IFB No. 32700084 – Farallon Well No. 3 Drilling Services

This is an Invitation for Bid (IFB) issued by the City of Buckeye, Arizona, for drilling services related to the Farallon Well No. 3 project. The City of Buckeye's Water Resources Department is requesting qualified contractors to furnish all labor, materials, and equipment to perform drilling services for a municipal production well. The scope of work includes reaming an existing test borehole to specified diameter and depth, performing geophysical logging and surveys, installing permanent well casing and screen, conducting rig development and test pumping, and supporting aquifer testing activities. The pre-bid meeting is scheduled for November 24, 2026, at 1:00 PM via Microsoft Teams, and attendance is recommended but not mandatory. The deadline for submitting written questions is December 9, 2026, at 3:00 PM local time. Bids must be submitted electronically to the City's Procurement Portal no later than December 16, 2026, at 3:00 PM local time. All work must be completed within 120 calendar days from the Notice to Proceed, with liquidated damages assessed for each calendar day of delay beyond the contractual completion date. Contractors must be duly licensed by the Arizona Registrar of Contractors and registered as vendors in the City's Vendor Access website.

The construction budget for this project is $2,000,000.00. Bid security equal to ten percent of the base bid is required, submitted as either a certified check, cashier's check, or surety bond. Performance and payment bonds covering 100 percent of the contract amount plus any authorized change orders are required prior to work commencement. The City reserves the right to reject any or all bids and to award the contract to the lowest responsive and responsible bidder. No specific set-asides are identified in the solicitation. All contractors are responsible for verifying site conditions and all measurements and quantities supporting their bids. Change order pricing will be determined by unit prices in the contract, by cost-plus-ten-percent fee, or by mutual agreement between the parties. Contractors must comply with all applicable federal, state, and local laws, including environmental regulations, Title VI civil rights requirements, and Arizona's E-Verify employment verification requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF BUCKEYE

INVITATION FOR BID

IFB NO. 32700084

FARALLON WELL NO. 3 - DRILLING SERVICES

CONTACT PERSON

Travis M. Stewart

Sr. Contracts Administrator 623.349.6173 tstewart@buckeyeaz.gov

Date Issued: November 17, 2026 Pre-Bid Meeting: November 24, 2026, at 1:00 PM Local Time Last Day for Questions: December 9, 2026, at 3:00 PM Local Time Bid Due Date: December 16, 2026, no later than 3:00 PM Local Time

PLEASE NOTE: IF DOCUMENTS WERE DOWNLOADED FROM THE CITY OF BUCKEYE’S

PROCUREMENT PORTAL WEBSITE, BIDDER IS RESPONSIBLE FOR OBTAINING ANY AMENDMENTS

EITHER THROUGH UPDATES ON THE WEBSITE, OR BY CONTACTING THE CITY’S CONTACT

PERSON.

Farallong Well No. 3 - Drilling Services IFB No. 32700084 mailto:tstewart@buckeyeaz.gov

TABLE OF CONTENTS

SECTION DESCRIPTION PAGE

100 NOTICE TO CONTRACTORS OF INTENT TO RECEIVE BIDS

200 INSTRUCTIONS TO BIDDERS

300 BID FORMS

400 BID SUBMITTAL FORM

500 DRAFT BASE CONSTRUCTION CONTRACT

ATTACHMENTS

1 Sample Surety Bond.…………………………………………………………………………….65

2 Subcontractor List.……………………………………………………………………………….66

3 Contractor’s Qualification Statement.………………………………………………….67

4 Technical Specifications

5 Site Map

Farallong Well No. 3 - Drilling Services IFB No. 32700084

SECTION 100

NOTICE TO CONTRACTORS OF INTENT TO RECEIVE BIDS

The City of Buckeye is seeking Bids from qualified contractors for the Farallon Well No. 3 – Drilling Services. Bids will be received electronically via the City’s Procurement Portal website no later than 3:00 PM local time on December 16, 2026.

Scope of Work:

The City of Buckeye’s Water Resources Department is requesting a quotation to conduct drilling services for Farallon Well No. 3. The awarded Contractor shall furnish all labor, materials, and equipment to perform the work as outlined in Section 100 - Scope of Work, Section 300 – Bid Forms, and Attachment 4 – Technical Specifications.

All contractors are responsible for verifying site conditions and all measurements and quantities in support of their bid.

Since the pilot borehole was already drilled and tested and the surface casing was previously installed, the drilling contractor will begin by reaming the test borehole to the specified diameter and target depth for completion as a permanent municipal production well. Following completion of reaming, the drilling contractor will retain a qualified geophysical logging subcontractor to perform a caliper log and deviation survey to verify borehole diameter, geometry, and alignment prior to installation of the permanent well casing and screen. Final well acceptance activities will include observation of casing completion and secure capping of the well, with all construction records incorporated into the final project documentation.

Following completion of rig development, the drilling contractor will install temporary test pumping equipment to conduct pump and surge development and support subsequent aquifer testing activities to include Step-Rate Discharge Testing and Constant-Rate Aquifer Testing.

All contractors engaged in City of Buckeye construction shall be duly licensed by the Arizona Registrar of Contractors.

All contractors selected for award shall be registered as a vendor in the City’s Vendor Access website prior to the awarding of an contract:

https://cityofbuckeyeaz.vendoraccess.tylerapp.com/main/registration

Pre-Bid Meeting

A Pre-Bid Meeting will be held on Tuesday, November 24, 2026, at 1:00 PM via Microsoft Teams. The link for the meeting has been provided below. Attendance to the Pre-Bid Meeting is not mandatory, but it is recommended. The purpose of this Meeting will be to clarify the contents of this Invitation for Bid to prevent any misunderstanding of the City’s intention and

Farallong Well No. 3 - Drilling Services IFB No. 32700084 https://cityofbuckeyeaz.vendoraccess.tylerapp.com/main/registration desires, and to give prospective bidders an opportunity to ask questions directly to City personnel.

Meeting Link

Any doubt as to the requirements of this Invitation for Bid, or any apparent omission or discrepancy should be presented to the City’s representative at this Meeting. The City’s representative will then determine the appropriate action. If necessary, the City’s Sr. Contracts Administrator will issue a written Addendum to the Invitation for Bid.

Questions

All correspondence relating to this Project should be addressed to the Sr. Contracts Administrator, Travis M. Stewart, via the solicitation page in the City’s Procurement Portal. All questions and inquiries related to the project or solicitation need to be received by the City on or before the deadline for questions.

END OF SECTION

Farallong Well No. 3 - Drilling Services IFB No. 32700084 https://teams.microsoft.com/meet/285069509811795?p=NiwZxN1ow7ypxN6RNx

SECTION 200

INSTRUCTIONS TO BIDDERS

To be considered, the Bids must be made in accordance with these Instructions to the Bidders.

Documents. Bidders may obtain a complete set of the Construction Documents from City of Buckeye’s Procurement Portal website https://buckeyeaz.bonfirehub.com/portal/?tab=openOpportunities.

Examination: Before submitting a Bid, Bidder shall carefully examine the Construction Documents, visit the site of the Work, and fully inform themselves as to all existing conditions and limitations, and shall include in the Bid a sum to cover the cost of all items included in the Work. The Bidder, if awarded the Contract, shall not be entitled to any additional compensation relative to any matter or thing, concerning which such Bidder might have fully informed itself prior to the Bidding.

Interpretations, Amendments. Should a Bidder find any ambiguity, inconsistency or error in the Construction Documents, or should the Bidder be in doubt as to their meaning, the Bidder shall at once notify the City, in writing, who will send a written amendment to all Bidders of record.

Neither City nor its representatives will be responsible for oral instructions or information.

Any amendments issued by the City during the time of bidding are to be included in the Bid, and will become a part of the Contract when awarded. The Bidders shall acknowledge receipt of amendments on the Bid form in the space provided. Amendments will be published on the project’s Procurement Portal page and will be available for download.

If a Bidder should fail to receive any amendment, or should fail to acknowledge receipt of same, the Bidder shall have the option of accepting a contract, if offered, including all amendments, at the Bid price, or withdrawing the Bid without penalty. The City is not responsible for assuring delivery of amendments to any Bidder. Failure to receive amendments or failure to acknowledge receipt shall not constitute a basis for claim, protest, or reissue of the invitation to bid.

Bids. To be entitled to consideration, Contractors must submit their Bids utilizing the Pricing Sheet provided in the solicitation and upload the forms provided in Sections 300 and 400 along with the forms provided in Attachments 1, 2 and 3. All forms must be submitted as one file in a .PDF format, with all blank spaces filled, the signature in longhand, and alterations or erasures initialed by the Bidder.

Where the Bidder is a business entity, e.g. corporation, partnership, limited liability company, the Bid must be signed by the legal name of such business followed by the name of the state or jurisdiction of formation and the legal signature of an officer, including title, authorized to bind the business to a contract.

Farallong Well No. 3 - Drilling Services https://buckeyeaz.bonfirehub.com/portal/?tab=openOpportunities

All contractors engaged in construction shall be licensed by the Registrar of Contractors in the State of Arizona.

Bids shall be uploaded by the due date and time to the City of Buckeye’s Procurement Portal website: https://buckeyeaz.bonfirehub.com/portal/?tab=openOpportunities.

Name of the file shall read: (Company Name) - IFB No. 32700084

All documents required as part of the “bid package” shall be completed, scanned as a .PDF, and uploaded to the City’s Procurement Portal website.

All bids received, via email, will be opened, documented and posted on the City of Buckeye’s Procurement Portal website under the webpage for this solicitation.

The Bidder assumes the responsibility for having the bid submitted on time via the Procurement Portal to the address shown above. Any Bids received after the Bid Due Date and Time shall not be considered. The Bidder assumes the risk of any delay in the electronic processing of the Contractor’s bid file through both parties’ (Bidder and City) network. Bidders must allow adequate time to ensure that the uploads are timely received by the City through the website. All time referenced are Buckeye, Arizona local times. Bidders agree to accept the time and date that is recorded on the uploaded file’s timestamp on the City’s Procurement Portal website as the official time. Any submissions that are 3:01 pm. or later on the scheduled due date will be considered late and therefore unresponsive.

All Bids shall remain firm for a period of Sixty (60) Calendar Days after the date of the Bid opening and the Contractor shall be prepared to begin construction upon the date established by the Notice to Proceed.

Mistakes discovered before bid opening may be modified or withdrawn by written notice received by the City prior to the time set for bid opening. After bid opening corrections in bids shall be permitted only to the extent that the bidder can, by clear and convincing evidence, demonstrate that such mistake is objective in nature, the nature of the mistake, and the intended bid price. After bid opening, no changes in bid prices or other provisions of bids prejudicial to the interest of the City or fair competition shall be permitted. In lieu of bid correction, a low bidder alleging a material mistake of fact may be permitted to withdraw its bid if:

(a) the mistake is clearly evident on the face of the bid document, but the intended correct bid is not similarly evident; or

(b) the bidder submits evidence that clearly and convincingly demonstrates that a mistake was made. All decisions to permit the correction or withdrawal of bids, or to cancel awards or contracts based on bid mistakes, shall be supported by a written determination by the City Manager.

Farallong Well No. 3 - Drilling Services IFB No. 32700084 https://buckeyeaz.bonfirehub.com/portal/?tab=openOpportunities

Time is of the essence for the Work under the Contract. The Bidder shall note that the Work must be completed within one hundred twenty (120) calendar days, and that failure to do so will result in a deduction for each and every calendar day that the Work shall remain uncompleted after the time specified for the completion of the Work, as liquidated damages and not as a penalty, based on the Maricopa Association of Governments’ Uniform Standard Specifications for Public Works Construction.

The City reserves the right to reject any or all Bids, and to award the Contract to the lowest responsive and responsible Bidder, whose bid conforms in all material respects to requirements and criteria set forth in the invitation for bids. The City further reserves the right to waive any informality or irregularity in the bidding process. In addition, the Bidder recognizes the right of the City to reject a Bid if the Bidder fails to furnish any required Bid security, or to submit the data required by the bidding documents, or if the Bid is in any way incomplete or irregular.

Bid Security. The Bidder is required to submit with their Bid a certified or cashiers' check, upon a solvent bank, or a surety bond in an amount equal to ten percent (10%) of the Base Bid made payable to the City of Buckeye. The bid security shall be given as a guarantee that the Bidder will enter into the Contract if awarded to them; and shall be declared forfeited as liquidated damages if they refuse to enter into said contract upon request to do so by the City. The Bid security other than bid bonds will be returned to the unsuccessful bidders and to the successful bidder upon the execution of a satisfactory payment and performance bond, and contract.

Failure by the Bidder to submit bid security will result in rejection of the Bid as non-responsive.

If a surety bond is used as bid security, it shall be executed on the form provided in Attachment 1 of the bid package and can be included as part of the electronic submission by the contractor.

The surety bond provided as bid security shall be executed solely by a surety company or companies holding a certificate of authority to transact surety business in this state issued by the Director of the Department of Insurance pursuant to Title 20, Chapter 2, Article 1. The surety bond shall not be executed by an individual surety or sureties.

Subcontractor Listing. The submission of a list of subcontractors is for the purpose of determining the qualifications of the subcontractors proposed for the Project. A form for submitting proposed subcontractors is included in Attachment 2 of the Bid Documents. This list must be submitted with the Bid. Lists submitted by unsuccessful Bidders, other than the three

(3) apparent low Bidders will be returned upon request. If prior to award of the Contract, the City has a reasonable and substantial objection to any subcontractor, the apparent low Bidder may, prior to the award, either withdraw his Bid without penalty, or may propose an acceptable substitution, provided that there is no change in the Bid cost. Failure of the Bidder to submit an acceptable substitute in a timely manner shall render the Bid non-responsive.

Responsibility of Subcontractors. Since the General Conditions and Amendments to the General Supplementary Conditions of the Contract for construction apply in every pertinent respect to each subcontractor, the Bidder shall carefully instruct each subcontractor to become

Farallong Well No. 3 - Drilling Services familiar with them, just as though these sections had been formally included by reference in each division of work. The Bidder shall also caution each subcontractor to become familiar with the contents of referenced specifications and standards, insofar as they affect each subcontractor. Each citation of a standard specification shall be construed to refer to the latest published revision, as of the date of the Invitation to Bid. Consideration will not be given to any claimed ignorance as to contents of any cited specification, since each subcontractor is deemed to be experienced and familiar with his own trade's generally accepted and published standards of quality.

No allowance shall be made on behalf of a subcontractor for errors due to subcontractor’s failure to familiarize itself with the existing site conditions.

Each subcontractor shall make the field measurements necessary for his own work and shall be responsible for the accuracy of those measurements and his work. Also, should any structural difficulties prevent a subcontractor or tradesman from installing his materials or equipment properly, the Contractor shall be promptly notified so that the DP may be consulted on how best to resolve the difficulty.

Should the specifications or detailed contract drawings fail to cover any particular phase of the Work, the installation or maintenance directions provided by the manufacturer shall be followed. Each subcontractor shall acquaint himself with the Work of other trades whose activities are mutually affected so that their efforts are coordinated to avoid mistakes, omissions, disputes or delays.

Each subcontractor shall remove tools, equipment, materials and debris from the site promptly upon completion of the Work and shall leave the work area clean and free of all rubbish and debris.

Each subcontractor shall unequivocally guarantee his entire work to be free from defects of material and workmanship for the one-year warranty period after acceptance by City.

Insurance Requirements. See Article 12 of the Construction Contract between City of Buckeye and Contractor for all insurance requirements.

Performance and Payment Bonds. The Contractor is required to provide and pay for performance and payment bonds. Bonds shall cover the faithful performance (100%) of the Contract, and the payment of all obligations (100%) arising thereunder, in such form as the City may prescribe and with such surety or sureties as are approved. The Contractor shall deliver the required bonds to the City not later than the date of execution of the Contract. The Contractor shall require the attorney in fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of his power-of-attorney indicating the monetary limit of such power. Bonds shall be furnished on the forms provided in the Construction Documents.

The surety bonds shall be executed solely by a company or companies holding a certificate of authority to transact surety business in the State of Arizona issued by the Director of the

Farallong Well No. 3 - Drilling Services

Department of Insurance pursuant to Title 20, Chapter 2, Article 1. The bond amounts shall be for one hundred percent (100%) of the Contract amount plus any authorized Change Orders added to the Contract, of which notice to the surety shall be waived. The bonds shall not be executed by an individual surety or sureties.

Summary of Work. See Section 100, 300, and Attachment 4.

Sales and Use Tax. The Contractor agrees to comply with, and to require all of his subcontractors to comply with, all the provisions of applicable State Sales Excise Tax Law and Compensation Use Tax Law and all amendments to same. To the furthest extent permitted by law, the Contractor further agrees to indemnify and save harmless the City, for, from and against any and all claims and demands made against it by virtue of the failure of the Contractor or any subcontractor to comply with the provisions of any and all said laws and amendments.

Waiver of Liens. The Contractor is responsible for the payment of all bills for labor and materials furnished by, or to, the subcontractors and himself on this project; and the Contractor shall deliver to itself on this project, and the Contractor shall also deliver to the City before final payment, a Waiver of Liens in duplicate from itself and each of its subcontractors, if any; and at such time Contractor shall certify delivery of such lien waivers for any and all subcontractors involved.

Qualifications of Contractors. The competency and responsibility of bidders, and of their proposed subcontractors, shall be considered in making the award, pursuant to the City of Buckeye Procurement Code.

Each contractor being considered for this project must accurately complete the Qualification Statement provided in Attachment 3 and submit it to the City either with its Bid or within twenty-four (24) hours following the Bid due date. Failure to do so may be grounds for rejecting the Contractor's Bid.

Failure to Complete Work within Time for Completion and Liquidated Damages. It is hereby understood and mutually agreed, by and between the Contractor and the City, that the date of beginning, rate of progress and the time for completion of the Work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the Work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed.

The Contractor agrees that said work shall be prosecuted regularly, diligently and uninterruptedly at such rate of progress as will ensure full completion thereof within the time specified. It is expressly understood and agreed, by and between the Contractor and the City, that the time for completion of the Work will be the time in calendar days identified in these Instructions to Bidders.

For each calendar day that any part of the Work remains uncompleted after the expiration of the time specified, or allowed for completion of the Work stipulated in the Contract, or as automatically increased by the additional work or materials ordered after the Contract is signed, the amount specified within these Instructions to Bidders as liquidated damages shall be deducted from any monies due the Contractor, or if no money is due the Contractor, City shall have the right to recover said sum or sums from the Contractor, from the surety, or from both.

It is understood between the City and the Contractor that it is extremely difficult and impracticable to determine the actual damage the City will sustain by reason of a delay in the completion of the Project. Therefore, it shall be understood that the time to complete the Project, beyond the contractual date of completion, is in itself prima facie evidence of actual damages incurred, and the amount of these deductions are to cover the liquidated damages caused by the loss of use, or limited use, of the Project and other additional City incurred losses, or expenses, due to the failure of the Contractor to complete the Work within the time specified.

Now, if the said contractor shall neglect, or fail or refuse to complete the Work within the time specified, then the Contractor does hereby agree, as a part consideration for the awarding of this contract, to pay the City a sum per calendar day based on the Maricopa Association of Governments’ Uniform Standard Specifications for Public Works Construction, until the Project is completed, not as a penalty, but as liquidated damages for such breach of contract as hereinafter set forth, for each and every calendar day that the Contractor shall be in default after the time stipulated in the Contract for completing the Work.

It is further agreed that time is of the essence of each and every portion of this contract and of the Specifications where a definite and certain length of time is fixed for the performance of any act whatsoever; and whereunder the Contract an additional time is allowed as herein before mentioned for the completion of any work, the new time limit fixed by such extension shall be of the essence of this contract, provided that the Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of work is due: To unforeseeable cause beyond the control and without fault or negligence of the Contractor, including, but not restricted to, acts of God, or of the public enemy, acts of City, acts of another contractor in the performance of a contract with the City, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather. The unusualness of the weather shall be determined by statistics from the local Weather Bureau over a period of the last ten (10) years. Upon request of City, the Contractor shall obtain statistical information from the Weather Bureau to support his claim for extension caused by unusual weather condition.

Provided, further, that the Contractor shall, within ten (10) days from the beginning of such delay, notify the City’s representative in writing, of the causes of the delay, who shall ascertain the facts and extent of the delays and notify the Contractor within a reasonable time of his decision in the matter.

Title VI Solicitation Notice:

The City of Buckeye, Arizona, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Site/Project Description: Farallon Well No. 3 – Drilling Services

Construction Budget: $2,000,000.00

END OF SECTION

Farallong Well No. 3 - Drilling Services

SECTION 300

BID FORMS

BID

IFB No. 32700084

Project Name: Farallon Well No. 3 – Drilling Services

Date: __________________________________

Bid from: __________________________________ (Name of Firm)

To: City of Buckeye

The following bid is made for construction services for the City of Buckeye, Arizona, in accordance with Construction Documents. The undersigned certifies that the Construction Documents, as well as the proposed construction site and conditions affecting the Work have been carefully examined; that the amount and nature of the Work to be done is thoroughly understood; and that at no time will misunderstanding of the drawings, specifications, or conditions to be overcome be pleaded.

The undersigned certifies that he or his firm is currently licensed under the provisions of ARS Sections 32-1151 and 32-1169. The undersigned further certifies that he or his firm has a privilege license pursuant to ARS Section 42-5005.

The undersigned has read Section 2, "Instructions to Bidders", paragraph "Sales and Use Tax" and understands that all sales and use taxes applicable to this project are included in all bid prices. The undersigned has read the Construction Contract between the City of Buckeye and Contractor, and will execute said agreement if awarded the Contract. Any exceptions to the terms and conditions have been stated in writing and submitted on a separate sheet with this bid. The undersigned understands that any exceptions taken to the Construction Contract that are not accepted and/or approved by the City may be a basis for rejection of the Bid as nonresponsive.

RECEIPT BY THE UNDERSIGNED OF THE FOLLOWING AMENDMENTS IS HEREBY

ACKNOWLEDGED:

AMENDMENT NUMBER: ___________________ DATED: ________________

AMENDMENT NUMBER: ___________________ DATED: ________________

AMENDMENT NUMBER: ___________________ DATED: ________________

AMENDMENT NUMBER: ___________________ DATED: ________________

Farallong Well No. 3 - Drilling Services

Name of Organization: __________________________________

(Check One) Corporation___ Partnership___ Individual___

Joint Venture___ Other___

Submitted by: ___________________________________

SIGNATURE: ___________________________________

NAME: ___________________________________

TITLE: ___________________________________

Principal Office: ___________________________________

Address: ___________________________________

Telephone: ___________________________________

Email: ___________________________________

___________________________ being duly sworn deposes and says that he/she is the

_______________________ of ______________________ Contractor(s), and that answers to the foregoing questions and all statements therein contained are true and correct.

Subscribed and sworn before me this ___________day of ________________, 20__

Notary Public: _____________________________________________

My Commission Expires: _________day of _______________________, 20__

Farallong Well No. 3 - Drilling Services

BASE BID:

The undersigned proposes to complete all of the Work in accordance with said Scope of Work and all associated amendments for the sum of:

____________________________________________________Dollars (__________________).

Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words shall govern.)

The Bid Table for IFB No. 32700084 Farallon Well No. 3 – Drilling Services has been uploaded to the solicitation page as a separate document: IFB No. 32700084 Bid Table. Contractors shall complete the above overall bid amount and the bid table in its entirety and include it as part of their bid package.

END OF SECTION

Farallong Well No. 3 - Drilling Services

SECTION 400

BID SUBMITTAL FORM

IFB 32700084: Farallon Well No. 3 – Drilling Services

Company Name: ___________________________________________________________

Authorized Representative:

Title:

Address:

Phone Number: Email Address:

Website Address:

The undersigned Offeror’s declares to have read and fully understand the IFB, Draft Construction Contract and agrees to all the terms, conditions, and provisions contained therein; and proposes and agrees that if this Bid is submitted and accepted, consultant will contract to perform in accordance with the Scope of Work and Bid.

Signature of Authorized Representative: ______________________________

Printed Name of Authorized Representative: ___________________________

Date:

END OF SECTION

Farallong Well No. 3 - Drilling Services

SECTION 500

DRAFT BASE CONSTRUCTION CONTRACT

CONSTRUCTION CONTRACT

BETWEEN

CITY OF BUCKEYE

AND

TBD

CONTRACT NO. 32700084

THIS CONTRACT is entered into as of ____________________, by and between the CITY OF BUCKEYE, an Arizona municipal Corporation (“City”) and _________________ (“Contractor”). The terms of this Contract are to be construed consistently with the other Contract Documents enumerated in Article 1 of the General Conditions of the Construction Contract.

In consideration of the mutual promises of the parties, the City and the Contractor agree as follows:

1. THE WORK: The Contractor shall furnish all labor, materials, equipment, and services, as more fully set forth in the Contractor Bid Forms, as required to complete the Farallon Well No. 3 – Drilling Services project, as more fully set forth in the Technical Specifications.

2. CONTRACT TIME: The Contractor shall commence the Work only if and when directed in a written Notice to Proceed signed by the City. Substantial Completion, as defined herein, shall be achieved within One Hundred Twenty (120) calendar days. In view of the difficulty or impossibility of determining the City’s damages from delay, should the Contractor fail to achieve Substantial Completion by that date, as extended by any City approved Change Orders, the Contractor agrees to pay and will pay to the City, in addition to all other sums pursuant to the Contract Documents, the sum of Dollars and Cents ($TBD) for each calendar day of delay as liquidated damages for such delay and not as a penalty. This sum may be withheld from the balance of the Contract Price as it becomes due. Should liquidated damages exceed the Contract Price due or to become due, then the Contractor shall pay the City the difference within three (3) days of receipt of written demand.

3. CONTRACT PRICE: Subject to increases and decreases for Change Orders in accordance with the Contract Documents, the City shall pay to the Contractor the following Contract Price, in progress payments as provided in the Contract Documents:

_________________ Dollars and _______________ Cents ($ ).

4. BONDS: The Contractor shall provide the Payment and Performance Bonds prior to the start of the Work.

Farallong Well No. 3 - Drilling Services

5. EXHIBITS: The following supplemental terms and conditions and/or documents are part of this Contract and incorporated by reference:

A. General Conditions of the Construction Contract.

B. Contractor Bid Forms.

C. Technical Specifications.

D. Insurance Requirements E. Payment and Performance Bonds.

[SIGNATURE PAGE TO FOLLOW]

IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date and year first set forth above.

CITY: CONTRACTOR:

CITY OF BUCKEYE, ,

an Arizona Municipal corporation a(n)

By:_________________________________ By:

Its:_________________________________ Its:

ATTEST:

By:

Its:_________________________________

RECOMMENDED:

APPROVED AS TO FORM:

EXHIBIT A

TO

CONSTRUCTION CONTRACT

BETWEEN

CITY OF BUCKEYE

AND

CONTRACTOR NAME

(General Conditions)

See following pages.

GENERAL CONDITIONS

TABLE OF CONTENTS

ARTICLE 1 GENERAL DEFINITIONS 5

ARTICLE 2 INTENT 6

ARTICLE 3 CONTRACTOR 6

ARTICLE 4 OTHER CONTRACTORS AND COOPERATION 6

ARTICLE 5 SITE CONDITIONS AND ENVIRONMENTAL MATTERS 7

ARTICLE 6 PRODUCT SAMPLES, TESTS, AND CERTIFICATES 13

ARTICLE 7 AS-BUILT DRAWINGS 14

ARTICLE 8 SUPERINTEDENCE BY THE CONTRACTOR 14

ARTICLE 9 SUBCONTRACTS 15

ARTICLE 10 COMMUNICATIONS 16

ARTICLE 11 PERMITS, TAXES, AND FEES 16

ARTICLE 12 INSURANCE 16

ARTICLE 13 INDEMNIFICATION 19

ARTICLE 14 PROGESS AND SCHEDULING 20

ARTICLE 15 DAILY LOG 20

ARTICLE 16 MISCELLANEOUS DUTIES 21

ARTICLE 17 INSPECTION OF WORK 23

ARTICLE 18 CORRECTION OF WORK 24

ARTICLE 19 DELAYS AND TIME EXTENSIONS 25

ARTICLE 20 SUSPENSION OF WORK 27

ARTICLE 21 RIGHT TO STOP WORK 28

ARTICLE 22 CHANGES 28

ARTICLE 23 PAYMENT 30

ARTICLE 24 WARRANTY 32

ARTICLE 25 SUBSTANTIAL COMPLETION 32

ARTICLE 26 FINAL INSPECTION 33

ARTICLE 27 ASSIGNMENT OF CLAIMS 33

ARTICLE 28 DISPUTES 34

ARTICLE 29 FORUM 34

ARTICLE 30 TERMINATION BY THE CITY 34

ARTICLE 31 TERMINATION FOR CAUSE 35

ARTICLE 32 TERMINATION FOR CONVENIENCE OF THE CITY 37

ARTICLE 33 ASSIGNMENT OF CONTRACT 37

ARTICLE 34 LAW TO GOVERN 37

ARTICLE 35 E-VERIFY REQUIREMENTS 38

ARTICLE 36 FEDERAL IMMIGRATION LAWS AND REGULATIONS 38

ARTICLE 37 ISRAEL 38

ARTICLE 38 FORCED LABOR OF ETHNIC UYGHURS 38

ARTICLE 39 NOTICE 38

Farallong Well No. 3 - Drilling Services

ARTICLE 1

GENERAL DEFINITIONS

“Addenda” means clarifications or changes in the Work provided to bidders in writing prior to the public bid on the Contract.

“Contract Documents” or “Contract” means the Construction Contract Between City and Contractor, the General Conditions of the Construction Contract, any Supplemental Conditions of the Construction Contract, the Drawings, the Specifications, the Performance and Payment Bonds, the Project Manual, Addenda and Modifications.

“Date of Substantial Completion” shall be the date certified by the City that the work is in the Condition defined herein as substantial completion.

“Day” means calendar day unless specifically otherwise provided herein or by law.

“Modifications” means Change Orders signed by the City, or other written amendments signed by both the City and the Contractor at or after the execution of the Contract, or the City’s written interpretations or directions for minor changes in the Work. A “minor change” is defined as one having no impact on cost or time or the City’s approved design intent, as determined by the City.

“Project” means all components of the improvements to be constructed for the City, regardless of whether the Work is all or only a part.

“Project Manual” means the written volume so titled which includes the bid documents, sample forms, specifications, and description of the project.

“Substantial Completion” means the Contractor’s work is sufficiently complete in accordance with the Contract Documents so that the City can occupy or utilize the work or designated portion thereof for the use for which it is intended.

“Work” consists of all labor (including supervision), materials, equipment, supplies and other items reasonably required to construct all or a portion of the Project according to the Contract Documents.

ARTICLE 2

INTENT

A. The Contract represents the entire and integrated agreement between the City and the Contractor, and it supersedes all prior oral or written negotiations, representations or agreements. The Contract may only be changed by written modifications, and the Contractor understands and agrees that if the Contractor proceeds with any work upon verbal request only, Contractor is agreeing by his conduct that such work, or change in the work, constitutes a minor change.

B. The Contract Documents are to include all items reasonably necessary to construct the Work, expressly or by inference. Words and abbreviations which have well-known technical, or trade meanings are used in the Contract Documents in accordance with such recognized meanings.

ARTICLE 3

CONTRACTOR

A. The Contractor is the individual or legal entity identified in the Contract Documents who is licensed to perform the Work under the laws of the State of Arizona. The Contractor shall only use duly licensed Subcontractors in connection with the Work, subject to the provisions for City approval contained in the Contract Documents.

ARTICLE 4

OTHER CONTRACTORS AND COOPERATION

A. The City reserves the right to award other contracts related to the Project, or to perform certain work itself. Such other work may or may not be known to the City or disclosed to the Contractor prior to bidding this project. The Contractor shall afford the City and other contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall properly coordinate its Work with theirs in such manner as the City may direct. The Contractor shall also assure at its own cost reasonable access of other contractors to the site and their work.

B. Upon request of the Contractor, the City will provide the Contractor with a copy of all plans, specifications, schedules and other data relating to other contracts or work. The Contractor shall thoroughly examine these documents and shall within three (3) days of completing such examination notify the City in writing of any conflicts with the Work to be performed by the Contractor. In no event shall such notice be given so late as to interfere with or delay the work to be performed by the Contractor. Failure of the Contractor to request, review, or provide written notice as provided above shall constitute a waiver of any objections or claims the Contractor may have as a result of the necessity to coordinate the Contractor’s work with other activities.

C. Should the Contractor sustain any damage through any act or omission of any other contractor, Contractor shall have no claim or cause of action against the City for such damage and hereby waives any such claim. The Contractor does not waive any claim or cause of action against any other contractor or subcontractor to recover any and all damages sustained by reason of the acts or omissions of such other contractor. The phrase “acts or omissions” as used in this section shall be defined to include, but not be limited to, any reasonable delay on the part of any such other contractor, whether due to negligence, gross negligence, inadvertence or any other cause.

D. Should the Contractor cause damage to the work or property of any other contractor or of the City, the Contractor shall upon receiving due notice, promptly attempt to settle with such other contractor by agreement, repair or otherwise to resolve the dispute. If such separate contractor sues or initiates a proceeding against the City on account of any damage alleged to have been caused by the Contractor, the City shall notify the Contractor who shall, to the fullest extent permitted by law, indemnify and hold harmless for, from, and against defend such proceedings, and if any judgment or award against the City arises there from the Contractor shall pay or satisfy it and shall reimburse the City for all attorney’s fees and court or other costs that the City has incurred.

ARTICLE 5

SITE CONDITIONS AND ENVIRONMENTAL MATTERS

A. The Contractor shall thoroughly acquaint himself with all available information concerning the conditions of the Work and is responsible for correctly and fully estimating the difficulty and cost of successfully performing the Work.

B. The Contractor agrees that it has thoroughly examined the site, plans and specifications, boring data and all other soils information and as-built data made available and by submission of the bid herein avows that it has satisfied itself as to the character, quality and quantity of surface and subsurface materials or existing obstacles to be encountered. The Contractor acknowledges that boring data and other soils information and as-built data made available is only a general indication of materials and/or conditions likely to be found adjacent to holes bored or in existing structures or facilities or other areas. If the Contractor determines that the information is erroneous, inadequate or ambiguous, it shall immediately report its conclusions to the City in writing. If the Contractor determines that the information is erroneous, inadequate, or ambiguous, and after reporting its conclusions to the City, remains dissatisfied or uninformed, the Contractor shall refrain from submitting a bid, or if the Contractor does submit a bid, the Contractor shall be deemed to have waived any claim it may have as the result of the alleged erroneous, inadequate or ambiguous information.

C. The Contractor must promptly notify the Owner and the Architect in writing of any apparent errors, inconsistencies, omissions, ambiguities, construction impracticalities or code violations discovered as a result of the Contractor’s review of the Contract Documents including any differences between actual and indicated dimensions, locations and descriptions, and must

Farallong Well No. 3 - Drilling Services give the Owner and the Architect timely notice in writing of same and of any corrections, clarifications, additional Drawings or Specifications, or other information required to define the Work in greater detail or to permit the proper progress of the Work. The Contractor must provide similar notice with respect to any variance between its review of the Site and physical data and Site conditions observed.

If the Contractor performs any Work involving an apparent error, inconsistency, ambiguity, construction impracticality, omission or code violation in the Contract Documents of which the Contractor is aware, or which could reasonably have been discovered by the review required by this section, without prompt written notice to the Owner and the Architect and request for correction, clarification or additional information, as appropriate, the Contractor does so at its own risk and expense and all claims relating thereafter are specifically waived.

D. The Contractor shall immediately, and before such conditions are disturbed, notify the City in writing of:

1. Subsurface or latent physical conditions encountered at the site which differ materially from those indicated in the Contract and which were not known by the Contractor or could not have been discovered by careful examination and investigation of the information available at bid time and which could adversely affect the timely performance of the Work or its cost; or

2. Unknown and unexpected physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered in the locale or generally recognized as inherent in Work of the character provided for in the Contract.

E. The City shall within ten (10) days, or such other reasonable time as necessary, investigate the conditions discovered. If the City find that conditions are so materially different as to support an equitable adjustment in the Contract Price or the Contract Time, this will be done by written Change Order. If the City determine that no Change Order will be issued, the Contractor shall continue with the Work at no additional cost and under no change in Contract Time.

F. No claim by the Contractor for an increase in the Contract Price or Contract Time hereunder shall be allowed without proper advance notice and an adequate opportunity for the City to investigate.

G. Environmental Matters: Contractor shall provide or cause to be provided a copy of this Section (Environmental Matters) to each Subcontractor and each Sub-subcontractor participating in the Work.

1. Definitions. The following terms will have their respective designated meanings:

“Environmental Law” means any and all laws, ordinances, regulations, rules and administrative and court decisions (federal, state and local) now or hereafter in effect and as in effect from time to time and as amended from time to time pertaining to environmental conditions or to protection or regulation of the environment (including, without limitation, the Comprehensive Environmental Response Compensation and Liability Act of 1980, as amended (42 U.S.C. Section 9601, et seq.); the Resource Conservation and Recovery Act of 1976 and the Solid Waste Disposal Act (42 U.S.C. 6901, et seq.); the Toxic Substances Control Act of 1976 (15 U.S.C.

Section 2601, et seq.); the Superfund Amendments and Reauthorization Act of 1986, Title III (42 U.S.C. Section 11001 et seq.); the Clean Air Act (42 U.S.C. Section 7401, et seq.); the Federal Water Pollution Control Act (33 U.S.C. Section 1251, et seq.); the Safe Drinking Water Act (42 U.S.C. Section 300f, et seq.); the Hazardous Materials Transportation Act (49 U.S.C. Section 5101, et seq.); the Oil Pollution Act (33 U.S.C. Section 2701 et seq.); the Arizona Environmental Quality Act (A.R.S. Section 49-101, et seq.); the Arizona Underground Storage Tank Act (A.R.S.

Section 49-1001, et seq.); the Arizona Water Quality Assurance Revolving Fund Act (A.R.S.

Section 49-281, et seq.) and any successor statutes to the foregoing and any regulations, rules or guidelines promulgated pursuant thereto.)

“Hazardous Substance” means any of the following: (i) any petroleum, oil, gasoline, kerosene, other petroleum product, flammable substance, volatile organic compound, volatile solvent, explosive, asbestos, polychlorinated biphenyl, dioxin, toxic herbicide or pesticide, radioactive material, radon gas and materials containing formaldehyde; (ii) any material, substance or waste now or hereafter defined as or included in the definition of “hazardous substances,” “hazardous wastes,” “hazardous materials,” “extremely hazardous wastes,” “extremely hazardous substances,” “restricted hazardous wastes,” “toxic substances,” “regulated substances,” “solid wastes,” “pollutant,” or “contaminant” or words of similar import in any Environmental Law; (iii) any other material, substance or waste now or hereafter classified or regulated as “hazardous” or “toxic” under any Environmental Law; (iv) any material, substance or waste now or hereafter listed in the United States Department of Transportation Table (49 CFR 172.101) or classified by the United States Environmental Protection Agency as “hazardous” (40 CFR Part 302) or in any successor or replacement tables or classifications as in effect from time to time; and (v) any Hazardous Waste.

“Hazardous Waste” means “hazardous waste”, as defined in the Resource Conversation and Recovery Act of 1976 and the Solid Waste Disposal Act (42 U.S.C. 6901 et seq.) and any successor statutes and any regulations, rules or guidelines promulgated pursuant thereto as in effect from time to time (including, without limitation, any such waste resulting from removal of, demolition of, modifications of or additions to part or all of any existing structure, facility or equipment).

“Contractor Hazardous Waste” means any Hazardous Waste arising during or from the Work that is generated by the acts or omissions of Contractor, a Subcontractor or any Sub-subcontractor (including, without limitation, a Contractor Release) and that is not City Hazardous Waste.

“City Hazardous Waste” means Hazardous Waste (i) that consists of Hazardous Substances in any existing structure, facility or equipment on City’s property or otherwise present on City’s property at commencement of the Work, and (ii) that has become Hazardous Waste due to any part of the Work. However, City Hazardous Waste does not include any Hazardous Substance that has become a Hazardous Waste due to any Contractor Release.

“Project Hazardous Waste” means any Hazardous Waste arising on City’s property from the Work (including, without limitation, Contractor Hazardous Waste and City Hazardous Waste), regardless of: (a) whether generated by the acts or omissions of City, Contractor, a Subcontractor or a Sub-subcontractor; (b) whether it consists of Hazardous Substances that were on or in City’s property at commencement of the Work and that have become Hazardous Waste in the course of the Work; and (c) whether it consists of Hazardous Substances that are brought on to City’s property for or during the Work by Contractor, a Subcontractor or a Sub-subcontractor and that have become Hazardous Waste in the course of the Work.

“OSHA” means the Federal Occupational Safety and Health Act (29 U.S.C. Section 651 et seq.)

and any successor statutes and any regulations, rules or guidelines promulgated pursuant thereto as in effect from time to time.

“Release” means any discharging, disposing, dumping, emitting, emptying, escaping, injecting, leaching, leaking, pouring, pumping, releasing, spilling, or similar action or event.

“Contractor Release” means a Release of a Hazardous Substance (including, without limitation, Hazardous Substances that were on or in City’s property at commencement of the Work) arising from acts or omissions of Contractor or any Subcontractor or Sub-subcontractor or their employees or workers. However, Contractor Release does not include Releases of pre-existing Hazardous Substances on City’s property of which City had not made Contractor aware and as to which Contractor, Subcontractors and Sub-subcontractors acted reasonably.

H. General Requirements.

1. Compliance with Environmental Law and OSHA. Contractor shall comply with, and shall cause all Subcontractors and Sub-subcontractors to comply with, this section and with all Environmental Law and OSHA applicable to (i) Contractor, (ii) Subcontractors, (iii) Subsubcontractors, (iv) the Work and (v) all of their activities in respect of the Work.

2. Hazardous Substances. (i) Hazardous Substances may be transported to and from and stored, used and be present on City’s property in such quantities as are generally recognized to be usual and customary for performance of the Work. (ii) Hazardous Waste may be generated on City’s property of such kinds and in such quantities as are generally recognized to be usual and customary in connection with performance of the Work. Hazardous Waste so generated may be stored temporarily on City’s property. (iii) Prior to final completion of the Work, Contractor shall remove or cause to be removed from City’s property and disposed of in accordance with Environmental Law and OSHA any Hazardous Substances (other than Project

Farallong Well No. 3 - Drilling Services

Hazardous Waste) brought onto City’s property during the Work or used in connection with the Work. (iv) Other than as provided in (i), (ii) and (iii), Contractor shall not, and Contractor shall cause all Subcontractors and Sub-subcontractors to not, dispose of, generate, manufacture, process, produce, Release, treat or otherwise store, use or have in or on or transport…