allow Bidders to become fully acquainted and familiar with the conditions as they exist and the operation to be carried out. Bidders shall make such investigation as they may see fit so that they may fully understand the facility, difficulties, and restrictions about the execution of the work. This will be the only tour of the facility provided by County personnel.
Bidders shall be required to sign a register sign-in sheet as the representative of the named business/company. Failure to attend any portion of the Mandatory Pre-Bid meeting, and failure to sign the sign-in sheet will disqualify Bidders from submitted bids. NOTE: The
Purchasing Agent will pick-up the register sign-in sheet after 15 minutes and respondent showing up after 10:15 A.M. will not be allowed to sign in on the register sign-in sheet.
6. Liquidated Damages Under the resulting contract, liquidated damages shall be $100.00 per calendar day for each day beyond the scheduled completion date shown on the resulting contract, which will be agreed upon between the County and Contractor receiving the award.
7. CONTRACT TERMS AND CONDITIONS
The extent and character of the services to be performed by the Contractor(s) shall be subject to the general control and approval of the Director of the Procurement or his authorized designee(s). The Contractor shall only comply with requests and/or orders issued by the contract administrator or his authorized designee(s) acting within their authority for the County.
Any change to the contract must be approved in writing by the Procurement Director of
Culpeper County and the Contractor. Contract Administrators do not have the authority to order or authorize change orders, or in any way obligate funds on behalf of Culpeper
County.
Contractor is cautioned not to accept or act upon verbal or written directives from individuals representing citizen volunteer and/or advisory groups or any other individuals or groups without written consent from the Procurement Director.
5 | P a g e
Any Contractor(s) performing services for the County of Culpeper are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and
County Safety and Occupational Health Standards and any other applicable rules and regulations. Also, any Contractor(s) shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area under this contract. The County has sole right to dismiss contractors and/or sub-contractors for non-compliance to the above rules and regulations and/or safety violation. The contractor must rectify all safety concerns prior to continuance of work.
The Contractor must have a current Class “A” contractor’s License.
8. SPECIAL TERMS AND CONDITIONS
A. The safety of the public is the primary concern for Culpeper County. The
Contractor shall place temporary pedestrian traffic, control devices surrounding the work area to protect the public, which may include, but not limited to barricades, tarps, plastic, yellow caution tape, or other means necessary to protect the public, surrounding areas, equipment, and vehicles.
B. Permit(s) are required for this project from Culpeper County and VA DEQ. The
County will provide the permits which are in process.
C. Area around work site shall be generally cleaned each day before leaving the site.
D. Contractor shall remove all debris from the site when complete. All material shall be disposed of in a legal and lawful manner off-site and at the contractor’s expense.
E. The Contractor shall coordinate & schedule work so that sports complex operations are maintained during the work required. There is no restriction on working days or hours.
F. Placement of spoils, and any excess topsoil fill will be coordinated with the
County’s Park & Recreation Department, and placed at a predetermined location.
G. Contractor may utilize the area around the site for parking / dumpster / material staging as agreed to in advance by the County
H. The Contractor is permitted to use the nearby building for electrical & water.
6 | P a g e
I. The County is responsible for third-part inspection for this project.
J. The Contractor is not required to provide background checks on its employees for this project.
9. BONDS
Bids shall be accompanied by either a cashier’s check or certified check or bidder’s bond in the amount of 5 percent (5%) of the bid amount made payable to the County of
Culpeper. Bonds shall be with a surety company acceptable to the County. A performance bond and a labor and material payment bond will be required in the amount of one hundred percent (100%) of the bid, including any additions and/or deductions and shall be provided by the successful bidder.
10. QUESTIONS
Any questions pertaining to the Scope of Work, or other solicitation documents must be received in writing by the Culpeper County Purchasing Office, before 10:00 A.M. on
Tuesday, February 16, 2024 to:
Culpeper County Purchasing Department
Attn: Alan H. Culpeper, CPPO, VCO, VCM
155 West Davis Street, Suite 100
Culpeper, VA 22701
E-mail: aculpeper@culpepercounty.gov
11. GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS/OFFERORS
Revised 12/11/2018
Vendor: These general rules and conditions shall apply to all purchases and be a part of each solicitation and every contract awarded by the Procurement Department of Culpeper County, unless otherwise specified. The Procurement
Department is responsible for the purchasing activity of Culpeper County. The term “County” as used herein refers to the contracting entity which is the signatory on the contract and may be either Culpeper County, or the Culpeper
County Board of Supervisors, a political subdivision of the Commonwealth of Virginia, or both. Bidder/Offeror or their authorized representatives are expected to inform themselves fully as to the conditions, requirements, and specifications before submitting bids/proposals: failure to do so will be at the bidder’s/offeror’s own risk and except as provided by law, relief cannot be secured on the plea of error.
Subject to all Federal, State and local laws, policies, resolutions, regulations, rules, limitations and legislation, bids/proposals on all solicitations issued by the Procurement Department will bind bidders/ offerors to applicable conditions and requirements herein set forth unless otherwise specified in the solicitation.
1. AUTHORITY-Except as delegated in the Culpeper County Purchasing Resolution, the Purchasing Agent has the sole responsibility and authority for negotiating, placing and when necessary, modifying every solicitation, contract and purchase order issued by the
County. In the discharge of these responsibilities, the Purchasing Agent may be assisted by assigned buyers. Unless specifically
7 | P a g e delegated by the Purchasing Agent, no other County officer or employee is authorized to order supplies or services, enter into purchase negotiations or contracts, or in any way obligate the County for an indebtedness. Any purchase order or contract made which is contrary to these provisions and authorities shall be of no effect and void and the County shall not be bound thereby.
2. COMPETITION INTENDED: It is the County’s intent that this solicitation permit competition. It shall be the Bidder’s/Offeror’s responsibility to advise the Purchasing Agent in writing if any language, requirement, specification, etc., or any combination thereof, stifles competition or inadvertently restricts or limits the requirements stated in this solicitation to a single source. The Purchasing Agent must receive such notification not later than five (5) business days prior to the deadline set for acceptance of the bids/proposals.
CONDITIONS OF BIDDING
3. CLARIFICATION OF TERMS - If any Bidder/ Offeror has questions about the specifications or other solicitation documents, the prospective Bidder/ Offeror shall contact the buyer in writing whose name appears on the face of the solicitation no later than five (5) business days prior to the date set for the opening of bids or receipt of proposals. Any revisions to the solicitation will be made only by addendum issued by the Buyer. Notifications regarding specifications may not be considered if received in less than five (5) business days of the date set for opening of bids/receipt of proposals.
4. CHANGES / MODIFICATON TO SOLICIATIONS – any and all changes, addendums, amendments, and/or supplements to any
Invitation to Bid (IFB), or Request For Proposal (RFP) shall be posted on the Culpeper County website on the Purchasing Office’s webpage under the tab titled. “Current Active Solicitation” found at the below address: web.culpepercounty.gov/rfps Any and all changes, addendums, amendments, and/or supplements to the RFP/IFB shall be posted no later than the latest time on the last day by which submissions have to be received by the Purchasing Office. Offerors/Bidders are responsible for monitoring the
Purchasing Office’s webpage for the posting of any changes, addendums, amendments, and/or supplements.
5. MANDATORY USE OF COUNTY FORM AND TERMS AND CONDITIONS: Failure to submit a bid/proposal on the official
County form provided for that purpose shall be a cause for rejection of the bid/proposal. Unauthorized modification of or additions to any portion of the Invitation to Bid or Request for Proposal may be cause for rejection of the bid/proposal. However, the County reserves the right to decide, on a case-by-case basis, in its sole discretion, whether to reject any bid or proposal which has been modified.
6. LATE BIDS/PROPOSALS & MODIFICATION OF BIDS/PROPOSALS: Any bid/proposal/modification received at the office designated in the solicitation after the exact time specified for receipt of the bid/proposal/modification is considered a late bid/proposal/modification.
The County is not responsible for delays in the delivery of the mail by the U.S. Postal Service, private carriers or the inter-office mail system. It is the sole responsibility of the Bidder/Offeror to ensure their bid/proposal reaches the Procurement Department by the designated date and hour.
a. The official time used in the receipt of bids/ proposals is that time on the automatic time stamp machine in the Procurement
Department.
b. Late bids/proposals/modifications will be returned to the Bidder/Offeror UNOPENED, if solicitation number, acceptance date and
Bidder/Offeror’s return address is shown on the container.
c. If the County closes its offices due to inclement weather scheduled bid openings or receipt of proposals will be extended to the next business day, same time.
7. WITHDRAWAL OF BIDS/PROPOSALS:
A Bidder/Offeror for a contract other than for public construction may request withdrawal of his or her bid/proposal under the following circumstances:
a. Bids/Proposals may be withdrawn on written request from the Bidder/Offeror received at the address shown in the solicitation prior to the time of acceptance.
b. Requests for withdrawal of bids/proposals after opening of such bids/proposals but prior to award shall be transmitted to the
Purchasing Agent, in writing, accompanied by full documentation supporting the request. If the request is based on a claim of error, documentation must show the basis of the error. Such documentation may take the form of supplier quotations, vendor work sheets, etc. If bid bonds were tendered with the bid, the County may exercise its right of collection. No Bid/Proposal may be withdrawn under this paragraph when the result would be the awarding of the contract on another bid/Proposal of the same bidder/offeror or of another bidder/offeror in which the Countyship of the withdrawing bidder/offeror is more than five percent. In the case of Invitation for Bid’s, if a bid is withdrawn under the authority of this paragraph, the lowest remaining bid shall be deemed to be the low bid. No bidder/offeror who is permitted to withdraw a bid/proposal shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom the contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid/proposal was submitted.
8 | P a g e
8. ERRORS IN BIDS/PROPOSALS – When an error is made in extending total prices, the unit bid price will govern. Erasures in bids/proposals must be initialed by the bidder/offeror. Carelessness in quoting prices, or in preparation of bid/proposal otherwise, will not relieve the Bidder/Offeror. Bidders/Offerors are cautioned to recheck their bids/proposals for possible error. Errors discovered after public opening cannot be corrected and the bidder will be required to perform if his or her bid is accepted.
9. IDENTIFICATION OF BID/PROPOSAL ENVELOPE: The signed bid/proposal and requested copies should be returned in a separate envelope or package, sealed and identified with the following information:
ADDRESSED AS INDICATED ON COVER PAGE (ISSUING DEPARTMENT)
IFB/RFP NUMBER – PR-24-1402
TITLE – CULPEPER COUNTY COMMUNITY POOL PROJECT
BID/PROPOSAL DUE DATE AND TIME – 2:00 P.M., February 27, 2024
VENDOR NAME AND COMPLETE MAILING ADDRESS (RETURN ADDRESS)
If a bid/proposal is not addressed with the information as shown above, the Bidder/Offeror takes the risk that the envelope may be inadvertently opened and the information compromised, which may cause the bid/proposal to be disqualified. Bids/Proposals may be hand delivered to the designated location in the office issuing the solicitation. Culpeper County will not accept facsimile and/or electronic bids/proposals No other correspondence or other proposals should be placed in the envelope.
10. ACCEPTANCE OF BIDS/PROPOSALS: Unless otherwise specified, all formal bids/proposals submitted shall be valid for a minimum period of one hundred twenty (120) calendar days following the date established for acceptance. At the end of the one hundred twenty
(120) calendar days the bid/proposal may be withdrawn at the written request of the Bidder/Offeror. If the proposal is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled.
11. CONDITIONAL BIDS: Conditional bids are subject to rejection in whole or in part.
12. BIDDERS PRESENT: At the time fixed for the opening of responses to a bid, bid contents will be made public for the information of bidders and other interested parties who may be present either in person or by representative. All bids will be opened at the time and place specified and read publicly. At the time fixed for the receipt of responses for Request for Proposals, only the names of the offerors will be read and made available to the public.
13. RESPONSE TO SOLICITATIONS: In the event a vendor cannot submit a bid on a solicitation, the vendor is requested to return the solicitation cover sheet with an explanation as to why the vendor is unable to bid on these requirements. Because of the large number of firms listed on the County’s Bidders List, it may be necessary to delete from this list the names of those persons, firms or corporations who fail to respond after having been invited to bid for three (3) successive solicitations. Such deletion will be made only after formal notification of the intent to remove the firm from the County’s Bidder’s List.
14. BIDDER INTERESTED IN MORE THAN ONE BID: If more than one bid is offered by any one party, either directly or by or in the name of his or her clerk, partner, or other persons, all such bids may be rejected. A party who has quoted prices on work, materials, or supplies to a bidder is not thereby disqualified from quoting prices to other bidders or firms submitting a bid directly for the work, materials or supplies.
15. TAX EXEMPTION: The County is exempt from the payment of any federal excise or any Virginia sales tax. The price bid must be net, exclusive of taxes. Tax exemption certificates will be furnished if requested by the Bidder/Offeror.
16. DEBARMENT STATUS: By submitting their bids/proposals, Bidders/Offerors certify that they are not currently debarred from submitting bids/proposals on contracts by the County, nor are they an agent of any person or entity that is currently debarred from submitting bids or proposals on contracts by the County or any agency, public entity/locality or authority of the Commonwealth of Virginia.
17. ETHICS IN PUBLIC CONTRACTING: The provisions contained in Sections 2.2-4367 through 2.2-4377 of the Virginia Public
Procurement Act as set forth in the 1950 Code of Virginia, as amended, shall be applicable to all contracts solicited or entered into by the County. By submitting their bids/proposals, all Bidders/Offerors certify that their bids/proposals are made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other Bidder, Offeror, supplier, manufacturer or subcontractor in connection with their bid/proposal, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.
18. NO CONTACT POLICY: No Bidder/Offeror shall initiate or otherwise have contact related to the solicitation with any County representative or employee, other than the Procurement Department, after the date and time established for receipt of bids/proposals. Any contact initiated by a Bidder/Offeror with any County representative, other than the Procurement Department, concerning this solicitation is prohibited and may cause the disqualification of the Bidder/Offeror from this procurement process.
9 | P a g e
19. VIRGINIA FREEDOM OF INFORMATION ACT: All proceedings, records, contracts and other public records relating to procurement transactions shall be open to the inspection of any citizen, or any interested person, firm or corporation, in accordance with the Virginia
Freedom of Information Act except as provided below:
a. Cost estimates relating to a proposed procurement transaction prepared by or for a public body shall not be open to public inspection.
b. Any competitive sealed bidding bidder, upon request, shall be afforded the opportunity to inspect bid records within a reasonable time after the opening of bids but prior to award, except in the event that the County decides not to accept any of the bids and to reopen the contract. Otherwise, bid records shall be open to public inspection only after award of the contract. Any competitive negotiation offeror, upon request, shall be afforded the opportunity to inspect proposal records within a reasonable time after the evaluation and negotiations of proposals are completed but prior to award except in the even that the County decides not to accept any of the proposals and to reopen the contract. Otherwise, proposal records shall be open to the public inspection only after award of the contract except as provided in paragraph “c” below. Any inspection of procurement transaction records under this section shall be subject to reasonable restrictions to ensure the security and integrity of the records.
Trade secrets or proprietary information submitted by a bidder, offeror or contractor in connection with a procurement transaction shall not be subject to public disclosure under the Virginia Freedom of Information Act; however, the bidder, offeror or contractor must invoke the protections of this section prior to or upon submission of the data or other materials, and must identify the data or other materials to be protected and state the reasons why protection is necessary.
c. Nothing contained in this section shall be construed to require the County, when procuring by “competitive negotiation”
(Request for Proposal), to furnish a statement of reasons why a particular proposal was not deemed to be the most advantageous to the County.
20. CONFLICT OF INTEREST: Contractor certifies by signing bid to the County that no conflict of interest exists between Contractor and
County that interferes with fair competition and no conflict of interest exists between Contractor and any other person or organization that constitutes a conflict of interest with respect to the contract with the County.
SPECIFICATIONS
21. BRAND NAME OR EQUAL ITEMS: Unless otherwise provided in the solicitation, the name of a certain brand, make or manufacturer does not restrict bidders to the specific brand, make or manufacturer named; it conveys the general style, type, character, and quality of the article desired, and any article which the County in its sole discretion determines to be the equal of that specified, considering quality, workmanship, economy of operation, and suitability for the purpose intended, shall be accepted. The Bidder is responsible to clearly and specifically indicate the product being offered and to provide sufficient descriptive literature, catalog cuts and technical detail to enable the
County to determine if the product offered meets the requirements of the solicitation. This is required even if offering the exact brand, make or manufacturer specified. Normally in competitive sealed bidding, only the information furnished with the bid will be considered in the evaluation. Failure to furnish adequate data for evaluation purposes may result in declaring a bid non-responsive. Unless the Bidder clearly indicates in its bid/proposal that the product offered is "equal" product, such bid/proposal will be considered to offer the brand name product referenced in the solicitation.
22. FORMAL SPECIFICATIONS: When a solicitation contains a specification which states no substitutes, no deviation therefrom will be permitted and the bidder will be required to furnish articles in conformity with that specification.
23. OMISSIONS & DISCREPANCIES: Any items or parts of any equipment listed in this solicitation which are not fully described or are omitted from such specification, and which are clearly necessary for the completion of such equipment and its appurtenances, shall be considered a part of such equipment although not directly specified or called for in the specifications. The Bidder/Offeror shall abide by and comply with the true intent of the specifications and not take advantage of any unintentional error or omission, but shall fully complete every part as the true intent and meaning of the specifications and drawings. Whenever the mention is made of any articles, material or workmanship to be in accordance with laws, ordinances, building codes, underwriter’s codes, A.S.T.M. regulations or similar expressions, the requirements of these laws, ordinances., etc., shall be construed as to the minimum requirements of these specifications.
24. CONDITION OF ITEMS: Unless otherwise specified in the solicitation, all items shall be new, in first class condition.
AWARD
25. AWARD OR REJECTION OF BIDS: The Purchasing Agent shall award the contract to the lowest responsive and responsible bidder complying with all provisions of the IFB, provided the bid price is reasonable and it is in the best interest of the County to accept it.
Awards made in response to a RFP will be made to the highest qualified offeror whose proposal is determined, in writing, to be the most advantageous to the County taking into consideration the evaluation factors set forth in the RFP. The Purchasing Agent reserves the right to award a contract by individual items, in the aggregate, or in combination thereof, or to reject any or all bids/proposals and to waive any informality in bids/proposals received whenever such rejection or waiver is in the best interest of the County. Award may be made to as
10 | P a g e many bidders/offerors as deemed necessary to fulfill the anticipated requirements of the County. The Purchasing Agent also reserves the right to reject the bid if a bidder is deemed to be a non-responsible bidder.
26. ANNOUNCEMENT OF AWARD: Upon the award or announcement of the decision to award a contract as a result of this solicitation, the Procurement Department may post award results, which may be viewed on the Culpeper County Procurement Website at http://web.culpepercounty.gov/rfps
27. QUALIFICATIONS OF BIDDERS OR OFFERORS: The County may make such reasonable investigations as deemed proper and necessary to determine the ability of the Bidder/Offeror to perform the work/furnish the item(s) and the Bidder/Offeror shall furnish to the
County all such information and data for this purpose as may be requested. The County reserves the right to inspect Bidder's/Offeror’s physical facilities prior to award to satisfy questions regarding the Bidder's/Offeror’s capabilities. The County further reserves the right to reject any bid or proposal if the evidence submitted by or investigations of, such Bidder/Offeror fails to satisfy the County that such
Bidder/Offeror is properly qualified to carry out the obligations of the contract and to complete the work/furnish the item(s) contemplated therein.
28. TIE BIDS: In the case of a tie bid, the County may give preference to goods, services and construction produced in Culpeper County or provided by persons, firms or corporations having principal places of business in the County. If such choice is not available, preference shall then be given to goods and services produced in the Commonwealth pursuant to Section 2.2-4324 of the Code of Virginia. If no
County or Commonwealth choice is available, the tie shall be decided by lot.
CONTRACT PROVISIONS
29. APPLICABLE LAW AND COURTS: Any contract resulting from this solicitation shall be governed in any respects by the laws of
Virginia without any regard to conflict of laws analysis, and any litigation with respect thereto shall be brought in the Circuit Court of
Culpeper County, Virginia. The parties waive any right of removal to federal court. The Contractor shall comply with applicable federal, state and local laws and regulations.
30. IMMIGRATION REFORM AND CONTROL ACT OF 1986: By submitting their bids, Bidders certify that they do not and will not during the performance of this contract employ unauthorized alien workers or otherwise violate the provisions of the federal Immigration
Reform and Control Act of 1986, as presently amended.
31. ANTI-TRUST: By entering into a contract, the Contractor conveys, sells, assigns, and transfers to the County all rights, title and interest in and to all causes of the action it may now have or hereafter acquire under the antitrust law of the United States and Culpeper County, relating to the particular goods or services purchased or acquired by the County under said contract. Consistent and continued tie bidding could cause rejection of bids by the Purchasing Agent and/or investigation for Anti-Trust violations.
32. PAYMENT TERMS: Unless otherwise provided in the solicitation payment will be made thirty (30) days after receipt of a proper invoice, or thirty (30) days after receipt of all goods or acceptance of work, whichever is the latter.
1. Invoices for items/services ordered, delivered/performed and accepted shall be submitted by the Contractor directly to the payment address shown on the purchase order/contract. All invoices shall show the contract number, purchase order number, and any federal employer identification number.
2. Any payment terms requiring payment in less than 30 days will be regarded as requiring payment 30 days after invoice or delivery, whichever occurs last. This shall not affect offers of discounts for payment in less than 30 days, however.
3. The date of payment shall be deemed the date of postmark in all cases where payment is made by mail.
4. The County's fiscal year is July 1 - June 30. Contractors are advised to submit invoices, especially for goods and/or services provided in the month of JUNE, for the entire month i.e. June 1 - June 30, so that expenses are recognized in the appropriate fiscal year.
33. PAYMENT TO SUBCONTRACTORS: A contractor awarded a contract under this solicitation is hereby obligated:
1. To pay the subcontractor(s) within seven (7) days of the contractor's receipt of payment from the County for the proportionate share of the payment received for work performed by the subcontractor(s) under the contract; or
2. To notify the County and the subcontractor(s), in writing, of the contractor's intention to withhold payment and the reason.
The contractor is obligated to pay the subcontractor(s) interest at the rate of one percent per month (unless otherwise provided under the terms of the contract) on all amounts owed by the contractor that remain unpaid seven (7) days following receipt of payment from the County, except for amounts withheld as stated in 2 above. The date of mailing of any payment by U.S. Mail is deemed to be payment to the addressee. These provisions apply to each sub-tier contractor performing under the primary contract. A contractor's obligation to pay an interest charge to a subcontractor may not by construed to be an obligation of the County.
http://web.culpepercounty.gov/
11 | P a g e
34. ASSIGNMENT OF CONTRACT: A contract shall not be assignable by the Contractor in whole or in part without the written consent of the Purchasing Agent.
35. DEFAULT: In case of failure to deliver goods or services in accordance with the contract terms and conditions, the County, after due oral or written notice, may procure them from other sources and hold the Contractor responsible for any resulting additional purchase and administrative costs. This remedy shall be in addition to other remedies which the County may have.
36. ANTI-DISCRIMINATION: By submitting their bids/proposals, Bidders/Offerors certify to the County that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Act of 1975, as amended, where applicable, the Virginians With Disabilities Act, the Americans With Disabilities Act and Section 2.2-4311 of the Virginia
Public Procurement Act. If the award is made to a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipient’s religion, religious belief, refusal to participate in a religious practice, or on the basis or race, age, color, gender or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. (Code of Virginia, Sec. 2.2-4343.1(E)).
In every contract over $10,000, the provisions in A and B below apply:
A. During the performance of this contract, the Contractor agrees as follows:
1. The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.
2. The Contractor, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, will state that such
Contractor is an equal opportunity employer.
3. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this Section.
B. The Contractor will include the provisions of A. above in every subcontract or purchase order over $10,000, so that the provisions will be binding upon each subcontractor or vendor.
37. INVOICES: Invoices for items ordered, delivered and accepted shall be submitted by the Contractor directly to the payment address shown on the purchase order/contract. All invoices shall show the IFB/RFP number and/or purchase order number.
38. CHANGES TO THE CONTRACT: Changes can be made to the contract in any of the following ways:
A. The parties may agree to modify the scope of the contract. An increase or decrease in the price of the contract resulting from such modification shall be agreed to by the parties as a part of their written agreement to modify the scope of the contract.
B. The County may order changes within the general scope of the contract at any time by written notice to the Contractor. Changes within the scope of the contract include, but are not limited to, things such as services to be performed, the method of packing or shipment, and the place of delivery or installation. The Contractor shall comply with the notice upon receipt. The Contractor shall be compensated for any additional costs incurred as the result of such order and shall give the County a credit for any savings. Said compensation shall be determined by one of the following methods.
1. By mutual agreement between the parties in writing; or
2. By agreeing upon a unit price or using a unit price set forth in the contract, if the work to be done can be expressed in units, and the contractor accounts for the number of units of work performed, subject to the County’s right to audit the Contractor’s records and/or determine the correct number of units independently; or
3. By ordering the Contractor to proceed with the work and keep a record of all costs incurred and savings realized. A markup for overhead and profit may be allowed if provided by the contract. The same markup shall be used for determining a decrease in price as the result of savings realized. The Contractor shall present the County with all vouchers and records of expenses incurred and savings realized. The County shall have the right to audit the records of the Contractor as it deems necessary to determine costs or savings.
Any claim for an adjustment in price under this provision must be asserted by written notice to the Procurement Department within thirty (30) days from the date of receipt of the written order from the Procurement Department. If the parties fail to agree on an amount of adjustment, the questions of an increase or decrease in the contract price or time for performance shall be resolved in
12 | P a g e accordance with the procedures for relieving disputes provided by the Disputes Clause of this contract. Neither the existence of a claim nor a dispute resolution process, litigation or any other provision of this contract shall excuse the Contractor from promptly complying with the changes ordered by the County or with the performance of the contract generally.
C. No modification for a fixed price contract may be increased by more than 25% or $50,000, whichever is greater without the advanced written approval of the Board of Supervisors or the , as applicable.
39. INDEMNIFICATION: Contractor shall indemnify, keep and save harmless the County, its agents, officials, employees and volunteers against claims of injuries, death, damage to property, patent claims, suits, liabilities, judgments, cost and expenses which may otherwise accrue against the County in consequence of the granting of a contract or which may otherwise result therefrom, if it shall be determined that the act was caused through negligence or error, or omission of the Contractor or his or her employees, or that of the subcontractor or his or her employees, if any; and the Contractor shall, at his or her own expense, appear, defend and pay all charges of attorneys and all costs and other expenses arising therefrom or incurred in connection therewith; and if any judgment shall be rendered against the County in any such action, the Contractor shall, at his or her own expenses, satisfy and discharge the same.
Contractor expressly understands and agrees that any performance bond or insurance protection required by this contract, or otherwise provided by the Contractor, shall in no way limit the responsibility to indemnify, keep and save harmless and defend the County as herein provided.
40. DRUG-FREE WORKPLACE: During the performance of this contract, the contractor agrees to (i) provide a drug-free workplace for the contractor’s employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the contractor’s workplace and specifying the actions that will be taken against employees for violations of…