About this file
This is an Invitation for Bid (IFB) advertisement issued by the Connecticut Airport Authority (CAA) for a runway rehabilitation project at Hartford-Brainard Airport in Hartford, Connecticut. The project, designated CAA Contract No. 2026-018, encompasses a comprehensive rehabilitation of Runway 2-20 including a 4-inch mill and overlay of existing pavement on Runway 2-20 and the runway intersection with Runway 11-29, Runway 2 Runway Safety Area grading modifications to meet current FAA requirements, miscellaneous airfield drainage improvements, runway electrical upgrades including removal and replacement of edge lights and guidance signs, installation of new cable and conduit, runway and taxiway markings, and pavement grooving. Additional work includes topsoil installation and seeding in disturbed areas. Sealed bids must be submitted electronically through https://ctairports.procureware.com no later than 1:00 p.m. on April 15, 2026. Contract documents became available for download on March 25, 2026. A pre-bid conference is scheduled for April 2, 2026, at 11:00 a.m. at Hartford-Brainard Airport, with an immediate site visit to follow. The deadline for submitting written questions is April 8, 2026, at 11:00 a.m. The contract completion timeline is sixty calendar days from the Notice to Proceed. No bidder may withdraw their bid within 180 days after the opening date.
The contract requires a bid bond or certified check equal to five percent of the bid amount, with the successful bidder obligated to furnish a Performance Bond and Labor and Materials Payment Bond each equal to 100 percent of the contract price. The project is subject to Federal Funding Rules and Regulations, including Davis-Bacon Act requirements, Title VI Civil Rights provisions, Buy American Preferences, Equal Employment Opportunity requirements, and State of Connecticut wage requirements. While no specific DBE contract goal has been established, the CAA encourages DBE participation and has implemented a neutral Small Business Element for the contract. All bidders must submit a small business participation form as a condition of bid responsiveness. The award will be made to the lowest responsible and responsive bidder whose bid conforms to the written requirements of the Owner. All costs incurred in responding to this IFB are borne by the bidder.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Runway 2-20 Rehabilitation Hartford-Brainard Airport
Hartford, Connecticut CAA Contract No.: 2026-018
ADVERTISEMENT FOR BID
Section 00 0010 - Page 1 of 4
Sealed bids will be received by the Connecticut Airport Authority (CAA) by submitting a bid electronically through https://ctairports.procureware.com. The CAA will not accept bids in any other manner. Vendors must be registered to access the bid in its entirety and to submit a bid.
Due date for bids is no later than 1:00 pm, April 15, 2026, at which time they will be publicly displayed for the following project. Bids must be uploaded to https://ctairports.procureware.com.
ProcureWare cannot accept multiple files. All bids must be uploaded as a single file. Bidders who wish to view the bid results may do so by logging into https://ctairports.procureware.com at the date and time noted above. The official time is the ProcureWare time indicator. The
ProcureWare system closes precisely at the time indicated above. Bids must be uploaded in their entirety with receipt of a confirmation number no later than the date and time indicated above. No bids will be able to be posted after the time noted above. All costs incurred in connection with responding to this IFB shall be borne by the Bidder.
RUNWAY 2-20 REHABILITATION
HARTFORD-BRAINARD Airport
HARTFORD, Connecticut CAA Construction Contract No. 2026-018
The project consists of:
The project consists of a 4-inch mill and overlay of the existing pavement of Runway 2-20 and Runway 11-29 at the runway intersection, Runway 2 Runway Safety Area (RSA) grading, miscellaneous airfield drainage and runway electrical improvements. Plant transplanting within select work areas. Variable depth milling existing bituminous pavements. Areas of the milled surface pavement experiencing cracking will be repaired prior to placement of the new pavement.
RSA grading at the approach to Runway 2 will be modified such that it will meet the current FAA grading requirements. Drainage structures and lengths of pipes that have failed to convey the flow of stormwater as originally intended will be replaced as part of this project. The electrical work includes the removal and replacement of Runway 2-20 edge lights, threshold lights, guidance signs, mandatory hold position signs, distance remaining signs and the regulator serving Runway 2-20. Also included in the project is the installation of new cable and conduit to all newly installed electrical items, installation of runway and taxiway markings, and pavement grooving on Runway 2-20. Topsoil, loam and seed will be installed in all disturbed areas.
The contract time for completion of all work is within sixty (60) calendar days from the date specified in the “Notice to Proceed”.
The work performed under this Contract shall be governed by Federal Contract Provisions, as applicable, set forth in the Contract Documents, unless otherwise noted, which include, but are not restricted to, Disadvantaged Business Enterprise (DBE) participation, Equal Employment Opportunity requirements, and compliance with State of Connecticut Wage requirements and Federal Wage and Hour requirements (Davis-Bacon Act). All requirements of the Federal funding and the CAA procurement process, as well as all administrative regulations shall apply to this project, as if herein written out in full.
https://ctairports.procureware.com/ https://ctairports.procureware.com/
Section 00 0010 - Page 2 of 4
The attention of prospective bidders is called to the fact that this project is to be bid upon and the contract executed, under the Federal Funding Rules and Regulations for carrying out the provisions of:
Civil Rights General Provisions (Title 49 United States Code, § 47123) Title VI Provisions of the Civil Rights Act of 1964, as amended and supplemented, Buy American Preferences (Title 49 United States Code, §50101) Foreign Trade Restriction: Denial of Public Works Contracts on Suppliers of Goods and
Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (DOT Regulation 49 CFR Part 30)
Davis-Bacon Act (DOL Regulation 29 CFR Part 5) Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246, as amended, and DOL Regulation 41 CFR Part 60) Government Debarment and Suspension and Government-wide Requirements for Drug-free
Workplace (2 CFR Part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5 DOT Suspension & Debarment Procedures & Ineligibility)
The requirements of 49 CFR Part 26, Regulations of the U.S. Department of Transportation, apply to this contract. It is the policy of the CAA to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying the requirements of this section. These requirements apply to all bidders/offerors, including those who qualify as a DBE. A DBE contract goal has not been established for this contract. However, CAA strongly encourages participation from DBE and all small business entities. To facilitate this, we have implemented a DBE neutral Small Business Element for this contract, ensuring that all DBE regulations apply to all involved.
As a condition of bid responsiveness, the bidder shall submit with its proposal, a small business participation form.
All requirements of the CAA procurement process, as well as all State of Connecticut administrative regulations shall apply to this project, as if herein written out in full. In addition, the State of Connecticut general provisions and prosecution of work requirements will apply, including compliance with State of Connecticut Wage requirements.
Each sealed bid shall be accompanied by a certified check, cashier's check or satisfactory Bid Bond, in an amount equal to five percent (5%) of the bid, payable to the Connecticut Airport Authority.
The successful bidder will be required to execute and furnish a Performance Bond, and Labor and Materials Payment Bond as security for faithful performance and payment of all bills and obligations arising from the performance of the work. Each security shall be in an amount of not
Section 00 0010 - Page 3 of 4 less than one hundred percent (100%) of the contract price and shall be in a form acceptable to the Owner.
Contract Documents will be available on March 25, 2026 and may be downloaded at:
https://ctairports.procureware.com. Vendors must be registered to access the contract documents in their entirety and to submit a bid.
COMMUNICATIONS:
During the period from advertisement of this Invitation for Bid (IFB) and until a Contract is awarded, Bidders shall not contact any employee of the CAA concerning this procurement except in writing via the clarifications tab for this solicitation that may be found at https://ctairports.procureware.com. The deadline to submit questions will be April 8, 2026 11:00 am (EST). The CAA reserves the right to respond to only questions it deems part of the technical process. Responses to questions will be provided to all Bidders in the form of an Addendum to the IFB, if the CAA determines it is in its best interest. Any questions received after this time will likely be unanswered. The CAA reserves the right, at its sole discretion, to respond to such questions. If a Bidder has a question related to the technical process after the question deadline noted above, then they may reach out to the CAA’s Purchasing Agent via email at procurement@ctairports.org.
ATTEMPTS TO INFLUENCE THE SELECTION PROCESS
Except for clarifying written questions sent to the CAA’s Purchasing Agent via email at procurement@ctairports.org as noted in the preceding paragraph, all Bidders, including any and all persons acting on their behalf, are strictly prohibited from contacting any employee of the CAA, Board official or Consulting firm, on/or regarding any matter relating to this IFB from the time the IFB is issued until a Contract is awarded.
The CAA reserves the right to disqualify any Bidder who contacts any employee of the CAA, Board official, or Consulting firm other than the Purchasing Agent, concerning this IFB during the period set forth in this section.
A Pre-Bid Conference for bidders will be conducted at Hartford-Brainard Airport, 239 Maxim Road, Hartford, CT 06114 in the Airport Maintenance/Operations Building on, April 2, 2026, 11:00 am (EST). Neither the Owner, nor the Architect/Engineer, shall be responsible for disseminating information discussed at this meeting, except as issued by Addendum.
A site visit will also be held immediately following the Pre-Bid Conference at Hartford- Brainard Airport, 239 Maxim Road, Hartford, CT 06114. It is strongly recommended that Bidders attend the site visit to familiarize themselves with the Scope of Work and site restrictions.
CAA will not schedule site visits after this time. No claims for extra costs shall be allowed because of lack of full knowledge of verifiable conditions.
mailto:procurement@ctairports.org mailto:procurement@ctairports.org
Section 00 0010 - Page 4 of 4
Attendees that arrive more than ten (10) minutes late may be considered as having not attended the conference.
No bidder may withdraw their bid within one hundred eighty (180) days after the actual date of opening hereof.
Award of the contract shall be made to the lowest responsible and responsive bidder, whose responsive bid conforms to written requirements of the Owner.
END OF SECTION